Document Edmpkj9YG8wMx69RrM41bryBg

Central Engineering Department I Project Scope Report Solid Aroclor.^Expansion s Anniston abama Plant By: R. S. Yates Central Engineering Department January 14, 1969 00*0546 TOWOLDMONOQ48131 DISTRIBUTION Organic Division 1. J. M. Smith 2. W. A. Kuhn 3. H. L. Williams 4. W. E. Voss Central Engineering 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. R. M. Kountz R. S. Yates 0. F. Bremer/P.K. Nunn J. W. Campbell/B. W. Steketee/R. B. Degenhardt L. R. Burchfield F. J. Holzapfel Central File R. C. Herman R. C. Herman R. C. Herman R. C. Herman oozom TOWOLDMONOQ48132 CEA 2080 Date: 1/16/69 By: R. S. Yates TABLE OF CONTENTS 1.1 Project Scope Summary 1.11 Title 1.12 Synopsis and Project "Tone" 1.2 Process Technology 1.21 Process Description 1.211 1.212 1.213 Details of Process Yields and Raw Material Usage Process Documents 1.22 Raw Materials 1.221 Specifications 1.222 Sources 1.23 Products and By-Products 1.231 1.232 1.233 1.234 Quality Considerations Specifications By-Products Packaging and Shipping 1.24 Waste Streams 1.25 Personnel, Property and Public Hazards 1.3 Manufacturing Facilities 1.31 Description 1.311 General 1.312 Manufacturing Facilities 1.32 Design Capacity 1.33 Flexibility Requirements 1.34 Future Expansion 1.4 1.35 Physical Appearance 1.36 Storage and Shipping Requirements Utilities 1.41 Utilities Summary 1.42 Utilities Facilities Page No. 1 1 1 3 3 3 3 4 4 4 5 5 5 5 6 6 7 7 9 9 9 9 10 10 11 11 11 12 12 12 0020548 TOWOLDMONOQ48133 Appendices A. Equipment Information Summary B. Process Flow Diagram C. Equipment Arrangement Study D. Building and Site Requirements E. Description of Work by Code of Accounts F. Preliminary Schedule G. Project Loss prevention Report 00205*9 TOWOLDMONOQ48134 Page 1 1.1 Project Scope Summary 1.11 Title Aroclors - Increase Solid Aroclor Capacity - Organic Division at Anniston, Alabama Plant CEA 2080 1.12 Synopsis and Project "Tone" The objectives of this project are to a. Provide new facilities to^ increase solid Aroclor plant capacity from 9.6 M lbs./year to 29.6 M lbs./year. b. Provide an overall production capacity for solid Aroclors of up to 30% more than indicated in the latest sales forecast. c. Provide for an orderly expansion of the solid Aroclor facilities. d. Complete these facilities by December, 1969. New facilities to be added are: f~ ' 1 1 ^ wo batch chlorinator systems consisting of a single terphenyl feed tank, two chlorination * tanks with heat removal systems and\one inter- 7 -mediate storage and blow tank. i ............ . ""t 2. fXh'off-gas recovery system consisting of heat -exchanger and surge tank to recover entrain ment lossss from both chlorinator systems. 3. (She batch distillation system consisting of 'still pot, external circulating system through ^ a gas-fired heater, condensing and receiving ^ equipment, and a high vacuum ejector. ' 4. Sufficient piping tie-ins to insure good oper ating flexibility with the existing batch system. 5. Expand the existing control room to provide sufficient space for instrumentation for the new facility. 6. Expand the existing Therminol heating system to provide proper distribution of hot fluid to the new facility. 7. Add drowning facilities at the HC1 plant to,, frown the extra HC1 gas produced from the .^ . bhlorinators.'"-"....... 0020550 TOWOLDMONOQ48135 Page 2 .8 A new elevator in Building 27. 9. A flaker for Aroclor 1268. Sales forecasts indicate that we will be out of solid Aroclor capacity in 1969. The plant is carrying out a debottlenecking program which will allow us to meet most of our 1969 requirements. The new facilities should be operational by December 1969 or earlier if possible. A preliminary schedule shows that if we can start definitive engineering in January, these new facilities will be available for start-up in December 1969. Full design capacity will not be necessary until after 1973. It is divisional policy in certain product groups to provide excess capacity over and above sales forecasts and we are providing a 31% excess capacity in these new facilities for 1973 based on the sales forecast of December 6, 1968. Low capital cost is important to this project, however, schedules must be met for a December 1969 or earlier start-up even at some increased capital cost. There are no items that could be deferred from this project to a later date. It is estimated that the cost of these new facilities will be: Capital Expense Total $ 950,000 50,000 $1,000,000 0020551 TOWOLDMONOQ48136 Page 3 1.2 Process Technology 1.21 Process Description 1.211 Details of Process Aroclors are the reaction products formed by the chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HCl gas pro duced is absorbed in water to produce muriatic acid. Solid Aroclors are produced in chlorinator reaction vessels, air blown and distilled. They are drummed, flaked, or flaked and milled and packaged for shipment. Distillation residues are discarded as waste or sold as Montars. Aroclors, when used as plasticizers and that crystallize at ambient temperatures are con sidered solid Aroclors. Below is a list of the Aroclor grades that are considered solid Aroclors: Aroclor Starting Designation Raw Material Chlorination Level Distilled 1268 Biphenyl 68% Yes 2565 25% Santowax C 75% Biphenyl 65% NO 406 5 40% Santowax R 60% Biphenyl 65% No --------- 4465 40% Santowax R 60% Biphenyl 65% Yes 5060 100% Santowax R 60% No 5460 100% Santowax R 60% Yes 5042 100% Santowax R 42% No 5442 100% Santowax R 42% Yes Vwe intend to make only Santowax'R based Aroclors Vin this new equipment. -; ; " .......... .... ' 1.212 Yields and Raw Material Usage Yields are calculated for both chlorine and Santowax and/or Biphenyl. Based on cost standards of January 1, 1969 these are (% theory to standard): 0020552 TOWOLDMONOQ48137 Page 4 Aroclor On On On On Designation Chlorine Biphenyl Santowax C Santowax R 1268 73 73 2565 96 96.2 96.2 4465 73 73 73 5060 96 96 5460 82 85 5442 80.2 73 The yield on 5460 has not been demonstrated. Last year the standard yield on chlorine and Santowax R was 73.5% Lime and Ferric chloride are added to all products as follows: Lime Ferric Chloride Lbs./lOO Lbs, firoclor 1.000 0.020 1.213 Process Documents "Standard Manufacturing Process for Aroclors Anniston Plant" September, 1966, M. J. Williams "Standard Operating Instructions for Aroclors Anniston Plant" November, 1968, M. J. Williams 1.22 Raw Materails 1.221 Specifications Raw material specifications, as listed below, are appended. Material Code Date Material 33500 2/26/57 Ferric Chloride Anhydride 83601 11/18/65 Biphenyl 82910 3/9/66 Santowax "C" 82602 3/2/66 Santowax "R" 82638 8/31/66 Chlorine Gas 38800 7/20/66 Lime Hydrate 0020553 TOWOLDMONOQ48138 Page 5 1.222 Sources Biphenyl Biphenyl is stored in horizontal tanks in the Biphenyl Area and pumped on demand into the Terphenyl Mix Tank. Ferric Chloride Received from the warehouse in 100 lb. kegs. Chlorine Received from tank cars and the chlorine plant. In 1969 the chlorine plant will be shut down and the entire supply will be from 44, 55 or 90 ton tank cars shipped into the plant. Liquid chlorine will be vaporized and trans ferred as a gas to the department area. Lime Hydrate Received from the warehouse in 50 lb. bags loaded on palettes. Santowax "C" Received from the continuous biphenyl stills on demand through a transfer line. Santowax " R" Received from a 50,000 gallon storage tank, heated west of the HB40 department, on demand, through a transfer line. Santowax "R" is ob tained from the continuous Santowax still in the Biphenyl refining area. 1.23 Products and By-Products 1.231 Quality Considerations T"Xroclor 5460 has a color and softening point"' \specification which because of the nature of the ,, v 'process gets out of control on occasion. Color is more of a problem than softening point. 1.232 Specifications Finished goods specifications, as listed below, are appended. 0020554 TOWOLDMONOQ48139 Page 6 Product Code 82616 82618 82619 82620 82622 82621 Date 3/11/66 3/11/66 3/11/66 3/11/66 3/11/66 3/15/66 Product Aroclor 1268 Aroclor 2565 Aroclor 4465 Aroclor 5060 Aroclor 5460 Aroclor 5442 1.233 By-Products HCl gas is a by-product of the chlorination re action and can be absorbed in water to produce muriatic acid or sewered and neutralized with limestone. Residues from the distillation are drawn off to drums and sold as Montars or discarded. Listed below are data on the Montars. Montar No. 5 6 7 8 Aroclor 5460 4465 1268 5442 Softening Point Range 155-195C 135-190C 200 C Calcium Oxide 1.6% 2.0% The plant is considering the flakering of Montars in order to change the product form. Latest sales forecast, November 27, 1968, in dicates sales requirements for the solid Montars as follows for the year 1969: Montar 5 Montar 5 crushed. Montar 5 crushed. Montar 6 180,000 dom. 400,000 inter. 80,000 50,000 lbs. lbs. lbs. lbs. 1.234 Packaging and Shipping to m o n o o Container Weights Material 1268 2505 446 5 5060 5460 5442 Weight - lbs. 200 50 and 500 50 and 500 50 and 100 50 and 100 50 and 450 Container Form 41 gal. fibre drum Flakes 5 and 40 gal. drums Solid 5, 40 and 55 <gal. drums Solid paper bags Flakes paper bags 5 and 40 gal. drums Flakes Solid TOWOLDMONOQ48140 Page 7 1.24 Waste Streams Approximately 2200 gallons of Montar 5 will be produced daily with an approximate composition as follows: Chlorine Iron Calcium Oxide 57-59% 0.12% 1.6% Some of this material is sold, the remainder is put drums and taken to the toxic dump. The plant has a project to pump these waste materials to Cleghorn's lake, a sump used for residue disposal. in An additional 70,000 lbs, of HC1 gas will be produced daily from this new plant and will have to be absorbed and sewered at the acid plant. If additional absorption capacity is required, a separate project will be sub mitted. 1.25 Personnel, Property and Public Hazards Chlorine Gas Causes eye, skin and mucous membrane irritation. Maximum allowable concentration is 2 ppm. Concentra tions in the order of 15 ppm will cause throat irri tation. Cannister gas masks, Scott Air Paks or other similar equipment is required in strong concentra tions. Biphenyl A toxic organic chemical. Breathing fumes or vapors should be avoided. During processing the material is usually hot (100C or above) and can cause serious thermal burns in contact with the skin. Protective garments should be worn go aboid contact. Flash point of biphenyl is 235f. Ferric Chloride Not toxic but presents an eye hazard. Normal pre cautions of wearing safety glasses should be followed. HCl Gas Fumes are toxic and hazardous to teeth, skin, eyes and mucuous membranes. In strong concentrations, rubber protective equipment should be worn. Maximum allowable concentration of HCl gas in air is 10 ppm. 0020556 TOWOLDMONOQ48141 Page 8 Santowax R Relatively non-toxic, however, the vapors are irritat ing to the bronchial tract. Prolonged breathing of vapors should be avoided. Material is generally hot (150C or above) and can cause serious thermal burns in contact with the skin. Crude Aroclors Crude Aroclors are hot since all are handled in Therminol heated jacketed lines. They can cause serious thermal burns in contact with the skin. Still Bottoms or Residue Fumes from still bottoms are toxic. They are ex tremely irritating to the mucous membranes, eyes and respiratory tract and should be avoided. They are hot (above 150C) and can cause serious thermal burns. Hydrated Lime Dust is irritating to the eyes and skin and any material on the skin should be washed off with water. 00*0557 TOWOLDMONOQ48142 Page 9 1.3 Manufacturing Facilities 1.31 Description 1.311 General The following information is included in the Appendix of this report: Equipment Information Summary Process Flow Diagram Equipment Arrangement Study Building and Site Requirement Description of Work by Code of Accounts Preliminary Schedule Project Loss Prevention Report 1.312 Manufacturing Facilities A 2000 gallon mix tank for terphenyls with charge lines and supported on a 40,000 lb. hopper scale. Two 3100 gallon chlorination tanks with circulation pumps and heat removal systems consisting of two shell and tube heat exchangers and a Therminol surge tank and pump. An off-gas system consisting of heat exchanger and 2000 gallon storage tank to recover entrain ment losses from the chlorinator off gases with tailings pump. A 6500 gallon batch intermediate storage and blow tank with scrubber and transfer pump. A 7300 gallon still pot, 3500 gallon receiver with entrainment separator, still condenser and ex ternal gas fired heater with submerged centrifugal pump. A condenser control system consisting of two shell and tube heat exchangers and a Therminol surge tank and pump. A three-stage ejector with intercondenser, and aftercondenser and catch tank and sump tank. Additions to the present control room to provide space for additional instrumentation. A two-stage HCl gas drowning system. A new freight elevator for Building 27. Additions to the present Therminol system. O020`,'>8 TOWOLDMONOQ48143 1.32 Design Capacity Chlorination: Basis OST Rate Producing Aroclor 5060 6350 hrs./year 27.6 M lbs./year Distillation: Basis OST _______ jiftate Producing Aroclor 5460 6350 hrs./year 2Q,, P,,,M lbs ./year -' J After these additions are complete, plant capacity will be as follows: Present Capacity New Capacity Total Capacity 9.6 M lbs./year 20.0 M lbs./year 29.6 M lbs./year Basis: OST 0AY 6350 hrs./year 7 3% Based on the December 6, 1968 Sales Forecast, (HD to RY) , excess capacity will be as follows: New Capacity Required Excess capacity Excess Capacity 1970 29.6 M lbs./yr. 17.1 M lbs./yr. 12.5 M lbs./yr. 73 % 1.33 Flexibility Requirements 1973 29.6 M lbs ./yr. 22.6 M lbs ./yr. 7.0 M lbs ./yr. 31 % Two complete and separate solid Aroclor systems will allow flexibility in our production^runs. We will pro duce the larger volume requirement,TAroclor 5460 (82%)* * y;in the new units with the remaining 'solid Aroclors being /produced in the smaller unit. Consideration will be given to incorporating the chlorinators into a continuous chlorination system at some future date. Both units will have the flexibility of being able to produce any of the solid Aroclor products. If fractionation is required to meet FDA standards, a separate distillation unit can be added to the existing system. 0020559 TOWOLDMONOQ48144 Page 11 1.34 Future Expansion The present expansion will occupy an 18 foot wide area directly to the north of Building 27. There is suf ficient area to the north of this expansion to provide for two additional chlorination-distillation systems. In the meantime, work should proceed toward developing continuous chlorination system which long range should provide greater flexibility in labor and equipment. a 1.35 Physical Appearance We propose to make the top roof deck concrete, a contin uation of the surface we installed to the west of Build ing 27 on project OEA 4-488. Additional weather protec tion will be provided in the form of a panel enclosure on the north wall of the structure. 1.36 Storage and Shipping Requirements No additional storage facilities are contemplated. Re cently completed project CEA 1430 provided a 5500 gallon day tank for finished solid Aroclors. In addition, a new 6900 lb./hr. flaker with a 5500 gallon flaker feed tank has also been installed in a separate flaking and packaging building. Raw material storage for Santowax R and Biphenyl are adequate. 0020560 TOWOLDMONOQ48145 Page 12 1.4 Utilities and Services 1.41 Utilities Summary The approximate utility requirements are as follows: For ejector, lbs.Air. For tracer and tankheating, lbs./hr. 450 250 Power, Installed HP 245 Cooling Tower Water, GPM 600 Potable Water, GPM 50 Natural Gas, Cu.Ft./hr. 2000 1.42 Utilities Facilities No additional utility facilities are required for this project. 0i056I TOWOLDMONOQ48146 K ..I. ^-WHi^crBnsffcsnBRt , ,. *0eOUCTeeK . v i.%- * , ^ it# OWOAIMO CHRIRCM.E PIWMN " Y 4 V. G. KRUMM1UCH PLART . ,r RAW MATERIAL " SPECIFICATIOM^ ScLm'mMA 1 1,1 " " "`""I'' W** . ' N.'- auRRUW 11 MATERIAL .,, FERRIC CHLORIDE ANHYDRIDE CNMCU FORMULA 1 *t- : . fc" - ! ISSUEDFeb. 2b, 19S7 STMIUIS IfMTWI? WFiwnn BFICL Or - New _ AMPLE FOR AMALtSM------T-l---------- . .............. M.tiio*. r. BOttJ* I UNCLASSIFIED INFORMATION General Test* (road* only on re<peet) Property Specification Appearance Black powder or grannlea Aaeay Sulfate 97.0%, Mia. 0.05%, Max. Ferroua Salle Trace, Max. Solubility: 10:10 of watar 10:10 of Formula JO alcohol Complete to .lightly turbid. Max. Complete to lightly tarbid. Mi. T. 142.21 1 "1 ~,, J.F.Q. Method li-A 22-570 120-575 S-570-1 112-B ; OtllOSbl TOWOLDMONOQ48147 CO" Monsanto Chemical ompany ORGANIC CHEMICALS OIVIWON FINISHED PRODUCT SPECIFICATION product (Trade name) Blphanyl PROOuCT (Chermeal *em*) Blphanyl CHEMICAL FORMULA PRODUCT COM 826.01 METHOD IDENTITY SALES cooe 135-000-03-09 TYPE Tachnlcal TYPE Tachnlcal r tr Issued 5/5/61 Anniston Plant By W. W. Klemoar Revised to odd tyj> value* 11-16-65 < auPfdlEOEl IEIC1 OF 7/8/65 C12H10 BCIAk-JOa w. IEMFU FOfl UULTRI 1 16 oi. can 154.20 Sal** Characteristics Routine teat* Appearanc* Cryatalllzlng Point, *C Color, Cardnar Limits Typical Valua* White to pal* yellow crystals 68.7 Min. 6 Max. Whit* crystals 68.8 1.5 General Teat (determined only on raouest) Biphenyl, I Napthalene, l 3 - Methylblphanyl, l 4 - Methylblphanyl, I Unknown, X Distillation Rang*, *C 1st drop - Dry Point Must Include 255*C 99.9 0.001 0.05 0.02 <*>.03 Thia spaclflcaelon foe lntarnal ua* only 0020563 TOWOLDMONOQ48148 c Monsanto I: FINISHED PRODUCT SPECIFICATION -I. PRODUCTION P, U. Moodv /a/ 2-1-66 k (ALII . E. Ault // 2-22-66 kCHCAlL OltCHIPTION > i tore FHODlKT Santovax C Anniston 6A'f I'lasiifivi 3-9-66 MOOUCT COOK 629.10 1 1 ALII CODE 7795-050-99-009 IT Internal RBSEaIiCM L. R. Stark /*/ 2-3-66 - M. McEv.n /a/ :-:2-fc6 OUAIITY CONTROL. (Chlmt ChumitO 0. E. Dolln // 2-1-66 CHEMICAL. FORMULA D tuPCNicoii of L-.. J-57___________ T in II T 1C D f; , RICIED INFORMATION \ trance l .'filing Point, #C B ) -.ho Terphenyl, X v ia Terphenyl, X [ 'J.u'a Terphenyl, X G . -iterphenyl, X !*" henyl, X 6 Point, *C 1.11. rine, ppm 0 .ul ' ir, ppm AMPLE FOM tNALYIII 2 - 1 Pint Cana J. A. Llddle 1-12-66 Brown, waxy aolld 350 Min. **10 **50 **26 **14 **0.1 **375 2.0 (Typical) 2.0 " G-l 064 064 064 072 064 114 0 i .ribution of Isomers end quaterphenyls very with operating condition* I limited data is available; therefore, the limits given are typical values of i.i >e characteristics* I! \r. roduct is mainly used as a raw material for other finished products produced *t ' uni- ton. . 'hi specification is for internal use only. r. m . III fK Routing Anolytit, All other* Anolyttd by requtti Only 0020*4* TOWOLDMONOQ48149 Monsanto ORGANIC C H E MIC ALS Ol VISION FINISHED PRODUCT SPECIFICATION PRODUCTION R. G. Moody /a/ 1-31-66 IALII W. E. Ault // 2-22-66 ICNCRAi. OOCMlVTlON ^ Mixed Terphenyla MOOWCT Santowax R MODUCT COOS joc^r. 132 vAxninnrcisiMtofndf wi 826.02 lAitfic66S Salee 3-2-66 7795-000-11-009 ARRROVAll RESEARCH ' ' L. R. Stark /a/ 2-3-66 - M. McEwan /a/ 2-22-66 QUALITY CONTROL (Chief ChemleO 0. E. Dolln // 1-25-66 CHEMICAL FORMULA MOL KIT. lUPI'HItOU IPICl. OP 2-12-62 C MAH AC T CRIST 1C UNRESTRICTED INFORMATION (R) Appearance (R) Color (liquid), NFA (R) Upper Hold Point, C (R) Lower Hold, *C RESTRICTED INFORMATION Distillation Range, C, SOX (Uncorrected) Ortho terphenyl, X Meta terphenyl, Z Para terphenyl, X Quaterphenyla, X ! x 1 pint cana LIMIT* J. A. Llddle 1-11-66 METHOD Yellow white noncrystalline flaked solid 4.0 Max. 136 - 145 48 - 63 G-l 128 129 129 350 - 400 10.0 - Typical Value 54.0 - II 27.0 - " II 9.0 - " II 1 t r- ! ft ft i>U/<n* 4 I// others Analysed by request Only 0020565 TOWOLDMONOQ48150 Monsanto ORGANIC CHO.MICALO OIVIOION RAW MATERIAL SPECIFICATION AAODUCTION MAT Km AC COOK 826.38 |PLANT Anniston 'OATIIFFH 8-31-66 APPROVALS MATCRIAL Chlorine Css using osfto. a*. 05. 27 Be below R. G. Moody /s/R. G. Moody - 8/11/66 ' AMOCURIMINT L. R. Stark /s/L. R. Stark - 8/29/66 QUALITY CONTROL CCfeJot CfeooUoO H. L. Phillips /s/H. L. Phillips - 8/15/66 QININAL DSSCRIPTION 0. S. Dolln /s/O. E. Dolln - 8/10/66 CHKMICAL FORMULA Greenish yellow gas UPCR0KDCS SPSCS OF Sept. 11. 1957 SAMPLE FOR ANALYSIS SLC sampling container ci2 Mol. wt. 70.91 ISSUED OT J. A. Llddle - 5/16/66 Typical Taluas UNRESTRICTED INFORMATION Materlal Supplied by Diamond Alkali Company Assay, (Vol. X) Residual Gases (Vol. X) Moisture, ppm Non-volatile Matter, ppm 99.4 Min 0.5 Max. 40 Max. 40 Max. 113 113 Material Supplied by Depts. 56. 57 (Anniston) Assay (Vol. X) H2 (Vol. X) CO, (Vol. X) CO (Vol. X) N2 (Vol. X) 02 (Vol. X) 85.5 - 93.5 1.5 - 2.5 (3 Max.) 0.5 - 1.0 Mil 3.0 - 8.0 1.2 - 3.0 113 113 113 113 113 113 (Rj Routtrim Anolytl*, All oilr Anmlfi *4 fey roquasi only. WCK.II4 0020566 TOWOLDMONOQ48151 Monsanto ORSANIC CHEMICALS OIVISION 38800 PLANT Lips Hydrate UtiR* DBPTS, RAW MATERIAL SPECIFICATION Anniston 7-20-66 27. 28 SUPPLIER Alabaster Line Co. . PRODUCTION APPROVALS RESEARCH R. G. Moody /s/R. G. Moody 6/9/66 PROCUREMENT N. P. Mueller /s/N. P. Mueller 7/13/66 QUALITY CONTROL fCMsf ChsssJsO H. L. Phillips /s/H. L. Phillips 6/10/66 0. E. Dolin /s/0. I. Dolln 6/8/66 OENERAL DESCRIPTION CHEMICAL FORMULA White fine powder Ca(0H)2 C HAN AC T ERISTIC UNRESTRICTED INFORMATION SAMPLE FOR ANALYSIS b - 1 lb. cans Typical Analysis Mol. wt. > 74.10 ISSUED SY J. A. tlddle 5/18/66 CaO (I) 73.00 MgO (X) 1.20 sio2 (X) 0.36 ai2o3 (X) 0.60 Pe203 (X) 0.30 Ignition Loss (X) Ca(0H)2 (X Calculated) 24.04 97.50<r> Screen Analysis Through 200 mesh (X) Through 325 aeah (X) 99.8 94.5 Baal* of Specifications! Suppliers typical analysis of product (5/23/66) Jj (1) Ca(OU)2 X - 100X - jgO(X) + SiOj (X) + AijOj (X) + *2Oj (X>] r (HJ Routine Anmlylm, All offlera Ana/yaitf bp re^uetf osUp. 0020567 TOWOLDMONOQ48152 Monsanto OROAN1C CHEMICAL! OlVIftlON FINISHED PRODUCT SPECIFICATION PRODUCTION R. G. Moodv /s/ 12-30-65 SALES W. E. Ault /s/ 3-2-66 6CNCAAL DESCRIPTION PRODUCT PAL^rNoTclor 1268 'product c6d4 ' v*I bAAVnInt iston i8aL26U,1c6ook Sale# 3-11-66 APPROVALS RESEARCH 1040-340-04-11-16 -009 L. R. Stark /a/ 3-8-66 QUALITY CONTROL ('Cfllsf CflMttlsO 0. E. Dolin /a/ 12-29-65 CHEMICAL FORMULA lotPT. 127-S Mixture MOL WT. IUPERICDCI IPCCI. OP 4-25-61__________ Characteristic ll x 16 oz IIMUIO V Can or W.M. Bottle |J A. Llddle 11-30-65 LIMIT* MIT MOD UNRESTRICTED INFORMATION (R) Appearance and color Color, Gardner White (R) Hold Point, *C (R) Acid No., mg KOH RESTRICTED INFORMATION Screen Test, % retained on No. 16 mesh No. 20 mesh Specific Gravity @ 25/25C., Pycnometer Loss @ 163C., 7. off-white powder 6 Max. 150 - 170 0.05 Max. 0.1 Max. 10 Max. 1.804 - 1.811 0.15 - 0.24 G-l 119 116 120 ' H ' Routine Analy Ail othtrs Analysed by request Only 0<?056a TOWOLDMONOQ48153 Monsanto FINJ5HED PRODUCT SPECIFICATION PRODUCTION R. G. Moodv /s/ 12-29-65 lALIt W. E. Ault /s/ 3-2-66 LLMLHAL DESCRIPTION PRODUCT lotPT. Aroclor 2565 lltlNf r PRObuCT CODK 127-S uU . Annieton vyrftiiktivi" ..... S8A2LK6*.1CO8O_K____________ Seles 3-11^66____________ 1040-390-04-009 APPROVAL* ' TiTTZVTH------------------------------------------------------------------------------- U. R. Stark /a/ 3-8-66 quality CONTROL tChM Chtmlal) 3. E. Dolin /a/ 12-29-65 CHKMtCAL PORMULA Mixture MOL. **T. Ol'tRIEDEI tPCCS. OF AMPLK POR ANALYSIS isauKO iv 4-25-61____________________________ 1 x 16 or. Can or W.M. Bottle J. A Liddle 11-30-65 C HARACTERIITIC LIMITS +s ooX UNRESTRICTED INFORMATION (R) Appearance and Color (R) Softening Point, C (R) Acid No., mg KOH/g Black, brittle realn 66 - 72 1.4 Max. G-l 115 116 (ft ) ft n ut ii All nthrrx Analvted fcv reauett Only 0020569 TOWOLDMONOQ48154 Monsanto ORGANIC CHEMICAL* DIVISION FINISHED PRODUCT SPECIFICATION PRODUCTION R. G. Moodv /./ 2-29-66 ALE* W. E. Ault /./ 3-2-66 LCNtAAL DESCRIPTION PRODUCT Aroclor 4465 TCIhT' Anniston OAVI'IMieTIVI 3-11-66 APPROVAL* product c66f DIOT. I27-S uH-------- 826.19 TTCimSl----------- Sales 1040-430-04-11-16-009 L. R. Stark /a/ 3-8-66 OUALITV CONTROL. (Chisi Chemist) 0. E. Dolln /a/ 12-29-65 CHEMICAL PORMULA Mixture MOL T. UP A A *E DEI SPECS. OP 4-25-61 CHARACTERISTIC UNRESTRICTED INFORMATION (R) Appearance and Color (R) Color, NPA, Molten (R) Softening Point, *C Acid No., mg ROH/g AMPLE FOR ANALYSIS ISSUED DV L x 16 oz. Can or W.M. Bottle J. A. Liddle 11-30-65 LIMIT* MSTMOO Clear, light yellow resin 2 Max. 60 - 66 0.05 Max. G-l G-4 115 116 ( R > Routine Analys is , All others Analysed by request Only % 0020570 TOWOLDMONOQ48155 Monsanto -INISHED PRODUCT SPECIFICATION PRODUCTION R. 0. Moodv /s/ 12-30-65 j*ALK ' W. E. Ault // 3-2-66 1-G-C-N-C-A-A-L--O-C-IC-N-<-P-T-I-O-N Mixture -Ot RT . iUP E RIEDEI IPECI. OF 4-25-61 CHARACTE. .aTIC UNRESTRICTED INFORMATION (R) Appearance and Color (R) Softening Point, C (R) Acid No. mg KOH/g PRODUCT Aroclor 5060 VlAnV ' ' PRODUCT COOK ' " use Anniston 826.20 Bill c#ri'TiVl ....... SALKS c6DK SaleB 3-11-66 1040-450-04-009 APPROVALS . RKSKARCH " n L. R. Stark /a/ 3r8-66 OUALITV CONTROL (Chief Chemist) 0. E. Dolln // 12-29-65 C-H-I-M-I-C-A-L--FO--R-M-U-L-A- |0PT. 1 27-S IAMPLI FOP ANALYSIS ISSUKO sv 1 x 16 or. Can or W.M. Bottle J. A. Liddle 11-30-65 LIMITS MKTMOD Black, brittle realn 105 - 115 0.5 Max. G-l 115 116 . ( l F (R> Routine Analysis, All otheis Analysed by request Only 0020571 TOWOLDMONOQ48156 Monsanto FINISHED PRODUCT SPECIFICATION PRODUCTION R. G. Moody // 12-30-65 BALES V). E. Ault /a/ 3-2-66 CCNLRAL DESCRIPTION Mixture ' PRODUCT Aroclor 5460 (High Soluble Grade) RLAnV PROOUCT COOK use ACnTnViTstlMoniCfiVI - - - - - - -826.22 I'il'fs c6bl Sales 3-11-66 APPROVALS RESEARCH 1040-480-06-009 L. R. Stark /a/ 3-8-66 QUALITY CONTROL (ChM Ch*ml0 0. E. Dolln // 12-29-65 C MIMIC AL FORMULA Idcrt. 127-S ............. SuPbRSEOCS BP EC B. OF 4-21-61 C H AH AC T ERISTIC ia*uso v 1 x 16 oz. Can or W.M. Bottle J. A. Liddle 11-30-65 LIMIT* MCTMQp UNRESTRICTED INFORMATION (R) Appearance and Color Clear, yellow to amber brittle resin or flakes G-l (R) Color, NPA, Molten 2 Max. G-4 (R) Softening Point, C 98 - 105 115 (R) Solubility (25 g in 25 g. Acetone @ 25C.) 3 hpur, Min. 117 Acid No., Mg KOH/gm. 0.05 Max. 116 Chlorine, X 58.5 - 60.6 093 RESTRICTED INFORMATION Hydrolysis Stability, ppm Cl 300 Max. 092 (H ) H out in i -J U oi he r* Anoly ted by request Only 0020572 TOWOLDMONOQ48157 Monsanto FINISHED PRODUCT SPECIFICATION PRODUCTION R. G. Moodv /a/ 12-29-65 SALES W. E. Ault /s/ 3-2-66 (. ( ML H AL DESCRIPTION Mixture MOL WT. SUPERSEDES SPECS. OP 4-25-61 C H AH AC T ERISTIC UNRESTRICTED INFORMATION (R) Appearance and Color (R) Color, NPA, Molten (R) Softening Point, C Acid No., mg. KOH/g t r enoowcr |o(T. " 1Aroclor 5442 27-S JLant PNOoucf co6d~ oil . Anniston 826.21 BXIIYfViIYJVI--------- SALKS COOK Sales___________ 3-15-^____________ 1040-470-04-009_____________________________ WKfcfAWbH ........................ L. R. Stark // 3-11-66_______________________________ . QUALITV CONTROL (Chlt 0. E. Dolln // 12-29-65 CMIMII SAMPLK POII ANALYSIS ISSUKD V 1 x 16 08. Can or W.M. Bottle J. A. Liddle 11-30-65 LIMITS MKTHOD Clear, yellow sticky resin 2 Hue. 46 - 52 0.05 Max. G-l G-4 115 116 ( t. p p i i i 0020673 TOWOLDMONOQ48158 * CENTRAL ENGINEERING DEPARTMENT 1 PROJECT NAME - CED EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM -' ) ' r n n *"" ST -- ----------- EQUIPMENT INFORMATION SUMMARY "WsyZe- CEA NO. 080 AREA / approved b* INITIAL ISSUE REV NO REV ISSUED ft-zz-sy / Z-27-69 QTY SI ZE, RATING. MODEL, ETC MATERIAL OF CONSTRUCTION OPERATING WEIGHT .POUNDS) REMARKS S ESTIMATED o URC PRICE (S) /- ftSZ Ptft/cep. Pcs 7ftft/K / 3coo &ftt &)&./ Srest 38600 t//n So fto/C V 9t> rW . /OS "ft/6ft SftcAer TT/enin/A/a t Skf-TY /Ss,sr~ /-/S3 /-/2.001 /-/S3.002 /-/S3 003 hZ&f- /-/S^-OO/ /-//-/JTS.007 /- /S6 /-/Sg'OO * /- /S7 fut-vet / /ioroft, S/toeR)Zft / /)lR Tc/Mg'f/V* /kft//i / //ft Convey,*/$ 1>oc7- / dusr (IllOcr0ft / Conr/Bots, Suor CouecToft. J /)/ft JLOCK / Pfaroft, //fttoc.K. /Stoweft t%/oftt. Sttweft. / / | Cst/VSYaft / trZSH /iiKfto tztrR <3ooo **/A i- /&HP //8*>Rp* Snfiry 6je/s*7 A/ /ZcotBs SeFS. t/ ?r"x/2%\ tgXf'-ft/tft <*/>/* eees-/-3o Oi/trriov 8 "/f/ACRo GiftcW &t. 75ft ft /Vo Zt>/ V CtK///- Zhft&e/ $ret?t W/7M M/bot- ft/zif Cftce) ft/triFft M>/A /&< ft /Vo 32>/f (JA//T Sorry k/c/tftr 700 te s V // Cftor ZftOA/ Srft/tY SosC/. /V -- Sfis.ro Vs/t&ftf/l V ftft/tffoo/.f/i #SS 8reft to tyfsr /ftt/s ^//p/jisoftpn 2-4,,ift/oe * *S7?f/~4_i>/L/ r. Tcec V 1 7/ /tlftsr Sftnr ft/ ! i - --- 1 reec V Sn. rien/rntg (5>v<wri4 ft/ 002057* C E - 22. * SOURCE: N = NEW E- EXISTING R:TO BE RELOCATED ** ESTIMATED WEIGHT PILLED WITH NORMAL CONTENTS OR TEST MATERIAL. WHICHEVER IS HEAVIER TOWOLDMONOQ48159 CENTRAL ENGINEERING DEPARTMENT PROJECT NAME EQUIPMENT INFORMATION SUMMARY 19SBOVE3 BV CED EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM QTY SIZE. RATING MODEL. ETC MATERIAL OF CONSTRUCTION CE A NO INITIAL I SSL E A = A / RASE ^ =, /^T REV NO REV ISSUE- / /-6-<r? DERATING WEIGHT .POUNDS) REMARKS s ESTIMATED c R PRICE c (S) F /-/O 3 7 L *" / /ZP7P/f/SshA /u' JA //7_)// 4/6 S*<-/c /-/03-OO/ PforoA, Tittir* feet, J+y.* / fAp /,'<pr, P``7 fact n/CCr 1 // /- /3*<'y 2 .r/V' CcrjCri At*/* ~" A' 7fA~c AS /-104 LpLtiK/ts/.TO*: /*4 /o / S4 ZS/mn /Pjt / . 7~ /iXT A* /'.'/?<? Vj%` WA o O r o \r j /-/rr ' V'- ' N 's? - ; > /, V' /*'- -A>/*f. &K P'A-r (S'-.ff : k//3S */A K &*'///->- rs/i/x A//7c * ca~ j/,/r /o- A/- !/jA- ~ Ou-'c 7r/ ~ 7h)/ ' h'S'c - ~ S> * <f`A -- -........ ........................ / 2C,6rfl./TP1'i- *'/3 ^~7f' A- ^ i - ' //V I'<. s*S' - .,'J>. A A~r .7?^ /Vv/> '/ /'' ^ XT " .* ' - / ` ~ / ? PA'A i 50JCE". N:NE* Er EXISTINS T3 BE RELOCATED ** EST1MHTEO WEISHT FILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER ^4/ / 7?-' ` / _________________1 TOWOLDMONOQ48160 CENTRAL ENGINEERING DEPARTMENT 6ROJECT N tME CEO EQUIPMENT IDENTIFICATION NUMBER /- r DESCRIPTION Of EQUIPMENT ITEM ' '' EQUIPMENT INFORMATION SUMMARY CBgPiBED S' 7 - .>-* - z e * no J3*C APE A / IffbjvED S'- iN'-iA^ ISSUE REV NO REV SS _p E C '' T. /"* * / 7-6-4? QTY SIZE. RATING. MODEL. ETC MATERIAL OF CONSTRUCTION IPERATING WEIGH" .POUNDS) REMARKS S ESTIMATED RC PRICE (S' / /j 4oo-osp iZe HP CV.CLi i. Tilt'.* c7 n t ,'v ~TCj. F6ZO >>f,v <Y &,fj*rr' /V/3*- * // x Y? .r ~- 290 sx rr / > x //rr ^aCV' Fo-S- ' r}tjt rjt.r.'c xS.-TittH- W/< /*.. rc 0; / 7`F /F- J'-fyr 6pr>' k'.r/.~r it -<*/' ..f .' /- /O 7 /-/OH o e \r s 7^/s.r a//h/a//=>7o7. / -?6S 7)cr/-t F70 Pi?~H ;ASLJSC. e /A/ CP+ok Ufjtr- /> " //vT'O 7/)r C FTFFJ. Fp'P/P'Hr Mf/^r %/&.** A//r/r 77Vy^ 7o,-- CP 0/~f^ /**< /o/yI&/SP~t? , Fro / /0000 s --pTo- OpreL V r-j pjr ?srs&.rr uV c. r x// r 7~ s&ro Fo to ere * V /* 'A? * MPe.ry y&rr pof/'>//V />-->- - w/f' r~ jFyt.P 7S'//.XT 770r - F . - ' ?4!?r7.i' f SOURCE: N:NE* E = exiS~iM5 R:*3 BE flELOCATEO ED WEISHT F'LLEC ORMAL. CONTENTS OP T5t MATERIAL. WM'CHgVEP IS MgAVIEI TOWOLDMONOQ48161 ~n si r CENTRAL ENGINEERING DEPARTMENT PROJECT NAME 33 c/`-JL 3/oz/C 4fid CZ C ~ n :-- --3 EQUIPMENT INFORMATION SUMMARY --r --: rt cr -- -- -- crer#e: bv /' />-.r' CEA NO Z090 AREA / 4 c- /S' approve: bv IN' TIAL ISSUE ?-27-63 REV NC REV ISSUED / A-O-O/ CEO EQUIPMENT IDENTIFICATION NUMBER /-/O 7 DESCRIPTION OF EQUIPMENT ITEM QTv SIZE. RATING. MODEL. ETC / 3 COO <**7S"Clx MATERIAL of CONSTRUCTION CflK$'rto Srrsj. DERATING WEIGHT .POUNDS) REMARKS s ESTIMATED 0 5 PRICE cF (S) k//3jf`tW-'~ AUS-C 3/700 A//? - ? " A/ R/C* x /PC " ZotvA, PzA7S CbttZ /aoPTY 4/00 <-30 A/et. Z/Di-ji. / -v'. f-i/O TPHZtUZS fii'lP MoR/Z- CZA/TRjruOPt. / /CO 6PM/jb'pl PutTu.r /Re* Pro 3*Jo /ml . //sen- Srr~ .7 Rfeip Fav & JCT fovOK Fa'O f-J/O -oof rfo70&, //fz>rjx4 _ /tOp / Sff^//ecoPPM r/rrc A/ /-/// o \r wj / 3j" (7 A L 42 or //>_ & ~ * <StEL. S27S 4'// 7t/R* or // /'yz "a,/(/4rry /r ez /*- - 'f'lA; PMr"r: Ia./c/',p~ /SO <F/V / $/MtOr SOURCE: NiNEW E=.EXISTING R:TO re relocated ** ESTIMATED WEIGHT RILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER f ,? .. ' TOWOLDMONOQ48162 -- -- --1 t 'T-- r-' CENTRAL ENGINEERING DEPARTMENT PROJECT NAME Z-S-r-y -v - "ZyS^/T/ /v v C<Lo As. CED EQUIPMENT identification NUMBER DESCRIPTION OF EQUIPMENT ITEM ' ~r c~- -- r~ ------ 1 ------- 1 -------- CT -- - 1 ---- |IcoAcP; iB^EGX9-*-.-. EQUIPMENT INFORMATION SUMMARY C E A NO '^r ,, /.r / QTY SIZE, rating. MODEL, ETC rTMBv j________________ IN 1 Tl A_ 1 SSv E /-<'/- F REV NO / MATERIAL OF construction 1PERATING WEIGHT .POUNDS) REMARKS REV 'SSoEC S ESTIMATED o RCE PRICE (S) /-JiZ /*>. /// /^;A,V TR/r'yxC /y_ / /SZ>m.'7b'*G- 2>UCTiy /.R2& /}/ S7X -SO Atu '**- v i, A /Af/ /-//:. /-/I? ' /rfos 0*c , 7/^L /_ /V /: _ fww* / soa?//a Trrc /7 7H/?ti)/A/6L. Cx>lk Erj / /ZSooo AfR Cag&j* ZrejTA Zooo // //st. r/ BtAOr / /hR Ceot-CA AtvtfRf: Aoo tr-a s=T /)A/ratAA OPBRAToR 7ATT kSfuft'r /S&OXBS /-//3 J-U4 / /rftrafi, Ct>otr< /y)/v /5?>VAJ///oa yH/stf &>*/>< / Z/JP///60 f/M / 3oo g/u. 4Z"aDx <j>kch ^TJTCl. rerrc // M /Z r- 4?zr Tisrlfj OR a/ //x'Aa Co/t. f/RSY) /Zct. /&./- 'fWs; ZivS,-- 9ZS/.B 5 7rtrtmf*s6 / 3aO&'v//&- A2> 2>UfTHE /PjH j /)v 3t i - /P SA/Ajl. /?fs* . - Af <A /A// /**, /- * / /^braiZ., /'Xr.,,A''fsO*. /5a /3 / 7Z>~C A/ 0020S78 J: source: N:NE G. z- EXISTING ** - T O BE RELOCATED ** EST1MA-EC WEIGHT Pi_i.EC WITH NOViL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER ^ TOWOLDMON0048163 CENTRAL ENGINEERING DEPARTMENT RROJEC T N AME />.<- ' /?** : -v. = CED EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM EQUIPMENT INFORMATION SUMMARY CCSEC5AREC 9' \ sOve: 6v ! OTY SIZE. RATING. MODEL. ETC MATERIA,. OF CONSTRUCTION /-// 7//fifr?jA/aK <S->247e / /,*#>. eoc >-3>4v- /vr<- &A-tz-*, Frrjr/. 937<^r- 30 *//> * ZC,^r . C E A NC w- AREA To. /s IN I AL ISSUE REV NC REV ISSUED / -1 7-i / /-e-e? OPERATING WEIGHT ,POUNDS) REMARKS S ESTIMATED o PRICE R C (S> E 9S3S 34 **:.. /y<P>.- > *J>~7` /CA/g 7 /? FK\ y-.: */-.- /''- ~ 3'B7-<s -V' /-/f7 S/7/&C/a/F ~3A; A/o // I-/I8 /rjfiTori Fo/nP C'/vTrc //*"/ I-/IS -oo; /-// ? /rfoTOK /Oa; /*'**-. Fh-u~ /// /? 'c ; <Sc. 0020579 / SOh $ 5~4 'OJ- >: 25 iJWc*v wr/L 'J&or C- SaWC /Tf*.' /'/- * 77r,rr;4/'/''*f-7~ Soco 4" / Z3?&*i/7Srw S'ij -Sx'fjyt~Z.l 7rT A/Cd AWv- J'F/'i 2'X?yF /3*!V TP7Z' Otvf:.' / 'F V / /irfiF//8ccKF-'f TTrrc V / /,, <- --. *: ^7v- -T/ T F rr /s' I/a t//rr #** 'rrry ** c. - Y -.j/. f ~;- 3/6 A'Vyi. 7^>> ^ 3>i ^ '* TZir- * // Wr r, /y 1 45 yT Fy>~-~ .SW/y -F : SOURCE: N:NE* E = ex;TING R s TO BE RELOCATED ** ESTIMATED WEIGHT FILLEO WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER /vjp- '/ S'', '. . ,* TOWOLDMONOQ48164 --4 CENTRAL ENGINEERING DEPARTMENT N AML i>. - X- . EQUIPMENT INFORMATION SUMMARY : bsca*EC = / X- sscve: 5' rm CE A NO rrr AREA / RAGE T = . /cT vial ISSUE REV NO REV ISSUED / /- ^ - y CED EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION Oe EQUIPMENT ITEM Zf/ST OTY / SIZE. RATING. MODEL. ETC 4dS /tcHpf -?& "C MATERIAL Oc CONSTRUCTION 57-ferz Ss/Pt'c- * ^ U/YKIT OPERATING WEIGHT .POUNDS) REMARKS /At C/'U\.3. f/~r 'ijTZr k/fsi/rr Ztl -A x Y'h"< - ^//A firy 7>* ~ i'X/ ;a:..-/jA 7j % c R CE A/ estimated PRICE (S /- /Z/ / 300 &*?&#*/ - ?/- J72S- MsCX 'tn Sol /'`As**. y 44":,z xS/%,*h jti/>Tr //S>',,=*7- ?Z3~*P i^/SupfhSr *rc,, /- )2Z ~7&KrrT\/*SGt- / 3oO P/l/to>'HD fivcTfj-S />/' 3*7 -13 /AjCJ. A/T+i t7)t // 2>a/f Ha*/ /-/2Z- ort /`/oT&K. 'S'Se^M/cL 7ontP / 20#^//hy!>cm Tsrc */ (~/23 Tnisn}Hv41~ G>f>j. *z. / /> 4&P, A!r> JTp SHSa. * ~ -/ ?37s&rr Z6"0//t *ZOT ? 304ri^r:i * 3^ e& * /-fHW-i *g/yHi /z ,~y.-- /V 3~?93-/Py 0020580 ___ _____________________________ < SOURCE: N;NE E = EXISTING R:TO BE SELOCiTEO ** ESTIMATED WEIGHT PILLED WITH NORMAL CONTENTS OB TEST MATERIAL. WHICHEVER IS HEAVIER ^/''Ai _______________ TOWOLDMONOQ48165 CENTRAL ENGINEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY OJ ECT NAME i- fsV S'L/C /hiofJiof S cbepapec B' r.c AOBPCVED B v CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM QTY SIZE. RATING. MODEL. ETC MATERIAL Oc CONSTRUCTION /-/24 7h/i PifrjXK / Per /kr>-' ^ /or'-/o r / / -- t - AtAt fj. Tu^(/ ^2>a, /tors-. 7.A' CfM 7`TTft. /-/24-&OI /%TOA, /);/. ti/nF-L / /S//r //AXAfh CEA NO PdSO ;N ' t. Ai ISSUE 7-17- i -= / REV NO PE-. .sS'je: / /-/c-<? OPERATING WEIGHT .POUNDS) REMARKS sc ESTIMATED R PRICE IS) E P)/n.T A3, ;f A TTrc A/ f-/22T fiiOW'f/ /ArsK o o ru o 9V h- t-/z& /-IZC-O'/ fisLQi*) 7/)r/K /v/j? //.A ^Vy 7/; ' 77*US **/ ./"A, ' / ZS00 6AL (7*t4H Srrn. &2&0 ////PuASoA 7~ V /2o"0* /Zo" ///*// -/*/?*/AJCJL. 7rf/' - A/ -48 >'*>- y /So '2. gas4 /%ATF Oo/^ 3 /fry /jfc/s/T' tPono <P0 h / /2som/3y^ 2/vfTnO /7 :v 3yZ /C> / /aZ/oA/is , _T4' -2"0> v /<2 /*7" 2c/s '* A/aac tv/'-yr X '>-'/* Au.r: /a,u. /Ict - Or/ti., A' 2>2>Atf*Kt ? 7crc n;;vFK F~S- V-- Tore 4 * SOURCE t N:NE* E = EXISTING R = T BE RELOCATED ** EST'M*TEC WEIGHT FILLED WITH NORMAL CONTENTS OR TE$T MTEUL WHI CM C V ER IS w E * V! E R 4/ A TOWOLDMONOQ48166 "T? 7~" CENTRAL ENGINEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY PROJECT NAME /*/' Sac/p f'r *, 1-v ir. >L PREPARED 9 ^ /; S APPROVED B CEO EQUIPMENT IDENTIFICATION NUMBER 7-/2 7 DESCRIPTION OF EQUtOMENT ITEM ^/~r ^5^/fy R QTY SIZE. RATING. MODEL. ETC MATERIAL OF CONSTRUCTION / 230 ACM/ /)~ /f/iVE'& & / e'At*?? *i 2>*r*7Sr/CV Va'-Y <$e#t,iH3r --cf RAGE 2CP " / 9> o* /S :S ' - A_ `SSUS REV NO REV ISSUES --*7-27- => L^_ .................... DERATING WEIGHT .POUNDS! REMARKS 1 ESTIMATED K PRICE c (1) E -V 7-/2Q ctfozi s /Ja>7te 7~/2$- CO/ SrtU. A'o & /7/TA7CK' OmTtfoL / /,300.030 Oveec* nrcc /Cooo So% 7/ Ybrter 72m a f&TM*-SSC O'* '370*0 O/feo O/r* 8'l>Mx3'tf/6M /ffiTU&H. / D // CtPY sysr&*\ 7-/2? Sjjll ft) r- A/o S / 7SCO c/u. 732 "C> X <? MO ChDj Srcn. /c/ooc 7//3i?&>Xr /ui.' 7/ foe*. A*sv<7tci /-V ' 2>/2A Tc-fi Pjoj 0 72,k-//*'' Y2COO j 4 source.: n = n e f: sxijtiwj r = to bf pelocatec ESTIMATED *<EISHT '"li-LEO WITH NOPM*l CONTENTS OR TEST MATERIAL- WHICHEVER IS HEAVIER /~CY' V TOWOLDMONOQ48167 CENTRAL ENGINEERING DEPARTMENT DRCJEC T NAME EQUIPMENT INFORMATION SUMMARY BBEPtRED /<t 7a-rc AOORCVED 6v ZO 3-0 N ~'Ai_ '(SUE 7-27-63 AREA / REV NO / RASE 70 o. SS REV ISSUED /-/c-o ? CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM QTY SIZE. RATING, MODEL, ETC MATERIAL OR CONSTRUCTION DERATING WEIGHT .POUNDS! REMARKS 1 ESTIMATED K PRICE CE ($) t-tso OYC4irj S^rWi/ITiO / Z/> - Sc /noGme- 4 '6 ' Cy*:r* - 4`6' C/H ?>// Zircct fooo- Jti/GlfHt J7 r/.&, // /// ///C-'L. jr>)f t - ioJ^j/r. ri 7* 9go- /"/3t *3>v^ /l/o S *r`- / <oOO<SCC' 7r*_ 7/*. Sr . / 2 7ZFi. 4ZOO 304 TuZCl y C/4 ./, 4 SrteiL & ZjfZ. STAFF/. 4 SiV/JSK x/4f */ x Brr 460 So. TOT % 71/Bcs CyJlf. -7 // . sc"/ /orr PaCC 6m 7/d </ W/S'Jt / '//. T /V&S v5/>rr M/&S-P7 5700 4.3 0 /-/32 Sth-l M> S tfecOvtr* / -733 7^C\/A? 7yA`C&jTtiVFuoA- / 7-/33-60 f / 7Cc*K <Rjrt P / 3700 >/u fatso*/ Srea. ?0 "0t> x/ZO'falSH Sjcco M/&jfrb*:~ 4UOO 4 ///(/ /A/6<Ji77/A/& 0 //>rr- io/jo/e/rr SSOO/BZ W/3Ti/w/C 2 1 , /* <>-. LJSorj 72767// /So c>> Ducrn-/7 7t?m A VC 3. 7-/0 /mi /2crr-. c/.) 4 2i3>- 7a rv i7Ar\CT Z C/K. // -- .... -. ..................... 777c A/ " 0020 583 * SOURCE : N:Nt* E = EXIST(NC ArT3 BE RELOCATED - ** ESTIMATED WEIGHT TILLED WITH NORMAL CONTENTS OR TEST M A T E RI AL WHICHEVER IS HEAVIER /jt-i Sf ' l ' * -------------------------- 1 TOWOLDMONOQ48168 CENTRAL engineering DEPARTMENT RROJEC t n AM JT*F7s/u bu> Af.jrxoKS EQUIPMENT INFORMATION SUMMARY A==ROVEC S CEO EQUIPMENT IDENTIFICATION NUMBEP 7-734 DESCRIPTION OF EQUIPMENT ITEM QTY SIZE. RATING. MODEL. ETC Srux. 77c S / ZOO <$f* S/7tuis*r/A/4 /uses' /oc "ns Mr/er/G** CTtA/r3/r*7^ 7787* S&yY Pt*r y MATERIAL OF CONSTRUCTION <3t*j8o*y Snrei- CEA NO < C *- ' IN 1 t> al ISSUE 9-27-69 AREA / // /~ REV NO REV ISSUED / 7-/6-G 7 OPERATING WEIGHT ^POUNDS) REMARKS sO ESTIMATED R CE PRICE {$) A/ 7- 734-007 /foro*i. Srtxi. 77$ 3~ C)9cvi'*'r'fsf> / ZClip/f&ar- 3P* TrC A/ 7-/3S 'siren 77;as*. / 300 Onx <78rrru 4?"27>/Sj "/7/S7 SZ7 77 706/7 x oS 20//6 /Y/ST*/A-' Cvfirr MtC7ir 92S 73* lo/v7/'9*r /SAG //36 7-73*,-00 7 Srfix. //o jero# ......... - - - rrea Cci>*tv- --------------- / 68r'>+/TK 77/TH /AjTCfc, C0*)t>^A)C* K >7/o <** /S8CX.7*A* sir fjrAi 7~/8Z T //VT*r Gt-olf/sS*. OT86E Wo8T8'**/> Too * <yx sre /$rinse Ss*c J?/yB2r*i A/dS Skz Y'at To 0 M//7C /*' * - /i.lMj.'.'A/S-rK 7/ - --........................ - / /O '' l/A/ne/T' ......... ; CrPtsoo 2rrsi. ---- ------------- To *c*/i/y-r 3SG <? /* C CP ru7 -- -----------------7f 0020584 ; * SOURCE: N--NE* E-EXIST'NC B:TO BE 9ELOC*tEO ** ESTIMATED NEISHT fl.LED WTM NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER ^ TOWOLDMONOQ48169 CENTRAL ENGINEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY FROJEC r NAME //-/>,/ S'^.iV />/; X*.a*iS obpbe:- ' /P -e- - AOBROvED B* CE a NC 8080 INITIAL ISSUE 9-27-C8 AREA / Z O RASE /2 . ^ REV ISSUED /-/- 7 CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM SI 2, RATING. MODEL. ETC MATERIAL OF CONSTRUCTION OPERATING WEIGHT .POUNDS) ESTIMATED PRICE <$) /- /37 &/.'r ,, \ /re-'-- 8/o ) /y*//Cr>Ze PfuC-x? J5u/rV? <T 7/>f*K ex>C 6/te , /OZ"ODi/36 W/TV ICC Cur/'fC' h/39 V /-?' 831) VfifscrCK PxnrMjO??- COtu'r/Xy/Xt. fZoW;//te`/* Ux 3/Z-/-P i'uentx Me*/ 1-/39 Tt/&m>nc>L Svpte 7b*/*? /-/4a TtfE&miHCL TZ/n/^ Ponne- C'C'vT/Xl/'fi^ /-/40-ooz Moro/i j TrfEK*vr/ci /-/f/ 7~Hkm ' L fo '-L r~ 0Z0585 300 Ac Ut2"00*S/,'/'.><X Stitzi 7/S //Xt/bME<? Co'L M /2/y //srj*/4 MfJ /v'ui XnXiA ///-Our'Oo r -- JLF6 s Lfn/orr A/<i/*r 93/TiSe /OOGPrt/7,//i> /9rs 3? 7-/0 2>u(ru /#6*j 7//H///*> /rr^ /fr/~ e/u Jffyr> /*> 77TPC A/ Coo oco **.< 3/(EM%. /tier 28o x<. rr /^o-r - Cn^Sxv Crsa. I 3^' //?/ 70&K/, rS/6'ht,,M8i- *A |xgxT />*/& CA/MT'; /M 'jT/- - * SOURCE : N:NE E = EXISTIN ** ESTIMATED W6ICHT FILLED WITH NORMA R = TO BE RELOCATED TENTS OR TEST MATERIA IICHEVER IS HEAVIER *' v vr, _ v TOWOLDMONOQ48170 ---- ----- ----- --T I-31 ----- CENTRAL ENGINEERING DEPARTMENT "ROJECT NAME Sir.o : " 1 r"^ ^ 1 EQUIPMENT INFORMATION SUMMARY obeoaREG Bv S. - APPROVED e CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM QTY SI ZE. RATING. MOOEL. ETC MATERIAL OF CONSTRUCTION cns str CEA NC ZO~, \ AREA / INiTiA. ISSUE RE v NO ?-Z7-S / 1 " -- RACE A* o- REV ISSUED /-/-/ OPERATING WEIGHT ,POUNDS! REMARKS so ESTIMATED uR PRICE CE <S) /- /-42 jSCToZ SortP 7hrss / ZOO Oa-u 36"0/>*4S'M4/> Stzci /860 /./isos mrr *//*$ *7 4 /- /43 SaS\IAT/>>C /-/43-cxr: / /forote, SXcv/trovi / sv _ '-A r fits- - - SOOC 40 s> ;- ^ "* dT If- " f/er't+rr ss'a" __ 0YSajl/c /yie~ / SoSf/faoofr/* 4 ' 7SSC 4 /-/44 /-MS /-/4<7 /-/47 fiiunflAY- etfi>eeci'i /K'tffiY/ SfYOFcSK /Yjk Sec-tK/nsx. ScKofc-r/: / Sooo */A- // z7t-^c^.A& r / $* 40 \ 24' /st/Si-rek ? SS^KOiAi'- / *fe-> . /?4yj?.rc-A. //?>' / 3t>'* 24'*M /%tyi. rr* fe M :<r\ <>-s' .......................... 4 4 1/ o' 0020586 source: NsNEW E s EXISTING r = to be relocated ESTIMATED WEI CH T KILLED WITH NORMAL CONTENTS OR TEST MATERIAL. WHICHEVER IS HEAVIER _________________1 TOWOLDMONOQ48171 ~r ra 1 ! 1 ttp *--1 -- --t --: cr: ct err -- -- CENTRAL ENGINEERING DEPARTMENT CBSP*RE- 9V EQUIPMENT INFORMATION SUMMARY S3 ,'sr .'.TLf C E A NO c/o AREA / 7-7 oc XT ROJ EC T NAME AOBROVED B ' N I T ' A *_ ISSUE 7-/C-0 7 0 7 a REV ISSUED CEO EQUIPMENT IDENTIFICATION NUMBER /- /T* .R DESCRIPTION OF EQUIPMENT ITEM /9osotc /? /fo/STETfi qty / SIZE. RATING. MODEL. ETC MATERIAL OP CONSTRUCTION OPERATING WEIGHT .POUNDS) REMARKS S o uR C e Y ESTIMATED PRICE IS> /-/Y-9 77/jto Su/t/O 77?/vo / /-/So 7/fDA//A/0 3. / V&Zr/CA^ CfAsr/Q/^vt-sf^ f-ZSO-OO/ f&ro/Q , T/SETte/H /A/O l. fu/t//* / 7970 < 79/ "lots/; Oi/Qc'-ts Smr.. 2&x>o h/fa/7'S. ~ Y Oh&SfAsOt.:: j//s/ftj; 0>mHiS7 iV/Si'tY /4/}/vfO 4co go/i 700 ' 7~>/? 7/>fi T/oshy Z\s7Y Cfrocb* 370Ei. Y ///`//9<X>0,>1 TTrrc Y /-/S/ 726 8 Szr/orO /- / /fa*'. AIaooo / 78 "lots 7 M Tot .': ~ lZ*:r- / S7/7//7or7'fl9 /d>o2) Tore Y Y 0020587 i SOURCE: N = NEW E = EXISTING = TO BE RELOCATED ** ESTIMATED WEIGH-" PILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER `^*f"S JC/'T X ' >' TOWOLDMONOQ48172 CENTRAL ENGINEERING DEPARTMENT PROJECT NAME /'v Ss-ui ^ EQUIPMENT INFORMATION SUMMARY 'L brepaREC B^ APPROVED Bv CED EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM SIZE. RATING. MODEL. ETC MATERIAL OF CONSTRUCTION CE A NC OPERATING WEIGHT .POUNDS) AREA / PASE REV NO REV ISSUED ESTIMATED PRICE iS) /- 3ocC * <j Srx. 3$6zc Sc fi<r/c 9t ^ /!?rk' SSC' ST Vmpry ^ ~C ' o o I\J O A source: m:new ** ESTIMATED WEIGHT f R = TO BE RELOCATED . CONTENTS OR TEST MATERIAL HICHEVER IS HE A TOWOLDMONOQ48173 TOWOLDMONOQ48174 &*rtM Gfta*A*7z> <3*4*2 Sttra+'t* 77*0-/Vf3 oso "ZZ-& teao * 30*O */-rr fcrAt. <> <A ~> t-oo /oo 9-*o O-SO 72-00 *43 BnX77 JCrure*iE *2-/*S (*> O^fO for v* 2-00 Banu. (/?> 9-SO Sirrr #> /oo font. <2-00043 TOWOLDMONOQ48175 1 -f- - . a'-cf (5 finouwD Ltyfcj- (Uu *cal r.itf-*- 8VH*T AW4t ***JT <TV6 JkjO AKCi.>. CE*-100 SOM l`;t</-o" ^ '/y*i /?>*> ^ - TOWOLDMONOQ48176 e tg j X ftj 80 Si t m ~(g) O'* Th>w> Le-vtj- soki-e. EauiPHttfT ARANtinHT ;njtf s>MP C.CW*t'l4>#0 5cAtf * * IO*-o* k*4 3 A*/ti *w i*/J- X>/v* 0020*92 TOWOLDMONOQ48177 Appendix D Building and Site Requirement Building Size Number of Floors - Three (includes ground and roof level) Area per floor - 1500 sq/ft. Bay Size - 20' X 18' - 2 required - 30' X 18' - 1 required - 12' X 18' - 1 required Type of Construction 1. Structure - Open steel structure. Roof to be reinforced concrete. North wall to be enclosed with Monsanto Lustra span panels or equal. Second level floor to be grating. Finish on steel to be coating standard No. 502 or equal. One stair at the east end of the structure. 2. Rooms Control room ceiling will be acoustical tile. Control room floor will be terrazzo to conform to existing floor. Walls will be painted concrete block. 3. Personnel Service Facilities None required. 4. Elevators A freight elevator for moving bags of lime and rework to the operating floor is required. Capacity - 5000 lbs. Only one floor is served. Heating and Ventilating None required. Electrical There are no flammable materials handled in the immediate oper ating area. Classification is water resistant. Normal grounding requirements. Lighting requirements - Allow sufficient lighting for opera tions at the ground, operating and roof level. 00205V3 TOWOLDMONOQ48178 Provide two welding receptacles at each operating level, six required. Provide two small tool outlet receptacles at each operating level, six required. D. Maintenance Provisions The coil in the furnace. Item 1-128, has to be accessible for repair. The submerged pump. Item 1-134, in the still pot. Item 1-129, must be installed so that it is readily removable. E. Drainage No spacial materials are required for drainage. Drainage ditches will be constructed in the ground level concrete pad and a curb installed around three sides of the entire pad. F. Communications None required. G. Safety No safety showers or eye wash fountains are required. No explosion barricades are required. No blow out panels are required. H. Fire Protection No sprinkler systems are required. No fire wall, fire hose stations, fire alarms, or foam systems are required. No building steel fireproofing is required. I. Walks and Roads None required. J. Railroads None required. K. Parking LotB None required. L. Fences None required. M. Dock Facilities 0020594 None required. TOWOLDMONOQ48179 N. Facilities to be Relocated The control room will be expanded and the existing chlorinator panel will be relocated into this new control room addition. O. Grading and Excavation The area to the north of Building 27 is a filled area and good soil is available at 12 to 15 feet from the surface. P. Site Covering Rock covering in the areas around the site location. 0020595 TOWOLDMONOQ48180 Appendix E Solid Aroclor Expansion Scope of Work 01 - Equipment See Equipment Information Summary 02 - Instrument Items See Instrument List and Summary 03 - Setting and Testing Equipment Area accessible for truck and train unloading. High lift can be used to set larger units. The new elevator will be in stalled in Building 27. 04 - Setting and Testing Instruments An addition to the present control room will be required to make space available for setting instruments. The new addi tion will be 20 ft. X 30 ft. 05 - Piling None required. 06 - Excavation For operating floor 100 ft. X 22 ft. X 1 ft 2200 cu.ft. For elevator pit 360 cu.ft 6 ft. X 10 ft. X 6 ft For structural piers 7700 cu.ft. Mfg. Area 7 piers X 8 ft. X 8 ft. X 12 ft. = 5400 = 5400 Control Room 3 piers X 8 ft. X 8 ft. X 12 ft = 2300 Backfill required 5000 cu.ft. Remove spoil - Sheet piling may be required for shoring. 0020596 TOWOLDMONOQ48181 Foundations For Structural Steel 10 pads X 6 ft. square X 1.2 deep with 12 ft. column 1.5 ft. square 700 cu.ft. Floor Slab - Reinforced Concrete 1100 cu.ft. 24 ft. X 90 ft. X 6" thick Equipment Pads 120 cu.ft. 10 items x 6" Thick X 6 ft. X 4 ft. Concrete Basin Within Floor Slab for drainage 450 cu.ft. 2 ft. wide X 1-1/2 ft. deep X 6" thick X 90 ft. long, 2 required Supports, Platforms and Structures Equipment Supports 55 tons Grating Requirement 2000 sq.ft. Handrails 400 ft. Toeplate 400 ft. Misc. Structural Supports 8 tons Stair Requirement One complete stairway for two levels Control Room Building Frame 10 tons Control Room Floor 300 cu.ft. 30 ft. X 20 ft. X 6" thick Other Buildinq Items Floor Covering for Control Room 600 sq.ft. 30 ft. X 20 ft. terrazzo to conform to existing floor Acoustical Ceiling for Control Room 600 sq.ft. Windows for control Room - Four Units 5 ft. X 4 ft. Doors for Control Room - Two Hollow Steel Units 0o^0597 3 ft. X 7 ft. TOWOLDMONOQ48182 10 - Sprinklers None required. 11 - Piping Item Service Material Size 1-101 Sant R C.S. 2" X3" Biphenyl C.S. 2" Vent C.S. 3" X4" To It.103 Misc. C.S. C.S. 3"X4" 3" X4" Misc. C.S. 2" X3" Misc. C.S. 2" X3" Therm.Ret. Steam Cond. C.S. C.S. C.S. 1" 1*5" 1" Rmks. Jacketed Traced Jacketed Jacketed Jacketed Hose Jacketed Hose Jacketed Hose - Length 75 ft. 75 ft. 35 ft. 30 ft. 2 ft. 2 ft. 2 ft. 50 ft. 40 ft. 40 ft. Insul. Valves 1" 2 - Jctd, 1" 2 - CD 3 1" 1 - Jctd, Vent 1" 1 - Jctd *- -- 1" 3 - FA37 1" 1" - 1-103 Chlor. Charge C.S. 3" X4" Jacketed 100 ft. IV 1 - Jctd 1-104 Relief C.S. 2" Relief Chlorine C.S. C.S. 3" 3,, To It. 105 C.S. 3" X4" Jkt. S .S.Inner Traced - Jacketed 50 ft. 50 ft. 60 ft. 30 ft. _ 1 _ CA46 -- 4 - DE41I 2" 1 Jctd 1-105 To It. C S.Jkt. 3"X4" 106 S . S.Inrier To It. 125 C.S. 3"X4" Sample C.S. 2" X3" Jacketed Jacketed Jacketed 50 ft. 25 ft. 30 ft. 1-106 To It. C .S.Jkt. 3"X4" 104 S .S.Inner To It. 116 C.S. 4" Jacketed - 25 ft. 25 ft. 2" 2 - Jctd 2" 1 - Jctd 2" 1 - Jctd 2" NO 2 - FA42 OOZOS**8 TOWOLDMONOQ48183 Item Service Material Size Rinks. Length Insul. Valves 1-107 To It. 108 C.S. 4" 2 tracers 50 ft. 1*5" 1 CA46 To HC1 Line C.S. 4" 2 tracers 50 ft. 1*5" 2 - CA46 To It. 109 C.S. 4" 2 tracers 30 ft. 1*5" 1 CA46 1-108 To It. 113 C.S. 3" - 20 ft. 1" - To It. 109 C.S. 4" 2 tracers 15 ft. 1*5" - Drain C.S. 1" - 20 ft. - 1 FA42 1-109 Vent Relief 200 psig steam In. Cond. Out To It. 110 C.S. C.S. C.S. C.S. C.S. 2"X3" Jacketed 2" 1" " 25 ft. 25 ft. 50 ft. 1*5" 1*5" 1" 2" X3" Jacketed 50 ft. 30 ft. 1*5" 2" 1 _ Jctd. - 2 - FA37 2 - FA37 1 Jctd. 1-110 To It. 101 C.S. 1-111 Vent Therm.in Therm.Out To It. 112 C.S. C.S. C.S. C.S. 2" X3" Jacketed 70 ft. 2" 2" l*' 1*5" 3" 20 ft. _ - 40 ft. 1*5" - 40 ft. 1*5" - 25 ft. 1" 2 - Jctd. 2 - FA37 2 - FA37 1 FA42 1-112 To It. 108 1-113 To It. Ill C.S. 3" C.S. 3" - 50 ft. 1" 1 - FA42 - 50 ft. 1" - 1-117 Relief Relief Chlorine To It.118 C.S. 2" Traced C.S. 3" - C.S. 3" - C.S. Jkt.3"X4" S.S.Inner - 50 ft. 50 ft. 100 ft. 30 ft. 2" 1 - CA46 - 4 - DE41M 1 - Jctd. 0020599 | TOWOLDMONOQ48184 Item Service Material Size Rmks. 1-118 To It. 119 C.S.Jkt. 3"X4" Jacketed S.S.Inner To It. 123 C.S. 3"X4" Jacketed Sample C.S. 2" X3" Jacketed Lenqth 50 ft. 25 ft. 30 ft. Insul. Valves. 2" 2 - Jctd 2" 1 - Jctd 2" 1 - Jctd 1-119 To It. C.,S. Jdt. 117 S..S.Inner To It. 123 C.S. 3" X4' ' Jacketed 4" 25 ft. 25 ft. 1-120 To It. 108 To HC1 Line C.S. C.S. 4" 2 Tracers 50 ft. 4" 2 Tracers 50 ft. 1-121 Vent To It. 122 Steam In Steam Out C.S. C.S. C.S. C.S. 4" 41*5" 1*5" .-' Traced " 30 ft. 30 ft. 50 ft. 50 ft. 2" No 2 - FA42 1*5" 1 CA46 1*5" 2 " CA46 -_ No 2 - FA42 i" i" 1-122 To It. 119 TO It. 123 C.S. C.S. 4" 4" Traced 70 ft. Traced 30 ft. No 3 FA42 No 1 FA42 1-123 To It. 121 TW in TW Out C.S. C.S. C.S. 4" Traced 40 ft. 6" ,3' - 50 ft. 6", 3' ' " 50 ft. 1-114 Vent to It. 115 Steam In Steam in C.S. C.S. C.S. C.S. 1-115 To It. 106 TO It. 116 C.S. C.S. 4" 4" 1*5" 1*5" 4" 4" _ Traced - " 30 ft. 30 ft. 50 ft. 50 ft. Traced Traced 70 ft. 30 ft. No 1 FA42 - 1 - EA46 " 1 EA46 -_ NO 2 _ FA42 i" i" No 3 FA42 No 1 - FA42 0010600 TOWOLDMONOQ48185 Item Service 1-116 To It. 114 TW In TW Out Material C.S. C.S. C.S. Size 4" 6", 3" 6" 3" Rmks. Traced - Length 40 ft. Insul. No Valves 1 - FA42 50 ft. 50 ft. - 1 - EA46 1 - EA46 1-124 To It. 125 C.S. 2" - 60 ft. - - 1-125 Steam In C.S. 1*5" - 60 ft. 2 2 - FA37 Steam Out C.S. 1*5" - 60 ft. 2 2 - FA37 Vent Saran Lined Steel 6" Traced 50 ft. No To It. 126 C.S. 3" X4" Jacketed 30 ft. 2 2 - Jctd. 1-126 To It. 129 1-127 Vent Drain 1-128 To It. 129 Gas In C.S. 3"X4" Jacketed 75 ft. 2 2 - Jctd. P.E. Saran Lined Steel 6" 3" - 50 ft. _ 50 ft. _ C.S. 3"X4" Jacketed 30 ft. 2" 2 - Jctd. C.S. 1*5" - 50 ft. 2 - CD3 1-129 To It. 130 C.S. 18" -- 2" - To It. 134 C.S. 3"X4" Jacketed 40 ft. 2" 2 - Jctd. 1-130 To It. C.S. 16" - 30 ft. 2" - 131 To It. 129 C.S. 2"X3" Jacketed 10 ft. 2" Site Glass To It. 141 C.S. 2" 30 ft. 1-131 To It. 132 To It. 141 C.S. C.S. 3"X4" Jacketed 20 ft. 2" - 40 ft. 2" 2 - Jctd. Site Glass 2 - FA37 OO^Ofcoi TOWOLDMONOQ48186 Item Service Material 1-132 Vent C.S. Relief C.S. To It. 135 C.S. To It. 133 C.S. Steam In C.S. Steam Out C.S. Size Rmks. 3" X4" Jacketed 4" - 3" X4" Jacketed 3"X4" Jacketed 1*S" - 1*5" Length 30 ft. 30 ft. 40 ft. 30 ft. 60 ft. 60 ft. Insul. 2" 2" 2" 2" 2" Valves 1 - Jctd 2 - Jctd 2 - Jctd 2 - FA37 2 " FA37 1-133 To It. 137 1-134 To It. 128 - 3"X4" Jacketed 110 ft. 2" 2 - Jctd 3"X4" Jacketed 40 ft. 2" 2 - Jctd 1-135 To It. 136 Steam In Steam Out Water In water Out - - 3" X4" Jacketed 30 ft. 2" 2 - Jctd 1" - 30 ft. 1" - 1" - 50 ft. 1" - 1" - 50 ft. 1" - 1" " 50 ft. 1" 1-136 Steam In C.S. Water In C.S. Water Out C.S. Aftercond. Water Out C.S. Intercond. Vent C.S. 2" 2" 2" 2" 3" _ 30 ft. 1*5" _ - 30 ft. - - 40 ft. - - 40 ft. - - 20 ft. 1-139 Steam In C.S. 1*5" - 50 ft. _ _ Steam Out C.S. 1*5" - 50 ft. - - Vent C.S. 3" - 20 ft. - - To It. 140 C.S. 2" " 30 ft. 1" 2 FA42 1-140 To It. 131 1-141 To It. 139 C.S. C.S. 2" 2M - 70 ft. - 2 - FA42 - 50 ft. 1" - 0020602 TOWOLDMONOQ48187 Item Service Material Misc. Therm 14 Conn. In C.S. Therm 14 Conn. Out C.S. Therm C.S. Size IV 1*5" 6" Rmks. " Lenqth Insul. 500 ft. 1*5" Valves 30 - FA37 500 ft. 1*5" 30 - FA37 - 500 ft. - 4 - FA37 12 - Ductwork A 6 ft. X 6 ft. cabinet will be required for housing drums for draw-off of residue product for still pot. 13 - Electrical Motors to be installed and wired: Number 1 5 1 2 3 2 1 1 1 Horsepower 2 5 7*S 10 15 20 25 30 50 Allow for remote pushbuttons and alarms for 10 motors. Lighting required in operating area: Ground Area, Operating Area, Roof Area, 18 ft. X 82 ft. 18 ft. X 82 ft. 18 ft. X 82 ft. 1476 ft*2 1476 ft2 1476 ft2 14 - Site Preparation None required. 15 - Sewers 1. 50 ft. of 4" permanite sewer pipe with one tie-in to exist ing 8" sewer which runs west of Building 27. 2. 150 ft. of 304 S.S. guttering around the top of the new structure with 3-4" downspouts, each 30 ft. long 0020603 TOWOLDMONOQ48188 16 - Underground Mains None required. 17 - Yards. Roads and Fencing None required. 18 - Railroads None required. 19 - Insulation Piping - Refer to Code 11 Equipment - As below - material Standard #100 Weatherproof, Std. #65 Item 1-101 1-104 1-107 1-109 1-111 1-117 1-120 1-125 1-129 1-130 1-132 1-139 10 Pumps Area 250 ft2 200 ft2 50 ft2 250 ft2 80 ft2 200 ft2 50 ft2 550 ft2 550 ft2 150 ft2 350 ft2 80 ft2 Thickness 2" 2" 1" 2" 1*5" 2" X" 2" 4" 3" 2" 1*5" 2" 20 - Painting Coating Standard #502, Epoxy System. All uninsulated piping, air, water, gas. Supports for Items 106, 113, 116, 119, 123, 128, 141, 142, 132, 135. 0020604 TOWOLDMONOQ48189 21 - Walls, lasonry, Roofs and Roofing Concrete roof deck for mfg. area - reinforced concrete, 20 ft. X 90 ft. X 5" thick Concrete roof for control room - reinforced concrete, 20 ft. X 35 ft. X 5" thick Concrete wall for control room - concrete block, 3 walls, total feet - 70 ft. X 15 ft. high Concrete enclosure for elevator - concrete block, 4 walls, total feet - 30 ft. X 25 ft. high Built up 4-ply roof for control room, 20 ft. X 35 ft. North wall of mfg. structure will have Monsanto Lustra Span panels for a distance of 80 ft. and height of 12 ft. in each level. 750 cu.ft. 290 cu.f t. 1050 sq.ft. 7 50 sq.ft. 700 sq.ft. 1920 sq.ft. 90 - Dismantling 1. North wall of Building 27, approximately 1500 sq. ft. of brick wall. 2. South wall of present control room, 450 sq.ft, of concrete block wall. 3. Shed to south of present control room, approximately 600 sq.ft, of transite roof and steel platforms inside shed. 4. Biphenyl heater on Still No. 1. This is a unit heater in the shed. 92 - Repairs Expense Replace existing head on Item 535. This is a 2000 gallon vessel and requires a new 78" O.D. carbon steel head. 93 - Relocation and Modification Expense 1. Remove and relocate Item 205, a 14' dia. X 10' high storage tank with coil and agitator. 2. Remove and relocate stairway to the north of Building 27. 3. Remove and relocate 10 ton stand-up tube air-conditioner which is now in the south section of the control room. 4. Remove and relocate a 20 ft. chlorinator panel from its existing position in the present control room to the new control room. 5. Remove the present 1268 flaker (24" X 48" unit) and replace with a new unit. This unit will be relocated to an area just east of the present flaker. 00Z06* TOWOLDMONOQ48190 APPENDIX E - Amendment No. 1 Scope of Work - CEA 2080 07 - Foundations L For Elevator Pit (Reinforced Concrete) r 08 - Supports, Platforms and Structures Equipment Support For Item 152 150 cu.ft. 6 tons Grating Requirement For Item 152 225 sq.ft. Handrails 60 ft. Toeplate 60 ft. Stair Requirement One Stairway For One Level 11 - Piping i Item Service Material Size Rmks. Length Insul. Valves 1-152 Charge C.S. 3"X4" Jacketed 125 Ft. 2" 1 - Jctd. Charge C.S. 2"X3" Jacketed 125 Ft. 2" 1 - Jctd. Therminol C.S. 1*2" - 200 Ft. 1*5" 2 - FA5 Vent C.S. 3" X4" Jacketed 30 Ft. - - Overflow C.S. 3"X4" Jacketed 30 Ft. 1*5" - Outlet C.S. 2" X3 " Jacketed 50 Ft. 1*5" 1 - Jctd. 12 - Ductwork A 6 ft. X 8 ft. X 10 ft. hopper will be required under the new flaker. 13 - Electrical Use PVC coated conduit. 19 - Insulation Item 1-152 Area 320 ft2 Thickness 2" 90 - Dismantling .2 A section of floor in Building 27 - Area 400 ft for 1268 flaker. i 0020606 TOWOLDMONOQ48191 92 - Repairs Expense 5. Repair or replace section of floor at new 1268 flaker. 93 - Relocation and Modification Expense Remove Item (5) from original scope and replace with the following: 5. Relocate 18" I beam to south of control room. This beam is 40 ft. long and will be moved south approximately one foot. 6. Relocate 2 - 6" IPS tower water lines to south of control room - Total feet = 100. 7. Relocate miscellaneous 2" IPS pipe to south of control room - Total feet = 100. 0020607 TOWOLDMONOQ48192 APPENDIX E - Amendment No. 2 Scope of Work - CEA 2060 This amendment describes the work required to install a power pulverizer to grind flakes of Aroclor 1268. it includes a mill, conveying duct to dust collector, air lock to discharge material into fiber containers and a dust collector with blower. Instruments will be required at the dust collector. 03 - Setting and Testing Equipment Pulverizer will be located under the flaker unit. The dust collector and pulverizer will be located on support steel. 08 - Supports, Platforms and Structures Miscellaneous equipment supports, light steel 1 Ton 12 - Ductwork Install 75 feet of 6 and 8" duct for blower and pulverizer. 11 - Piping Install 100 feet of lh" IPS piping to filter for air. 13 - Electrical Motors to be installed and wired: Number Horsepower 1 10 15 1 Conduit run to dust collector controls 20 - painting Support steel with Std. #502 Epoxy System. 0020608 TOWOLDMONOQ48193 APPENDIX E - Amendment No. 3 Scope of Work - CEA 2080 Spares A pump, indentical to Item 1-134,is to be purchased and held as a spare in the storeroom. Item 1-134 is a special submerged pump, critical to the operation of the Aroclor plant, and is required to prevent losses due to pump failures. Size TDH Make 200 GPM 100 Feet Taber Heavy Duty 0020609 TOWOLDMONOQ48194 0020610 TOWOLDMONOQ48195