Document Edmpkj9YG8wMx69RrM41bryBg
Central Engineering Department
I Project Scope Report
Solid Aroclor.^Expansion s
Anniston
abama Plant
By: R. S. Yates Central Engineering Department January 14, 1969
00*0546
TOWOLDMONOQ48131
DISTRIBUTION
Organic Division
1. J. M. Smith 2. W. A. Kuhn 3. H. L. Williams 4. W. E. Voss
Central Engineering
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
R. M. Kountz R. S. Yates 0. F. Bremer/P.K. Nunn J. W. Campbell/B. W. Steketee/R. B. Degenhardt L. R. Burchfield F. J. Holzapfel Central File R. C. Herman R. C. Herman R. C. Herman R. C. Herman
oozom
TOWOLDMONOQ48132
CEA 2080
Date: 1/16/69
By:
R. S. Yates
TABLE OF CONTENTS
1.1 Project Scope Summary
1.11 Title 1.12 Synopsis and Project "Tone"
1.2 Process Technology
1.21 Process Description
1.211 1.212 1.213
Details of Process Yields and Raw Material Usage Process Documents
1.22 Raw Materials
1.221 Specifications 1.222 Sources
1.23 Products and By-Products
1.231 1.232 1.233 1.234
Quality Considerations Specifications By-Products Packaging and Shipping
1.24 Waste Streams
1.25 Personnel, Property and Public Hazards
1.3 Manufacturing Facilities
1.31 Description
1.311 General 1.312 Manufacturing Facilities
1.32 Design Capacity
1.33 Flexibility Requirements
1.34 Future Expansion
1.4
1.35 Physical Appearance 1.36 Storage and Shipping Requirements Utilities
1.41 Utilities Summary
1.42 Utilities Facilities
Page No.
1
1 1
3
3
3 3 4
4
4 5
5
5 5 6 6
7
7
9
9
9 9
10
10
11
11 11 12
12
12
0020548
TOWOLDMONOQ48133
Appendices A. Equipment Information Summary B. Process Flow Diagram C. Equipment Arrangement Study D. Building and Site Requirements E. Description of Work by Code of Accounts F. Preliminary Schedule G. Project Loss prevention Report
00205*9
TOWOLDMONOQ48134
Page 1
1.1 Project Scope Summary
1.11 Title
Aroclors - Increase Solid Aroclor Capacity - Organic Division at Anniston, Alabama Plant CEA 2080
1.12 Synopsis and Project "Tone"
The objectives of this project are to
a. Provide new facilities to^ increase solid Aroclor plant capacity from 9.6 M lbs./year to 29.6 M lbs./year.
b. Provide an overall production capacity for solid Aroclors of up to 30% more than indicated in the latest sales forecast.
c. Provide for an orderly expansion of the solid Aroclor facilities.
d. Complete these facilities by December, 1969.
New facilities to be added are:
f~ ' 1 1
^
wo batch chlorinator systems consisting of
a single terphenyl feed tank, two chlorination * tanks with heat removal systems and\one inter-
7
-mediate storage and blow tank.
i
............
. ""t
2. fXh'off-gas recovery system consisting of heat
-exchanger and surge tank to recover entrain
ment lossss from both chlorinator systems.
3. (She batch distillation system consisting of 'still pot, external circulating system through
^ a gas-fired heater, condensing and receiving
^ equipment, and a high vacuum ejector.
'
4. Sufficient piping tie-ins to insure good oper ating flexibility with the existing batch system.
5. Expand the existing control room to provide sufficient space for instrumentation for the new facility.
6. Expand the existing Therminol heating system to provide proper distribution of hot fluid to the new facility.
7. Add drowning facilities at the HC1 plant to,, frown the extra HC1 gas produced from the .^
. bhlorinators.'"-".......
0020550
TOWOLDMONOQ48135
Page 2
.8 A new elevator in Building 27.
9. A flaker for Aroclor 1268.
Sales forecasts indicate that we will be out of solid Aroclor capacity in 1969. The plant is carrying out a debottlenecking program which will allow us to meet most of our 1969 requirements. The new facilities should be operational by December 1969 or earlier if possible. A preliminary schedule shows that if we can start definitive engineering in January, these new facilities will be available for start-up in December 1969.
Full design capacity will not be necessary until after 1973. It is divisional policy in certain product groups to provide excess capacity over and above sales forecasts and we are providing a 31% excess capacity in these new facilities for 1973 based on the sales forecast of December 6, 1968.
Low capital cost is important to this project, however, schedules must be met for a December 1969 or earlier start-up even at some increased capital cost. There are no items that could be deferred from this project to a later date.
It is estimated that the cost of these new facilities will be:
Capital Expense Total
$ 950,000 50,000
$1,000,000
0020551
TOWOLDMONOQ48136
Page 3
1.2 Process Technology
1.21 Process Description
1.211 Details of Process
Aroclors are the reaction products formed by the chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HCl gas pro duced is absorbed in water to produce muriatic acid. Solid Aroclors are produced in chlorinator reaction vessels, air blown and distilled. They are drummed, flaked, or flaked and milled and packaged for shipment.
Distillation residues are discarded as waste or sold as Montars.
Aroclors, when used as plasticizers and that crystallize at ambient temperatures are con sidered solid Aroclors. Below is a list of the Aroclor grades that are considered solid Aroclors:
Aroclor
Starting
Designation Raw Material
Chlorination
Level
Distilled
1268
Biphenyl
68%
Yes
2565
25% Santowax C 75% Biphenyl
65%
NO
406 5
40% Santowax R 60% Biphenyl
65%
No
--------- 4465
40% Santowax R 60% Biphenyl
65%
Yes
5060
100% Santowax R
60%
No
5460
100% Santowax R
60%
Yes
5042
100% Santowax R
42%
No
5442
100% Santowax R
42%
Yes
Vwe intend to make only Santowax'R based Aroclors
Vin this new equipment. -; ;
" .......... .... '
1.212 Yields and Raw Material Usage
Yields are calculated for both chlorine and Santowax and/or Biphenyl. Based on cost standards of January 1, 1969 these are (% theory to standard):
0020552
TOWOLDMONOQ48137
Page 4
Aroclor
On
On
On
On
Designation Chlorine Biphenyl Santowax C Santowax R
1268
73 73
2565
96 96.2 96.2
4465
73 73
73
5060
96
96
5460
82
85
5442
80.2
73
The yield on 5460 has not been demonstrated. Last year the standard yield on chlorine and Santowax R was 73.5%
Lime and Ferric chloride are added to all products as follows:
Lime Ferric Chloride
Lbs./lOO Lbs, firoclor 1.000 0.020
1.213 Process Documents
"Standard Manufacturing Process for Aroclors Anniston Plant" September, 1966, M. J. Williams
"Standard Operating Instructions for Aroclors Anniston Plant" November, 1968, M. J. Williams
1.22 Raw Materails
1.221 Specifications
Raw material specifications, as listed below, are appended.
Material Code
Date
Material
33500
2/26/57
Ferric Chloride Anhydride
83601
11/18/65
Biphenyl
82910
3/9/66
Santowax "C"
82602
3/2/66
Santowax "R"
82638
8/31/66
Chlorine Gas
38800
7/20/66
Lime Hydrate
0020553
TOWOLDMONOQ48138
Page 5
1.222 Sources
Biphenyl
Biphenyl is stored in horizontal tanks in the Biphenyl Area and pumped on demand into the Terphenyl Mix Tank.
Ferric Chloride
Received from the warehouse in 100 lb. kegs.
Chlorine
Received from tank cars and the chlorine plant. In 1969 the chlorine plant will be shut down and the entire supply will be from 44, 55 or 90 ton tank cars shipped into the plant. Liquid chlorine will be vaporized and trans ferred as a gas to the department area.
Lime Hydrate
Received from the warehouse in 50 lb. bags loaded on palettes.
Santowax "C"
Received from the continuous biphenyl stills on demand through a transfer line.
Santowax " R"
Received from a 50,000 gallon storage tank, heated west of the HB40 department, on demand, through a transfer line. Santowax "R" is ob tained from the continuous Santowax still in the Biphenyl refining area.
1.23 Products and By-Products
1.231 Quality Considerations T"Xroclor 5460 has a color and softening point"' \specification which because of the nature of the ,,
v 'process gets out of control on occasion. Color is more of a problem than softening point.
1.232 Specifications
Finished goods specifications, as listed below, are appended.
0020554
TOWOLDMONOQ48139
Page 6
Product Code 82616 82618 82619 82620 82622 82621
Date 3/11/66 3/11/66 3/11/66 3/11/66 3/11/66 3/15/66
Product Aroclor 1268 Aroclor 2565 Aroclor 4465 Aroclor 5060 Aroclor 5460 Aroclor 5442
1.233 By-Products
HCl gas is a by-product of the chlorination re action and can be absorbed in water to produce muriatic acid or sewered and neutralized with limestone.
Residues from the distillation are drawn off to drums and sold as Montars or discarded. Listed below are data on the Montars.
Montar No.
5 6 7 8
Aroclor
5460 4465 1268 5442
Softening Point Range
155-195C 135-190C
200 C
Calcium Oxide
1.6% 2.0%
The plant is considering the flakering of Montars in order to change the product form.
Latest sales forecast, November 27, 1968, in dicates sales requirements for the solid Montars as follows for the year 1969:
Montar 5 Montar 5 crushed. Montar 5 crushed. Montar 6
180,000 dom. 400,000 inter. 80,000
50,000
lbs. lbs. lbs. lbs.
1.234 Packaging and Shipping
to m
o
n
o o
Container Weights
Material 1268 2505 446 5 5060 5460 5442
Weight - lbs. 200
50 and 500 50 and 500 50 and 100 50 and 100 50 and 450
Container
Form
41 gal. fibre drum
Flakes
5 and 40 gal. drums
Solid
5, 40 and 55 <gal. drums Solid
paper bags
Flakes
paper bags 5 and 40 gal. drums
Flakes Solid
TOWOLDMONOQ48140
Page 7
1.24 Waste Streams
Approximately 2200 gallons of Montar 5 will be produced daily with an approximate composition as follows:
Chlorine Iron Calcium Oxide
57-59% 0.12% 1.6%
Some of this material is sold, the remainder is put drums and taken to the toxic dump. The plant has a project to pump these waste materials to Cleghorn's lake, a sump used for residue disposal.
in
An additional 70,000 lbs, of HC1 gas will be produced daily from this new plant and will have to be absorbed and sewered at the acid plant. If additional absorption capacity is required, a separate project will be sub mitted.
1.25 Personnel, Property and Public Hazards
Chlorine Gas
Causes eye, skin and mucous membrane irritation. Maximum allowable concentration is 2 ppm. Concentra tions in the order of 15 ppm will cause throat irri tation. Cannister gas masks, Scott Air Paks or other similar equipment is required in strong concentra tions.
Biphenyl
A toxic organic chemical. Breathing fumes or vapors should be avoided. During processing the material is usually hot (100C or above) and can cause serious
thermal burns in contact with the skin. Protective garments should be worn go aboid contact. Flash point of biphenyl is 235f.
Ferric Chloride
Not toxic but presents an eye hazard. Normal pre cautions of wearing safety glasses should be followed.
HCl Gas
Fumes are toxic and hazardous to teeth, skin, eyes and mucuous membranes. In strong concentrations, rubber protective equipment should be worn. Maximum allowable concentration of HCl gas in air is 10 ppm.
0020556
TOWOLDMONOQ48141
Page 8 Santowax R
Relatively non-toxic, however, the vapors are irritat ing to the bronchial tract. Prolonged breathing of vapors should be avoided. Material is generally hot (150C or above) and can cause serious thermal burns in contact with the skin. Crude Aroclors Crude Aroclors are hot since all are handled in Therminol heated jacketed lines. They can cause serious thermal burns in contact with the skin. Still Bottoms or Residue Fumes from still bottoms are toxic. They are ex tremely irritating to the mucous membranes, eyes and respiratory tract and should be avoided. They are hot (above 150C) and can cause serious thermal burns. Hydrated Lime Dust is irritating to the eyes and skin and any material on the skin should be washed off with water.
00*0557
TOWOLDMONOQ48142
Page 9
1.3 Manufacturing Facilities
1.31 Description
1.311 General
The following information is included in the Appendix of this report:
Equipment Information Summary Process Flow Diagram Equipment Arrangement Study Building and Site Requirement Description of Work by Code of Accounts Preliminary Schedule Project Loss Prevention Report
1.312 Manufacturing Facilities
A 2000 gallon mix tank for terphenyls with charge lines and supported on a 40,000 lb. hopper scale. Two 3100 gallon chlorination tanks with circulation pumps and heat removal systems consisting of two shell and tube heat exchangers and a Therminol surge tank and pump. An off-gas system consisting of heat exchanger and 2000 gallon storage tank to recover entrain ment losses from the chlorinator off gases with tailings pump. A 6500 gallon batch intermediate storage and blow tank with scrubber and transfer pump. A 7300 gallon still pot, 3500 gallon receiver with entrainment separator, still condenser and ex ternal gas fired heater with submerged centrifugal pump. A condenser control system consisting of two shell and tube heat exchangers and a Therminol surge tank and pump. A three-stage ejector with intercondenser, and aftercondenser and catch tank and sump tank. Additions to the present control room to provide space for additional instrumentation. A two-stage HCl gas drowning system. A new freight elevator for Building 27. Additions to the present Therminol system.
O020`,'>8
TOWOLDMONOQ48143
1.32 Design Capacity
Chlorination:
Basis OST Rate
Producing Aroclor 5060 6350 hrs./year 27.6 M lbs./year
Distillation:
Basis OST _______ jiftate
Producing Aroclor 5460 6350 hrs./year
2Q,, P,,,M lbs ./year -' J
After these additions are complete, plant capacity will be as follows:
Present Capacity New Capacity Total Capacity
9.6 M lbs./year 20.0 M lbs./year 29.6 M lbs./year
Basis:
OST 0AY
6350 hrs./year 7 3%
Based on the December 6, 1968 Sales Forecast, (HD to RY) , excess capacity will be as follows:
New Capacity Required Excess capacity Excess Capacity
1970 29.6 M lbs./yr. 17.1 M lbs./yr. 12.5 M lbs./yr.
73 %
1.33 Flexibility Requirements
1973 29.6 M lbs ./yr. 22.6 M lbs ./yr.
7.0 M lbs ./yr. 31 %
Two complete and separate solid Aroclor systems will allow flexibility in our production^runs. We will pro duce the larger volume requirement,TAroclor 5460 (82%)* *
y;in the new units with the remaining 'solid Aroclors being /produced in the smaller unit. Consideration will be
given to incorporating the chlorinators into a continuous chlorination system at some future date. Both units will have the flexibility of being able to produce any of the solid Aroclor products. If fractionation is required to meet FDA standards, a separate distillation unit can be added to the existing system.
0020559
TOWOLDMONOQ48144
Page 11
1.34 Future Expansion
The present expansion will occupy an 18 foot wide area directly to the north of Building 27. There is suf ficient area to the north of this expansion to provide for two additional chlorination-distillation systems. In the meantime, work should proceed toward developing continuous chlorination system which long range should provide greater flexibility in labor and equipment.
a
1.35 Physical Appearance
We propose to make the top roof deck concrete, a contin uation of the surface we installed to the west of Build ing 27 on project OEA 4-488. Additional weather protec tion will be provided in the form of a panel enclosure on the north wall of the structure.
1.36 Storage and Shipping Requirements
No additional storage facilities are contemplated. Re cently completed project CEA 1430 provided a 5500 gallon day tank for finished solid Aroclors. In addition, a new 6900 lb./hr. flaker with a 5500 gallon flaker feed tank has also been installed in a separate flaking and packaging building.
Raw material storage for Santowax R and Biphenyl are adequate.
0020560
TOWOLDMONOQ48145
Page 12
1.4 Utilities and Services 1.41 Utilities Summary The approximate utility requirements are as follows:
For ejector, lbs.Air. For tracer and tankheating, lbs./hr.
450 250
Power, Installed HP
245
Cooling Tower Water, GPM
600
Potable Water, GPM
50
Natural Gas, Cu.Ft./hr.
2000
1.42 Utilities Facilities
No additional utility facilities are required for this project.
0i056I
TOWOLDMONOQ48146
K ..I.
^-WHi^crBnsffcsnBRt
,
,.
*0eOUCTeeK
. v i.%-
* ,
^
it# OWOAIMO CHRIRCM.E PIWMN " Y 4
V. G. KRUMM1UCH PLART . ,r
RAW MATERIAL "
SPECIFICATIOM^
ScLm'mMA 1 1,1 " " "`""I''
W**
.
' N.'-
auRRUW
11
MATERIAL
.,,
FERRIC CHLORIDE ANHYDRIDE
CNMCU FORMULA 1
*t-
:
. fc" - !
ISSUEDFeb. 2b, 19S7
STMIUIS IfMTWI?
WFiwnn BFICL Or
- New
_
AMPLE FOR AMALtSM------T-l---------- .
..............
M.tiio*. r.
BOttJ*
I
UNCLASSIFIED INFORMATION
General Test* (road* only on re<peet)
Property
Specification
Appearance
Black powder or grannlea
Aaeay Sulfate
97.0%, Mia. 0.05%, Max.
Ferroua Salle
Trace, Max.
Solubility: 10:10 of watar
10:10 of Formula JO alcohol
Complete to .lightly turbid.
Max. Complete to
lightly tarbid.
Mi. T. 142.21
1 "1 ~,,
J.F.Q. Method li-A
22-570 120-575 S-570-1 112-B ;
OtllOSbl
TOWOLDMONOQ48147
CO" Monsanto Chemical ompany ORGANIC CHEMICALS OIVIWON
FINISHED PRODUCT SPECIFICATION
product (Trade name)
Blphanyl
PROOuCT (Chermeal *em*)
Blphanyl
CHEMICAL FORMULA
PRODUCT COM
826.01 METHOD IDENTITY
SALES cooe 135-000-03-09 TYPE Tachnlcal TYPE Tachnlcal
r tr
Issued 5/5/61 Anniston Plant By W. W. Klemoar Revised to odd tyj> value* 11-16-65 <
auPfdlEOEl IEIC1 OF 7/8/65
C12H10
BCIAk-JOa w. IEMFU FOfl UULTRI 1 16 oi. can
154.20 Sal**
Characteristics Routine teat* Appearanc*
Cryatalllzlng Point, *C Color, Cardnar
Limits
Typical Valua*
White to pal* yellow crystals
68.7 Min.
6 Max.
Whit* crystals
68.8 1.5
General Teat (determined only on raouest)
Biphenyl, I
Napthalene, l
3 - Methylblphanyl, l
4 - Methylblphanyl, I
Unknown, X
Distillation Rang*, *C 1st drop - Dry Point
Must Include 255*C
99.9 0.001 0.05 0.02
<*>.03
Thia spaclflcaelon foe lntarnal ua* only
0020563
TOWOLDMONOQ48148
c Monsanto
I: FINISHED PRODUCT
SPECIFICATION -I.
PRODUCTION
P, U. Moodv /a/ 2-1-66
k (ALII . E. Ault // 2-22-66 kCHCAlL OltCHIPTION
>
i tore
FHODlKT
Santovax C
Anniston 6A'f I'lasiifivi 3-9-66
MOOUCT COOK
629.10 1 1 ALII CODE
7795-050-99-009
IT
Internal
RBSEaIiCM
L. R. Stark /*/ 2-3-66 - M. McEv.n /a/ :-:2-fc6 OUAIITY CONTROL. (Chlmt ChumitO
0. E. Dolln // 2-1-66
CHEMICAL. FORMULA
D tuPCNicoii
of
L-.. J-57___________
T in II T 1C
D f; , RICIED INFORMATION
\ trance
l .'filing Point, #C
B ) -.ho Terphenyl, X
v ia Terphenyl, X
[ 'J.u'a Terphenyl, X
G . -iterphenyl, X !*" henyl, X
6 Point, *C 1.11. rine, ppm
0 .ul ' ir, ppm
AMPLE FOM tNALYIII 2 - 1 Pint Cana
J. A. Llddle 1-12-66
Brown, waxy aolld 350 Min. **10 **50 **26 **14 **0.1 **375 2.0 (Typical) 2.0 "
G-l
064 064 064 072 064 114
0 i .ribution of Isomers end quaterphenyls very with operating condition* I limited data is available; therefore, the limits given are typical values of
i.i >e characteristics*
I! \r.
roduct is mainly used as a raw material for other finished products produced *t
' uni- ton.
. 'hi specification is for internal use only.
r. m . III
fK Routing Anolytit, All other* Anolyttd by requtti Only
0020*4*
TOWOLDMONOQ48149
Monsanto
ORGANIC C H E MIC ALS Ol VISION
FINISHED PRODUCT SPECIFICATION
PRODUCTION
R. G. Moody /a/ 1-31-66
IALII
W. E. Ault // 2-22-66
ICNCRAi. OOCMlVTlON
^ Mixed Terphenyla
MOOWCT
Santowax R
MODUCT COOS
joc^r. 132
vAxninnrcisiMtofndf wi
826.02 lAitfic66S
Salee
3-2-66
7795-000-11-009
ARRROVAll
RESEARCH ' '
L. R. Stark /a/ 2-3-66 - M. McEwan /a/ 2-22-66 QUALITY CONTROL (Chief ChemleO
0. E. Dolln // 1-25-66
CHEMICAL FORMULA
MOL KIT. lUPI'HItOU IPICl. OP
2-12-62
C MAH AC T CRIST 1C
UNRESTRICTED INFORMATION
(R) Appearance
(R) Color (liquid), NFA
(R) Upper Hold Point, C
(R) Lower Hold, *C
RESTRICTED INFORMATION
Distillation Range, C, SOX (Uncorrected)
Ortho terphenyl, X Meta terphenyl, Z Para terphenyl, X Quaterphenyla, X
! x 1 pint cana
LIMIT*
J. A. Llddle 1-11-66
METHOD
Yellow white noncrystalline flaked solid
4.0 Max.
136 - 145
48 - 63
G-l
128 129 129
350 - 400
10.0 - Typical Value
54.0 -
II
27.0 -
"
II
9.0 - "
II
1
t
r-
! ft ft i>U/<n* 4 I// others Analysed by request Only
0020565
TOWOLDMONOQ48150
Monsanto
ORGANIC CHO.MICALO OIVIOION
RAW MATERIAL SPECIFICATION
AAODUCTION
MAT Km AC COOK
826.38
|PLANT
Anniston 'OATIIFFH 8-31-66
APPROVALS
MATCRIAL
Chlorine Css
using osfto.
a*. 05. 27
Be below
R. G. Moody /s/R. G. Moody - 8/11/66 '
AMOCURIMINT
L. R. Stark /s/L. R. Stark - 8/29/66 QUALITY CONTROL CCfeJot CfeooUoO
H. L. Phillips /s/H. L. Phillips - 8/15/66 QININAL DSSCRIPTION
0. S. Dolln /s/O. E. Dolln - 8/10/66
CHKMICAL FORMULA
Greenish yellow gas
UPCR0KDCS SPSCS OF
Sept. 11. 1957
SAMPLE FOR ANALYSIS
SLC sampling container
ci2 Mol. wt. 70.91
ISSUED OT
J. A. Llddle - 5/16/66 Typical Taluas
UNRESTRICTED INFORMATION
Materlal Supplied by Diamond Alkali Company
Assay, (Vol. X) Residual Gases (Vol. X) Moisture, ppm Non-volatile Matter, ppm
99.4 Min 0.5 Max. 40 Max. 40 Max.
113 113
Material Supplied by Depts. 56. 57 (Anniston)
Assay (Vol. X) H2 (Vol. X)
CO, (Vol. X) CO (Vol. X) N2 (Vol. X) 02 (Vol. X)
85.5 - 93.5 1.5 - 2.5 (3 Max.) 0.5 - 1.0 Mil 3.0 - 8.0 1.2 - 3.0
113 113
113 113 113 113
(Rj Routtrim Anolytl*, All oilr Anmlfi *4 fey roquasi only. WCK.II4
0020566
TOWOLDMONOQ48151
Monsanto
ORSANIC CHEMICALS OIVISION
38800
PLANT
Lips Hydrate
UtiR* DBPTS,
RAW MATERIAL SPECIFICATION
Anniston 7-20-66
27. 28
SUPPLIER
Alabaster Line Co.
.
PRODUCTION
APPROVALS RESEARCH
R. G. Moody /s/R. G. Moody 6/9/66
PROCUREMENT
N. P. Mueller /s/N. P. Mueller 7/13/66 QUALITY CONTROL fCMsf ChsssJsO
H. L. Phillips /s/H. L. Phillips 6/10/66
0. E. Dolin /s/0. I. Dolln 6/8/66
OENERAL DESCRIPTION
CHEMICAL FORMULA
White fine powder
Ca(0H)2
C HAN AC T ERISTIC
UNRESTRICTED INFORMATION
SAMPLE FOR ANALYSIS
b - 1 lb. cans
Typical Analysis
Mol. wt. > 74.10
ISSUED SY
J. A. tlddle 5/18/66
CaO (I)
73.00
MgO (X)
1.20
sio2 (X)
0.36
ai2o3 (X)
0.60
Pe203 (X)
0.30
Ignition Loss (X) Ca(0H)2 (X Calculated)
24.04 97.50<r>
Screen Analysis
Through 200 mesh (X) Through 325 aeah (X)
99.8 94.5
Baal* of Specifications! Suppliers typical analysis of product (5/23/66) Jj (1) Ca(OU)2 X - 100X - jgO(X) + SiOj (X) + AijOj (X) + *2Oj (X>]
r
(HJ Routine Anmlylm, All offlera Ana/yaitf bp re^uetf osUp.
0020567
TOWOLDMONOQ48152
Monsanto
OROAN1C CHEMICAL! OlVIftlON
FINISHED PRODUCT SPECIFICATION
PRODUCTION
R. G. Moodv /s/ 12-30-65
SALES
W. E. Ault /s/ 3-2-66
6CNCAAL DESCRIPTION
PRODUCT PAL^rNoTclor 1268
'product c6d4
' v*I
bAAVnInt iston
i8aL26U,1c6ook
Sale#
3-11-66
APPROVALS RESEARCH
1040-340-04-11-16 -009
L. R. Stark /a/ 3-8-66
QUALITY CONTROL ('Cfllsf CflMttlsO
0. E. Dolin /a/ 12-29-65
CHEMICAL FORMULA
lotPT. 127-S
Mixture
MOL WT. IUPERICDCI IPCCI. OP
4-25-61__________ Characteristic
ll x 16 oz
IIMUIO V
Can or W.M. Bottle |J A. Llddle 11-30-65
LIMIT*
MIT MOD
UNRESTRICTED INFORMATION
(R) Appearance and color Color, Gardner
White
(R) Hold Point, *C
(R) Acid No., mg KOH
RESTRICTED INFORMATION
Screen Test, % retained on
No. 16 mesh
No. 20 mesh
Specific Gravity @ 25/25C., Pycnometer
Loss @ 163C., 7.
off-white powder 6 Max. 150 - 170 0.05 Max.
0.1 Max. 10 Max. 1.804 - 1.811
0.15 - 0.24
G-l 119 116
120
' H ' Routine Analy
Ail othtrs Analysed by request Only
0<?056a
TOWOLDMONOQ48153
Monsanto
FINJ5HED PRODUCT SPECIFICATION
PRODUCTION R. G. Moodv /s/ 12-29-65
lALIt W. E. Ault /s/ 3-2-66 LLMLHAL DESCRIPTION
PRODUCT
lotPT.
Aroclor 2565
lltlNf
r
PRObuCT CODK
127-S uU
.
Annieton vyrftiiktivi"
..... S8A2LK6*.1CO8O_K____________
Seles
3-11^66____________ 1040-390-04-009 APPROVAL*
' TiTTZVTH-------------------------------------------------------------------------------
U. R. Stark /a/ 3-8-66 quality CONTROL tChM Chtmlal)
3. E. Dolin /a/ 12-29-65 CHKMtCAL PORMULA
Mixture
MOL. **T. Ol'tRIEDEI tPCCS. OF
AMPLK POR ANALYSIS
isauKO iv
4-25-61____________________________ 1 x 16 or. Can or W.M. Bottle J. A Liddle 11-30-65
C HARACTERIITIC
LIMITS
+s ooX
UNRESTRICTED INFORMATION
(R) Appearance and Color (R) Softening Point, C (R) Acid No., mg KOH/g
Black, brittle realn 66 - 72 1.4 Max.
G-l 115 116
(ft ) ft n ut ii
All nthrrx Analvted fcv reauett Only
0020569
TOWOLDMONOQ48154
Monsanto
ORGANIC CHEMICAL* DIVISION
FINISHED PRODUCT SPECIFICATION
PRODUCTION
R. G. Moodv /./ 2-29-66
ALE*
W. E. Ault /./ 3-2-66
LCNtAAL DESCRIPTION
PRODUCT
Aroclor 4465 TCIhT' Anniston OAVI'IMieTIVI
3-11-66 APPROVAL*
product c66f
DIOT.
I27-S
uH--------
826.19 TTCimSl-----------
Sales
1040-430-04-11-16-009
L. R. Stark /a/ 3-8-66
OUALITV CONTROL. (Chisi Chemist)
0. E. Dolln /a/ 12-29-65
CHEMICAL PORMULA
Mixture
MOL T. UP A A *E DEI SPECS. OP
4-25-61
CHARACTERISTIC
UNRESTRICTED INFORMATION
(R) Appearance and Color
(R) Color, NPA, Molten
(R) Softening Point, *C
Acid No., mg ROH/g
AMPLE FOR ANALYSIS
ISSUED DV
L x 16 oz. Can or W.M. Bottle J. A. Liddle 11-30-65
LIMIT*
MSTMOO
Clear, light yellow resin 2 Max. 60 - 66 0.05 Max.
G-l G-4 115 116
( R > Routine Analys is , All others Analysed by request Only %
0020570
TOWOLDMONOQ48155
Monsanto
-INISHED PRODUCT SPECIFICATION
PRODUCTION
R. 0. Moodv /s/ 12-30-65
j*ALK
'
W. E. Ault // 3-2-66
1-G-C-N-C-A-A-L--O-C-IC-N-<-P-T-I-O-N
Mixture
-Ot RT . iUP E RIEDEI IPECI. OF
4-25-61
CHARACTE. .aTIC
UNRESTRICTED INFORMATION (R) Appearance and Color (R) Softening Point, C (R) Acid No. mg KOH/g
PRODUCT
Aroclor 5060 VlAnV ' '
PRODUCT COOK
' " use
Anniston
826.20
Bill c#ri'TiVl ....... SALKS c6DK
SaleB
3-11-66
1040-450-04-009
APPROVALS
. RKSKARCH
"
n
L. R. Stark /a/ 3r8-66
OUALITV CONTROL (Chief Chemist)
0. E. Dolln // 12-29-65
C-H-I-M-I-C-A-L--FO--R-M-U-L-A-
|0PT.
1 27-S
IAMPLI FOP ANALYSIS
ISSUKO sv
1 x 16 or. Can or W.M. Bottle J. A. Liddle 11-30-65
LIMITS
MKTMOD
Black, brittle realn 105 - 115 0.5 Max.
G-l 115 116
.
(
l F
(R> Routine Analysis, All otheis Analysed by request Only
0020571
TOWOLDMONOQ48156
Monsanto
FINISHED PRODUCT SPECIFICATION
PRODUCTION
R. G. Moody // 12-30-65
BALES
V). E. Ault /a/ 3-2-66
CCNLRAL DESCRIPTION
Mixture
'
PRODUCT
Aroclor 5460 (High Soluble Grade)
RLAnV
PROOUCT COOK
use
ACnTnViTstlMoniCfiVI
- - - - - - -826.22
I'il'fs c6bl
Sales
3-11-66
APPROVALS RESEARCH
1040-480-06-009
L. R. Stark /a/ 3-8-66
QUALITY CONTROL (ChM Ch*ml0
0. E. Dolln // 12-29-65
C MIMIC AL FORMULA
Idcrt.
127-S
.............
SuPbRSEOCS BP EC B. OF
4-21-61
C H AH AC T ERISTIC
ia*uso v
1 x 16 oz. Can or W.M. Bottle J. A. Liddle 11-30-65
LIMIT*
MCTMQp
UNRESTRICTED INFORMATION
(R) Appearance and Color
Clear, yellow to amber brittle resin or flakes
G-l
(R) Color, NPA, Molten
2 Max.
G-4
(R) Softening Point, C
98 - 105
115
(R) Solubility (25 g in 25 g. Acetone @ 25C.)
3 hpur, Min.
117
Acid No., Mg KOH/gm.
0.05 Max.
116
Chlorine, X
58.5 - 60.6
093
RESTRICTED INFORMATION
Hydrolysis Stability, ppm Cl
300 Max.
092
(H ) H out in i
-J U oi he r* Anoly ted by request Only
0020572
TOWOLDMONOQ48157
Monsanto
FINISHED PRODUCT SPECIFICATION
PRODUCTION
R. G. Moodv /a/ 12-29-65
SALES
W. E. Ault /s/ 3-2-66
(. ( ML H AL DESCRIPTION
Mixture
MOL WT. SUPERSEDES SPECS. OP
4-25-61
C H AH AC T ERISTIC
UNRESTRICTED INFORMATION
(R) Appearance and Color
(R) Color, NPA, Molten
(R) Softening Point, C
Acid No., mg. KOH/g
t
r
enoowcr
|o(T.
" 1Aroclor 5442
27-S
JLant
PNOoucf co6d~
oil
.
Anniston
826.21
BXIIYfViIYJVI--------- SALKS COOK
Sales___________
3-15-^____________ 1040-470-04-009_____________________________
WKfcfAWbH
........................
L. R. Stark // 3-11-66_______________________________ . QUALITV CONTROL (Chlt
0. E. Dolln // 12-29-65
CMIMII
SAMPLK POII ANALYSIS
ISSUKD V
1 x 16 08. Can or W.M. Bottle J. A. Liddle 11-30-65
LIMITS
MKTHOD
Clear, yellow sticky resin 2 Hue. 46 - 52 0.05 Max.
G-l G-4 115 116
(
t.
p
p
i i
i 0020673
TOWOLDMONOQ48158
*
CENTRAL ENGINEERING DEPARTMENT
1 PROJECT NAME
-
CED EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
-'
) ' r n n *"" ST -- -----------
EQUIPMENT INFORMATION SUMMARY "WsyZe-
CEA NO.
080
AREA
/
approved b*
INITIAL ISSUE
REV NO REV ISSUED
ft-zz-sy / Z-27-69
QTY
SI ZE, RATING. MODEL, ETC
MATERIAL OF CONSTRUCTION
OPERATING WEIGHT
.POUNDS)
REMARKS
S ESTIMATED
o
URC
PRICE (S)
/- ftSZ
Ptft/cep. Pcs 7ftft/K
/ 3coo &ftt
&)&./ Srest 38600 t//n So fto/C V
9t> rW . /OS "ft/6ft
SftcAer TT/enin/A/a t
Skf-TY /Ss,sr~
/-/S3
/-/2.001 /-/S3.002
/-/S3 003 hZ&f-
/-/S^-OO/ /-//-/JTS.007 /- /S6 /-/Sg'OO * /- /S7
fut-vet
/
/ioroft, S/toeR)Zft / /)lR Tc/Mg'f/V* /kft//i /
//ft Convey,*/$ 1>oc7- /
dusr (IllOcr0ft
/
Conr/Bots, Suor CouecToft. J
/)/ft JLOCK
/
Pfaroft, //fttoc.K. /Stoweft t%/oftt. Sttweft.
/ /
| Cst/VSYaft
/
trZSH /iiKfto tztrR
<3ooo **/A i-
/&HP //8*>Rp*
Snfiry 6je/s*7 A/ /ZcotBs
SeFS.
t/
?r"x/2%\ tgXf'-ft/tft <*/>/*
eees-/-3o Oi/trriov
8 "/f/ACRo
GiftcW &t.
75ft ft /Vo Zt>/ V CtK///-
Zhft&e/ $ret?t
W/7M M/bot- ft/zif Cftce) ft/triFft
M>/A
/&< ft /Vo 32>/f (JA//T
Sorry k/c/tftr
700 te s
V //
Cftor ZftOA/
Srft/tY SosC/. /V
--
Sfis.ro Vs/t&ftf/l V
ftft/tffoo/.f/i #SS 8reft to tyfsr /ftt/s ^//p/jisoftpn 2-4,,ift/oe *
*S7?f/~4_i>/L/ r.
Tcec
V
1 7/ /tlftsr Sftnr ft/
! i - --- 1
reec
V
Sn. rien/rntg (5>v<wri4
ft/
002057*
C E - 22.
* SOURCE: N = NEW
E- EXISTING
R:TO BE RELOCATED
** ESTIMATED WEIGHT PILLED WITH NORMAL CONTENTS OR TEST MATERIAL. WHICHEVER IS HEAVIER
TOWOLDMONOQ48159
CENTRAL ENGINEERING DEPARTMENT
PROJECT NAME
EQUIPMENT INFORMATION SUMMARY
19SBOVE3 BV
CED EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
QTY
SIZE. RATING MODEL. ETC
MATERIAL OF CONSTRUCTION
CE A NO INITIAL I SSL E
A = A
/
RASE
^ =, /^T
REV NO REV ISSUE-
/ /-6-<r?
DERATING WEIGHT
.POUNDS)
REMARKS
s ESTIMATED c R PRICE c (S) F
/-/O 3
7 L *" / /ZP7P/f/SshA /u' JA //7_)// 4/6 S*<-/c
/-/03-OO/ PforoA, Tittir* feet, J+y.* /
fAp /,'<pr, P``7
fact n/CCr 1 // /- /3*<'y 2 .r/V' CcrjCri At*/* ~"
A'
7fA~c
AS
/-104
LpLtiK/ts/.TO*: /*4 /o
/
S4
ZS/mn
/Pjt / . 7~ /iXT A*
/'.'/?<? Vj%` WA
o
O r o
\r
j
/-/rr
' V'- ' N 's? - ; > /, V' /*'-
-A>/*f. &K P'A-r (S'-.ff :
k//3S */A K &*'///->- rs/i/x
A//7c * ca~ j/,/r /o- A/- !/jA- ~
Ou-'c 7r/ ~ 7h)/ ' h'S'c - ~
S> * <f`A
-- -........ ........................
/ 2C,6rfl./TP1'i- *'/3 ^~7f' A- ^ i - '
//V I'<. s*S' - .,'J>.
A
A~r
.7?^ /Vv/>
'/
/'' ^ XT "
.* ' -
/
` ~ / ? PA'A
i 50JCE". N:NE*
Er EXISTINS
T3 BE RELOCATED
** EST1MHTEO WEISHT FILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
^4/ /
7?-' `
/
_________________1
TOWOLDMONOQ48160
CENTRAL ENGINEERING DEPARTMENT
6ROJECT N tME
CEO EQUIPMENT IDENTIFICATION
NUMBER
/- r
DESCRIPTION Of EQUIPMENT ITEM
' ''
EQUIPMENT INFORMATION SUMMARY
CBgPiBED S'
7 - .>-* -
z e * no J3*C
APE A
/
IffbjvED S'-
iN'-iA^ ISSUE
REV NO REV SS _p E C
'' T. /"* *
/ 7-6-4?
QTY
SIZE. RATING. MODEL. ETC
MATERIAL OF CONSTRUCTION
IPERATING WEIGH"
.POUNDS)
REMARKS
S ESTIMATED
RC
PRICE (S'
/ /j 4oo-osp iZe
HP CV.CLi i. Tilt'.*
c7 n t ,'v ~TCj.
F6ZO
>>f,v <Y &,fj*rr'
/V/3*- *
//
x Y? .r ~-
290 sx rr / > x //rr
^aCV' Fo-S- ' r}tjt rjt.r.'c
xS.-TittH- W/< /*.. rc 0; /
7`F /F- J'-fyr
6pr>' k'.r/.~r
it -<*/' ..f .'
/- /O 7
/-/OH
o e \r s
7^/s.r a//h/a//=>7o7.
/ -?6S 7)cr/-t F70 Pi?~H ;ASLJSC. e /A/ CP+ok Ufjtr- /> " //vT'O
7/)r
C
FTFFJ. Fp'P/P'Hr Mf/^r %/&.**
A//r/r
77Vy^
7o,--
CP
0/~f^ /**< /o/yI&/SP~t?
, Fro / /0000 s --pTo-
OpreL V r-j pjr ?srs&.rr
uV c. r x// r 7~
s&ro
Fo to ere *
V
/* 'A? * MPe.ry
y&rr pof/'>//V />-->- -
w/f' r~ jFyt.P 7S'//.XT
770r - F . - '
?4!?r7.i'
f SOURCE: N:NE*
E = exiS~iM5
R:*3 BE flELOCATEO
ED WEISHT F'LLEC
ORMAL. CONTENTS OP T5t MATERIAL. WM'CHgVEP IS MgAVIEI
TOWOLDMONOQ48161
~n si r
CENTRAL ENGINEERING DEPARTMENT
PROJECT NAME
33 c/`-JL 3/oz/C 4fid CZ C
~ n :-- --3
EQUIPMENT INFORMATION SUMMARY
--r --: rt
cr -- -- --
crer#e: bv
/' />-.r'
CEA NO
Z090
AREA
/ 4 c- /S'
approve: bv
IN' TIAL ISSUE
?-27-63
REV NC REV ISSUED
/ A-O-O/
CEO EQUIPMENT IDENTIFICATION
NUMBER
/-/O 7
DESCRIPTION OF EQUIPMENT ITEM
QTv
SIZE. RATING. MODEL. ETC
/ 3 COO <**7S"Clx
MATERIAL of CONSTRUCTION
CflK$'rto Srrsj.
DERATING WEIGHT
.POUNDS)
REMARKS
s ESTIMATED 0 5 PRICE cF (S)
k//3jf`tW-'~ AUS-C
3/700 A//? - ? " A/ R/C* x /PC "
ZotvA, PzA7S CbttZ
/aoPTY
4/00 <-30 A/et. Z/Di-ji. / -v'.
f-i/O
TPHZtUZS fii'lP MoR/Z- CZA/TRjruOPt.
/ /CO 6PM/jb'pl PutTu.r /Re* Pro 3*Jo
/ml . //sen- Srr~ .7
Rfeip Fav &
JCT fovOK Fa'O
f-J/O -oof rfo70&, //fz>rjx4 _ /tOp / Sff^//ecoPPM
r/rrc
A/
/-///
o
\r
wj
/ 3j" (7 A L 42 or
//>_ & ~ * <StEL.
S27S 4'// 7t/R* or // /'yz "a,/(/4rry
/r ez /*- - 'f'lA; PMr"r: Ia./c/',p~
/SO <F/V / $/MtOr
SOURCE: NiNEW
E=.EXISTING
R:TO re relocated
** ESTIMATED WEIGHT RILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
f ,? .. '
TOWOLDMONOQ48162
-- -- --1 t 'T-- r-'
CENTRAL ENGINEERING DEPARTMENT
PROJECT NAME
Z-S-r-y -v -
"ZyS^/T/ /v v C<Lo As.
CED EQUIPMENT identification
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
' ~r c~- -- r~ ------ 1 ------- 1
-------- CT -- - 1 ----
|IcoAcP; iB^EGX9-*-.-. EQUIPMENT INFORMATION SUMMARY
C E A NO
'^r ,, /.r /
QTY
SIZE, rating. MODEL, ETC
rTMBv j________________
IN 1 Tl A_ 1 SSv E
/-<'/- F
REV NO
/
MATERIAL OF construction
1PERATING WEIGHT
.POUNDS)
REMARKS
REV 'SSoEC
S ESTIMATED
o
RCE
PRICE
(S)
/-JiZ
/*>. /// /^;A,V
TR/r'yxC /y_
/ /SZ>m.'7b'*G- 2>UCTiy /.R2& /}/ S7X -SO
Atu
'**- v
i, A /Af/
/-//:.
/-/I?
' /rfos 0*c , 7/^L /_ /V /: _ fww* / soa?//a
Trrc
/7
7H/?ti)/A/6L. Cx>lk
Erj
/ /ZSooo AfR Cag&j* ZrejTA Zooo // //st. r/ BtAOr /
/hR Ceot-CA
AtvtfRf:
Aoo tr-a s=T
/)A/ratAA OPBRAToR
7ATT kSfuft'r
/S&OXBS
/-//3
J-U4
/ /rftrafi, Ct>otr< /y)/v
/5?>VAJ///oa yH/stf &>*/><
/ Z/JP///60 f/M
/ 3oo g/u. 4Z"aDx
<j>kch ^TJTCl.
rerrc
//
M /Z r-
4?zr
Tisrlfj OR a/
//x'Aa Co/t. f/RSY)
/Zct. /&./- 'fWs; ZivS,--
9ZS/.B 5
7rtrtmf*s6
/ 3aO&'v//&- A2> 2>UfTHE /PjH j /)v 3t i - /P
SA/Ajl. /?fs*
. - Af
<A /A// /**,
/- * / /^braiZ., /'Xr.,,A''fsO*. /5a /3 /
7Z>~C
A/
0020S78
J: source: N:NE
G. z- EXISTING
** - T O BE RELOCATED
** EST1MA-EC WEIGHT Pi_i.EC WITH NOViL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
^
TOWOLDMON0048163
CENTRAL ENGINEERING DEPARTMENT
RROJEC T N AME
/>.<- '
/?** : -v. =
CED EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
EQUIPMENT INFORMATION SUMMARY
CCSEC5AREC 9'
\
sOve: 6v
!
OTY
SIZE. RATING. MODEL. ETC
MATERIA,. OF CONSTRUCTION
/-//
7//fifr?jA/aK <S->247e
/ /,*#>. eoc
>-3>4v-
/vr<-
&A-tz-*, Frrjr/.
937<^r-
30 *//> * ZC,^r .
C E A NC w-
AREA
To. /s
IN I AL ISSUE
REV NC REV ISSUED
/ -1 7-i
/
/-e-e?
OPERATING WEIGHT
,POUNDS)
REMARKS
S ESTIMATED
o PRICE
R C
(S>
E
9S3S 34 **:.. /y<P>.- >
*J>~7` /CA/g 7 /? FK\ y-.: */-.- /''- ~
3'B7-<s
-V'
/-/f7
S/7/&C/a/F ~3A; A/o //
I-/I8
/rjfiTori Fo/nP C'/vTrc //*"/
I-/IS -oo; /-// ?
/rfoTOK /Oa;
/*'**-.
Fh-u~ /// /? 'c ; <Sc.
0020579
/ SOh $ 5~4 'OJ- >: 25
iJWc*v wr/L
'J&or C-
SaWC /Tf*.'
/'/- * 77r,rr;4/'/''*f-7~
Soco
4"
/ Z3?&*i/7Srw S'ij -Sx'fjyt~Z.l 7rT
A/Cd AWv- J'F/'i 2'X?yF /3*!V TP7Z' Otvf:.'
/ 'F
V
/ /irfiF//8ccKF-'f
TTrrc
V
/ /,, <- --. *: ^7v-
-T/ T F rr
/s' I/a t//rr
#** 'rrry ** c. - Y -.j/. f ~;-
3/6 A'Vyi. 7^>> ^
3>i ^ '*
TZir- *
//
Wr
r, /y
1
45 yT
Fy>~-~
.SW/y -F :
SOURCE: N:NE*
E = ex;TING
R s TO BE RELOCATED
** ESTIMATED WEIGHT FILLEO WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
/vjp- '/ S'', '. . ,*
TOWOLDMONOQ48164
--4
CENTRAL ENGINEERING DEPARTMENT
N AML
i>. -
X- .
EQUIPMENT INFORMATION SUMMARY :
bsca*EC =
/ X-
sscve: 5'
rm
CE A NO
rrr
AREA
/
RAGE
T = . /cT
vial ISSUE
REV NO REV ISSUED
/ /- ^ - y
CED EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION Oe EQUIPMENT ITEM
Zf/ST
OTY /
SIZE. RATING. MODEL. ETC
4dS /tcHpf -?& "C
MATERIAL Oc CONSTRUCTION
57-ferz Ss/Pt'c- * ^ U/YKIT
OPERATING WEIGHT
.POUNDS)
REMARKS
/At C/'U\.3.
f/~r 'ijTZr
k/fsi/rr Ztl -A x Y'h"< -
^//A firy 7>* ~
i'X/ ;a:..-/jA 7j
%
c R CE
A/
estimated PRICE (S
/- /Z/
/ 300
&*?&#*/ - ?/- J72S- MsCX 'tn Sol /'`As**. y
44":,z xS/%,*h
jti/>Tr //S>',,=*7-
?Z3~*P
i^/SupfhSr *rc,,
/- )2Z
~7&KrrT\/*SGt-
/ 3oO P/l/to>'HD fivcTfj-S />/' 3*7 -13
/AjCJ. A/T+i t7)t // 2>a/f Ha*/
/-/2Z- ort /`/oT&K. 'S'Se^M/cL 7ontP / 20#^//hy!>cm
Tsrc
*/
(~/23
Tnisn}Hv41~ G>f>j. *z.
/ /> 4&P, A!r> JTp SHSa. * ~ -/ ?37s&rr Z6"0//t *ZOT
?
304ri^r:i *
3^ e& * /-fHW-i *g/yHi /z ,~y.--
/V
3~?93-/Py
0020580
___ _____________________________
< SOURCE: N;NE
E = EXISTING
R:TO BE SELOCiTEO
** ESTIMATED WEIGHT PILLED WITH NORMAL CONTENTS OB TEST MATERIAL. WHICHEVER IS HEAVIER
^/''Ai
_______________
TOWOLDMONOQ48165
CENTRAL ENGINEERING DEPARTMENT
EQUIPMENT INFORMATION SUMMARY
OJ ECT NAME
i- fsV S'L/C /hiofJiof S
cbepapec B'
r.c
AOBPCVED B v
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
QTY
SIZE. RATING. MODEL. ETC
MATERIAL Oc CONSTRUCTION
/-/24
7h/i PifrjXK
/ Per
/kr>-' ^ /or'-/o r / / -- t - AtAt
fj. Tu^(/ ^2>a, /tors-. 7.A'
CfM 7`TTft.
/-/24-&OI
/%TOA, /);/. ti/nF-L
/ /S//r //AXAfh
CEA NO
PdSO
;N ' t. Ai ISSUE
7-17- i -=
/
REV NO PE-. .sS'je:
/ /-/c-<?
OPERATING WEIGHT
.POUNDS)
REMARKS
sc ESTIMATED
R
PRICE IS)
E
P)/n.T A3, ;f A
TTrc
A/
f-/22T
fiiOW'f/ /ArsK
o o
ru
o 9V
h-
t-/z& /-IZC-O'/
fisLQi*) 7/)r/K /v/j?
//.A
^Vy 7/; '
77*US **/ ./"A, '
/ ZS00 6AL
(7*t4H Srrn. &2&0 ////PuASoA 7~ V
/2o"0* /Zo" ///*//
-/*/?*/AJCJL. 7rf/' -
A/ -48 >'*>-
y /So '2. gas4
/%ATF Oo/^ 3 /fry /jfc/s/T'
tPono <P0
h
/ /2som/3y^ 2/vfTnO /7 :v 3yZ /C>
/
/aZ/oA/is , _T4'
-2"0> v
/<2 /*7" 2c/s '* A/aac tv/'-yr X '>-'/* Au.r:
/a,u. /Ict - Or/ti., A' 2>2>Atf*Kt ? 7crc
n;;vFK F~S- V--
Tore
4
* SOURCE t N:NE*
E = EXISTING
R = T BE RELOCATED
** EST'M*TEC WEIGHT FILLED WITH NORMAL CONTENTS OR TE$T MTEUL WHI CM C V ER IS w E * V! E R
4/ A
TOWOLDMONOQ48166
"T? 7~"
CENTRAL ENGINEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY
PROJECT NAME
/*/' Sac/p f'r *, 1-v ir. >L
PREPARED 9 ^
/; S
APPROVED B
CEO EQUIPMENT IDENTIFICATION
NUMBER
7-/2 7
DESCRIPTION OF EQUtOMENT ITEM
^/~r ^5^/fy R
QTY
SIZE. RATING. MODEL. ETC
MATERIAL OF CONSTRUCTION
/ 230 ACM/ /)~ /f/iVE'& & / e'At*?? *i 2>*r*7Sr/CV Va'-Y <$e#t,iH3r --cf
RAGE
2CP "
/ 9> o* /S
:S ' - A_ `SSUS
REV NO REV ISSUES
--*7-27- =>
L^_
....................
DERATING WEIGHT
.POUNDS!
REMARKS
1 ESTIMATED
K PRICE
c (1)
E
-V
7-/2Q
ctfozi s /Ja>7te
7~/2$- CO/ SrtU. A'o & /7/TA7CK' OmTtfoL
/ /,300.030
Oveec* nrcc /Cooo
So% 7/
Ybrter 72m a
f&TM*-SSC O'*
'370*0
O/feo O/r*
8'l>Mx3'tf/6M
/ffiTU&H.
/ D // CtPY sysr&*\
7-/2?
Sjjll ft) r- A/o S
/ 7SCO c/u.
732 "C> X <?
MO ChDj
Srcn. /c/ooc 7//3i?&>Xr /ui.' 7/ foe*. A*sv<7tci /-V
' 2>/2A Tc-fi Pjoj 0 72,k-//*''
Y2COO j
4 source.: n = n e
f: sxijtiwj
r = to bf pelocatec
ESTIMATED *<EISHT '"li-LEO WITH NOPM*l CONTENTS OR TEST MATERIAL- WHICHEVER IS HEAVIER
/~CY' V
TOWOLDMONOQ48167
CENTRAL ENGINEERING DEPARTMENT
DRCJEC T NAME
EQUIPMENT INFORMATION SUMMARY
BBEPtRED /<t 7a-rc
AOORCVED 6v
ZO 3-0
N ~'Ai_ '(SUE 7-27-63
AREA
/
REV NO
/
RASE
70 o. SS
REV ISSUED /-/c-o ?
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
QTY
SIZE. RATING, MODEL, ETC
MATERIAL OR CONSTRUCTION
DERATING WEIGHT
.POUNDS!
REMARKS
1 ESTIMATED K PRICE CE ($)
t-tso
OYC4irj S^rWi/ITiO / Z/> - Sc /noGme- 4 '6 ' Cy*:r* - 4`6'
C/H ?>// Zircct
fooo-
Jti/GlfHt J7 r/.&, // /// ///C-'L. jr>)f t - ioJ^j/r. ri 7*
9go-
/"/3t
*3>v^ /l/o S
*r`-
/
<oOO<SCC' 7r*_
7/*. Sr . / 2 7ZFi.
4ZOO 304 TuZCl y C/4 ./, 4
SrteiL & ZjfZ.
STAFF/. 4 SiV/JSK
x/4f */ x Brr
460 So. TOT % 71/Bcs
CyJlf. -7 // .
sc"/ /orr
PaCC 6m 7/d
</
W/S'Jt / '//. T /V&S
v5/>rr M/&S-P7
5700 4.3 0
/-/32
Sth-l M> S tfecOvtr* /
-733
7^C\/A?
7yA`C&jTtiVFuoA-
/
7-/33-60 f
/ 7Cc*K <Rjrt P
/
3700 >/u
fatso*/ Srea.
?0 "0t> x/ZO'falSH
Sjcco M/&jfrb*:~ 4UOO 4
///(/ /A/6<Ji77/A/& 0
//>rr- io/jo/e/rr SSOO/BZ
W/3Ti/w/C 2 1 , /* <>-. LJSorj
72767// /So c>> Ducrn-/7 7t?m A VC 3. 7-/0
/mi /2crr-. c/.) 4 2i3>- 7a rv
i7Ar\CT Z C/K. // --
....
-. .....................
777c
A/
"
0020 583
* SOURCE : N:Nt*
E = EXIST(NC
ArT3 BE RELOCATED
- ** ESTIMATED WEIGHT TILLED WITH NORMAL CONTENTS OR TEST M A T E RI AL WHICHEVER IS HEAVIER
/jt-i Sf ' l ' *
-------------------------- 1
TOWOLDMONOQ48168
CENTRAL engineering DEPARTMENT
RROJEC t n AM JT*F7s/u
bu> Af.jrxoKS
EQUIPMENT
INFORMATION
SUMMARY
A==ROVEC S
CEO EQUIPMENT IDENTIFICATION
NUMBEP
7-734
DESCRIPTION OF EQUIPMENT ITEM
QTY
SIZE. RATING. MODEL. ETC
Srux. 77c S
/ ZOO <$f*
S/7tuis*r/A/4 /uses'
/oc "ns
Mr/er/G** CTtA/r3/r*7^
7787* S&yY
Pt*r y
MATERIAL OF CONSTRUCTION
<3t*j8o*y Snrei-
CEA NO < C *- ' IN 1 t> al ISSUE 9-27-69
AREA
/
//
/~
REV NO REV ISSUED
/ 7-/6-G 7
OPERATING WEIGHT
^POUNDS)
REMARKS
sO ESTIMATED
R CE
PRICE
{$)
A/
7- 734-007
/foro*i. Srtxi. 77$ 3~ C)9cvi'*'r'fsf>
/ ZClip/f&ar- 3P*
TrC
A/
7-/3S
'siren 77;as*.
/
300 Onx
<78rrru
4?"27>/Sj "/7/S7
SZ7
77
706/7 x oS
20//6 /Y/ST*/A-' Cvfirr MtC7ir
92S 73* lo/v7/'9*r
/SAG
//36
7-73*,-00 7
Srfix. //o jero#
......... - -
-
rrea Cci>*tv-
---------------
/ 68r'>+/TK
77/TH /AjTCfc, C0*)t>^A)C* K
>7/o <**
/S8CX.7*A*
sir fjrAi 7~/8Z T //VT*r Gt-olf/sS*.
OT86E
Wo8T8'**/> Too * <yx sre /$rinse Ss*c J?/yB2r*i A/dS
Skz Y'at To 0
M//7C /*' * -
/i.lMj.'.'A/S-rK
7/
- --........................ - / /O '' l/A/ne/T'
......... ; CrPtsoo 2rrsi.
---- -------------
To *c*/i/y-r
3SG <? /* C
CP ru7
-- -----------------7f
0020584
;
* SOURCE: N--NE*
E-EXIST'NC
B:TO BE 9ELOC*tEO
** ESTIMATED NEISHT fl.LED WTM NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
^
TOWOLDMONOQ48169
CENTRAL ENGINEERING DEPARTMENT
EQUIPMENT INFORMATION SUMMARY
FROJEC r NAME
//-/>,/ S'^.iV />/; X*.a*iS
obpbe:- '
/P -e- -
AOBROvED B*
CE a NC
8080
INITIAL ISSUE
9-27-C8
AREA
/
Z O
RASE
/2 . ^
REV ISSUED
/-/- 7
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
SI 2, RATING. MODEL. ETC
MATERIAL OF CONSTRUCTION
OPERATING WEIGHT
.POUNDS)
ESTIMATED PRICE <$)
/- /37
&/.'r ,,
\
/re-'-- 8/o )
/y*//Cr>Ze PfuC-x?
J5u/rV? <T 7/>f*K
ex>C 6/te ,
/OZ"ODi/36
W/TV ICC Cur/'fC'
h/39 V /-?' 831)
VfifscrCK PxnrMjO??- COtu'r/Xy/Xt.
fZoW;//te`/* Ux 3/Z-/-P
i'uentx Me*/
1-/39
Tt/&m>nc>L Svpte 7b*/*?
/-/4a
TtfE&miHCL TZ/n/^ Ponne- C'C'vT/Xl/'fi^
/-/40-ooz
Moro/i j TrfEK*vr/ci
/-/f/
7~Hkm ' L fo '-L r~
0Z0585
300 Ac Ut2"00*S/,'/'.><X
Stitzi
7/S
//Xt/bME<? Co'L M
/2/y //srj*/4 MfJ /v'ui XnXiA
///-Our'Oo r -- JLF6 s
Lfn/orr A/<i/*r
93/TiSe
/OOGPrt/7,//i> /9rs 3? 7-/0
2>u(ru /#6*j
7//H///*>
/rr^ /fr/~ e/u Jffyr> /*>
77TPC
A/
Coo oco **.<
3/(EM%. /tier
28o x<. rr
/^o-r -
Cn^Sxv Crsa. I 3^'
//?/ 70&K/, rS/6'ht,,M8i-
*A
|xgxT />*/&
CA/MT'; /M 'jT/- -
* SOURCE : N:NE
E = EXISTIN
** ESTIMATED W6ICHT FILLED WITH NORMA
R = TO BE RELOCATED TENTS OR TEST MATERIA
IICHEVER IS HEAVIER
*' v vr, _ v
TOWOLDMONOQ48170
---- ----- ----- --T I-31 -----
CENTRAL ENGINEERING DEPARTMENT
"ROJECT NAME
Sir.o
:
" 1 r"^ ^
1
EQUIPMENT INFORMATION SUMMARY
obeoaREG Bv
S. -
APPROVED e
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
QTY
SI ZE. RATING. MOOEL. ETC
MATERIAL OF CONSTRUCTION
cns str
CEA NC
ZO~, \
AREA
/
INiTiA. ISSUE
RE v NO
?-Z7-S /
1 " --
RACE
A* o-
REV ISSUED
/-/-/
OPERATING WEIGHT
,POUNDS!
REMARKS
so ESTIMATED
uR PRICE CE <S)
/- /-42
jSCToZ SortP 7hrss
/ ZOO Oa-u 36"0/>*4S'M4/>
Stzci /860
/./isos mrr *//*$ *7
4
/- /43
SaS\IAT/>>C
/-/43-cxr: / /forote, SXcv/trovi
/
sv _ '-A r fits- - -
SOOC 40 s>
;-
^ "* dT If- "
f/er't+rr ss'a" __
0YSajl/c /yie~
/ SoSf/faoofr/*
4
'
7SSC
4
/-/44 /-MS /-/4<7 /-/47
fiiunflAY- etfi>eeci'i
/K'tffiY/ SfYOFcSK /Yjk
Sec-tK/nsx. ScKofc-r/:
/ Sooo */A- // z7t-^c^.A& r
/ $* 40 \ 24' /st/Si-rek ? SS^KOiAi'-
/ *fe->
. /?4yj?.rc-A.
//?>'
/ 3t>'* 24'*M /%tyi. rr* fe M :<r\ <>-s'
..........................
4 4 1/ o'
0020586
source:
NsNEW
E s EXISTING
r = to be relocated
ESTIMATED WEI CH T KILLED WITH NORMAL CONTENTS OR TEST MATERIAL. WHICHEVER IS HEAVIER
_________________1
TOWOLDMONOQ48171
~r ra 1 ! 1 ttp *--1 --
--t --: cr: ct err -- --
CENTRAL ENGINEERING DEPARTMENT
CBSP*RE- 9V
EQUIPMENT INFORMATION SUMMARY S3 ,'sr .'.TLf
C E A NO
c/o
AREA
/ 7-7 oc XT
ROJ EC T NAME
AOBROVED B
' N I T ' A *_ ISSUE
7-/C-0 7
0 7 a
REV ISSUED
CEO EQUIPMENT IDENTIFICATION
NUMBER
/- /T* .R
DESCRIPTION OF EQUIPMENT ITEM
/9osotc
/? /fo/STETfi
qty /
SIZE. RATING. MODEL. ETC
MATERIAL OP CONSTRUCTION
OPERATING WEIGHT
.POUNDS)
REMARKS
S o uR C e
Y
ESTIMATED PRICE IS>
/-/Y-9
77/jto
Su/t/O
77?/vo
/
/-/So
7/fDA//A/0 3.
/
V&Zr/CA^ CfAsr/Q/^vt-sf^
f-ZSO-OO/ f&ro/Q , T/SETte/H /A/O l. fu/t//*
/
7970 < 79/ "lots/;
Oi/Qc'-ts Smr..
2&x>o
h/fa/7'S. ~
Y
Oh&SfAsOt.::
j//s/ftj; 0>mHiS7
iV/Si'tY
/4/}/vfO
4co go/i
700 ' 7~>/? 7/>fi T/oshy
Z\s7Y
Cfrocb* 370Ei.
Y
///`//9<X>0,>1
TTrrc
Y
/-/S/
726 8 Szr/orO
/- / /fa*'. AIaooo
/
78 "lots 7 M Tot .': ~ lZ*:r-
/ S7/7//7or7'fl9
/d>o2)
Tore
Y
Y
0020587
i SOURCE: N = NEW
E = EXISTING
= TO BE RELOCATED
** ESTIMATED WEIGH-" PILLED WITH NORMAL CONTENTS OR TEST MATERIAL WHICHEVER IS HEAVIER
`^*f"S JC/'T X ' >'
TOWOLDMONOQ48172
CENTRAL ENGINEERING DEPARTMENT
PROJECT NAME
/'v Ss-ui
^
EQUIPMENT INFORMATION SUMMARY
'L
brepaREC B^ APPROVED Bv
CED EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
SIZE. RATING. MODEL. ETC
MATERIAL OF CONSTRUCTION
CE A NC
OPERATING WEIGHT
.POUNDS)
AREA
/
PASE
REV NO REV ISSUED
ESTIMATED
PRICE
iS)
/-
3ocC
* <j Srx. 3$6zc
Sc fi<r/c
9t ^ /!?rk'
SSC' ST
Vmpry ^ ~C
'
o o I\J O
A source:
m:new
** ESTIMATED WEIGHT f
R = TO BE RELOCATED . CONTENTS OR TEST MATERIAL
HICHEVER IS HE A
TOWOLDMONOQ48173
TOWOLDMONOQ48174
&*rtM Gfta*A*7z> <3*4*2 Sttra+'t*
77*0-/Vf3 oso
"ZZ-&
teao * 30*O */-rr
fcrAt.
<>
<A ~>
t-oo
/oo 9-*o O-SO
72-00 *43
BnX77 JCrure*iE *2-/*S (*> O^fO
for v*
2-00
Banu. (/?> 9-SO Sirrr #> /oo
font.
<2-00043
TOWOLDMONOQ48175
1
-f- -
. a'-cf
(5
finouwD Ltyfcj- (Uu *cal r.itf-*-
8VH*T AW4t ***JT <TV6 JkjO AKCi.>.
CE*-100
SOM l`;t</-o"
^ '/y*i
/?>*> ^ -
TOWOLDMONOQ48176
e tg j X ftj
80
Si t
m
~(g) O'*
Th>w> Le-vtj-
soki-e.
EauiPHttfT ARANtinHT ;njtf
s>MP
C.CW*t'l4>#0
5cAtf * * IO*-o*
k*4 3 A*/ti
*w i*/J-
X>/v*
0020*92
TOWOLDMONOQ48177
Appendix D
Building and Site Requirement
Building Size
Number of Floors - Three (includes ground and roof level)
Area per floor - 1500 sq/ft.
Bay Size
- 20' X 18' - 2 required
- 30' X 18' - 1 required
- 12' X 18' - 1 required
Type of Construction
1. Structure - Open steel structure. Roof to be reinforced concrete.
North wall to be enclosed with Monsanto Lustra span panels or equal.
Second level floor to be grating. Finish on steel to be coating standard No. 502 or equal.
One stair at the east end of the structure.
2. Rooms
Control room ceiling will be acoustical tile.
Control room floor will be terrazzo to conform to existing floor.
Walls will be painted concrete block.
3. Personnel Service Facilities
None required.
4. Elevators
A freight elevator for moving bags of lime and rework to the operating floor is required. Capacity - 5000 lbs. Only one floor is served.
Heating and Ventilating
None required.
Electrical
There are no flammable materials handled in the immediate oper ating area. Classification is water resistant.
Normal grounding requirements.
Lighting requirements - Allow sufficient lighting for opera tions at the ground, operating and roof level.
00205V3
TOWOLDMONOQ48178
Provide two welding receptacles at each operating level, six required.
Provide two small tool outlet receptacles at each operating level, six required.
D. Maintenance Provisions
The coil in the furnace. Item 1-128, has to be accessible for repair.
The submerged pump. Item 1-134, in the still pot. Item 1-129, must be installed so that it is readily removable.
E. Drainage
No spacial materials are required for drainage. Drainage ditches will be constructed in the ground level concrete pad and a curb installed around three sides of the entire pad.
F. Communications
None required.
G. Safety
No safety showers or eye wash fountains are required. No explosion barricades are required. No blow out panels are required.
H. Fire Protection
No sprinkler systems are required.
No fire wall, fire hose stations, fire alarms, or foam systems are required.
No building steel fireproofing is required.
I. Walks and Roads
None required.
J. Railroads
None required.
K. Parking LotB
None required.
L. Fences
None required.
M. Dock Facilities
0020594
None required.
TOWOLDMONOQ48179
N. Facilities to be Relocated The control room will be expanded and the existing chlorinator panel will be relocated into this new control room addition.
O. Grading and Excavation The area to the north of Building 27 is a filled area and good soil is available at 12 to 15 feet from the surface.
P. Site Covering Rock covering in the areas around the site location.
0020595
TOWOLDMONOQ48180
Appendix E
Solid Aroclor Expansion Scope of Work
01 - Equipment
See Equipment Information Summary
02 - Instrument Items
See Instrument List and Summary
03 - Setting and Testing Equipment
Area accessible for truck and train unloading. High lift can be used to set larger units. The new elevator will be in stalled in Building 27.
04 - Setting and Testing Instruments
An addition to the present control room will be required to make space available for setting instruments. The new addi tion will be 20 ft. X 30 ft.
05 - Piling
None required.
06 - Excavation
For operating floor 100 ft. X 22 ft. X 1 ft
2200 cu.ft.
For elevator pit
360 cu.ft
6 ft. X 10 ft. X 6 ft
For structural piers
7700 cu.ft.
Mfg. Area 7 piers X 8 ft. X 8 ft. X 12 ft. = 5400 = 5400
Control Room 3 piers X 8 ft. X 8 ft. X 12 ft = 2300
Backfill required
5000 cu.ft.
Remove spoil - Sheet piling may be required for shoring.
0020596
TOWOLDMONOQ48181
Foundations
For Structural Steel
10 pads X 6 ft. square X 1.2 deep with 12 ft. column 1.5 ft. square
700 cu.ft.
Floor Slab - Reinforced Concrete
1100 cu.ft.
24 ft. X 90 ft. X 6" thick
Equipment Pads
120 cu.ft.
10 items x 6" Thick X 6 ft. X 4 ft.
Concrete Basin Within Floor Slab for drainage
450 cu.ft.
2 ft. wide X 1-1/2 ft. deep X 6" thick X 90 ft. long, 2 required
Supports, Platforms and Structures
Equipment Supports
55 tons
Grating Requirement
2000 sq.ft.
Handrails
400 ft.
Toeplate
400 ft.
Misc. Structural Supports
8 tons
Stair Requirement
One complete stairway for two levels
Control Room Building Frame
10 tons
Control Room Floor
300 cu.ft.
30 ft. X 20 ft. X 6" thick
Other Buildinq Items
Floor Covering for Control Room
600 sq.ft.
30 ft. X 20 ft. terrazzo to conform to existing floor
Acoustical Ceiling for Control Room
600 sq.ft.
Windows for control Room - Four Units
5 ft. X 4 ft. Doors for Control Room - Two Hollow Steel Units
0o^0597
3 ft. X 7 ft.
TOWOLDMONOQ48182
10 - Sprinklers
None required.
11 - Piping
Item Service Material Size
1-101 Sant R
C.S.
2" X3"
Biphenyl
C.S.
2"
Vent
C.S.
3" X4"
To It.103 Misc.
C.S. C.S.
3"X4" 3" X4"
Misc.
C.S.
2" X3"
Misc.
C.S.
2" X3"
Therm.Ret. Steam Cond.
C.S. C.S. C.S.
1" 1*5" 1"
Rmks. Jacketed Traced Jacketed
Jacketed Jacketed
Hose Jacketed
Hose Jacketed
Hose -
Length 75 ft. 75 ft. 35 ft.
30 ft. 2 ft.
2 ft.
2 ft.
50 ft. 40 ft. 40 ft.
Insul. Valves 1" 2 - Jctd, 1" 2 - CD 3 1" 1 - Jctd, Vent 1" 1 - Jctd
*-
--
1" 3 - FA37 1" 1" -
1-103 Chlor. Charge
C.S.
3" X4" Jacketed 100 ft.
IV 1 - Jctd
1-104 Relief
C.S.
2"
Relief Chlorine
C.S. C.S.
3" 3,,
To It. 105 C.S.
3" X4"
Jkt.
S .S.Inner
Traced -
Jacketed
50 ft. 50 ft. 60 ft. 30 ft.
_ 1 _ CA46 -- 4 - DE41I 2" 1 Jctd
1-105 To It. C S.Jkt. 3"X4"
106
S . S.Inrier
To It. 125
C.S.
3"X4"
Sample
C.S.
2" X3"
Jacketed
Jacketed Jacketed
50 ft.
25 ft. 30 ft.
1-106 To It. C .S.Jkt. 3"X4"
104
S .S.Inner
To It. 116
C.S.
4"
Jacketed -
25 ft. 25 ft.
2" 2 - Jctd 2" 1 - Jctd 2" 1 - Jctd
2" NO 2 - FA42
OOZOS**8
TOWOLDMONOQ48183
Item Service Material Size
Rinks. Length Insul. Valves
1-107 To It. 108
C.S.
4"
2 tracers 50 ft.
1*5"
1 CA46
To HC1 Line C.S.
4"
2 tracers 50 ft.
1*5"
2 - CA46
To It. 109
C.S.
4"
2 tracers 30 ft.
1*5"
1 CA46
1-108 To It. 113
C.S.
3"
-
20 ft.
1"
-
To It. 109 C.S.
4"
2 tracers 15 ft.
1*5"
-
Drain
C.S.
1"
-
20 ft.
-
1 FA42
1-109 Vent Relief 200 psig steam In. Cond. Out
To It. 110
C.S. C.S. C.S.
C.S. C.S.
2"X3" Jacketed 2" 1" "
25 ft. 25 ft. 50 ft.
1*5" 1*5"
1" 2" X3" Jacketed
50 ft. 30 ft.
1*5" 2"
1 _ Jctd. -
2 - FA37
2 - FA37 1 Jctd.
1-110 To It. 101
C.S.
1-111 Vent Therm.in Therm.Out To It. 112
C.S. C.S. C.S. C.S.
2" X3" Jacketed 70 ft.
2"
2" l*' 1*5" 3"
20 ft.
_
-
40 ft.
1*5"
-
40 ft.
1*5"
-
25 ft.
1"
2 - Jctd.
2 - FA37 2 - FA37 1 FA42
1-112 To It. 108
1-113 To It. Ill
C.S.
3"
C.S.
3"
-
50 ft.
1"
1 - FA42
-
50 ft.
1"
-
1-117 Relief Relief Chlorine
To It.118
C.S. 2" Traced
C.S.
3"
-
C.S.
3"
-
C.S. Jkt.3"X4" S.S.Inner
-
50 ft. 50 ft. 100 ft. 30 ft.
2"
1 - CA46 -
4 - DE41M 1 - Jctd.
0020599
|
TOWOLDMONOQ48184
Item Service Material Size
Rmks.
1-118 To It. 119
C.S.Jkt. 3"X4" Jacketed S.S.Inner
To It. 123
C.S.
3"X4" Jacketed
Sample
C.S.
2" X3" Jacketed
Lenqth 50 ft.
25 ft. 30 ft.
Insul. Valves. 2" 2 - Jctd
2" 1 - Jctd 2" 1 - Jctd
1-119 To It. C.,S. Jdt.
117
S..S.Inner
To It. 123
C.S.
3" X4' ' Jacketed 4"
25 ft. 25 ft.
1-120 To It. 108
To HC1 Line
C.S. C.S.
4" 2 Tracers 50 ft. 4" 2 Tracers 50 ft.
1-121 Vent To It. 122 Steam In Steam Out
C.S. C.S. C.S. C.S.
4" 41*5" 1*5"
.-' Traced "
30 ft. 30 ft. 50 ft. 50 ft.
2" No 2 - FA42
1*5" 1
CA46
1*5" 2 " CA46
-_ No 2 - FA42 i" i"
1-122 To It. 119
TO It. 123
C.S. C.S.
4" 4"
Traced
70 ft.
Traced
30 ft.
No 3 FA42 No 1 FA42
1-123 To It. 121
TW in
TW Out
C.S.
C.S. C.S.
4" Traced 40 ft.
6" ,3' - 50 ft. 6", 3' ' " 50 ft.
1-114 Vent
to It. 115 Steam In Steam in
C.S.
C.S. C.S. C.S.
1-115 To It. 106
TO It. 116
C.S. C.S.
4" 4" 1*5" 1*5"
4"
4"
_
Traced
-
"
30 ft.
30 ft. 50 ft. 50 ft.
Traced Traced
70 ft. 30 ft.
No 1 FA42
- 1 - EA46 " 1 EA46
-_ NO 2 _ FA42 i" i"
No 3 FA42 No 1 - FA42
0010600
TOWOLDMONOQ48185
Item Service 1-116 To It.
114
TW In TW Out
Material C.S.
C.S. C.S.
Size 4"
6", 3" 6" 3"
Rmks. Traced
-
Length 40 ft.
Insul. No
Valves 1 - FA42
50 ft. 50 ft.
-
1 - EA46 1 - EA46
1-124 To It. 125
C.S.
2"
-
60 ft.
-
-
1-125 Steam In C.S.
1*5"
-
60 ft.
2
2 - FA37
Steam Out C.S.
1*5"
-
60 ft.
2
2 - FA37
Vent
Saran Lined Steel
6"
Traced
50 ft.
No
To It. 126
C.S.
3" X4" Jacketed 30 ft.
2
2 - Jctd.
1-126 To It. 129
1-127 Vent Drain
1-128 To It. 129
Gas In
C.S.
3"X4" Jacketed 75 ft.
2
2 - Jctd.
P.E.
Saran Lined Steel
6" 3"
-
50 ft.
_
50 ft.
_
C.S. 3"X4" Jacketed 30 ft. 2" 2 - Jctd.
C.S.
1*5"
-
50 ft.
2 - CD3
1-129 To It. 130
C.S.
18"
--
2" -
To It. 134 C.S. 3"X4" Jacketed 40 ft. 2" 2 - Jctd.
1-130 To It.
C.S.
16"
-
30 ft.
2"
-
131
To It. 129 C.S. 2"X3" Jacketed 10 ft. 2" Site Glass
To It. 141
C.S.
2"
30 ft.
1-131 To It. 132
To It. 141
C.S. C.S.
3"X4" Jacketed 20 ft. 2" - 40 ft.
2" 2 - Jctd. Site Glass 2 - FA37
OO^Ofcoi
TOWOLDMONOQ48186
Item Service Material
1-132 Vent
C.S.
Relief
C.S.
To It. 135
C.S.
To It. 133
C.S.
Steam In
C.S.
Steam Out
C.S.
Size
Rmks.
3" X4" Jacketed
4" -
3" X4" Jacketed
3"X4" Jacketed
1*S"
-
1*5"
Length 30 ft. 30 ft. 40 ft. 30 ft. 60 ft. 60 ft.
Insul. 2" 2" 2" 2" 2"
Valves 1 - Jctd
2 - Jctd 2 - Jctd 2 - FA37 2 " FA37
1-133 To It. 137
1-134 To It. 128
-
3"X4" Jacketed 110 ft. 2" 2 - Jctd 3"X4" Jacketed 40 ft. 2" 2 - Jctd
1-135 To It. 136
Steam In Steam Out Water In water Out
-
-
3" X4" Jacketed 30 ft. 2" 2 - Jctd
1"
-
30 ft.
1"
-
1"
-
50 ft.
1"
-
1"
-
50 ft.
1"
-
1"
"
50 ft.
1"
1-136 Steam In C.S.
Water In C.S.
Water Out C.S. Aftercond.
Water Out C.S. Intercond.
Vent
C.S.
2" 2" 2"
2"
3"
_
30 ft.
1*5"
_
-
30 ft.
-
-
40 ft.
-
-
40 ft.
-
- 20 ft.
1-139 Steam In C.S.
1*5"
-
50 ft.
_
_
Steam Out C.S.
1*5"
-
50 ft.
-
-
Vent
C.S.
3"
-
20 ft.
-
-
To It. 140
C.S.
2"
" 30 ft. 1" 2 FA42
1-140 To It. 131
1-141 To It. 139
C.S. C.S.
2" 2M
-
70 ft.
-
2 - FA42
-
50 ft.
1"
-
0020602
TOWOLDMONOQ48187
Item Service Material
Misc.
Therm 14 Conn.
In
C.S.
Therm 14 Conn.
Out
C.S.
Therm
C.S.
Size IV
1*5"
6"
Rmks. "
Lenqth Insul.
500 ft.
1*5"
Valves 30 - FA37
500 ft.
1*5"
30 - FA37
-
500 ft.
-
4 - FA37
12 - Ductwork
A 6 ft. X 6 ft. cabinet will be required for housing drums for draw-off of residue product for still pot.
13 - Electrical
Motors to be installed and wired:
Number
1 5 1
2
3 2 1 1 1
Horsepower
2 5 7*S 10
15 20 25 30 50
Allow for remote pushbuttons and alarms for 10 motors.
Lighting required in operating area:
Ground Area, Operating Area, Roof Area,
18 ft. X 82 ft. 18 ft. X 82 ft. 18 ft. X 82 ft.
1476 ft*2 1476 ft2 1476 ft2
14 - Site Preparation
None required.
15 - Sewers
1. 50 ft. of 4" permanite sewer pipe with one tie-in to exist ing 8" sewer which runs west of Building 27.
2. 150 ft. of 304 S.S. guttering around the top of the new structure with 3-4" downspouts, each 30 ft. long
0020603
TOWOLDMONOQ48188
16 - Underground Mains
None required.
17 - Yards. Roads and Fencing
None required.
18 - Railroads
None required.
19 - Insulation
Piping - Refer to Code 11
Equipment - As below - material Standard #100 Weatherproof, Std. #65
Item
1-101 1-104 1-107 1-109 1-111 1-117 1-120 1-125 1-129 1-130 1-132 1-139 10 Pumps
Area
250 ft2 200 ft2
50 ft2 250 ft2
80 ft2 200 ft2
50 ft2 550 ft2 550 ft2 150 ft2 350 ft2
80 ft2
Thickness
2" 2" 1" 2" 1*5"
2" X"
2" 4" 3" 2" 1*5" 2"
20 - Painting
Coating Standard #502, Epoxy System.
All uninsulated piping, air, water, gas.
Supports for Items 106, 113, 116, 119, 123, 128, 141, 142, 132, 135.
0020604
TOWOLDMONOQ48189
21 - Walls, lasonry, Roofs and Roofing
Concrete roof deck for mfg. area - reinforced concrete, 20 ft. X 90 ft. X 5" thick
Concrete roof for control room - reinforced concrete, 20 ft. X 35 ft. X 5" thick
Concrete wall for control room - concrete block, 3 walls, total feet - 70 ft. X 15 ft. high
Concrete enclosure for elevator - concrete block, 4 walls, total feet - 30 ft. X 25 ft. high
Built up 4-ply roof for control room, 20 ft. X 35 ft.
North wall of mfg. structure will have Monsanto Lustra Span panels for a distance of 80 ft. and height of 12 ft. in each level.
750 cu.ft. 290 cu.f t. 1050 sq.ft. 7 50 sq.ft. 700 sq.ft. 1920 sq.ft.
90 - Dismantling
1. North wall of Building 27, approximately 1500 sq. ft. of brick wall.
2. South wall of present control room, 450 sq.ft, of concrete block wall.
3. Shed to south of present control room, approximately 600 sq.ft, of transite roof and steel platforms inside shed.
4. Biphenyl heater on Still No. 1. This is a unit heater in the shed.
92 - Repairs Expense
Replace existing head on Item 535. This is a 2000 gallon vessel and requires a new 78" O.D. carbon steel head.
93 - Relocation and Modification Expense
1. Remove and relocate Item 205, a 14' dia. X 10' high storage tank with coil and agitator.
2. Remove and relocate stairway to the north of Building 27.
3. Remove and relocate 10 ton stand-up tube air-conditioner which is now in the south section of the control room.
4. Remove and relocate a 20 ft. chlorinator panel from its existing position in the present control room to the new control room.
5. Remove the present 1268 flaker (24" X 48" unit) and replace with a new unit. This unit will be relocated to an area just east of the present flaker.
00Z06*
TOWOLDMONOQ48190
APPENDIX E - Amendment No. 1 Scope of Work - CEA 2080
07 - Foundations
L For Elevator Pit (Reinforced Concrete)
r 08 - Supports, Platforms and Structures Equipment Support For Item 152
150 cu.ft. 6 tons
Grating Requirement For Item 152
225 sq.ft.
Handrails
60 ft.
Toeplate
60 ft.
Stair Requirement
One Stairway For One Level
11 - Piping
i
Item Service Material Size
Rmks. Length Insul. Valves
1-152 Charge
C.S.
3"X4" Jacketed 125 Ft. 2"
1 - Jctd.
Charge
C.S.
2"X3" Jacketed 125 Ft. 2"
1 - Jctd.
Therminol C.S.
1*2"
-
200 Ft. 1*5"
2 - FA5
Vent
C.S.
3" X4" Jacketed 30 Ft. -
-
Overflow C.S.
3"X4" Jacketed 30 Ft. 1*5"
-
Outlet
C.S.
2" X3 " Jacketed 50 Ft. 1*5"
1 - Jctd.
12 - Ductwork
A 6 ft. X 8 ft. X 10 ft. hopper will be required under the new flaker.
13 - Electrical
Use PVC coated conduit.
19 - Insulation
Item 1-152
Area 320 ft2
Thickness 2"
90 - Dismantling
.2
A section of floor in Building 27 - Area 400 ft for 1268 flaker.
i 0020606
TOWOLDMONOQ48191
92 - Repairs Expense 5. Repair or replace section of floor at new 1268 flaker.
93 - Relocation and Modification Expense Remove Item (5) from original scope and replace with the following: 5. Relocate 18" I beam to south of control room. This beam is 40 ft. long and will be moved south approximately one foot. 6. Relocate 2 - 6" IPS tower water lines to south of control room - Total feet = 100. 7. Relocate miscellaneous 2" IPS pipe to south of control room - Total feet = 100.
0020607
TOWOLDMONOQ48192
APPENDIX E - Amendment No. 2 Scope of Work - CEA 2060
This amendment describes the work required to install a power pulverizer to grind flakes of Aroclor 1268. it includes a mill, conveying duct to dust collector, air lock to discharge material into fiber containers and a dust collector with blower. Instruments will be required at the dust collector.
03 - Setting and Testing Equipment
Pulverizer will be located under the flaker unit. The dust collector and pulverizer will be located on support steel.
08 - Supports, Platforms and Structures
Miscellaneous equipment supports, light steel
1 Ton
12 - Ductwork
Install 75 feet of 6 and 8" duct for blower and pulverizer.
11 - Piping
Install 100 feet of lh" IPS piping to filter for air.
13 - Electrical
Motors to be installed and wired:
Number
Horsepower
1 10 15 1
Conduit run to dust collector controls
20 - painting
Support steel with Std. #502 Epoxy System.
0020608
TOWOLDMONOQ48193
APPENDIX E - Amendment No. 3 Scope of Work - CEA 2080
Spares
A pump, indentical to Item 1-134,is to be purchased and held as a spare in the storeroom. Item 1-134 is a special submerged pump, critical to the operation of the Aroclor plant, and is required to prevent losses due to pump failures.
Size
TDH Make
200 GPM 100 Feet Taber Heavy Duty
0020609
TOWOLDMONOQ48194
0020610
TOWOLDMONOQ48195