Document EqJxxMkb7J0MQ4y4gN6D7wE34
ruMiu i irr o
' .EXHIBlT;nll
KH-340
June 15th, 1970.
Mr. Lee 0. Jenne Keene Corporation
U. 3.Sound Control Division #1
Princeton, N. J. 08540. Lear LeeI am forwarding invoice oovering cost of repairing a KDB job done on a metal building for the Kosher Steel Company, in Dallas. First report of fallout was on Maroh 4th and material was off in five different locations. Repairs were made on Maroh 9th. On Maroh 11th another cal waa received from the customer to the effect that fallout had oocurred in two more spots. At this point I suggested that we be in no hurry to make these repairs but wait to see how muoh mose would oome off. When repairs were made on June 10th & 11th material was off in nine spots but no fallout had oocurred for several weeks.
This building is a Texas size toilet (15 Holer) and change house for plant workers. The results obtained here were so outstanding that the company has included the Powerhouse and a large warehouse in their 1970 budget. Ho KDB, however.
I still have not repaired the ceiling of the Automatlo Products Company, in Garland, another KDB failure. On the last inspection material was off in fifteen different spots, none larger than a small desk. This shop contains 15 Auto matlo screw maohines and on the last inspection no material waa off over these maohines. I plain to make repairs to this job this month.
tours very truly,
T, 8. Chenoweth
j