Document EqKdVNwVRwQVBgE6bXx05DBrn

CHLOR - ALKALI 2 1994 REACTIVE CHEMICALS REVIEW CELL AREA DO A 046059 CONFIDENTIAL CELL AREA CHEMICAL REACTIONS TOTAL CEL1a 2 NaCl + 2 H2O +Current ------------------ > MAIN REACTIONS IN ANODE; 2 NaCl ------------------ > 2 Cl- ------------------ > MAIN REACTIONS IN CATHODE; 2 H2O + 2 e- ------------------ > 2 Na+ + 2 OH- ------------------ > CI2 + H2 + 2 NaOH 2 Cl" + 2 Na+ CI2 + 2e' H2 + 2 OH" 2 NaOH Dow Confidential DO A 046060 OONFTOFNTIAI 09/28/94 CELL AREA CHEMICAL REACTIONS SIDE REACTIONS IN ANODE; HCI + OHCl2 + OH' 2 HOC1 + OC13 Cl2 + 6 NaOH 2 ohCI2 + H2O HOC1 HOCI + OH- > h2 + Cl- > C1' + HOC1 > CI3" + C12 + h2 ---------------- > NaC103 + 5 NaCl + 3 H2O ---------------- > ------------------ > <---------------- 1/2 + H2O + 2 e" HOC1 + H+ + C1" > <------------------ H+ + OC1OC1' + H2 SIDE REACTIONS IN CATHODE; NaOCl > 2 oci- ------------------ > OC1' + H2O + 2 e- > Dow Confidential 1/2 2 + NaC1 O2 + CI2 + 2 e- C1" + 20H_ DO A 046061 OONFTDFNTTAl 09/28/94 CELL AREA CHEMICAL REACTIONS SODIUM BISULFITE ADDITION! NaHS03 + NaOCl + NaOH ------------------ > Na2S04 + NaCl + H20 SODIUM THIOSULFATE ADDITION: Na2S203 + 4 NaOCl + 2 NaOH -------------------> CELL WASH REACTIONS; C02 + H20 > <-------------------- h2co3 > <-------------------- 2 Na2S04 + 4NaCI + H20 H2CO3 pH -6.0 H+ + HCO3 pH -9.0 HC03- > <---------------- H+ + C03= pH -11.5 Dow Confidential DO A 04606? GONFIDFNT IA1 09/28/94 To E-201 CELL AREA Steam from CELL AREA RAW MATERIALS RAW MATERIALS; Brine (Saturated) Electric Current 68,000 AMPS/Circuit Maximum HC1 16 % Salt Slurry PRODUCTS: Chlorine Gas Hydrogen Gas Cell Effluent 95 % 99% 10 % Dow Confidential DO A 046064 CONFTDFNTI Al 07/17/92 CELL AREA Chlorine Cells Potential Problem: Loss of Anolyte Level Result: Hydrogen in Chlorine Explosion; Arcing within cell Preventative Measures: - 2 level transmitters and 1 low level carbon probe - 4" rectifier shutdown (2/3,2/2,171) - backup side feed level controller - low level alarms low low-low 5.5" 5.0" - 6" minimum operating head - VRD conforming to CATC guidelines - Level selection - high reading at >16" low reading at < 16" - visual rounds Potential Problem: High Series Hydrogen Pressure Result: Hydrogen in Chlorine Explosion Preventative Measures: - 2 series relief on hydrogen stack at 4.5 - 6.0" - high H2 pressure alarm at 4" - foam drains October 6,1994 Dow Confidential Information efp DO A 04A065 CONFIDENTIAL Potential Problem: High Hydrogen During Operation Result: Hydrogen in Chlorine Explosion Preventative Measures: - 2" air dilution valves - open air dilution valves between 0.5 and 1.0% - "quickie H2" and "total gas H2" analyzers - Troubleshooting plugged radial feeders take salt off (300 gpl max salt) look for restricted H2 outlets bad cells - Follow CATC guideline concerning air dilution and shutdown - series voltage alarm to detect possible clip drop voltage prob. - clip drop profiles quarterly by cell crew - anolyte and catholyte temperature alarms > 80 C October 6,1994 Dow Confidential Information efp DO A 0460A6 CONFIDENTIAL Potential Problems Oxygen in hydrogen Result: Explosion in hydrogen header ("pop" if minor in nature) Incidents: - 1993 Mod5 code problem resulted in no N2 purge on shutdown which lead to an explosion S-5/S-8 @ CA-2 - 1993 CA-2 Hydrogen log fire due to arcing at boot connection on S-8 hydrogen log caused by ground on series - 1994 S-4 at Cl-1 plant; failure to bottle series before lowering head to stop under-cell leak. - 1994 S-5 at Cl-1 between cell leak caused loss of catholyte level; H2 ignited above caustic trap. Preventative Meaures: - Nitrogen purge activated in startup/shutdown steps for the hydrogen stacks - Low nitrogen flow alarm at 200 lb/hr; normal rate 500 lb/hr - Nitrogen valve position alarms - hydrogen compressor shutdown -1.5 INWA instantaneous or 1 /8 INWA for 2 seconds - standard operating procedure to "bottle" series on all shutdowns (purges the cell with brine) - off-line procedures for cell maintenance - cell sprayers and housekeeping October 6,1994 Dow Confidential Information efp DO A 046067 CONFTDFNTTAl LIST OF CRITICAL INSTRUMENTS IN THE CELL AREA pFJCRIPTION 16 pH probes (2 on each series, one on east end and one on west end) 8 LSH carbon probes (1 on each series) 8 LSL carbon probes (1 on each series) 16 level transmitters (2 on each series, one on east end and one on west end) Quickie hydrogen analyzer (Takes one stream off each series) 2 Sump l level transmitters (1 transmitter for CKT 1 side and 1 for CKT 2 side) 2 Sump 1 LSH level switches (1 switch for CKT 1 side and 1 for CKT 2 side) 2 Sump 1 LSL level switches (1 switch for CKT 1 side and 1 for CKT 2 side) ALARM SETPOINT High - 4.3 pH Low - 1.5 pH FREOUENCY CHECKED Weekly High - 18 inches Low - 4<Q inches High - 19 inches Low Inches Low Low finches Low Shutdown -finches High - 0.5 % High High - 1 % Monthly Monthly Monthly Monthly High - 87 % Low - 10 % Semi-Annually High - 90 % Semi-Annually Low - 15 % Semi-Annually DOW CONFIDENTIAL INFORMATION Do A 046068 oonfidenttai 7/15/92