UNION CARBIDE CORPORATION CHEMICALS AND PLASTICS ENGINEERING
SOUTH CHARLESTON, WEST VIRGINIA
MEMORANDUM
February 22, 1973
fteceriveo
23 1273 r / j. ports'
R. Turner E. 0. Garrett D. R. Matheny/G. R. Monk J. J. Potter, JrV C. J. Swan, Jr. (6)
^MMUNICAr/ON COP
*s*roy Aftr Ue
y
Pile No,
Coplea
D. V. Moody, Jr. C. C. Beely
J. E. Repp J. L. Slapeon
rRSULATIOK-EESIGR CRITERIA 8PIRIT8-CRATE ETHANOL RBFIHEMEOT ETHANOL PIART BO. 12 TEXAS Cm, TEXAS
Following are the recommended material and thickness specifications for
each anticipated service condition: Temperature .
Material
Insulation
Service
Ranee
Specification Thickness
Process - Piping and Equipment
Procesa - Piping Process - Equipment Process Equipment - Subjected
to Cyclic or Thawout Temps.
Utility Piping (Steam, Water, Air, etc.)
Above 50'F
Belov 50*F Belov 50*F Belov 50*F normal (up to ltOO*F thawout)
50*F to 250*F
1A<2>
1M 1K-B
TIM-101-515
TIM-lll-515
TIM-111-515
TIM-lll-515
3A '
t.
tt
Utility Equipment (Steam, Water, Air, etc.)
8team
Traced
lines
or
(k) Equip.
50*F to 250*F All temperatures
j^3) 2A(1)
TIM-101-515
Personnel Protection - Piping
135*F to 250*F
Personnel Protection - Equipment 135*F to 250*F
^3)
UCTC 17273
>*2* it*.-
Service
Personnel Protection - Piping or Equipment
2
Temperature Range
250*F and above
Material Specifications
and)
Insulation Thickness
TIM-lte-515
Tire Protection - Piping and Equipment
Tire Protection - Piping Tire Protection - Equipment
Wote
Above 50*F
50*F and below 50*F and below
w(i>
1A<2> 1M
TIM-133-515
TIM-13lt-515 TIM-13U-515
(X) All valves, fittings and other Irregular surfaces shall receive a mastic weather harrier.
(2) Aluminum Jacketing used In services operating below 50*F shall have a baked-on acrylic enamel finish on the outside to prevent condensation.
(3) On smell equipment where spraying of urethane would he impractical, Material Specification 2M may he used.
(k) for steam operating at 1*00*F or less, copper traclj shall he used. For steam operating above 1*00*F, stainless steel tracing shall he used.
Because of restrictive regulations Imposed by the Occupational Safety and Bealth Administration (OSHA), the Texas City Plant has adopted a policy stating that no new asbestos-containing Insulations shall he installed on new Installations. Material Specification 2A presently approves calcium silicate products which still contain asbestos fibers. By the time material procure ment is necessary, asbestos-free products will he readily available; there fore, the material for Specification 2A should he one of the following:
Kaylo 10-AF
- Owens-Coming Fiberglaa Corp.
Thermo-12
- Johns-ManviHe Corporation
8uper Caltemp, type XA - Pabco Industrial Producta
This criteria la being issued for simultaneous review and preparation ofInsulation and Beat Tracing Schedules. Any consents should be directed to
UCTC 172*74
UNION CARBIDE CORPORATION
CHEMICALS AND PLASTICS
ENGINEERING
SOUTH CHARLESTON, WEST VIRGINIA
February 22, 1973
MEMORANDUM
FEB 23 1973 / J. PCxxjg^
R. Farmer X. 0. Garrett D. R. Netheny/G. R. Hook J. J. Potter, Jr*
C. J. ftran, Jr. (6)
Coulee
D**or Aftet PlU No,____
iJ
D. V. Moody, Jr.
C. C. Seely J. H. Repp J. L. 81apeca
DBQLXEZOS-PBSIGR CRITERIA SPIRITS-GRADE ETHANOL RSFISBKEKI ETHANOL PIAKT SO. 12 TEXAS CM, TEXAS
Following are the recommended material and thickneaa specifications for
each anticipated service condition:
Temperature .
Material
Insulation
Bervlce
Range
Specification Thlctoeae
Proceaa - Piping and Equipment
Procesa - Piping Proces* - Equipment Process Equipment - Subjected
to Cyclic or Tbawovt Temps.
Utility PlpU* (Steam, Water, Air, etc.)
Utility Equipment (Steam, Water, Air, .etc.) Steam Traced Lines or Equip.^
Personnel Protection - Piping Personnel Protection - Equipment
Above 50'?
Belov 50*? Belov 50*F Belov 50*? normal (up to too*? thawout)
50*? to 250*?
1
50*? to 250*?
.!*<*>
1M 1M-B
TIM-101-515
TIM-HI-515 TIM-in-515 TIM-111-515
-* *
3A*':
t , .4
* *
7K^3)
All temperaturea
TIM-101-515
135*? to 250^? 135*? to 250*?
7&3>
UCCTXC 06221
2
8ervlce
Temperature Range
Personnel Protection - Piping 250*? and above
or Squipnent
Material Specifications
2A^
Insulation Thickness
HX-lte-515
fire Protection - Piping and Equipment
fire Protection - Piping fire Protection - -Equipment
Kate*
Above 50*?
50*? and below 50*? and below
ltA^
01
EW-133-515
T3M-13^515 TDt-13^515
(1) ALL valves, fittings sod other irregular surfaces shall receive a asstic
weather barrier. \#
--*r-
(2) Aluminum Jacketing used in services operating helcw SO*? shell have a hahed-on acrylic enamel finish on the outside to prevent condensation.
(3) On smell. equipaant where spraying of urethane would he Impractical,. Material Specification 2M nay he vised.
(k) ?or steea operating at U00*? or less, copper tracing shall he need.. Per steam operating above J*00*F, stainless steel tracing shall ho used. .
Because of restrictive regulations imposed by the Occupational Safety and Bsalth Administration (OSHA), the Texas City Plant has adopted a policy stating that no new-asbestos-containing Insulations shall be installed on new installations. Material Specification 2A presently approves calcium silicate products which still contain asbestos fibers. By the time material procureaent is necessary, asbestos-free products will be readily available; there fore, the material for Specification 2A should be one of the following:
Kayla 10-AF Tbexso-12
- Owens-Coming flberglms corp. - Johns-Manvllle Corporation
I
Sager Caltemp, 3^fpe KA - Pabco Industrial Products
This criteria is being Issued for simultaneous revler and preparation-of Insulation and Baat Tracing Schedules. Any comments should be directed to
UCCTXC 06222