Ed Vole's Plant Inspection February 4, I960_______
:
Inspection. Rus Sprague, Jim Larkin and Elmer Schramm accompanied him during the Inspection.
A general discussion of electrical grounds for equipment was held and the
F.I.A. standard of five ohms. It is believed better if it were changed to one ohm, since one ohm resistance is easy to obtain. General railroad track static grounds will be Included. BUILDING 26 1. Several cylinders in the storage cage were not chained.
2. A broken ladder, which was tagged, was laying on the ground ready to be destroyed and had lost its condemned tag because rain had made the cardboard tag come loose from the string.
3. An open can of kerosene was sitting on the edge of a table next to a large lathe.
4. Broom and shovel should be put on a rack in the shop. Tool racks would help the appearance of this area greatly.
5. It was recommended that some precaution be taken to prevent the possibility of burns from the open gaS'Space heaters. Many people in this country catch themselves on fire each year by backing up to an open heater to warm themselves.
' 6.
The use of two-prohged electrical outlets should be eliminated
.. . . ''and replaced with three prongs. The program to do this should
be accelerated in order to completely eliminate adaptors.
T. Recommend a yellow circle be painted under all safety showers that do not presently have one.
Recommend a safety self-closing type valve (5-gallon) for solvent storage in the laboratory.
9. Lockers in the electrical departments need a general policing . action for better organisation and straightening.
HONS 037464
'
-2-
.10 Replace safety glaee in front of hood in the laboratory.
A JMI. AA ggrroouunndd ccoonnnneeccttiioonn aahhoouulldd bbee ppuutt oonn tthhee dduuaall aaeeaall vvaaccuuuumm ppuummpp fdW HlA ^ftflonuthe eaat wall bench In the laboratory. A guard ahould also be
*0 for the belt drive.
Qfl* )2. |/AtL*ower the eye bath In the laboratory.
/
f
JJ^Metal covered waate basket, are a must for the laboratory
^*
Laboratory housekeeping leyel would be rated as definitely "pig."
r *-fl(hi*.
The "hot plate"area should be given a complete clean-down.
>
yy*
Soap dishes should be provided around the sinks.
MSA industrial gas mask in small lab has been used and should
be replaced--seal has been removed.
..
up
/Zacs tXm**-
Shelves in the lab icebox are down again. Make necessary
. . /5 /
repairs to prevent this from happening.
4AM**'** tw*e->c
19.
/i' 20. i
21.
Recommend we discontinue the stocking of the cloth masks as they afford no protection. Industrial respirators should be substituted. '
Elmer Schramm is to talk to the MSA representative on his next trip about the dust protection afforded by the Mine Safety respirator.
Investigation should be made of the free-swinging hoist in the store room and consider putting safety chains to block area below when lowering or raising the material.
22, ,, The fire hose in this outside storeroom 11 not standard and should be " ' ` changed. At present It will work, but it should be standardised.
2). All fire hydrant caps should be checked for. hand looseness. '
24. The three-prong adaptors on the floor polishers in the storeroom have been removed.
25. Mr. Sprague told Mr. Vols that conversion throughout the plant to a three-prong system should be completed by May 1950.
25. Broken window in the storeroom door should be replaced.
>^7\tm<L O'
HONS 031'*65
J*
ZT. Consider replacement of th "guillotine" paper cutter In the Multlllth Room with a "elide type" cutter to correct a safety hasard.
Zl. Electrical connection on the east wall stall at start-stop switch Is loose and should be fixed.
Zf. Safety shower circle In carpenter shop with no shower over It.
50. Second floor storeroom should have Items picked off the floor and put on shelves.
51. Change the method of storing fluorescent bulbs so that It does not conflict with the sprinkler head.
SZ. Thermocouple wires are stored with a bad overhang. An eye could be put out with this manner of storage.
SS. Other sprinklers have Interference in this area and this should be changed.
54. There are some open conduit above the storeroom, second floor.
55. Wastepaper on the floor should be removed.
Si. The new free-swinging hoist on the second floor should hkve ths electrical connection to the motor hung by a spring,
57. A sign on the second floor elevator is loose.
58. 'bhristmas tree"wlrlng in the laboratory storage room should not be allowed. A hot plate and electric heaters all attached to one unit.
-14* ' The stationery supply room needs complete thorough clean-up, expecially straightening of the shelves on the bottoms '
40. PA system for conference room located on second floor is in poor shape and should bs repaired.
41. Floor loading should be checked in the motor storage room, Niran samples stored on floor has been questioned.
42. Electrical junk room on the third floor needs a thorough clsan-up.
037*66 HONS
4). \ Laboratory storage of solvents in old oil room should have C clamp ] replaced with.pierce point type clamp.
44.J /
/ y
Pressure vacuum type fitting should be installed on the drums along with self-closing type valves. The C clamp installation and entire grounding situation is entirely unsatisfactory x>n all drums stored in the solvent storage room,
45. Foamite cans stored in the Fire House on the floor should be stored on the wooden platform.
46. Solvent storage in the paint storage room--drum should be provided with safety vent and self-closing valves. Protecto seals "collection can" with protecto screen should be Installed under the mineral spirit drum.
47. Broken window pane in the paint shop should be replaced.
4B. The contractors' material stored in the paint shop is in bad shape and, if it is stored here, should be put up to Monsanto standard.
49. Evaluate the possibility of completely fencing in, with locked gates, the north side of the paint shop. This transformer station should be considered for this complete protection.
50. The recirculating water pump at the pond is leaking badly and pack ing glands should be repaired.
SERVICE BUILDING 51. A new waste can is needed for the white locker-wash room. This should have a cover. Makeshift system on drinking fountains should be corrected in both white and colored locker room. All trash cans should be replaced as they are rusting out.
52. Pop valves on the hot water tank are disconnected and should be connected back into the sewer.
55, A leaking radiator valve in the same room should be changed or repaired. Maintenance Department should send a man to check the lower valve station.
54. Seal on fire extinguisher in the clothing room is not adequately installed. The seal can be pulled without breaking seal. (Reminder to Elmer Schramm---replace seals on fire truck fire extinguishers pulled during the inspection.)
Rons 037*67
-5-
VOg-Materlal Handling Area
55, .
Storage of oil and other itema in one storeroom la completely out of hand and ahould have immediate attention for aafe atorage as well at housekeeping, neatness, and appearance.
56. Tools are.etored properly on the wall and la a big help to the area.
57; The 5-gallon can of gasoline stored in the sealed room Is a potential safety haaard. This can Is being moved to the outside of the building. Gasoline should be stored In a safety can rather than the painted galvanised can it la presently stored in.
58. Eight-pound sledge with small handle Is taped. This tape should be removed to indicate a split handle and the handle replaced.
59. Road just Inside gate between Nlran waste ponds and Service Build ing needs repairing.
60.
NIRAN 61.
Lubricating dempster dumpster truck can be improved by pulling truck fully on rack before chocking, consequently decreasing the likllhood of unit rolling off.
Niran drumming station pulls on the palletiser and needs to be renewed.
. 62, Light bulb fixture near'filter it bent and should be repaired.
63. Circle ahould be painted on or built into floor under safety showers.
64. .
,
Nipple protruding in area under showers, Niran drumming station,
could puncture man's head or face as he jumps under emergency
shower.
...............................
'
65. Top off the soda ash conveyor blocks fire blanket and fire extinguisher.
66. Renew fire blanket box in 400 Area.
67j, Replace window pane in deluge system door.
68. Loose hanger on fume duct system in center of 400 Area. Consider ation should be given to storage of all extraneous matter out of the deluge control room.
HONS 037468
6'
69. Non-standard aluminum ladder la in an aroalve condition and should be destroyed immediately.
78. Three wire a sticking out of a conduit Just outaide aecond floor, 400 ' Area platform, ahould be tied in or removed.
71. Electrical appllancee in the eating area of Niran Contol Room Office ia two-pronged system and ahould be converted Immediately to threeprong.
72. Have atatlc ground lnetalled on air mover.
73. No Indicating thermometer on reaidue hold tank.
74. Inatallatlon of new etaira to replace ladders in cubicle areaa ahould be expedited.
75. Inetall couplinge on all hoae and uae plant atandard hoae.
76. Electric heater on emergency ahower immediately outaide and aouth of control room ahould be removed.
77. Handle on valvee ahould ba properly aet.
78. Chack poaelblllty of lnatalllng automatic ahut-off motor, in caaa of extreme out of balance condition, on the grind motor on the cooling tower.
79. Valve at platform to Niran tank ahould be repacked Niran leaking.
80. Locker a in maintenance ahop-Nlran need a complete cleaning up and better organisation. Men'a lockera ahould be repainted and namea of tha men put on with a profeoelonal touch.
81. * * Bracket for chain to chain cylindera to the new hellwelder ayatem la designed for the ahort-fat type cylinder. Suggest bracket be changed to accommodate all types f cylinders.
82. There are many tools with broken, taped .wooden handles *. these ahould be replaced.
83. Need some spare cylinder racks, compressed gas cylinder racks, for tha Niran shop area.
MQN5 037469
-7
2 PROCESS k BOILER ROOMS
64. An opening In the eteire In the loading dock, at the point of lost time accident, atlll ha* not been filled in.
85. Limit witches on elevator, #2 Procea* Building, ehould be Inspected and eet to operate.*o that the cable will not unwind.
86. Storage cabinet* in #2 Proce** Building, that the warehouse depart* ment uses, need complete clean-up.
87. Electric wire is strung through a ladder in the Boiler Plant and the temporary Installation for the boiler feed make-up is completely unsatisfactory. It should be made into a permanent installation.
.88 Metal floor panel to the south of the boiler feed pump is completely
unsafe. Anyone stepping on it will go down into the trash. It should be replaced Immediately.
89. Installation of gas heater in the boiler room is not satisfactory. A man can be burned very easily.
90. There is a cold packing on the steam tie line immediately east of the boiler room that needs to be brought down.
91. Ladder on the north side of the #2 Process Building and Boiler Room should either have a cage around it or be removed.
92. Iron wire on north end of the building is loose.
93. The gas heater in #5 Boiler Room is turned up much too high, flames
are leaping out, this can damage #5 Boiler Room; should be cinched
out.
,
.94 Use of the top sections of ladders should be discontinued.
95. Cracks in #5 boiler show that there has .been considerable movement in the unit during the past few weeks.
94. Loose wires on the f5 boiler stack are close to 440 volt line on the west side of the building.
97. East side of #2 Process Building track is Sprung*-should be repaired.
98. Pump coupling unguarded on Eco pump at the incinerator. (Nlran)
,1
*0'
-B-
99. Install a cold plate on the platform at that point. (Niran)
100. The alcohol tank dike area should be drained immediately. (Niran)
101. Water in the lump at the southwest corner of the tank farm. (Niran)
102. - Ineulation ii coming down in the Niran fire pump booster house.
103. Valve is leaking on the fire system.
104.
There is no cage on the ladder to the top of the water tank at the fire pump.
105. SfcR rules that the fire booster pump station ehould have caps on them for protection of offense.
CHLORINE 106. Install a hose rack immediately south of Chlorine office.
107.
Grating around^water collecting ditch which is on the south side of
the Chlorine plant, should be tied down. Presently it is a tripping
haaard.
'
108.
Ladders on ground at COg tank. At this location a ladder rack is being used for storage of pipe, measuring sticks, etc.
109.
Consideration should be given the use of Corby connections In all areas where hose are used.
110. Grating covers on salt sump are a tripping haaard.
1 11- Excessive corrosion atatart and stop buttons for KC1 elevator.
T12,
Install a new wheel on grinder in welding shop.
113. 440 fly cable on ground in the welding shop. Should be put overhead.
114.
Steeple should be checked to determine whether or not temporary
repair is adequate.
.
115.
There are three electric fans in the welding shop that should be destroyed.
MQNS 037971
9
BJPHENYL lit. There are tools lying In the mud out at the benzol loading docks.
117. Jack-leg device on weft benzol tank to remove fence post is completely unsatisfactory and unsafe.
118. Cage glass on west HC1 tank is broken and glass is falling down Into tube,
119. Stairs in HC1 area should be posted as unsafe on the second level as well as on the ground level.
120. Cage board located in the corner of the Biphenyl meter room should be placed in a rack.
121. The installation of the blower in the Biphenyl meter room should be expedited.
122. Deadman switch on link belt car spotter is not standard.
123.
Pull cable on the light standard at the aroclor loading dock should be
replaced.
'
124. There is a frayed ground cable tied to a conduit at the benzol unload ing pump.
125. Insulation requires repair at this pump.
126. Ground cable on 6-inch Joint on benzol unloading line is broken.
127.
Benzene protecto seal tank car dome cover is not complete. A new one should be purchased immediately.
- 128. Present grounding clamps are not satisfactory, as much as the points .. - *' do not penetrate the paint.
129, Miscellaneous pipe fittings on third level in Biphenyl should be removed.
ISO. Hoist over number four unit does not have safety hooks,
131. No. 13 Biphenyl unit heat exchanger is leaking water.
132. The practice of using.10 and 12 gauge sheet as a flying flange should be discontinued.
MONS 037472
10
133. Motor guard missing on chlorinator pump southwest chlorinator area.
134. Chlorinator pumpa should have a machanical seal,
1}S.
Relocate nitrogen blowout cylinder on chlorine ferric line to new location to enable the cylinder to be securely chained.
136. Wall on second floor, Aroclor, without safety latch-rack. It is needed to store shovels, scrapers, brooms, etc.
1ST. Measuring stick storage for second floor needed.
138. COj cylinders, second floor, just outside aroclor control room wired instead of chained.
139.
Aroclor, second floor, dumb waiter cage opens when elevator is on first level--should be corrected.
140. Sampling cup on wire not standard for sampling of material.
14 1. Hanger needed to secure light fixture over the #2 aroclor filtrate tanksecond floor-now held by wire and "skewed" out of position.
WONS 037**73