TO P. G. Benignus - GO
Some capacitor Aroclor customers' orders indicate a
desired loading temperature of 120C; others ask*
for 140C.
`
We will promise to have the loaded cars for these illequipped customers at 120C before they are headed for shipment. Our storage tanks will not get that hot, so the material must be heated further in the tank car. This may mean/ in some cases, a 24 hour delay. (For instance, Electronic Components entered an order on 10/13 for shipment on 10/13. This is impossible to begin with, so the car was loaded on the morning of 10/14 for shipment tonight (10/14). We are heating the car now ana it may be ready for switching out tonight. If it is not hot enough in time, then it will go out on 10/15) .
I think 140C is not possible with the 80 psi steam at our loading docks. Even if it were, by heating for 24 48 hrs., we cannot afford to tie up our loading spots for that time period.
If the above is not satisfactory, then seme expenditure would be necessary. We do not hold cur tanks hotter than necessary because it presents PC3 fume problems and drumming problems. 'Isolating one storage tank for these customers is not an answer either.
If 140C is thought absolutely necessary, please let me know.
R. M. McCutcnan