industrial hygiene survey
Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
1
TITLE PAGE-STOCK NO. 100TP
< o
w
0%
G3 0
Sj zK
< tr
8
Z1 y 2Z tf) T
15
z< <O I0
J
6
o
tsf
A '
CTD019497
rn
Industrial Hygiene Survey AMBLER A/C PIPE PLANT March 23-24, 1981
Of
CTD019498
' MFG.CO, H A S T IN G S M N . L O S A N G E L E S - C H IC A G O
LO G AN O H -M C G R EG O R TX LO C U S T GROVE GA
TITLE PAGE-STOCK NO. 100TP
P re-R eport
CertainTeed
Subject > RESPIRATOR FIT TESTS
Date March 27, 1981
^ )3`^J
To
Bill Magers
From
/
Janis Wooosan
Location and mail code
A Location and mail code 1125/4
cc: O. H. Kittilstad - 1125/4
Per our conversation of March 24, 1981 on respirators, attached find copies of:
1. General Industry Standards (29 CFR 1910).
2. OSHA Industrial Hygiene Field Operations Manual (Chapter 3).
Refer to pages 261 and 262 of the General Industry Standard for Respiratory Protection 29 CFR 1910.134(e)(5). This paragraph (highlighted in yellow) requires respirator training and fit tests for employees.
Refer to pages 81 and 83 of the OSHA Industrial Hygiene Field Operations Manual. The sections highlighted in yellow are the procedures and require ments that OSHA compliance officers follow when inspecting a manufacturing location.
This information completely outlines federal regulations for respiratory protection in regard to training and fitting the employees with respirators. The respirators presently being used--3M 8710 and AO Dust Demon--are approved for use in asbestos contaminated atmospheres but are not made with high efficiency filter material and therefore cannot be fit tested.
JLW/tmf
! MM
CTD019499
aa
CertainTeed
Date April 6, 1981
Subject AMBLER INDUSTRIAL HYGIENE SURVEY March 23-24, 1981
cc: J. McGinley - 2125/2B D. Hall - 2125/2B 0. Kittilstad - 1125/4
To Hank Benhardt
Janis Woodson
Location and mail code Ambler 258
Location and mail code 1125/4
n.''
1
Attached find the log of sampling results for samples taken for asbestos analysis and audiodosimetry noise dose during the survey March 23-24, 1981.
Per our conversations over the past week regarding the air sample levels found at the Press Operator Station, Console, Roll-up and Crusher, it is understood that follow-up samples will be taken by Bill Magers to determine the source for these levels. Please keep me informed of the work being done and sample results found for these areas.
When comparing the results of the air samples taken in the Finishing Department during this survey and those taken last year in Finishing, the levels have been substantially reduced by at least 50% and more at some operations. This is no doubt related to the increased attention and maintenance given to the dust collection system.
Noise is still a problem at the plant, especially in Finishing, which will be discussed in detail in the forthcoming survey report.
I will be available after April 10 to make a return visit to help to determine dust sources and to do some follow-up sampling. I am also working with the microscopy lab in Insulation Group to determine the type of fibers found on those samples taken March 23-24. Results of these analyses will not be available until the end of April.
Also attached find copies of the field notes (Air Monitoring Data Sheets) which you requested for use in informing the employees of their exposure levels.
If I can be of any further assistance or if you have any questions regarding the sample results please contact me.
JLW/tmf
Attachments
i} -y
CTD019500
l J l
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
TABLE _____ Personal Fiber Exposures
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
Manufacturing Department
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
TWA for Sample Period (f/cc)
REMARKS
001 Mixer
S. Minio
Operator
(3/23/81)
002
003
Fibers (Asbestos) QO
6:40a 9:18a
158
1.7
A 9:18a CfT 1:04p
226
0.25
1:04p
VJr 3:37p
153
0.35
0.71
Cleaned out vacuums on second floor during this sample
Manufactured 10" 3300 & 12" 2400 pipe. 8 dumps made this day (27.5X of Fiber Crocidollte)
004 005
007
Mixer Operator (3/24/81)
Press Operator (3/23/81)
S. Minio
Fibers (Asbestos)
7:15a 29 0.28 7:44a
C. Worthington
Fibers
$ 6:33a
(Asbestos) (>r 9:16a
163
0.67
9:16a 226 >3.1* \r 1:02p
,-,V 1:02P 159 >5.7* 3:41p
-- >3.1*
Manufacturing 10" & 12" 2400 1 dump made. (30.8X of Fiber Crocldollte)
Manufacturing 10" 3300 & 12" 2400 pipe. Felts: Top-77 hours Bottom-new. No down time
Wall/panel Installed at approx. 3pm
008 Press
C. Worthington Fibers
7:47a 175 >5.0*
Operator (3/24/81)
(Asbestos) V
$A |
10:42a
Manufacturing 10" 6 12" 2400
pipe* Felts: Top-87 hours Bottom-10 hours. Wall/panel Installed for this sample. Employee 20 min. break.
009 010
Mandrel Handler (3/23/81)
J. Mascola
Fibers (Asbestos)
383 >0.86*
sh 1:05p 166 0.68 3:51p
0.81
Manufacturing 10" 3300 & 12"
2400 pipe. No down time.
Finishing/Fittings Department
Oil Line #3
A. DeClerlco
Lathe
(control
side)
012 (3/23/81)
013
.I
014
Fibers
^6:11a 169 --
(Asbestos) Q) 9:00a
9!00a 78 --
10:18a
A^10il8a 102 0.26
12t00n
r^!2,32p 213 0.099 *,o5p
0.15
Void sample - pump problems
Void sample - pump problems
Finishing 21* 4000 6 5000 pipe end 21" 5000 1/2 HEO's. Qernnup 1110 -- li20p
CTD019501
* NOTE! (>) - CREATES THAN - Saaple via huvll; loaded with pariculate, fiber* were obecured asking fiber
amlyila difficult.
.
Industrial Hygiene Survey Ambler A/C Pipe Plant
March 23 & 24p 1981
TABLE _____ Personal Fiber Exposures
No. 81 015
016 017 018 019
021 022 023 024 025 026 027
POSITION LOCATION (DATE)
NAME/AREA
Line 03 Lathe Operator (control
side) (3/24/81)
A. DeClerico
Line #3 Lathe Helper (drive
side) (3/23/81)
F. Toley
line #3 Lathe Helper (drive
side) (3/24/81)
Line #3 Inspector (3/23/81)
F. Toley A. Camasso
Line 13 Tester Operator (3/23/81)
G. Bojacluk
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Fibers (Asbestos) $
(
12:55p 3:00p
125 0.098
Fibers
/ 6:13a 168 0.061
(Asbestos)
9:01a
9:01a 179 0.15 12:00n
*
0^12!34p
47 0.25
l:21p
^T)l:21p 162 0.20 4:03p
Fibers (Asbestos)
12:54p 126 0.25 3:00p
Fibers (Asbestos)
^ 6:25a 9:04a
159 0.18
9:04a 103 0.047 v- lU:47a
316 0.10 t)N 4:03p
Fibers (Asbestos)
6:14a 9:02a
168 0.34
/ 9:02a 234 0.27 12:56p
12:56p 1:22p
26 0.27
1:22p 160 0.15 4:02p
TWA for Sample Period (f/cc)
0.15
0.11
0.26
REMARKS
Changes made to dust collectlon system. Finishing 18" 3300-5000 pipe and 18" 5000 1/2 MEO 's.
Finishing 21" 4000 & 5000 pipe and 21" 5000 1/2 MEO's.
Clean-up 1:10 - l:20p
Finishing 18" 3300-5000 pipe and 18" 5000 1/2 MEO's.
Finishing 21--4000-5000 pipe and 21" 5000 1/2 MEO's.
Finishing 21" 4000-5000 pipe and 21" 5000 1/2 MEO's.
CTD019502
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
TABLE _____ Personal Fiber Exposures
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
028 Line *3
J. Lucas
Be Her
(control
6lde)
029 (3/23/81)
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Fibers (Asbestos)
a 6:20a ^ 8:58a
158 0.30
TWA for Sample Period
REMARKS Belling 21" 4000-5000 pipe
. jl 8:58a 183 0.24 ()VV 12:01p
0.23
030 031 032 033
Boring Mill #15 Operator (3/24/81)
F. Marlncola
(AlL 12 = 35p 207 0.18 0 4:02p
Fibers
6:15a 255 0.47
(Asbestos) QW 10:30a
..0,0 10 s 30a 284 0.30 0X 3:14p
3:14p
55 0.17
O 4:09p
0.36
034 035
Boring Mill #54 Operator (3/24/81)
C. Handschln
Fibers
6:02a 267 0.12
(Asbestos) Q^M0i29a
10:29a
-
-
036 10:29a 264 0.16 3:13p
037
mV) 3:13p
56 0.067
Ov'1 4:09p
0.13
Boring 18" 3300-5000 and 21" 5000 cplgs. Void sample
-
038 Rework
E. Enchavarria Fibers
/ K 6:15a
49 0.30
Sav/Korlt
(Asbestos) Qw 7:04a
Drill
Operator
039 (3/23/81)
7:10a 202 0.37 \)X 10:32a
040 M 10:32a 159 0.36 0^ 1:1 lp
0.33
Operating Revnrk Saw 12" pipe
Operating Korlt Drill making 8x4 Wyes.
041
042 043
Pencil
Sharpener Operator (3/24/81)
I
D. Rodriguez
D\^l:llp 167 0.25 u 3:58p
Fibers
yjf' 8:41a 129 0.34
(Asbestos) (a 10:50a
,m\^1 0:50a 310 0.30
^ 4:00p
0.31
Operating Pencil Sharpener 8" 1/4's.
Putting rings in 16" couplings
CTD019503
Industrial Hygiene Survey Asbler A/C Pipe Plant
March 23 & 24, 1981
TABLE _____ Personal Fiber Exposures
No. 81
044
045
POSITION LOCATION (DATE)
We t Saw Operator 0/24/81)
NAME/AREA J. Reynolds
046
047 046
Ue t Saw Helper (3/24/81)
L. DlAmico
049
050 051
Lehman Lathe Operator (3/23/81)
B. Barnett
052
053 Nebel
J. DeSilva
Lathe
Operator
(3/24/81)
054
055 Tool
F. DeTuro
Grinder
(3/24/81)
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Fibers (Asbestos)
6:21a 10:36a
254 0.27
J? 10:36a 11:56a
80 0.28
OrCl2:31p
177 0.39
3:28p
Fibers
ft*1 6i21a 254 0.21
(Asbestos)
10:35a
QV'! 10:35a 120 0.23 0V 12:35P
TWA for Sample Period
0.31
0.21
REMARKS Cutting 18" 1/4 lengths.
Cutting 16" 1/4 lengths.
^r 132::1375pp 162 0.18
Fibers
^ 6:45a 144 0.43
(Asbestos) qv- 9:09a
9:09a 241 0.21 1:10p
r 1:lOp 185 0.47 ry' *15p
Fibers (Asbestos)
6:01a 267 0.11 10:28a
J 10:28a 319 0.083 3:47p
Fibers (Asbestos)
8:14a 10:10a
116 0.14
0.35 0.10
21" 5000 sewer 1/4 lengths
.
Making 10" 200 PAD 3's.
Unloading & stacking 10" couplings
CTD019504
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
TABLE _____ Area/Environmental Fiber Samples
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
056 Bag Opener (3/24/81)
Area
ANALYSIS FOR
TIME
MIN.
Fibers (Asbestos)
7:15a 7:44a
29
057 Bag Opener (3/24/81)
Area
Fibers o1' (Asbestos)
2:30p 2 :55p
25
058
Pipe Machine
Area
Fibers
Rollup
(Asbestos)
(3/24/81)
>
7:48a 10:41a
173
059
Pipe Machine
Area
console/
control panel
(3/24/81)
060 Crusher (3/24/81)
Area
Fibers (Asbestos)
7:50a 10:61a
171
Fibers (Asbestos)
7:56a 10:36a
166
RESULT (f/cc)
0.21 <0.018** >3.06*
1.71
>3.91*
REMARKS
Setting at Bag Opener on Bag compactor while opener was in operation, making a dump.
Setting at Bag Opener on Bag compactor while opener was not in operation.
Pump hanging at pipe machine roll-up/prees section S' from floor, 4' from press section, 5* from operator.
Pump setting on console 5* from floor, 15' from press section, 10* behind operator.
Pump hanging 4' from floor near control panel. Not crushing but dust collector dust running through cyclone.
* NOTE: (>) - GREATER THAN - Sample was heavily loaded with particulate, fibers were obscured making fiber analysis difficult*
** NOTE: (<)
LESS THAN - Fiber concentration on filter found to be less than the average flben. concentration of blank filters.
\
I
l
) CTD019505
Industrial Hygiene Survey Ambler A/C Pipe Plant Harch 23 A 24, 1981
TABLE _____ Audiodosimetry Results
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
TIME
MIN*
Manufacturing Department
061 Mandrel Handler (3/23/81)
J. Mascola
062 063
Tray Loader (3/24/81)
Je Carey
Utility Truck
Driver (3/23/81)
T. Rowan
Finishing Department
064 UuJ 066 067
Line 13 Lathe Operator (3/23/81)
Line 13 Lathe Helper (3/23/81)
Wet Saw Operator (3/24/81)
Wet Saw Helper (3/23/81)
A. DeClerlco
F. Toley
.
J. Reynolds
L. DaMlco
068 069
Korit Drill Operator (3/24/81)
Lehman Lathe Operator (3/23/81)
A. Enchavarrla B. Barnett
070
Finishing Truck Driver (3/24/81)
071 Sweeper Operator (3/24/81)
/nteoance Department
072
Boiler Operator (3/24/81)
S. Wright H. Dukes
I* Dukes
7:20a 3:51p
8:45a 4:00p 7:25a 3:57p
7:15a 4:05p
7:15a 4:03p
6:21a 3:28p
7:06a 3:57p
6:30a 4:00p
6:45a 4:15p
6:39a 4:05p
6:00a 4:09p
8:48a 4:12p
511 435 512
530 528 547 531 570 570 566 609
444
RESULTS
Eight Hour
Dosimeter
85 dBA
90 dBA
REMARKS
103Z 542 1172
Manufacturing 10" 3300 6 12" 2400 pipe
No mandrel change made
No mandrel change made
2062 2292 1712
632 1022 1132
622 422
Finishing 21" 4000-5000 pipe AND 21" 5000 1/2 MEO's. Finishing 21" 4000-5000 pipe AND 21" 5000 1/2 MEO's. Cutting 18" 1/4 lengthse
Cutting 18" 1/4 lengthse Making 8x4 wyes 21" 5000 sever 1/4 lengths
On sweeper throughout day*
892
CTD019506
R eport
rn
Industrial Hygiene Survey AMBLER A/C PIPE PLANT May 5, 1981
LJ
to
CTD019507
MFG CO. H A S T IN G S M N - L O S A N G E L E S C H IC A G O LO G A N OH "M C G R EG O R TX - LO C U ST G R O VE GA
TITLE PAGE-STOCK NO. 100TP
Certainieed
Date May 19, 1981
Subiect
AMBLER FOLLOW-UP SURVEY - May 5, 1981
T - locfl: ; ' a- : -- : zr-ze
Hank f.onhardt \
f rFrom Janis Woodsqa,
- - -7
Ambler 258
Location and mail code 1125/4
cc: J. McGinley - 2125/2B D. Hall - 2125/2B 0. Kittilstad - 1125/4
Attached find the log of results for samples taken for asbestos analysis on May 5, 1981. This survey was made as a follow-up to the March survey in which samples were taken to determine the effectiveness of changes made at the Pipe Machine.
Samples taken at the Pipe Machine during this follow-up survey show greatly reduced fiber levels for the Press Operator and Mandrel Handler, as well as the area sample locations. Manufacturing processes were basically the same this day as back in March. Although the machine ran somewhat faster and had a new bottom felt back in March, the pipe size this day was the same (12").
ft
The Crusher is still an area of concern. The sample results (103-113) have a wide range which leads to the idea that something other than the machinery at the Crusher is causing the fluctuation. Samples were taken when hoppers were dumped and it seams to have an influence on the samples taken at the aisle (103-107) but not the one closer to the back wall (108-112). Again, it is recommended that as changes are made in this area, follow-up samples should be taken in different places around the Crusher area to determine possible problems not always at the same place.
Although the problem at the Pipe Machine has subsided I am still working with the IG microscopy lab to determine the type of fibers found at the Pipe Machine. These results should be known by the middle of June. I apologize f-or the delay in these analyses.
Comparison fiber counts were made with Bill Magers while at the plant. The microscope was found to be out of phase which leads to erroneous counts. After aligning and setting up the microscrope myself. Bill and I recounted a slide. The counts were then found to be within comparable range, but way off from his original count. It has been recommended to Bill before, and I am again insisting, that Bill set up and align the microscope every time he moves the microscope otherwise the counts he makes are in error.
A final report will be written when the results are received from the IG lab. In the meantime, if I can be of any further assistance to you or if you have any comments or questions in regard to this survey please contact me.
JLW/tmf
P.S. Also attached find copies of the field notes (Air Monitoring Data Sheets) which you requested for use in informing the employees of their exposures.
CTD019508
Industrial Hygiene Survey Ambler A/C Pipe Plant Hay 5, 1981
No. 073 074
POSITION LOCATION (DATE)
Press Operator (5/5781)
075
075 077
Mandrel Handler (5/5/81)
078 Crusher Operator (5/5/81)
079
080
NAME/AREA C. Worthington
J. Mascola H. Dukes
TABLE Personal Fiber Exposures
ANALYSIS FOR
TIME MIN RESULT f/cc
TWA FOR
SAMPLE PERIOD
Fibers (Asbestos)
6:30a 8:54a
144
0.78
8:54a 1:01p
247
0.27
0.45
l:01p 59 0.39 x: ' 2:00p
Fibers (Asbestos)
A 6:42a 9:05a
143
0.072
9:05a t X 1:50p
285
0.038
0.049
Fibers (Asbestos) 0L
6:52a 8:59a
127
,A\b 8:59a ol 12:02p
183
1.16 0.37
12:40p 4:00p
200
-
0.69
REMARKS
Manufacturing 12" 150 pipe 9 3/4 ton per hour. Felt hours-
Top: 44 Bottom: 31 1/2
Manufacturing 12" 150 pipe 9 3/4 ton per hour. Felt houra-
Top: 44 Bottom: 31 1/2
Worked entice day at crusher*
Void Samplepump problems.
CTD019509
Industrial Hygiene Survey Ambler A/C Pipe Plant Hay 5, 1981
TABLE Area/Environmental/Englneerlng Fiber Samples
No. POSITION LOCATION (DATE)
NAME/AREA
ANALYSIS FOR
TIME MIN RESULT f /cc
TWA FOR SAMPLE PERIOD
REMARKS
081 Mixing Area (5/5/81)
082
Area
Fibers
5:14a 52 0.20
(Asbestos) '9 6:06a
/ , 0-'
6:06a 8:56a
170
0.11
Pump hanging on I beam 15' from
mixing pot 6* from floor. Before start up.
083 Area near
Area
Tailing pumps
(5/5/81)
084
085
Fibers (Asbestos)
7:03a CP 9:03a
120
0.056
/' ' -\_
9:03a 12:59p
236
0.041
1:05p 200
0.037
y 4:25p
Pump hanging 51 from floor 5' from pipe machine
086 Area at Mandrel Return (5/5/81)
Area
Fibers
5:12a 55 0.020
(Asbestos)
6:07p
Is'
Pump hanging 15' from Tailing pump 5' from Mandrel return. Before start up
087 088
6:07a 9:04a
177
0.028
r "3 ' 9:04a 12:59p
235
0.033
-
089 Rollup (5/5/81)
Area
Fibers (Asbestos)
6:46
--
--
VOID SAMPLE
090
d3^ 6:47a 125
1.32
Pump hanging at
8:52a
pipe machine roll
up/press section 5'
from floor k% from
091
8:52a 250 >0.57*
press section S'
1:02p
from operator.
092 tfxx 1:02p 203 >0.16* 4:25p
093 Console (5/5/81)
Area
Fibers (Asbestos)
5:10a 54 0.07 6:06a
Before start up
094
(p 6t06a 167
0.22
Pump setting on
8:53a
console 5' from
floor 15' from
press section 10'
)5
8:53a 246 0.10
behind operator.
12:59p
096
$ 12l59p 206
0.17
4l25p
*Nota: (>) Craatar than - Staple vai heavily loaded with particulate, fibers were obscured asking fiber analyses difficult.
CTD019510
Industrial Hygiene Survey Ambler A/C Pipe Plant Hay 5, 1981
TABLE Area/Envlronmental/Englneerlng Fiber Samples
Ho. POSITION LOCATION (DATE)
097 2nd Floor (5/5/81)
NAME/AREA Area
098 Hfg. Dept. Fire Hose (5/5/81)
099
Area
100 Aisle near Crusher (5/5/81)
101
102
Area
103 Crusher near Aisle (5/5/81)
109
Area
105 106 107
108 Crusher near vail
(5/5/81)
Area
109
no in
112
At crusher
113 Above Rotary
Area
Valve ExhauBt
Bags
(5/5/81)
ANALYSIS FOR
TIME MIN RESULT f/cc
TWA FOR SAMPLE PERIOD
REMARKS
Fibers (Asbestos)
9:08 229 0.22 12:57
--
Pump 5' from floor #1 mixor above screw conveyor
Fibers (Asbestos)
Si 6:45a 8:57a
132
0.26
,C 8:57a 3:18p
381
0.10
Pump hanging 4' from floor at fire hose racket at door to locker room
Fibers (Asbestos)
rjV1,
5:08a 6:16a
68
0.015
Before start up
6:16a 8:57a
161
0.18
\ 8:57a ' 3:18p
381
0.087
--
Pump setting 10' from corner of crusher area 30* from crusher
Fibers
6:55a
(Asbestos) P' 8:58a
123
2.89
sP
8:58a 11:91a
163
0.59
<p 12:03p 30 0.65
12:33p
--
Pump hanging above motor 4* from floor neaT control panel 2 hoppers dumped
Shaking bags in dust collector
12:40p 98 0.65 2:18p
No hopper6 dumped
dp"
2:18p 9:00p
102
0.95
Started cleanup 3:10
Fibers
6:54a
(Asbestos) Q-? 8:59a
125
2.15
8:59a 12:03p
189
0.99
Pump hanging 5' from floor 3' from wall above goods on floor 2 hoppers dumped
& 12:03p 30 1.07 12:33p
<P 12:90p 98 1.56
2:18p
--
Shaking bags in dust collector
No hoppers dumped
0V\ 2:18p 82 0.098 4:00p
P)l/H2i02p
Fibers
31 2.79
(Asbestos) ^ 12)33p
CTD019511
--
Started cleanup 3:10
Shaking dust collector bags Vlsable dust released at Bags*
C F -Ai n t t D * l f.iHx r f L"E
*15, (".jniioAIUG- P*7A ^ 1 T
o\^\/\&\Ati
*t _
_>--
SF\n*k*<*' isun__ _______
f i e t << eass f- l t S S T O s
'oPEfJ F AC E
t0^0>L N 5- E F , Mill! PO(\E Filtea
TOT^t "D^ST
S1 L t C. K tJM
AS ( M ^>-T f U r< S
Q C to* EH FR5: Q cyclome fj ClOifO F AC
5^. P^C Filter, GI.ASS FltEC.-Silver mr. lnuR
V'lJU C * - Of Z Z (t'SnOr'.l ^
CHARCOAL Tut!
O 1 5 o -j. C hrRcoRl
c FoH/u,l;{ my DC
D 1MPimC-ER.S , T JO IW SERIES
Q 5ot)iuM 61 u v. F i t F
PHI NOU
D SlUEFl GIL
[ | 300 *"3 ^11 * ^ ^ OtL
Noi SE
Q Audi ohoSi meteRu
85 i 6A to i 6ft
fc|,,*i **?* P*/Nf gHP^avff ^ **AM
pif
Qt-fo-M -D**Tfc ftuT)lotloi*MlT6 p
]f*J Mu "wf* tl C.
-l*m lir gwviNHiwTM.
&yU<^
."DlvV^tl let^tim!
iLf-g^.*yA^*lV Tt,ar~AI
fUMCltftwiMC NlK*U.7 HOI FwJ00*MKICr NO IhHuy
OulStHE TEMlttfiiutE *f
<ONHK 1 fun f Mft. [
073
wi/fcg t, t/Gsb
WtN^ "fellttltO M
I W|N> RfUUtY
1 nPK
Time VAH
lOtftL1 H|NUTf$ I lF f|
VOlvHC
Oi-STMr Qj-Rl-Ry Oj-?TtTw O r m *
R/Lyt'J Result
t-H- J4h /.76 b6^b
G7<{
076 _____ |
fip> (
i:o)
w
t.Ol 3-;<n
wi | no 43f,'U \LiL
/ 'bo4-09
Os vumO O7**'" O i. L""iLy Oe svw
AiAEoCmI c.^ci*4Ttnio
o. . 0.^3/t-.
0-3e}jjj's.
1
*lp tNUfiK wrC ll}P<44<it t
0yg$ Qno QiomTmii
'*fap IF- faHltmlV whim 1
TZoa *W A heMl
0.45b/ee^ )
l >*! I 4
Hoot. CoUHtO tro*o*t - 7.
> iu: m t-ViHt u.Tio.m'
CytsCNoO 5oeTiMtS
"Hwt V, **UCni$
/
?//c
CTD019512
l'F T*,M-ttD TF.iPt riVtll"E
5NnoHltJfr X>^ 5HST
fX/
[~j
Fieti.iuss ness tos
T OT ^ F T3UST
. _ SlLICA X JST
D ftSt HALT Fl/HiS
I | vmlL t*LO(Ot fr-?., Dr-.i f.)
C Fof.f", AMCE WYOt
ri Phinou
noi se
iOFTOLKOfe _ r.iimt
0^OOPPEN fAC-E
C lo EB rRC= Q cyclone [j CiOiEtl F FCE CH A C.COAL "Tl6. O ImPiij GERE > y-jo in SERIES O Sim c A 11 l
Audio-doSimeteR
d&A m \K/- 1`
M C E F , Mini PORE Filter
5^. PVC Filter
Q C.CASS FitEC.- Si.lip. Nn.fii.UIT
Q I 5o ~j. CHAR coal f~~] 5oCiu t i-ULf tl F
Q 3oo
S'MC ROIL
65 4 6a
to <1 6*
4V> r t f_T_
L_. pvfoert f
P
P
(3 WPFC. P**P [3ftEi%itooSi#iiTEP
--EpfR-PlM.,. M-VH,---- ,-------,----- ,----- ------------------ ,-U f1 M k 1 r
1.
c
PlPfltl
UM|
'Mr
--
-
/y&o
L^KRtftT CPMUtL fi'MCnow'Mt
frUPETJ_________________________________ t-RnAR! [3 r*i Fwf^ioMtMi, NO***uy
owl *WE TfcttftWiutS *t
uiini titRtto m
w(hi (iaurr
C*oun | Pun P
Sc * At.
oAn>Tt~
ti ME
Tot Asi.nr
mwuil*SS I lP Ml
VkvME L|T-S
0~?fa
^'<4 4:06 J^SM.
Oil
<e;
!:6o Mt* utf 5/o,/j?
Oi-S-"r 05'el"*r Oa-STtT.Q,i '*
Rnaltsij Result
05,`""`# 07,,',*< Qi.SN.wEEsQg Snw
AlRfiotMC CnULTinua
Q, 672-//fi'j?s
0.05
>lt
mriT|l emjai
1t 1
y^S Qno QsoMitinES
1*
T
Sn(tiHIV wot! m \
'\
(fPUM#
. _ HfieST.r SlMtT
UKtUT ft* CwT
**T (|VU
Ml ftit--ft K.IIIM"
CyESCnoQ SoniTi MtS
*(WiCAtC null A R?oCi.
/) 1/
ft Hoot CaWICItt (itoSutE - 7.
rnftftl -- M ft! L
CTD019513
klf f TftiwTtfD l.-tjSTfiL HVtilfJt
r,3rjnPR,iMt
SS-SEl
t, * * * \#* * o
[j Z' f i e E (.t l ASS Asets t o s
Total DuS T
El Lit *i T J ST
LJ AS< H*l7 FutilS
| | vi'iyl c>-.oiitt fi'oior; f.)
I i Fo ( f'. F.Ltt WY TIE I i Fhcncl
Noi SE
*w _ r.4 i ;
9QxtfPE FACE
Q c Lot ED FACc
Q CYCLONE 'J tlO'.Etl FAC. E CH A RcoAl Tut I mPin 6 CLt, , yj i Q Silica GEL
SERIES
Q Audi odoSi meter.
J m i| >< 1
i_. pofo?1 M-** PjMf
[3 t **&'*
pMnf
~~j ^ft Pm^P
01)#?b*t *>**r<
8.IM17E
B^O-^U M C E F , mill POAf Fii.1^
s.*. P^C. Filter
Q OCAS! FicEC.-Silvip. Mtr. r.LiEA Q I 5 0 -j C KH coAl f ] 5oFl*iM EiCulFiTF
I j 3oo "'J S'iic R G E c 8S i 6A 10 i 6ft
n fUMCtiow"* N6**Au.y
r*o*i fw*VoiMt no KftHuy
Oul SIDE TlKftWiotE *F CNtk^ t U M f
**
*7?
Ol*)
C>%6
ra??4/
fUel 1
ujim? "bitttvo m TME
Wef H)NU1
wiNt t(uurr ___________*____
cfn V0kVP(
Qi-^r '03"fl*-#r AwAlySiJ Resoly
i?n*3}
i.%5 ^cf5
/4
J.& 3%[/k
^}i4yj
12*50 2-7
*0 H*"11 O7 **'" AlA.QfM( C**t tTtf.Mam
ULp-f./lt^ * a 39/A^ .
t/:Cb -HO $0ij>
/O'fffj------- P*j*=z&jO-8&<x
tie Mint
t ip sf>himiv whim i
0yr$ Qf* 0SitinES
t*i i*i^i. St lifts
C(U
SnAtT^,neS''E
1M*iWT MElfS |1
_J
Aktt*IXVpbPTVT
97/JA- ___$ (tfl_________, > rtn.
S Hoot. Co.ct* tfo^ofct - 7.
CYtsCNoO Soffit"**
CTD019514
CerfcainTeedE
To
D. Hall
Subject
Mail Code
2125/2B
From 0. H. Kittilstad
AMBLER ASBESTOS FIBER SURVEILLANCE PROGRAM
Mail Code
1125/A
Ext. 7765
Date
July 28, 1981
cc: J. McGinley - 2125/2B W. Blakeslee - 2126/00
During the Industrial Hygiene Survey at Ambler in May, 1981, we reviewed the in-plant air sampling program which is well established at Ambler. Several recom mendations to improve the program are as follows:
1. A conscious attempt should be made to include all employees in the sampling protocol.
2. Employee exposures should be conducted to obtain an 8 hour time weighted average. A minimum of 7 hours of sampling including 3 to A samples for the total period should be obtained. Reports being received in this office show TWA's are being calculated on samples of A or less hours duration.
3. Pump calibrations should be made on a regular basis. Preferably, pumps should be calibrated prior to and following each days use. Regular calibration of the pumps should be made in any event to insure that the flow rate and rotameter reading are in calibration. Accurate records of the calibrations should be maintained.
A. We observed during the survey that W. Magers' microscope was out of alignment. The microscope should be set up and aligned before each use and whenever moved. This should include a phase ring alignment. In addition, the porton reticle should be calibrated every 6 months. Poor alignment and microscope calibration can seriously contribute to erroneous fiber counts.
5. Care should be taken to insure that a minimum amount of mounting solution is used to dissolve the filter. Too much solution may cause fibers to drift from filter counting area. It also makes it difficult to actually tell where the filter slice is.
I would appreciate your informing me of your actions to implement these recom mendations.
OHK/car
-lijf CTD019515
Location and mail code
2125/2B
Location and mail code
1125/4
X\ -Js
KJ
TJ
1 A CD
V 4J iNJ CO
V, ^ rH |V
rH v`
<0 3:
Vv
a
X~ i*2
c H >
EO
* In CO
v" o,
h- Q u. J o
00 o>
oo
m
CM O
CQ "C--M LA
in
<U
rH
"o-s. MO
CM
*---n.
CM m LTl
r--i CM
<
CM
1
CM
r--1 pH
11
4)
>. 4-J 0) o
0) rH
1 u
rH V- to <D
c CO a> rH H rC N
o c CO 4J a aj rH a
X PQ CG
c rH c c rH pC
0 to H 0 K PQ
* U u
o a <d u
o c vH 4-J
<U
>
3
OJ c a; H 00 re
u (0 0 C h-t
in
V
rH
X) E
0) pC <u CO
rH
no 0)
pC
u to 4J 4J
<
u 0 u
w o
I
! I
CTD019516
INDUSTRIAL HYGIENE SURVEY
Ambler A/C Pipe Plant March 23 & 24, 1981 May 3, 1981
INTRODUCTION
An Industrial Hygiene Survey was conducted at the Ambler Asbestos-Cement Pipe Plant March 23 & 24 with a follow-up survey made on May 5, 1981 by Janis Woodson, Corporate Health & Safety.
The survey was conducted to audit an on-going in-plant fiber exposure surveillance program and to follow-up on employee exposures to noise. Sixty-three personal air sample measurements were made during the survey, along with 38 Area/Environmental and Engineering samples. A follow-up sound pressure level survey supplemented by 12 personal audiodosimetry exposures was also conducted.
The appendices to the report document the air sampling methodologies, the analysis techniques, and the current standards used in evaluating the data. The field notes and in-house laboratory documentation of this survey are on file in Corporate Health and Safety.
This report is an "Employee Exposure Record" as defined in 29 CFR 1910.20 and must be retained indefinitely in the plant and made available upon request to those federal officials/designees as specified in 29 CFR 1910.20 (d).
SUMMARY
Little to no action has been taken on 8 of the 13 recommendations made in our survey of last year. A summary of the status of these recommendations is provided.
Excessive noise exposure is the major health problem found during this survey. A recommendation to obtain an expert consultant on engineering noise control is made. Improvements in the hearing conservation program, are also recommended.
All personal exposures to asbestos fibers were found to be less than the current OSHA 2 fiber/cc standard.
Area samples in the Crusher Area in excess of 2 fibers/cc were measured. A Time Weighted Average personal exposure sample on the Crusher Operator was 0.69 f/cc.
Improvements in the asbestos exposure levels were found in the Bag Opener Area, and the Finishing and Fittings Department.
CTD019517
2.
Ambler A/C Pipe Plant Manufacturing Schedule
March 23 & 24, 1981 May 5, 1981
Monday 3/23/81 1st Shift
Manufacturing Department
10" 3300 pipe 12" 2400 pipe 10 hours - no downtime 9.4 tons/hr. Felt hours - Top: 77
Bottom: new Furnish: #13 & #23 Batch: 12.82 Fiber (27.5% Crocidolite Fiber) Vat Temperature: 72
Tuesday 3/24/81 1st Shift
10" & 12" 2400 9 3/4 hrs. - 1/4 hr. downtime 9.6 tons/hr. Felt hours - Top: 87
Bottom: 10 Furnish: #23 & #12 Batch: 13.7% Fiber (30.8% Crocidolite Fiber) Vat Temperature: 80
Finishing/Fittings Department
Lathe #3: 21" 4000 & 5000 pipe 21" 5000 1/2 MEO's
Lathe #3: 18" 3300 & 5000 pipe 18" 5000 1/2 MEO's
Boring Mills: 18" 3300 & 5000 21" 5000 cplgs.
Rework: 12" Korit: 8x4 wyes Pen. Sharp.: 8" 1/4's Wet Saw: 18" 1/4 lengths Lehman: 21" 5000 1/4 lengths Nebel: 10" 200 PAD 3's
Tuesday 5/5/81 1st Shift
12"150 pipe 8 hour6 - no downtime 8.9 tons/hr. Felt hours - Top: 44
Bottom: 31 1/2 Furnish: #39 Batch: 16.1% Fiber (31.2% Crocidolite Fiber) Vat Temperature: 94
--
CTD019518
3.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 3, 19B1
ASBESTOS FIBER MEASUREMENTS
Table I lists the results of personal exposure samples on March 23 and 24, 1981. Table IV lists the results of personal exposure samples during the follow-up survey on May 5, 1981. Area and Engineering sample results are listed in Table II and V. Area samples represent general environmental conditions at the location sampled. Engineering samples represent specific point sources, not related to exposure, for the purpose of detecting sources of fiber release.
A summary comparison of last years fiber levels with the results of this survey is made in Table VI.
Manufacturing Department
An automatic bag opener has been installed since last year's survey. The mixer operators Time Weighted Average (TWA) exposure was 0.71 f/cc this year (#001-003) as compared to 2.36 f/cc last year. An area sample taken in the Bag Opener was 0.21 f/cc (#056), which shows a reduction in fiber levels compared to the manual dumping method.
No open/torn bags or loose fibers were found at the Bag Opener area or in the fiber warehouse.
Fiber levels in excess of 2.0 f/cc were measured in area samples at the Pipe Machine and Press Operators work stations (Samples #006,007 and 008). The source of the airborne fibers was not obvious. A follow-up study by plant personnel attributed the excess levels to air currents disturbing fibers under the pipe machine. A plastic curtain was installed across the machine at and below the anvill roll. Subsequent samples (Samples #073, 075 and 089-092) found substantially reduced levels for these job positions.
Area samples were also taken around the pipe machine/manufacturing area to determine if air currents were carrying the particles in another direction. This was found to be negative as shown in samples 081 - 099 (Table V).
An Area sample at the press section/roll up area was found to be 1.32 f/cc (#090). Further study of the source and contributing factors such as air movements disturbing fibers should be conducted. Care should be taken in comparing the effectiveness of engineering changes by insuring that comparable measurements include sampling under the same manufacturing conditions (e.g., same type/size pipe, tons per hour and blend/formula).
CTD019519
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
4.
The use of used felts has been eliminated at the entry to the primary tunnel, although the use of this material is still found in other areas of the plant (i.e., entrance to the Maintenance Machine Shop, other tunnel openings and in shipping - felt strips are used to pad the chains when securing the load to the trailer). The used felt may contain asbestos fibers and upon drying may release asbestos fibers when cut, handled, moved, or abraided. Our recommendation of last year, that the use of used felt in all of the areas be discontinued, is repeated.
Crusher
An area sample (#060) on 3/24/81 measured greater than 3.91 fiber/cc near the control panel of the Crusher. In an attempt to shed light on the source of the fiber, area and engineering samples were taken on a follow-up survey on 5/5/81. A TWA personal exposure sample taken on the Crusher Operator during the follow-up (078 & 079) measured 0.69 f/cc.
The area and engineering samples (100-113) show no consistent pattern of Crusher area activity producing elevated fiber counts. Visual observation and results of 2 of the 13 samples (110,113) indicate the shaking of dust collector bags during employee breaks and lunch may be a contributing factor, the actual source being the rotary valve exhaust bags. Samples 103 and 108 suggest that hopper dumping may also be a contributing factor.
While the survey revealed no apparent excess exposure to the Crusher Operator, an engineering study of this operation is recommended to determine the source of airborne fiber in this area.
CTD019520
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
5.
Finishing/Fittings Department
Time weighted average personal exposure samples in this department ranged from 0.10 to 0.36 f/cc (Sample //Oil to 055). Significant improvement is noted over the January 1980 measurements (See Table VI). The column labled ">0.5 f/cc", shows a decrease from 47% last year to only 2% this year. The increased attention given to ventilation and dust collection system by supervisors in the department has proven effective.
An accumulation of tailings was observed on the floor between the Lathe and Tester on Lathe Line If3. Likewise, the Lehman Lathe had accumulated tailings. The apparent source of the tailing deposits is an inadequate velocity in the exhaust ducting to transport the heavy tailings. This results in a blocking of the ductwork, further lessening fiber transport in the duct. A smoke tube test found a negative flow from the duct. Also, the operator uses the flexible exhaust ductwork as a local vacuuming source and tailings accumulated in the duct drop out onto the floor.
Engineering should review these operations. A possible solution to the tailings cleanup is a portable industrial vacuum cleaner.
NOISE MEASUREMENTS
Noise exposures in excess of the 90 dBA OSHA standard are pervasive in this plant. A comparison of this survey's noise data with last years show little noise reduction has been achieved. A number of suggestions to reduce noise were submitted in our report of last year. Little has been done to implement those recommendations. Those recommendations are repeated.
If the group and/or the plant does not have the expertise to implement those recommendations and/or believes additional outside expertise in noise control engineering is required, the additional recommendation is made that such outside consultation be obtained. Corporate Health & Safety will be happy to work with the group to obtain an outside consultant.
Table III and Figures 1 and 2 show the results of audiodosimeter and sound pressure level measurements obtained In this survey.
CTD019521
6.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
NOTE:
All audiodosimetry measurements in this survey were made with the dosimeter set at the 83 dbA cutoff. This results in slightly conservative estimates of the OSHA 90 dbA exposure measurement guidelines for noise levels below about 88 dbA and little to no difference for those exposure above 88 dbA. Conversely, the 85 dbA cutoff, estimates on the low side for the OSHA Hearing Conservation Ammendment Standard (currently in an administrative deferral) which sets the cutoff at 80 dbA. A review of the sound-pressure level measurements at the Ambler Plant indicate that in those positions where the audiodosimeter readings exceed 100% with the 85 dbA cutoff, that the SPL's are generally above 88 dbA. As a result there should be little difference in determining percent of exposure regardless of the dosimeter cutoff position.
The OSHA standard, 29 CFR 1910.95 (a-b) requires that engineering and /or administrative measures (e.g. job rotation) must be undertaken when exposure exceeds 90 dbA for an 8 hour Time Weighted Average. Likewise, that hearing protection is mandatory for exposures in excess of 90 dbA.
The deferred Hearing Conservation Amendment 29 CFR 1910.95 (c-i) requires
audiometric testing, non-mandatory hearing protection, training and other
hearing conservation practices for exposure of 85 dbA or greater for an 8 hour
TWA. It is our opinion that the OSHA 85 dbA action level will not be changed.
There is adequate documentation that at 85 dbA exposure, 15 percent of workers
will suffer hearing impairment. [At 90 dbA, 21 to 29% of workers will suffer
impairment]. To protect our employees hearing and minimize future liability for
hearing loss compensation, a hearing conservation program pegged to 85 dbA is
recommended regardless of OSHA's requirements.
~
Manufacturing Department
Those employees in the manufacturing department exceeding the 8 hour allowable dose (100% 90 dBA mode) during Dec. 79/Jan. 80 survey were: Machine Tender, Mandrel Handler, Tray Loader, and Utility Truck Driver. During this survey 3 of the above 4 job positions were resampled with the Mandrel Handler (061) and Utility Truck driver (063) again exceeding the allowable noise dose (100%). The tray loader's exposure (062) was substantially lower which is attributed to the fact that no mandrel change was made during the shift.
Recommendations made last year were to:
1. Start by installing air mufflers on pipe machine air cylinders 2. Install sound absorbing pads on metal to metal impact and roll surfaces 3. In the interim, hearing protectors should be worn by employees.
CTD019522
7.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
The first two recommendations have yet to be completed. The Mandrel Handler's and Press Operator's work stations were both posted as required hearing protection areas but employees in the areas were not wearing hearing protectors. An OSHA Inspector when touring the facility would cite the plant for this. Wherever it is posted that hearing protection is required it must be enforced.
Finishing/Fittings Department
Eight audiodosimeter measurements were taken in Finishing/Fittings. Excessive noise levels, those over 100%, were detected for Lathe Line #3 operator (064), Lathe Line it3 Helper (065), Wet Saw Operator (066), Korit Drill Operator (068) and Lehman Lathe Operator (069). Four of these five job positions were reported as excessive last year.
The following was recommended for the if3 Lathe Line last year: "Air release noise is most prominant at the control operator side.......... Control of noise at this area should be initiated by the installation of air silencers at the Lathe Operator's station, control side."
The report went on to recommend: "... all employees whose job positions were found to exceed 100% should be required to wear hearing protection. It is recommended that several types of hearing protectors be made available to employees so that they can choose the one most comfortable. These machines and job positions should be posted with signs requiring the use of hearing _ protection. These employees should also be provided with annual audiometric examinations."
It was also stated: "If engineering controls cannot reduce the levels to 90 dBA, consideration should be given to administratively control the noise by having the employees change positions along the finishing line. By rotating the employees through job positions on an hourly basis, and by engineering reductions, it may be possible to reduce all employee exposures to less than
100%."
The need for air mufflers at the if3 Lathe Line was again pointed out to plant management (shown in Figure it 1), as was the need to enforce the use of hearing protection. On the follow-up survey May 5th the air noise at the Lathe had been reduced considerably for the lathe operator. The actual lathing of the pipe, especially the final cut is the greatest noise problem and was still found to be above acceptable levels, therefore it is still recommended that administrative controls (i.e. , job rotation) be instituted until these levels are substantially reduced. This area still needs to be posted as a required hearing protection area and the use of hearing protection enforced.
CTD019523
8.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
The wood saw was found to range from 92 - 98dBA when actually cutting. This is above the allowable noise level but the cutting cycle is not constant and no one employee is exposed to this level for 8 hours. The following suggestions for noise reduction are carried over from last year.
1. A sound absorptive barrier built between FD9 Coupling Saw and #10 Rework Saw would reduce noise levels for both saw operators.
2. A sound absorptive barrier panel (with plastic viewing window) built into the rework saw handle would reduce the saw operators exposure.
3. #15 & 16 Coupling Mills need air mufflers to reduce the periodic bursts of noise. Further reduction can be obtained by applying sound absorbing foam inside the mills.
4. Reduction of noise at the crusher could be accomplished by lining non wearing surfaces inside the crusher with sound absorbing acoustics.
5. Installation of noise barriers walls or curtains between fittings department equipment would reduce noise levels for the entire department.
Until noise is reduced by engineering on administrative controls it is imperative that hearing protection use be enforced. All plant positions should be reviewed to determine possible employee noise exposures and where additional noise measurements are required, (i.e., Lathe Lines #1 & #2 as well as other operations not covered by this report).
CTD019524
9.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
STATUS OF 1980 RECOMMENDATIONS
It is recommended:
1. That a thorough review of the OSHA Asbestos Standard, 1910.1001, be conducted by a panel of plant management personnel to reassess the degree of Ambler plant compliance with that standard. Special emphasis should be placed on personal monitoring to determine 8-hour exposures in those positions where excess levels were determined by this survey.
Status:
Asbestos Monitoring Data Sheets received here in Corporate Health & Safety show calculated TWA's on samples totaling less than 4hours. The number of people being sampled is ample but an 8 hour TWA is mandatory to determine the full shift exposure and to comply with OSHA Regulations.
2. That followup work consisting of short term samples be taken in and around the restroom, locker room and lunch room areas.
Status:
To date Corporate Health & Safety has not received results of these samples.
3. That whenever any changes - minor or major - are made to manufacturing process/systems, fiber exposure measurements should be made and followup work done to assure that exposures are well within standards at all times.
Status: This is an on going recommendation.
4. That a plant level Respirator Control Unit Program be developed using the concepts pr6S6nted in Section C of the CertainTeed Health and Safety Manual and Appendix II to this report.
Status:
Fit testing, one of the requirements of an OSHA Required Respira tor Program is not being done. It is doubtful as to the com pleteness of the rest of the plant's program. Paragraphs 1 & 2 on Page 7 in the body of the survey report states: "A very large drawback with the 3M 8710 is that employees cannot be properly fit tested to assure us that when an employee is wearing the respirator, he is being properly protected. Undetected leaks around the nose or face due to facial contour lead to false security that the respirator is in fact offering protection. It is especially important that all employee's who are required to wear respirators be fit tested." "... A single use respirator, 3M 9900, as well as other permanent half-mask respirators approved by NIOSH for protection against asbestos containing dusts should be utilized. These should also be made available to all employees who request a respirator."
CTD019525
10.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
At present the 3M 8710 and AO Dust Demon Masks are being used. These respirators are not fit testable as presently required by OSHA and should be replaced by the 3M 9900 for use in required respirator areas and made available to employees requesting them.
5. That housekeeping be improved in the manufacturing area and also that it include vacuuming and cleaning of machine and structural surfaces in and around the area.
Status:
General Housekeeping has been improved throughout the plant especially in the finishing/fittings department.
6. That engineering studies be made to isolate the fiber source at the pipe machine and to explore the feasibility of exhaust ventilation to control fibers.
Status:
One fiber source has been located at the Pipe Machine which has been somewhat contained by the plastic curtain installed at/below the anvil roll.
A continual study should be made in this area to be assured levels remain at the present levels.
7. That when dry scrap pieces are moved that they be wet down to control dust during disposal.
Status: A wet sweep program is in effect for all dust on floors.
8. That a series of fiber samples be taken at the shot blaster, shot blasting area and on the Shot Blaster Operator while it is in operation.
9. That further monitoring be done on those employees involved in scrapping and sanding mandrels while on racks over their heads as well as those resting on the floor.
/)
Status:
Corporate Health and Safety has received results of only 1 sample taken at the Shot Blaster and Mandrel Scrapping Operation which was 1.29 f/cc. It is essential that monitoring be done at this operation to document present levels, and that an assessment be made to determine possible changes that should be made to reduce fiber levels.
CTD019526
11.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
10. That those employees in the Finishing and Fittings Department vacuum more frequently throughout the shift to help reduce background fiber levels.
Status:
The fiber levels in this department have been substantially reduced by the extended effort of supervisors and employees.
11. The text of this report contains a number of suggestions for the control of
noise exposure. If the methods recommended or other engineering and/or administrative controls cannot feasibly reduce the noise to acceptable levels, a hearing conservation program to include the mandatory use of ear defenders and periodic audiometric testing of exposed employees must be implemented.
Status:
Implementation of noise control recommendations are not apparent. Mandatory use of hearing protection must be enforced where applicable.
CTD019527
12.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
STATUS OF 1980 ENGINEERING REPORT RECOMMENDATIONS
1. That the heater in the area of the fiber dump be redirected or replaced by a non-forced air heating unit.
Status: Completed 1980.
2. That until the automatic bag opener is put in operation, the blast gate at the fiber dump be positioned to obtain optimal velocity for control of fiber dispersion.
Status: Completed 1980 and the Automatic Bag Opener is presently in use.
3. That a non-asbestos sealer be used in place of the A/C mud presently being used in an around the manufacturing area.
Status:
The use of the A/C mud has been reduced, although there are still some places where it is being used.
4. That the exhaust ventilation to the Mixer/Blender be changed to provide permanent control of dust at this area.
Status:
Recent samples show some improvement has been made in the ventilation at this area.
CTD019528
13.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
RECOMMENDATIONS
It is recommended that:
1. The on-going study should be made of the manufacturing area, especially at the press section/roll up area to determine wind currents and other dust sources, be continued.
2. The use of used felt in all areas of the plant and shipping be discontinued.
3. The on-going study of the Crusher Area to determine dust sources at this area and to measure the effectiveness of changes be continued.
4. The problem with the accumulation of tailings at Lathe Line #3 and the Lehman Lathe be studied and corrected.
5. Hearing Conservation programs with annual audiometric examinations should be established for employees whose exposures exceed 85 dBA level for an 8-hour period, i.e., a 50% reading on the Audiodosimeter.
6. Employees with exposures exceeding 90 dBA on an 8-hour Time Weighted Average, i.e., 100% reading on audiodosimeter should be required to wear hearing protection.
Those job positions tested and found to exceed the 8 hour allowable^ dose (100%) during the Dec. 79/Jan. 80 survey and this survey are:
Manufacturing
Machine Tender Mandrel Handler Tray Loader Utility Truck Driver Crusher Operator
Finishing/Fittings #3 Lathe Operator #3 Lathe Helper ff3 Inspector if3 Tester Operator FD16 Boring Mill Operator
FD9 Coupling Saw Operator
FD13 Universal Mill Operator FD28 Korit Drill Operator FD21 Wet Saw Operator Pencil Sharpener Operator FD7 Lehman Lathe Operator FD10 Rework Saw Operator
CTD019529
14.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981 May 5, 1981
7. The following areas be posted as required hearing protection areas: (a) Lathe Line #3 Operator Work Station (b) Lathe Line #3 Helper Work Station (c) Lathe Line 1/3 Tester Operator Work Station (d) Lathe Line #3 Inspector Work Station (e) FD 16 Boring Mill Operator Work Station (f) Mandrel Return & Change Conveyor Area
8. Previous recommendations (Dec. 79/Jan. 80 survey) be implemented and suggestions be considered for Manufacturing & Finishing/Fittings noise reduction. Help from an outside consultant should be obtained if the expertise is not available within the plant or group.
9. A review of all plant positions should be made to determine possible employee noise exposures for all areas of the plant.
10. Until noise is reduced by engineering controls or administrative means, that hearing protection use be enforced.
11. When hearing protection is required, several types of hearing protection should be made available for the employees to choose from (i.e., disposable plugs, reusable earplugs - with/without neckcord and ear muffs).
12. That a quarterly status report on all of the above recommendations be made to Corporate Health and Safety.
CTD019530
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
TABLE I Personal Fiber Exposures
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
TWA for
Sample Period (f/cc)
REMARKS
Manufacturing Department
001 Mixer
S. Mlnio
Operator
(3/23/01)
002
003
Fibers (Asbestos)
6:40a 9:18a
158
1.7
9:18a 1:04p
226
0.25
1:04p 3:37p
153
0.35
0.71
Cleaned out vacuums on second floor during this sample
Manufactured 10" 3300 6 12" 2400 pipe. 8 dumps made this day (27.52 of Fiber Crocidolite)
Employee wore 3M 8710 Respirator
004 Mixer
S. Hlnlo
Operator
(3/24/81)
Fibers (Asbestos)
7:15a 29 0.28 7:44a
Manufacturing 10" 6 12" 2400 1 dump made. (30.8Z of Fiber Crocidolite) Employee wore 3M 8710 Respirator
005 Press
C. Worthington Fibers
Operator
(Asbestos)
(3/23/81)
006
6:33a 9:16a
163
0.67
9:16a 226 >3.1* 1:02p
>3.1*
Manufacturing 10" 3300 6 12" 2400 pipe. Felts: Top-77 hours Bottom-new. No down tine
007
1:02p 159 >5.7*
Wall/panel installed at
3:41p
approx. 3pm
Employee wore 3M 8710
Respirator
008 Press
C. Worthington Fibers
Operator
(Asbestos)
(3/24/81)
7:47a 10:42a
175 >5.0*
Manufacturing 10" 6 12" 2400 pipe. Felts: Top-87 hours Bottom-10 hours. Wall/panel Installed for this sample. Employee 20 min. break. Employee wore 3M 8710 Respirator
009 Mandrel Handler (3/23/81)
010
J. Mascola
Finishing/Fittings Department
Fibers (Asbestos)
6:42a 383 >0.86* 1:05p
1:05p 166 0.68 3:51p
0.81
Manufacturing 10" 3300 & 12" 2400 pipe. No down tine.
/V'T1 nUrtU'iOlwEvHv1
Oil Line #3 Lathe (west
A. DeClerico
Fibers (Asbestos)
side) 012 (3/23/81)
013
014
6:11a 169 -- 9:00a
9:00a 10:18a
78 --
10:18a 102 0.26 12:00n
12:32p 213 0.099 4:05p
0.15
Void sample - pump problems
Void sample - pump problems
Finishing 21" 4000 & 5000 pipe and 21" 5000 1/2 MEO's. Cleanup 1:10 - l:20p
* NOTE : (>) - GREATER THAN - Sample was heavily loaded with parlculate, fibers were obscured making fiber analysis difficult.
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 6 24, 1981
TABLE I (cont.) Personal Fiber Exposures
16.
No. 81 015
016 017 018 019 020
021 022 023 024 023 026 027
POSITION LOCATION (DATE)
NAME/AREA
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Line #3 Lathe Opera tor (West
side) (3/24/til)
Line #3 Lathe Helper (East
6lde) (3/23/81)
A. DeClerlco F. Talese
Fibers (Asbestos)
Fibers (Asbestos)
Line 43 Lathe Helper (East
side) (3/24/81)
Line 13 Inspector (3/23/81)
F. Talese A. Camasso
Fibers (Asbestos)
Fibers (Asbestos)
Line #3 Tester Operator (3/23/81)
C. Bojacluk
Fibers (Asbestos)
12:55p 125 0.098 3: OOp
6:13a 168 0.061 9:01a
9:01a 179 0.15 12:00n
12:34p 1:21 p
47 0.25
1:2 lp 162 0.20 4:03p
12:54p 126 0.25 3: OOp
6:25a 159 0.18 9:04a
9:04a 103 0.047 10:47a
10:47a 316 0.10 4:03p
6:14a 168 0.34 9:02a
9:02a 234 0.27 12:56p
12:56p 1:22p
26 0.27
l:22p 160 0.15 4:02p
TWA for Sample Period (f/cc)
0.15
0.11
0.26
REMARKS
Changes made to dust collec tion system. Finishing 18" 3300-5000 pipe and 18" 5000 1/2 MEO's.
Finishing 21" 4000 & 5000 pipe and 21" 5000 1/2 MEO's.
Clean-up 1:10 - l:20p
Finishing 18" 3300-5000 pipe and 18" 5000 1/2 MEO's. Changes made to dust collect collection system.
Finishing 21" 4000-5000 pipe and 21" 5000 1/2 MEO's.
Finishing 21" 4000-5000 pipe and 21" 5000 1/2 MEO's.
CTD019532
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 6 24, 19bl
TABLE I (cont.) Personal Fiber Exposures
17.
No. 81
028
029
POSITION LOCATION (DATE)
Line #3 Beller (West
side) (3/23/81)
NAME/AREA J. Lucas
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Fibers (Asbestos)
6:20a 158 0.30 8:58a
8:58a 183 0.24 12:01p
030
12:3 5p 207 0.18 4:02p
031 Boring
F. Marincola
Fibers
Mill #13
(Asbestos)
Operator
(3/24/81)
032
6:15a 255 0.47 10:30a
10:30a 284 0.30 3:14p
033
3:14p 4:09p
55 0.17
034
035 036
Boring Mill #54 Operator (3/24/81)
C. Handschin
FIbers (Asbestos)
037
6:02a 267 0.12 10:29a
10:29a
-
-
10:29a 284 0.16 3:13p
3:13p 4:09p
56 0.067
036 Rework
E. Enchavarria Fibers
Saw/Korit
(Asbestos)
Drill
Operator
039 (3/23/81)
040
6:15a 7:04a
49 0.30
7:10a 202 0.37 10:32a
10:32a 159 0.36 1: lip
041
042 Pencil
D. Rodriguez
Fibers
Sharpener
(Asbestos)
Operator
(3/24/81) 043
1:11 p 167 0.25 3:58p
8:41a 129 0.34 10:50a
10:50a 310 0.30 4:00p
TWA for Sample Period
0.23
0.36
0.13
0.33
0.31
REMARKS Belling 21" 4000-5000 pipe
8" 150 couplings
Boring 18" 3300-5000 AND 21" 5000 cplgs. Void- sample
Operating Rework Saw 12" pipe Operating Korlt Drill making 8x4 Wyes.
Employee wore 3M 6710 Respirator Operating Pencil Sharpener 8" 1/4's. Putting rings in 16" couplings
CTD019533
Industrial Hygiene Survey Ambler A/C Pipe Plant March 21 6 24, 1981
TABLE I (cont.) Personal Fiber Exposures
16.
No. 81
044
045
POSITION LOCATION (DATE)
Wet Saw Operator (3/24/81)
NAME/AREA J. Reynolds
046
047 048
Wet Saw Helper (3/24/81)
L. DiAmlco
049
050 051
Lehman Lathe Operator (3/23/81)
B. Barnett
052
053 Nebel
J. DeSllva
Lathe
Operator
(3/24/81) 054
055 Tool
F. DeTuro
Grinder
(3/24/81)
ANALYSIS FOR
TIME
MIN.
RESULT (f/cc)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
6:21a 254 0.27 10:36a
10:36a 11:56a
80 0.28
12:31p 177 0.39 3:28p
6:21a 254 0.21 10:35a
10:35a 120 0.23 12:35p
12:35p 162 0.18 3:17p
6:45a 9:09a
144 0.43
9:09a 241 0.21 1: lOp
1:10p 4:15p
1B5 0.47
6:01a 267 0.11 10:28a
10:28a 319 0.083 3:47p
8:14a 116 0.14 10:10a
TWA for Sample Period
0.31
0.21
0.35
0.10
REMARKS Cutting 18' 1/4 lengths.
Employee wore 3M 8710 Respirator Cutting 16" 1/4 lengths.
Employee wore 3M 8710 Respirator 21" 5000 sewer 1/4 lengths
Making 10' 200 PAD 3's.
Unloading 6 stacking 10" couplings
CTD019534
I
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
TABLE II Area/Envlrorunental Fiber Samples
) 9.
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
056 Bag Opener (3/24/81)
Area
057 Bag Opener (3/24/81)
Area
058
Pipe Machine
Area
Rollup
(3/24/81)
059
Pipe Machine
Area
console/
control panel
(3/24/81)
060 Crusher (3/24/81)
Area
ANALYSIS FOR
TIME
KIN.
Fibers (Asbestos)
7:15a 7:44a
29
Fibers (Asbestos)
2:30p 2:55p
25
Fibers (Asbestos)
7:48a 10:41a
173
Fibers (Asbestos)
7:50a 10:41a
171
Fibers (Asbestos)
7:54a 10:34a
164
RESULT (f/cc)
0.21 <0.018** >3.06*
1.71
>3.91*
REMARKS
Setting at Bag Opener on Bag compactor while opener was in operation, making a dump.
Setting at Bag Opener on Bag compactor while opener was not In operation.
Pump hanging at pipe machine roll-up/press section 5* from floor* 4' from press section, 5* from operator.
Pump setting on console 5* from floor, 15* from press section, 10' behind operator.
Pump hanging 4* from floor near control panel. Not crushing but dust collector dust running through cyclone.
* NOTE: ( - GREATER THAN - Sample was heavily loaded with particulate, fibers were obscured making fiber analysis difficult
** NOTE: (<) - LESS THAN - Fiber concentration on filter found to be le6s than the average fiber concentration of blank filters.
CTD019535
Industrial Hygiene Survey Ambler A/C Pipe Plant March 23 & 24, 1981
--
TABLE 111 Audiodosimetry Results
20.
No. POSITION 81 LOCATION
(DATE)
NAME/AREA
TIME
MIN.
Manufacturing Department
061 Mandrel
J. Mascola
Handler
(3/23/B1)
062
Tray Loader
J. Carey
(3/24/81)
063
Utility Truck
T. Rowan
Driver
(3/23/81)
Finishing Department
064 Line #3
A. DeClerico
Lathe
Operator
(3/23/81)
065 Line #3
F. Talese
Lathe Helper
(3/23/81)
066 Wet Sav
J. Reynolds
Operator
(3/24/81)
067 Wet Saw
L. DaMico
Helper
(3/23/81)
06B 069 07(J 071
Korit Drill Operator (3/24/81)
Lehman Lathe Operator (3/23/81)
Finishing Truck Driver (3/24/81)
Sweeper Operator (3/24/81)
A. Enchavarria B. Barnett S. Wright H. Dukes
Maintenance Department
072 Bo 12c r Operator (3/24/81)
L. Dukes
7:20a 3:51p
8:45a 4:00p 7:25a 3:57p
7:15a 4:05p
7:15a 4:03p
6:21a 3:28p
7:06a 3:57p
6:30a 4:00p
6:45a 4:15p
6:39a 4:05p
6:00a 4:09p
8:48a 4:12p
511 435 512
530 528 547 531 570 570 566 609
444
RESULTS
Eight Hour
Dosimeter
85 dBA
90 d&A
REMARKS
103Z 54Z 1171
Manufacturing 10" 3300 6 12" 2400 pipe
No mandrel change made
No mandrel change made
206Z 229Z 1711
63Z 102Z 113Z
62Z 42Z
Finishing 21" 4000-5000 pipe AND 21" 5000 1/2 MEO's.
Finishing 21" 4000-5000 pipe AND 21" 5000 1/2 MEO's. Cutting 18" 1/4 lengths. Employee wore E.A.R. Plugs
Cutting 18** 1/4 lengths. Employee wore ear muffs Making 8 x 4 wyes
21" 5000 sewer 1/4 lengths
On sweeper throughout day.
89Z
CTD019536
I
Industrial Hygiene Survey Ambler A/C Pipe Plant
Hay 5, 1981
No. POSITION LOCATION (DATE)
073 Press Operator (5/5/81)
074
075
076 Mandrel Handler (5/5/81)
077
078 Crusher Operator (5/5/81)
079
080
NAME/AREA C. Worthington
J. Mascola H. Dukes
2).
TABLE IV Personal Fiber Exposures
ANALYSIS FOR Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
TIME MIN RESULT f/cc
TWA FOR SAMPLE PERIOD
6:30a 8:54a
144
0.78
8:54a 1:01p
247
0.27
0.45
1:01p 59 0.39 2:00p
6:42a 9:05a
143
0.072
9:05s l:50p
285
0.038
0-o^
0<W
6:52a 8:59a
127
1.16
8:59a 12:02p
183
0.37
12:4 0p 4:00p
200
-
0.69 -
RD1ARKS
Manufacturing 12' 150 pipe 9 3/4 ton per hour. Felt hours-
Top: 44 Botton: 31 1/2
Manufacturing 12" 150 pipe 9 3/4 ton per hour. Felt hours-
Top: 44 Bottom: 31 1/2
Worked entire day at crusher.
Void Samplepump problems.
CTD019537
Industrial Hygiene Survey Ambler A/C Pipe Plant Hay 5, 1981
TABLE V Area/Envlronmental/Englneering Fiber Samples
No. POSITION LOCATION (DATE)
OBI Mixing Area (5/5/81)
NAME/AREA Area
082
083 Area near
Area
Tailing punpa
(5/5/81)
084
085
086 Area at Mandrel Return (5/5/81)
Area
087
088
089 Rollup (5/5/81)
090
Area
091
092
093 Console (5/5/81)
094
Area
095 096
ANALYSIS FOR Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
TIME MIN RESULT f/cc
TWA FOR SAMPLE PERIOD
5:14a 52 0.20 6:06a
6:06a 8:56a
170
0.11
7:03a 9:03a
120
0.056
9:03a 12:59p
236
0.041
1:05p 4:25p
200
0.037
5:12a 55 0.020 6:07p
6:07a 9:04a
177
0.028
9:04a 12:59p
235
0.033
6:46
--
--
-
REMARKS
Puxnp hanging on I bean 15' from mixing pot 6' from floor. Before start up.
Pump hanging 5' from floor 5' from pipe machine
Pump hanging 15* from Tailing pump 5' from Mandrel return. Before start up
VOID SAMPLE
6:47a 8:52a
125
1.32
8:52a 250 >0.57 1:02p
1:02p 203 >0.16 4:25p
5:10a 54 0.07 6:06a
6:06a 8:53a
167
0.22
8:53a 12:59p
246
0.10
12:59p 4:25p
206
0.17
Pump hanging at pipe machine roll* up/press section 5* from floor 4' from press section 5* from operator.
Before start up
Pump setting on console 5' from floor 15' from press section 10' behind operator.
CTD019538
Industrial Hygiene Survey Ambler A/C Pipe Plant Hay 5, 1981
TABLE V (cont.) Area/Environmental/Engineering Fiber Samples
No. POSITION LOCATION (DATE)
097 2nd Floor (5/5/81)
NAME/AREA Area
ANALYSIS FOR
Fibers (Asbestos)
TIME MIN RESULT f/cc
TWA FOR
SAMPLE PERIOD
9:08 229 0.22 12:57
--
REMARKS
Pump 5' from floor *1 mixor above screw conveyor
098 Mfg. Dept* Fire Hose (5/5/81)
099
Area
100 Aisle near Crusher (5/5/81)
101
Area
102
103 Crusher near Aisle (5/5/81)
104
Area
105
106 107
108 Crusher near wall (5/5/81)
Area
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
Fibers (Asbestos)
6:45a 8:57a
132
0.26
8:57a 3:18p
381
0.10
5:08a 68 0.015 6:16a
6:16a 8:57a
161
0.18
8:57a 3:18p
381
0.087
6:55a 8:5Ba
123
2.89
8:58a 11:41a
163
0.54
12:03p 30 0.65 12:33p
12:40p 98 0.65 2:18p
2:18p 4:00p
102
0.45
6:54a 8:59a
125
2.15
-- --
109 110 111 112
At crusher
113 Above Rotary
Engineering -
Valve Exhaust
at source
Bags
(5/5/81)
Fibers (Asbestos)
8:59a 12:03p
184
0.99
12:03p 30 1.07 12:33p
12:40p 96 1.56 2:18p
2:18p 82 0.098 4:00p
--
12:02p 12:33p
31 2.79
--
CTD019539
Pump hanging 4' from floor at fire hose bracket at door to locker room
Before start up
Pump setting 10f from corner of crusher area 30' from crusher
Pump hanging above motor 4' from floor near control panel 2 hoppers dumped
Shaking bags in dust collector
No hoppers dumped
Started cleanup 3:10
Pump hanging 5* from floor 3' from vail above goods on floor 2 hoppers dumped
Shaking bags in dust collector
No hoppers dumped
Started cleanup 3:10
Shaking dust collector bags Visable dust released at Bags.
TABLE VI Ambler A/C Pipe Plant Dec. 79/Jan 80 Survey Results Compared to March/May 81 Survey
24.
Department
Manufacturing Finishing Crusher
No. Samples 1/80 5/81
66 30
79 42
14 16
Mean (f/cc) 1/80 5/81
1.3 0.44
0.69 0.25
3.02 0.98
Plant
159 88* 1.17 0.45
Percent >2.0 f/cc 1/80 5/81
17 3
50
50 19
Percent >0.5 f/cc 1/80 5/81
76 17
47 2
93 63
Percent >0.1 f/cc 1/80 5/81
100 60
100 86
100 81
13 5 62 18 100 76
A total of 101 samples were taken during the March & May '81 survey. 5 were voided due to problems in the field, and 8 from the March survey were not included in this table because engineering work was completed and the samples were redone in May and found to have lower levels.
CTD019540
Us_ Jfc.i: Lj \-.v v.^ w i . jl! C F.K TAX IJ jED COi 1PORAT I ON
3A.i/57
JOB 1)ESCRI1-T10;;:^i7 .
_*?
C_JCU&L<-
CONDITIONS:
U, n <f-f000hloc>d>
; INSTRUMENT: B 6 E 22OS 1'SLM
1,<32UjRj-
-&J?
o
EXPOSURE: REE. A/R:
NOISE SURVEY SHEET
REF. 0.0002 HICROBAli EXHIBIT f SHEET OF
ENGIltfiER: ) ]
B & K 1613 OCTAVE FILTER
k
25.
UJCKOI'l'UNL: CALIBRATOR:
B6K ,,.
STA.
: no. TIME
/ / 31
EMPLOYEE
~ {ZtsoA-*--- /
I'KOXl'.CTOR:
!
CAEIBRAT10N DATE:
BEFORE AFTER
NETWORK
l'EAK
OCTAVE CENTER FREO. (Hz.)
a*A,A B*ct LIK. HOLD 31.5 63 125 250 500 IK 2K 4K 8K 16K
% % n H123 n \o n n S5 8b 72
2. -IrtSfUtXLer* '
3
% %fe hi 93 & ft 1o
% Si
w//Z- Si to
%>
vc. hF
Fz. 77 7<>
SKETCH - REMARKS
-
^fc ji^njdL
(L^aJL^ Kio vru-1_>/
Y
7"z
<D j
CTD019541
CTD019542
27.
APPENDIX I
Monitoring/Analytical Procedures
and
Current Standards
Asbestos
Personal samples, Area samples which reflect employee exposure levels, and Area/ Environmental/Engineering samples were obtained on Millipore 0.8 micrometer Mixed Cellulose Ester Filters (MCEF). DuPont P4000 air sampling pumps were calibrated before and after each sampling day to approximately 2 liters per minute (1pm). In most cases, a series of 3 or 4 different filter samples were obtained for the person or area to establish an eight hour time weighted average concentration (TWA).
The analysis was conducted according to the USPHS/NIOSH Membrane Filter Method for Evaluating Airborne Asbestos Fibers (P&CAM 239) by an experienced fiber counter who was trained by NIOSH. Fibers were counted on a Nikon Model 96982 phase contrast microscope at 400X magnification.
Che current OSHA standard is given in 29 CFR 1910.1001. It calls for an employee TWA airborne limit of two fibers, longer than 5 micrometers, per cubic centimeter of air (f/cc). Also, no employee shall be exposed at any time to airborne concentrations in excess of 10 f/cc.
Noise
A Bruel & Kjaer 2209 precision sound level meter with B&K 4133 1/2 inch microphone was utilized to obtain sound pressure level measurements. This instrument was calibrated before and after this survey. The reference for all sound pressure level measurements is 0.0002 microbar.
DuPont Model D-376 audiodosimeters were also utilized during this survey and were set at the 85 dB cutoff mode. The audiodosimeters were calibrated before and after each day of dosimetry sampling utilizing the DuPont Audiodosimeter Calibrator Model Cl 14 by the direct reading method. Before and after each survey week the audiodosimeters were calibrated by the timed calibration procedure utilizing the DuPont calibrator Cl14 and the Model R225 readout. This calibration was done for 5 minutes, 10 seconds at 114 dB to give an expected 30% +/- 4% result.
The Permissible noise exposure given in OSHA 29 CFR 1910.95, ranges between 90 decibels for 8-hours per day through 115 decibels for a maximum duration of 1/4 hour per day according to the table below. Also, exposure to impulsive or impact noise should not exceed the 140 decibel peak sound pressure level ceiling value. The maximum permissible
udiodosimeter dose is 100%.
CTD019543
28.
APPENDIX II
KEY ELEMENTS OF A RESPIRATOR PROGRAM
The Occupational Safety and Health Administration (OSHA) provides regulations for the use of respirators in OSHA standard, 29 CFR 1910.134. OSHA indicates that harmful levels of atmospheric contamination of dusts, fogs, fumes, mists, gases, smokes, sprays and vapors shall be prevented as far as feasible by accepted engineering controls. When effective engineering controls are not feasible or when they are being instituted, appropriate respirators are to be used. It is required that employers provide respirators which are applicable and suitable for the purpose intended. The employer is responsible for the establishment and maintenance of a respiratory protective program which includes the following eleven items.
1. Written Operating Procedures. The respirator procedures must be written and should address the selection and use of respirators. The location's procedures for items 2 through 11 should be discussed and explained in detail. Responsibilities for specific aspects of the program should also be specified in the location's written respirator program.
2. Proper Selection. The selection of the appropriate respirator is based on the physical state of the substance (gas, vapor, particulate, etc...) the warning properties of the chemical, the toxicity of the agent involved, the protection factor of the respiratory device, and the airborne level of the agent. Other factors to be considered include permissable exposure levels, oxygen dificiency, and approved equipment.
3. Training and Fitting for the Employees. It is required that employees are instructed and trained in the proper use, limitations, selection, and maintenance of respirators. Employees should be trained in the nature of the hazard. The employee must be trained to check the fit of the respirator each time it is used.
Fitting through the use of quantitative fit testing (isoamyl acetate or irritant smoke) is also required.
4. Exclusive Employee Use. Where practicable, the respirators should be assigned to individual workers for their exclusive use.
5. Cleaning and Disinfecting. Respirators are to be regularly cleaned and disinfected. This must be done throughly after each use for respirators used by more than one worker. For respirators assigned to one worker, respirators must be cleaned and disinfected daily when they are routinely used throughout the day.
6. Storage. Respirators shall be stored in a convenient, clean, and sanitary location. It is especially important that rubber parts are stored so that they do not lose their original shape. A misshapen mask is essentially broken and no longer holds its approval.
CTD019544
Industrial Hygiene Survey Appendix II Key Elements of a Respirator Program
7. Inspection and Maintenance. Respirators used routinely msut be inspected during cleaning. Worn or deteriorated parts must be replaced.
Respirators for emergency use such as self-contained devices shall be thoroughly inspected at least once a month and after each use.
8. Work AREA Surveillance. Appropriate surveillance of work area conditions and degree of employee exposure shall be maintained.
It is necessary to review the work area to identify contaminants and assess the degree of hazard on a regular basis.
9. Inspection and Evaluation of the Program. Regular inspections are required to insure that respirators are properly selected, used, cleaned, and maintained.
10. Medical Examination. OSHA indicates that an employee should not be required to use a respirator unless a physician has determined that the employee is physically able to perform the work and use the equipment. The respirator user's medical status should be reviewed periodically.
11. Approved Respirators. Approved (NIOSH/MSHA) respirators are to be used when they are available. The approvals on respirators apply to the respirators as whole units. The approval is valid for the whole unit in good condition. It is nullified by the mixing of components and by use of non-approved components.
This is a condensed summary of the OSHA regulations on the use of respirators. Background information on respirators is given in' the following sources:
A Guide to Industrial Respiratory Protection, John A. Pritchard, Los Alamos Scientific Laboratory, HEW Publication No. (NIOSH) 76-189, 1976.
Practices for Respiratory Protection, ANSI Z88.2, 1980, American Standards Institute, Inc., 1430 Broadway, NY, NY, 10018.
OSHA Standard Method for Determination of Respiratory Protection Program Acceptability, Industrial Hygiene Field Operations Manual, OSHA Instruction CPL 2-2.20, April 2, 1979, Office of Field Coordination.
/tmf
CTD019545