Document EenRDJNJZLrwa4dj2Rz2oGBN
INTER-OFFICE MEMO TENNECO CHEMICALS, INC.
ToJ. T. Sweeney
At Flemington
From R. A. Donovan
At Flemington
Subject Activity Report - October, 1982 Production Department
Date November 2, 1982
Copy to
X. Safety
The October shift safety meeting addressed the topic of recreational safety for_the autumn and winter months. Also, September's audit was reviewed and the progress of the main items highlighted in the audit was discussed.
Additionally, two recent accidents were reviewed and steps to be taken to prevent future accidents of this same nature were discussed.
Accident Statistics - October
First Aid Cases Recordable Injuries Restricted Duties Lost Time Injuries
0 0 0 0
t-
II. Statistics
Production & Losses Quality Summary
Overtime Statistics
-Controllable O.T. = 15.8%
-Breakdown of Controllable O.T.
a) Long term absences
8.5%
b) Short term absences
2.8%
c) Vacation coverage
2.1%
d) Miscellaneous
2.4%
(Negotiations, Safety Mtg. 9 Physical)
Attachment II Attachment III
III. Personnel
1) Three Production Department reprimands were issued in October, They were for poor attendance (verbal), failing to punch time card (verbal), and operational error (written).
2) ICWU contract negotiations were held on October 12, 13, and 27, 1982. Additional meetings are scheduled for the first week in November with the intent of arriving at an agreement prior to the expiration of the contract (November 7, 1982).
3) Three ICWU employees are on long term absences as of November 1, 1982.
rEN 3868
2- -
IV. Costs
1) Conversion cost for October is estimated to 9.96<?/lb.
2) VCM and VAM usage, at 1030.8 pounds/M pounds, will be better than budget (1032).
3) Controllable overtime for the Production Department was 15.8%. The major factor in the overtime was coverage for long term absenteeism.
V. Major Projects and On-Going Programs
1) Type 391 resin was produced at Flemington for the first time in three (3)-years. This material was produced for Kentile as an alternative for Type 314 resin. October's production was made under LOP. All properties have been "on target" and will not be made under LOP in the future.
VI. Capital Programs
Nothing to report. VII. Environmental
t
. if.
1) The VCM content of the stripped slurry averaged 123 ppm - there were no excursions over the EPA limit.
2) The reactor vapor samples averaged 865 ppm of VCM in October there were no excursions over the EPA limit.
3) The VCM content of the Waste Water Stripper bottom was below 1 ppm for October.
4) The Reactor Building VCM level averaged .3 ppm in October.
5) A total of 11 Production Department employees were monitored for
VCM exposure via charcoal tube analysis in October. Additional
employees have been monitored, but as yet these charcoal tubes
have not been analyzed. The exposures analyzed are summarized
as follows:
% Above Avg. Exp.
it of Samples it Above 1 ppm 1 ppm
ppm
U K ) (Ji
Reactor Operator Utility Operator Production Foreman
6 2 3
2 33 00 00
VIII. Opportunities Nothing to report.
IX. Vulnerabilities Nothing to report.
X. Industry Trends Nothing to report.
TEN 3869
41
XI. Comments 1) "RFT" for October was 87.2%, with 2.6% ultimately dispositioned as Grade III. 2) An operational error resulted in the cross contamination of 142,000 pounds of resin when the Dryer Operator dried Type 391 on top of bin containing Type 400 resin. This material was dispositioned as Grade III.
RAD: ms
TEN 3870