Document Emy5V6YwDkmKr043m1X6Z3xR4
ABD00311805
SAFETY - C. M. Markerson/J. V. Uptain
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
Injuries bv Department
Jan.
1 2 3
2 0
Fiscal Y.T.D. 1995
8 3 11
2 0
Y.T.D. 1994
7 _2
9
1 1
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
12 03 25 00 00 <2. 3 11
0
5
3
1 2
_a
11
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
05 00 02
11 22 01 0. _0
3 11
6 0 1 2 1 0
11
Non-Occupational Injuries
Lost Workday Cases Days Lost
Contractor Injuries
First Aid Cases Medical Treatment Cases Lost Workday Cases
00 00
00 00 00
5 124
0 0 0
Safety Record
Last lost time injury Days since Employee hours since -
01/22/94 374
460,830
On January 31, 1995, the employees of the Aberdeen Plant completed 374 days with no lost time injury.
The main topic for the plant safety meetings during the month was "Medical and Exposure Records Access".
ABD00311806
SAFETY - Continued
Routine dosimetry results for the month were:
Chemical
< PEL Number Percent
VCM Lead Total Particulates
55 94.8 6 100.0 2 100.0
> PEL
Number
Percent
3 5.2 00 00
One of the three VCM overexposures was without benefit of respiratory protection. Monthly Injury Summary
Iniurv Class FA RWC RWC
Department I&E Yard Maintenance
Description Back strain. Muscle strain, left side. Contusion, middle right back
ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals)
TOTAL INJURIES
OSHA RECORDABLE
ABD00311807
COST VARIANCES - J. B. Autrey
Variable Costs
Product
Jan.. 95 Variance. $M
Efficiency
Price
Total
PVC Flexible Compound Plasticizer
Total
< 184.5> 31.9 81.6
< 71.0>
<3060.9> < 418.3> < 197.5> <3676.7>
<3245.4> < 386.4>
< 115.9> <3747.7>
PVC Resin
The unfavorable efficiency variance for PVC was due to an un favorable VCM efficiency on a total production basis. Higher than budgeted VCM prices continue to be the cause of the majority of the negative variable cost variance.
Flexible Compound and Plasticizer
The major contributors to the negative Compound price variance continue to be higher than budgeted resin transfer prices and antimony oxide prices, and is offset by favorable aluminum tri hydrate prices. The negative Plasticizer price variance is due to phthalic anhydride and alcohol pricing.
Manor Price Variances
Variance - $M
VCM m Resin to Compound m Antimony Oxide m Aluminum Trihydrate Filler m Phthalic Anhydride Alcohol
<3185.3> < 272.7> < 103.9>
61.7 < 89.7> < 108.5>
VINYL - J. D. Olson
Safety
The Vinyl Department had no injuries in January.
The monthly safety meetings were held on shift.
General
January's production of 51.9MM is a new monthly production record surpassing the previous mark of 49.8MM set in December, 1994.
r
ABD00311808
VINYL - Continued
General - continued
Jan.
- Production, MM Lbs. - Reactor Stream Factor, % - Resin Quality, % Prime - VCM Efficiency, Lbs./Lb. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, %
%
51.9 97.1 97.9 1.0447 1674 100.0 1148.0 37.0 92.7 96.3
Reactor Downtime
m Operational downtime (recovery scheduling conflicts).
mm Mechanical (Mechanical replacement, recovery system repairs)
Drver Downtime
m Operational downtime (cleaning, product changes, and centrifuge plugs).
mm Mechanical downtime
mm Reactor limited production
YTD
341.4 95.6 97.1
1.0381 1588 94.0
7663.0 35.6 95.4 97.2
Hours
128
85
Hours
51
70
151
COMPOUND- S. C.Hillman
Safety
The Compound Department had no OSHA recordable injury during the month.
General
Compound prime production in January totaled 7.4MM pounds.
Plasticizer production totaled 1.8MM pounds in January. was completed on the first DCS training.
Testing
ABD00311809
COMPOUND - Continued
Comoound Production
Operating Davs
Production M (Lbs). Month Ayq,/Day Fiscal Y.T.D.
Line I
31
Line III
31
Line V
31
Total
% Prime
Capacity Utilization Factor
1880 4215 1265 7360 97.5 70.3
61 136
41 237
13592 28483
8398 50173
97.1 68.6
The utilization factor basis was changed for January.
Downtime
Hours
L_ine__I_
- Product Changes - Miscellaneous Maintenance - Quality - Miscellaneous
112 32 5
21
Line__IIX
- Product Changes - Miscellaneous Maintenance - Miscellaneous
57 32
5
Line V
- Product Changes - Miscellaneous Maintenance - Quality - Miscellaneous
53 22 16
9
Operating Davs
Production (M Lbs.) Month Avg,/Day Fiscal Y.T.D
Plasticizer
31
% Prime
Capacity Utilization Factor
1787 79.2 69.4
58
12711 84.6 91.1
ABD00311810
ENGINEERING - J. E. Nickerson
OSHA Process Safety
HAZQ.ES
The New Module HAZOP was completed. Work began on the SA Module HAZOP. Completion is scheduled for March, 1995.
New Module Charge Water System Upgrade
This project will install a new hot water charge pump and associated piping in the New Module. This will provide faster charges and allow simulanteous charge and rinse. Construction is mostly complete. Final tie-ins and programming were completed for startup during the DCS shutdown in late January. We will optimize rates and complete any required troubleshooting in February.
Economy Surplus_Eower Conversion
A plant electrical curtailment plan is being drafted for potential temporary reductions in power under the new contract. Design work is complete for a power monitoring system which is required with ESP. Contract negotiations with the Aberdeen Water and Light and TVA are in progress. Conversion to the new rate structure should be complete by March 20, with a chance for conversion in February.
Recovery Compressor Addition for OldJModule
The AFE has been approved and drafting for the mechanical design is underway.
Activator Replacement_and.Resin Transfer Improvements
The feeder is on order. Mechanical design work is in progress.
Reactor 741 Larger Batch Trial
The AFE has been approved. Mechanical design work for installation on reactor 741 has commenced. A radioactive materials license is pending.
V-10 Coalescing Filter
A coalescing filter to reduce moisture in the resin dryer transfer air will be installed. Air moisture problems have increased since the rental compressor was brought in.
ABD00311811
ENGINEERING - Continued
Plant Air Upgrade
The silo aeration and blend tank mechanical design is nearly complete. Some piping has been installed. Compressor bid speci fications are in progress.
ENVIRONMENTAL - K. G. Akins
Water
All wastewater discharge limitations were within permitted limits for the month of January.
Air
Mississippi's Title V air operating permit regulations became effective 1/28/95. The plant will have until 1/28/96 to sub mit a Title V air permit application. The emission inventory was essentially completed in January and work will now focus on regulatory analysis and operating flexibility.
The NESHAPS Subpart V VCM valve survey was completed in late December and included a survey of all valves in VCM service. No leakers were found.
Wastes
There were no waste shipments in January.
KEY ENVIRONMENTAL COMPLIANCE DATA
MONTH
FYTD
Stormwater Outfall Excursions Wastewater Outfall Excursions Reportable NESHAP Excursions Reportable non-NESHAP Air Excursions CERCLA/SARA Reportable Incidents Other Reportable Incidents Citations and NOV's Received
0 1 1 0 0 0 0
0 2 1 0 0 0 0
ABD00311812
ENERGY CONSERVATION - J. A. Bodron
A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU
January. 1995
6.5% 6.9% 2491.0 156.2
Fiscal Y.T.D.
8.0% 7.9% 2441.8 1002.5
ABERDEEN ENERGY EFFICIENCY
BTU/LB TOTAL PRODUCTION