Document Eq3ROaqoqRbnGB6qbn1wkywOV

' Monsanto trom inXme> lootioni g^ Buckley - W. G. Krummrlch Plant ftEFERSNCC I TO July 9, 1974 Status - PCB Environmental Control Program J. R. Savage - B2SL G. L. Bratsch M i Or- Engman M. R. Foresman P. E. Heisler G. A. Hippe P. B. Hodges - E1SP A. E. Leisy/G. Johnson A. Gallion W. B. Papageorge - B2SL W. R. Richard - T3A J. A. Munoz I. PCB Losses in Sewers June losses at .9 lb/day from operating departments and the incinerator compared to 4.5 lb/day of last month. A. Aroclor Department. PCB losses at .8 lbs/day compared to 4.4 lbs/day of last month. . B. Incinerator losses remained low at .10 lbs/day. C.' Waste Treatment Influent. Losses averaged 2.5 lbs/day compared to 4 lbs/day of last month. D. Waste Treatment Effluent. Losses averaged 2 lbs/day compared to 3 lbs/day of last month. II. Program Status The HC1 pressure control valve opened 9 times for very short periods during the month indicating that a good balance between HC1 production and consumption has been maintained. The duct leading from the demister has been kept clear and the benefit has been reflected in the results. There have been no measur able losses from the HC1 using areas and the amount reaching the treatment plant is much closer to that measured at the department. The estimate for Project 8440 to provide flow measure ment and proportional sampling at the incinerator has been submitted for approval. J?Jf. ILtMhp.. /ghw C. P. Buckley DSW 353136 STLCOPCB4085327 STLCOPCB4085328