Document EgyNzk24XzK8E1eEwjBz95QV
U.S. Environmental Protection Agency Region 4 61 Forsyth Street Atlanta, GA 30303
Emergency Planning and Community Right-to-Know Act (EPCRA) Inspection Report
Company Name Arclin USA, LLC
Lead Inspector Name
Amy Federoff
Inspection Team Members_ Mark Briggs
SIC/NAICS 35199, 325211
Inspection Date
04/18-20/23
_
1. Record names and titles of the facility representatives participating in the inspection.
Name/Title Andy Smith/ HSE Manager
Phone: (334) 222-7581
2. Obtain exact name and address of the facility being inspected, as well as any Parent Company information.
Facility Name:
Arclin USA, LLC
Address:
14139 US Highway 84, Andalusia, Alabama
County:
Covington
Owner/Operator/Parent Company (Name, Address, Phone):
Arclin USA, LLC, 1000
Hotcomb Woods Pkwy Suite 342 Atlanta, GA 30076, 678-781-4410
How long owned/operated, recent sale of facility (date)? N/A
3. Obtain/review facility description.
a. Officers' names and titles: Dan Cox/ Plant Manager
b. Incorporation date and location: N/A
c. Other facilities owned by the company: 12 in US and Canada
d. Number of employees:
27
e. Annual Corporate Sales: N/A
f. Process Description and Process Diagrams: Resin is manufactured as a batch process in
four separate kettles inside the resin manufacturing building where various chemicals
including formaldehyde, phenol, urea and anhydrous ammonia are blended to create a
product that can then be trucked off-site for distribution. Formaldehyde used for resin
production is manufactured in a continuous on-site process located in an outdoor area
separate from the resin manufacturing building. To manufacture formaldehyde, methanol
is combined with oxygen (air) and a catalyst in a heated reactor. Formaldehyde formed
in the reactor is cooled and diluted with water to create a 52 percent (%) solution that is
then stored on site in one of four formaldehyde storage tanks ranging in size from 30,000
gallons to 50,000 gallons. The formaldehyde can also be sold directly to formaldehyde
distributors. Anhydrous ammonia is delivered to the facility via tank truck and stored in a
Inspection Identifier:
J.N. EPCRA 04/20/2023
Page 1 of 4
13,600-gallon horizontal storage tank before being pumped to an ammonia vaporizer and then into one of the resin manufacturing kettles. Other chemicals including methanol, urea and phenol are delivered to the facility by rail and all resin products are shipped off-site by truck.
g. Jurisdictional Fire Department: 4. Compliance Review by Statute:
Andalusia FD
Section 312
a. Obtained chemical inventory list
Y N N/A
b. View purchase records (where applicable)
Y N N/A
c. Tier II reports to SERC, LEPC, fire dept (Haz. Chem 10,000 lbs)? Y N N/A
d. Tier II reports to SERC, LEPC, fire dept (EHSs 500 lbs or TPQ)? Y N N/A
e. Reviewed documentation of maximum daily amounts stored?
Y N N/A
f. Reviewed SDSs?
Y N N/A
g. Reviewed documentation of submissions?
Y N N/A
h. Has each report from the past 3 years been submitted by March 1?
Y N N/A
Section 313
i. Form R/A to State and EPA for Toxic Chemicals: Manufactured, Processed 25,000lbs, Otherwise Used 10,000 lbs Y N N/A
j. Obtained list of 313 chemicals MPOU at the facility
Y N N/A
k. Obtained documentation of submissions?
Y N N/A
l. Has each report from the past 3 years been submitted by July 1?
Y N N/A
Inspection Identifier:
J.N. EPCRA 04/20/2023
Page 2 of 4
Additional Observations:
Inspection Identifier:
J.N. EPCRA 04/20/2023
Page 3 of 4
Report Prepared By:
Name (Printed):
Jordan Noles
Title:
Inspector
JORDAN NOLES Date: 2023.07.05 14:42:12 -04'00' Digitally signed by JORDAN NOLES
Signature:
Report Authorized By:
Name (Printed):
Jason Dressler
Title: Signature:
Chief, North Air Enforcement Section
Digitally signed by JASON
JASON DRESSLER DRESSLER
Date: 2023.07.05 17:52:32 -04'00'
Inspection Identifier:
J.N. EPCRA 04/20/2023