section 202.103 Monitoring' and Testing
The Agency n/ require tint -equipment testing and monitoring, as authorized e.lse>dere in this Chapter, accompany the construction or operation of emission sources under a. permit containing an rACS* ,
Section 202.304 ' Compliance Oates
a) No owner or operator subject'to a permit
.utilizing an ACS Is relieved of the responsibility for achieving and maintaining . reduction of'emissions as expeditiously as-- practicable, but-not Tater than the compliance date required under "other applicable regulations.
b) Notwithstanding subsection (a), an owner or operator may demonstrate compliance with 3$
111. Ada. Code 2IS pursuant to an Agency approved alternative compliance plan contained-in a permit utilizing an ACS tdilch is applied for prior to Oecember 11. ig82. ... . The Agency shall approve such an alternative
compliance plan If, and only if." the applicant demonstrates that:
1) The alternative compliance plan extends the.compliance date for each emission
source subject to the ACS-no longer than , necessary to enable that emission source to utilize the ACS. but in no case later than. December 31. 1987:
2) The emission source-belongs-to a category .pf emission sources having a compliance date of December IT.' 1982 or later under
**?
IS
1.11.
A*.
Code
215;
*
3) The use of an-ACS will result in either greater or faster overall emission reductions than would otherwise be
achieved; and
. :4) Such extension is consistent with the . requirements of1the Clean Air Act.
Section 202.10$ Public Participation
The initial issuance of a permit containing an ACS shall be subject to applicable Agency public participation procedures (3.S 111. Adm. Code 1661 prior to Issuance. At a minima, the Agency shall provide an opportunity for public comnent.
. Section 202.306 Standards for Issuance
The-.Agency shall issue a permit containing an ACS if. and only if. the permit applicant demonstrates that:
a) The ACS provides, in the aggregate with respect to each regulated pollutant, equivalent or less total emissions than would otherwise be required.
b) The Impact of the ACS is environmentally equivalent to that >hich would otherwise be
achieved and maintained under existing requirements..
c) The methods Tor assuring, compliance with the . conditions and requirements of the permit
under the ACS are equivalent to those that are associated with otherwise applicable requirements.
d) The. ACS compiles with any applicable requirements contained In IS 111. Ado. Code 203. 230 or 231.
ej USEPA has not disapproved the proposed ACS or aqr compTtanre schedule It may contain due to the existence of a federal enforcement action pending against a participant iii the ACS.
TKThe'ACS-does-oot-peRwU.an -increase-in -- emissions of" any pollutant which IS listed or regulated pursuant to-Sectton 112 of the Clean Air Act (42 U.S.C.74l2ctseq.).
(Source: Amended at 7 111. Reg. 8091. effective June 27. 1983)
Section 202.307 . Notification to USEPA '
Upon Issuance or an ACS permit, the Agency shall not.tfy USEPA of emission limitations, alternative compflance-plawv' and anyother permit"conditions applicable to emission sources under an ACS.
.(Source:,. Amended at 7 111. Reg. 8091. effective dune 27. 1981|
SU8PAXT o: PERMIT DURATION. REVISION
. AND .RENEWAL
Section 202.401 - Duration .
a) A.permit containing an ACS shall be Issued for no longer than five years, or for such shurtei period or thc-Agcucymajr specify un necessary for periodic review of the ACS or to ;accompl1sh the purposes of the Act or of
. ..this Chapter.. .However.. an ACS permit may.jot be issued for. a period of time-whlch is
. greater than, the useful-life of an emission ..source which contributes an emission . reduction to the ACS. The burden of proving the useful life of the" emission source is on the applicant: .....................
b) Upon the initial, issuance or renewal of an ACS permit, the.Agency shall consider all factors which li reasonably construes as bearing upon the useful life of an emission "source which contributes an emlfstdn reduction to the Aics. Where a shutdown ortnlwr'source'cufftrtburfs' in-eailsfteir reduction to an-ACS. the Agency'shall specify the useful life of the shutdown emission source In.a permit condition, factors which the Agency considers shall include, as a minimum: