Document Edg4wnaVpDGbb2Y57bjKMmDYR

South Carolina Department of Health and Environmental Control PLAINTIFF'S EXHIBIT 2600 Bull Street Columbia. S.C. 29201 Commissioner Robert S. Jackson, MD. Appalachia 111 District Environmental Quality Control 151 E. Wood Street Spartanburg, S.C. 29303 (803) 596-3800 May 23, 1985 MEMORANDUM Board Moses H. Clarkson, Jr., Chairman Leonard W. Douglas, MJD,, Vice-Chairman Barbara P. Nuessle, Secretary Gerald A. Kaynard Orea L. Brady, Jr. James A. Spruill, Jr. William H. Hester, MJ>. To: From: Re: V. Robert J. Betterton Bureau of Air Quality Control Ronald R. Garrett Appalachia III District Daniel ConstructionCompany Asbestos Removal from Hoechst Fibers Spartanburg County As you are aware, I inspected the Daniel Construction Company asbestos removal of the staple stretch area at Hoechst Fibers. The removal was out of doors and on the roof. Therefore, there were no barriers (poly) in place, no clean room, or showers. Personnel doing the removal were in street clothes under their Tyvek coveralls. It is noteworthy that removal is of H^&C ducting insulation; subsequently, fibers could be introduced into the intakes. Although the asbestos was wet before removal, I don't feel Daniel took adequate precautions to protect the workers removing the material nor any Hoechst personnel that may be exposed during the removal. . il. : ( RRG/dlk % Attachment. -- Asbestos Removal Evaluation cc: William P. Brantley - Bureau of Air Quality Control HWA SB STEW 12438 .. LEVEL 1 INSPECTION CHECKLIST A. COMPLIANCE WITH 40 CFR 61 SU3PART (NESHAP) I. REMOVAL COMPANY 1 (****. . C* !_i______________________________________ REMOVAL SITE_y^^././ F, Ws ri. /, 1. Was proper notification received? 2. Demolition only: was asbestos re moved prior to demolition? 3. Demolition only: did demolition activities prior to asbestos removal not preclude access to the material or damage it? 4. Demolition only: were friable asbestos materials encased in concrete adequately wetted whenever exposed during demolition? DATE/TIME YES ( fas' - /o.'jo,*.*. . * SEE NO N/A 1COMMENTS ~X )C ..... ) ( - )( - )( ^)( a. - ( )( K <-'')( r :> . V*v -* ( )( )( ^>( - -.-y) 5. Was asbestos wetted before being removed or stripped? 6. Was asbestos which was removed or stripped more that 50 ft. above ground transported to the ground in sealed containers or dust-tight chutes? 7. Authorized emergency demolition only: . was the portion of the structure containing friable asbestos adequately wetted during wrecking. Give name of authorizing agency in comments. ( ^K * ( A-'X ( )( X)( )( )C ^)( . :r; . * .-* <* * )( )( )' 8. Was the "no visible emissions to the atmosphere" requirement of the regula tion being met? ( )( )( ^)( > 9. Were asbestos contaminated waste materials wetted and placed into sealed, leakproof containers to which warning labels were / attached? ( ^ )( )( )( ) .0. HNA SB STEW 12440 LEVEL 1 INSPECTION CHECKLIST B. COMPLIANCE WITH 29 CFR 1910 SUBPART Z SECTION 1001 REMOVAL COMPANY * ca. REMOVAL Sin^i.*c-i t r'lL^i-c OATE/TIHE ?r///sS'~/0-`> 1.^ Were workers observed to be wearing their respirators at all times when they should have been? If not explain in comments. - 2. Does the removal company have a respirator program in place? 3. Were workers -provided with special .clothing such as coveralls, head, foot and hand coverings and required to use them? . (^ ( *<)( ( a/>( )( )( )( /;* )( } .) k ' - * 4. Was contaminated clothing disposed ofin sealed, impermeable bags which had warning signs attached? < <^)( )( )( > 5. Was type C supplied air provided to ; workers until 8 hour time weighted average airborne fiber concentrations were determined? i ( >( )( .)( 6. Was respiratory protection, at least air purifying respirators, utilized throughout the removal? ( M )( .)( 7. Was personal monitoring conducted to determine the 8 hour average and ceiling concentrations of fibers? ( )( /)( * )( ) 8. Was area monitoring conducted to determine the average and ceiling fiber concentrations? (./)( 9.. Were warning signs posted at all entrances to the removal area and at any place were exposure could be expected? % ( K ,) -4- HNA SB STEW 12441 III. COMMENTS FULLY DESCRIBE ANY VIOLATIONS NOTED: HNA SB STEW 12443 13. Was a type C supplied air systan provided for the workers? (If not indicate type in comments) 14. Was a type C supplied air system equipped with full face respirators provided for the workers? (If not, indicate type in comments. ( )( fX K ) ( )( /)( X ) 15. Did the workers appear to be wearing their respirators correctly and did facial hair appear to not be a source of leakage? 15. Was the Intake of the supplied air pump located away from any source of contamination? ( */>( X X ( )( X C;.<* . V 17. If the pump was fuel powered did the supplied air have to pass through a manifold equipped with a CO monitor, oil/water separator and a particle fil ter? ( )( K VX A* ' 18. If the air came from an oilless electric pump was it equipped with any kind of filters and CO monitors? ( )( )( S)( 'M'y 19. Was it equipped with a HEPA filter? ( )(. X /){ Xi: : 20. Were respirators required during pre paration of the work area? wtl 21. -Were respirators required during clean up? 22. If any respirators not in use were - available for examination, did they - appear to be spotlessly clean? (X ( /)( ( )( X /x X X *---;*-; v*. .*y.-r*.-v. X *<x 23. Were the respirators stored up, off the ground and away from sources of contamination? x( />( X 24. Was water applied to the asbestos with low pressure sprayers? (Based on In terview, not necessarily observed) < /X 25. Was excessive water use minimized? ie., no water was observed leaking out of the work area? . . `` 26. Was ammended water Used? _ ;: :*v-' (. / )( X ^X :y=.'c;' M^ -8- HNA SB STEW 12445 . .':vi {s LEVEL 2 INSPECTION B. GENERAL INFORMATION: BASED ON INTERVIEW WITH JOB-SITE SUPERVISOR \ I. What type of respirators were worn during preparation of the work area? fij o v 2. What type of respjrators were used during the removal? *?* & t 3. What type respirators were worn during clean-up? ______ *-> > ______________________________________ 4. What procedures were followed to minimize emmissions during stripping!? < -<? r <!> sh />c if ' . 5. What procedures were followed to minimize enissions during clean-up and , * breakdown?_______ <r O/K /- ``t ' 6. What was "clean air" value to which contractor must continue cleaning' operations before clearance is achieved? , o a-~ ' ' ' ...7. How large did the clean air sample have to be (liters)? 8. Type and percent {%) asbestos present? kc* f4 9, How many workers were there? _________ -^C_________ ;_____________ i 10. How many supervisors were there? 11. How many nf the supervisors have attende^^supervision of asbestos <^~batement contracts^yr related courses? (OO -k~ -f fit's ^ Kcp.c. e<* if ST)*1 k-r*-tos ' 4 (V . : <*' - V , O-V. >. . . .... . . -10- v- . -'.n:` South Carolina Department of Health and Environm ntal Control 2600 Bull Street Columbia, S.C. 29201 Comntiiaioner Robert S. Jackson, M.D. Appalachia III District Environmental Quality Control 151 E. Wood Street 29303 ' May ZS, iHob , MEMORANDUM Board Moses H. Clarkson. Jr., Chairman Leonard W. Douglas. M.D.. Vice-Chairman Barbara P. Nuessle. Secretary Gerald A. Kaynard Oren L. Brady. Jr. James A. Spruill, Jr. William H. Hester. M.D. To: From: He: Robert J. Betterton Bureau of Air Quality Control Ronald R. Garrett Appalachia III District Daniel Construction Company Asbestos Removal from Hoechst Fibers Spartanburg County As you are aware, I inspected the Daniel Construction Company asbestos removal of the staple stretch area at Hoechst Fibers. The removal was out of doors and on the roof. Therefore, there were no barriers (poly) in place, no clean room, or showers. Personnel doing the removal were in street clothes under their Tyvek coveralls. It is noteworthy that removal is of H\/AC ducting insulation; subsequently, fibers could be introduced into the intakes. Although the asbestos was wet before removal, I don't feel Daniel took adequate precautions to protect the workers removing the material nor any Hoechst personnel that may be exposed during the removal. RRG/dlk * Attachment -- Asbestos Removal Evaluation cc: William P. Brantley - Bureau of Air Quality Control HNA SB STEW 12571 I ASBESTOS REMOVAL EVALUATION 1. Name of Removal Company .2 Address of Removal Company /| <o < <? / As 3 / 3. Name of Removal Site F~r 4 r- i_______ 4. Location of Removal Site of- 5-fy< ^ What (Bldg, structure, room etc) is being stripped? .6 Name of Job Site Supervisor P-r0<K //t>/? c. |?.<! Lr A to k . f' -C. 7. Date/Time of Inspection 8. Was there a written contract for the project? /f> <> /j . s '// /<5' S~ /l> o ,0 -e P.'c y . r fi*,.uug. / 9. If so, who developed'the contract? .10 Was there a representative for the building owner onsite? Who? .11 Who collected the air samples? -}~fo /? ^..1 r* li /*J 12. Who will go to the landfill with in 24 hours of disposal: the air manager or the solid waste consultant? ^ o ju (:r*- - ^ ^ "r 13. Level of inspection performed. ____________ ;______________ 14. Work in progres: preparation, removal or cleanup/breakdown? * c*" *-* ^ i _______ __ 15. Number of points subtracted in NESHAP Section? ________________ 16. Number of points subtracted in OSHA Section? 17. Number of points subtracted in Level 2 section (Be sure to count , off 6 points for Questions 1,2, 5,22,30,32. Count off 9 points for Q 13). % 18. Total score (subtract the sum of 15-17 above from 100). NNA SB STBW 12572 ^Jor ofo/PCP S/mc f pp,tjfrr (ufiF su-ldoai LEVEL 1 INSPECTION CHECKLIST A. COMPLIANCE WITH 40 CFR 61 SU3PART (NESHAP) AI. REMOVAL COMPANY - / {****. Ca ,_____________ REMOVAL SITE-ZA^^/./ F/4-r* OATE/TIME jr^ /g'5"- /*:<*>-- II. . , 1. Was proper notification received? 2. Demolition only: was asbestos re moved prior to demolition? 3. Demolition only: did demolition activities prior to asbestos removal not preclude access to the material or damage it? t' 4. Demolition only: were friable asbestos materials encased in concrete adequately wetted when ever exposed during demolition? 5. Was asbestos wetted before being removed or stripped? 6. Was asbestos which was removed or stripped more that 50 ft. above ground transported to the ground in sealed containers or dust-tight chutes? 7. Authorized emergency demolition only: was the portion of the structure con taining friable asbestos adequately wetted during wrecking. Give name of authorizing agency in comments. 8. Was the "no visible emissions to the atmosphere" requirement of the regula tion being met? 9. Were asbestos contaminated waste materials, wetted and placed into sealed, leakproof containers to which warning labels were attached? - SEE YES NO N/A COMMENTS ( ~7^)( " )( )(" ( )( 5( ^)( ) ( )( )( ^)( ( )( K *^)( ir'U >< )( (>^)( )( ^ )(. ( )( )( i/ )( ( )( )( ){ )( )( HNA SB STEW 12573 10. Was asbestos waste taken to an approved landfill and was the material buried with in 24 hours by atleast 6 inches of non asbestos materials? ( )( )( )( \ III. COMMENTS ) (attach additional sheets if necessary) IV. FULLY DESCRIBE ANY VIOLATIONS NOTED (attach additional sheets if necessary) -3- HNA SB STEW 12574 LEVEL 1 INSPECTION CHECKLIST B. COMPLIANCE WITH 29 CFR 1910 SUBPART Z SECTION 1001 A-->' A.REMOVAL company S' *- C*o.----------------------------------------- removal . * r.'^Av 1. _ Were workers observed to be wearing their respirators at all times when they should have been? If not explain in comments. 2. Does the removal company have a respirator program in place? 3. Were workers-provided with special .clothing such as coveralls, head, foot and hand coverings and required to use them? ( r )( ( ( /){ i( )( ){ )( . ) j( ) )( ) 4. Was contaminated clothing disposed of in sealed, impermeable bags which had warning signs attached? ( 5. Was type C supplied air provided to workers until 8 hour time weighted average airborne fiber concentrations were determined? ( 6. Was respiratory protection, at least air purifying respirators, utilized throughout the removal? ( 7. Was personal monitoring conducted to determine the 8 hour average and ceiling concentrations of fibers? )( / )( )( )( )( 8. Was area monitoring conducted to determine the average and ceiling fiber concentrations? ( /){ ){ 9- Were warning signs posted at all entrances to the removal area and at any place were exposure could be expected? (/)(-)< )( )( )( )( )( X ) ) } ) ) .) -4HNA SB STEW 12575 10. Were caution labels affixed to all materials containing asbestos fibers or to their containers? 11. Were external surfaces of the removal area kept free of accumulations of asbestos? 12. Will the enployer keep the air monitoring records for 20 years? 13. Will the employees be given access to the air monitoring data? 14. Will the employees be notified if it is determined that they had exposures in excess of the standard? 15. Were employees provided with medical exams within 30 days of employement? The exams were to include Chest, XRay, Pulmonary Function Text (FVC and FEV) and a history to elicit symptomatology of respiratory disease. 16. Are annual medical exams given to permanent employees? 17. Will the employer keep the medical records for 20 years and will they be available for authorized inspection? ( )( )( ( >( H ( < / )( )( )( ( t/){ )( ){ )( )( )( ) ) ) ) ) ( r )( )( )( ) ( /)( )( )( ) ( /)( )( )( ) -s- HNA SB STEW 12576 / III. COMMENTS FULLY DESCRIBE ANY VIOLATIONS NOTED: HNA SB STEW 12577 6 LEVEL 2 INSPECTION CHECKLIST A. OBSERVATIONS FRCM OUTSIDE THE WORK AREA I. Was the work area sealed off using polyethlene sheets? SEE YES NO N/A COMMENTS (")('" )( " M~ 2.- Was a decontamination'unit constructed? 3. Old the decontamination unit consist of clean, shower and equipment rooms? 4. Oid the clean room appear to be clean? ( )( X V. , } { X>^X X ( )(. )( ^f( ). .) 5. Oid the clean room, the ground outside or other areas, eg., the dumpster, appear to be free of plaster-like debris? .6 Did the polyethylene barriers appear to be in good shape: not ripped or hanging down excessively? ( ( )( )( * K .) )( )( ^) 7. Was a routine maintenance program in effect to keep poly in place? .8 Was there a separate airlock for removing bags of contaminated waste? 9. Oid the bags of waste appear to be clean on the outside? ( )( )( ( )( % ( 'X 10 Did the material inside the bags appear to be damp? If dry enter a violation for question 9 of the NESHAP section (Level 1). ( /)( .11 Were workers who carried the bags of waste to the truck required to wear respirators? , ( )( .X S)( ) X) X ': }) X - . -f -X ) 12. Were workers who unloaded the truck'.-, at the landfill required to wear respirators? (- X:,,v-X )( ) HNA SB STEW 12578 -7- 13. Vlas a type C supplied air syston provided for the workers? (If not indicate type in comments) 14. Has a type C supplied air system equipped with full face respirators provided for the workers? (If not, indicate type in comments. 15.' Oid the workers appear to be wearing their respirators corrtctly and did facial hair appear to not be a source of leakage? 16. Was the intake of the supplied air pump located away from any source of contamination? 17. If the pump was fuel powered did the supplied air have to pass through a manifold equipped with a CO monitor, oil/water separator and a particle filter? 18. If the air came from an oilless electric pump was it equipped with any kind of filters and CO monitors? 19. Was it equipped with a HEPA filter? 20. Were respirators required during pre paration of the work area? wI 21. -Were respirators required during clean up? 22. If any respirators not in use were available for examination, did they appear to be spotlessly clean? 23. Were the respirators stored up, off the ground and away from sources of contamination? 24. Was water applied to the asbestos with low pressure sprayers? (Based on in terview, not necessarily observed) 25. Was excessive water use minimized? ie., no water was observed leaking out of the work area? 26. Was ammended water Used? -8- ( H fH )( ( )( /){ >< ( )( )( ( )( )( //)( ( )( )( //)( ( )( ( )( (k </)( )( */){ )( Sn h )( )( ( . )( )( ^i( ( /){ )( )( rn.y-H vx. X HNA SB STEW 12579 27. Did the water from the shower unit drain into drums or into City sewers? 28. Was the water filtered before disposal? 29. Was contaminated water not allowed to drain onto the ground? 30. Was a negative air machine used? 31. Oi.d it exhaust to the outside air? r 32. Oid all equipment such as ladders, scaffolding, airnoses, etc., stored outside the work area appear to be clean and free of gross asbestos con tamination? 33. Was all equipment spotlessly clean? 34. Were most of the workers experienced? 35. Was a dust supression agent used to damp wipe for the final cleanup? (detergent/surfactant is not usually considered a satisfactory dust supres sion agent). 36. Were workers provided with an isolated place to store their street clothes that would prevent asbestos contamination? ( )( )( >( ) ( )( )( v) ( )( )( < )( )( j/){. ;\;j: ( X - )( .`.yf ( )( ( y')( ( /){ )( yiC )( )( )( )( > ) `) ( )( )( )( /^) ( )( )( ) COMMENTS: * -9- SB STEW 12580 - * LEVEL 2 INSPECTION 8. GENERAL INFORMATION: 8ASEO ON INTERVIEW WITH J08-SITE SUPERVISOR \ 1. What type of respirators were worn during preparation of the work area? fj o A/ _______________________________________'__ 2. What type of respirators were used during the removal?______' \AJ i ( <; s* /} /? ?** *> - C, ' 3. What type respirators were worn during clean-up? ________________ _________ ______ __________________________________________________ 4. What procedures were followed to minimize emmissions during stripping? _____ i S' S' ,-n __________________________________________ 5. What procedures were followed to minimize enissions during clean-up and breakdown? _______ >** <- 6. What was "clean air" value to which contractor must continue cleaning operations before clearance is achieved? , o n_;; ,7. How large did the clean air sample have to be (liters)? 8. Type and percent (t) asbestos present? {f<- 9. How many workers were there? _________ ______________________________________ 10. How many supervisors were there? n Hnw many nf fhq sup.ervisors have attende<^supervision of asbestos <^~~abatement contracts^yr related courses? /u o -f- ~f~ h. 5 <; fiP,c* ( a </ r*; (p" fl* -4 O,cI TC-O* *T* : <g) '.ji.-v -10- HNA SB STEW 12581