Document EdbXx73b8n6xv2oGxxb1y6eML
Mission] at the facility which includes the Mission source or air pollution control equipment: the type. slai. efficiency and specifications '{Including engineering drawings. . plans and specifications certified to hy a registered"Illinois professional engineer) of -the proposed cmtssslcn source or air pollution control.equipment; naps, statistics and other data reasoo&piy' soft 1clent to,describe the location of the emission source or air pollution control equipment. The Agency, may waive the submission by the applicant of such engineering . drawings, plans, specifications, or such other '-positions of the above data or Information.as H shall deem Inappropriate of unnecessary to the construction permit application, provided that any such waiver by the Agency shall be given in writing to the applicant. The. Agency may adopt procedures which require data and Information In addition to and In amplification of the natters specified In the first sentence of this .paragraph, which are reasonably designed to determine^ compliance with 'this. Chapter, and Ambient air quality standards, and which set forth the format by which all data.and Informal Ion shall, be submitted.
Section 10I.1S3 . Incomplete Applications
An application shall not be deemed to be filed until the applicant has submitted all Information and completed all application forms .required by Section' 201.152 an'd procedures ' adopted and effective pursuant, thereto. Provided.- however, that If the Agency falls to notify the applicant within days after the filing of a purported application that the application Is Incomplete and.of the reasons the Agency deems It -Incomplete.-the application shall be deemed to have been filed as of the data of such purported filing. The applicant may treat the Agency's notification that an application ts incomplete as a.denial of the application for'purposes'of review.
Section 201.154 Signatures
All applications and supplements thereto shall be s tgned by the owner and operator of the emission source or.air pollution control equipment, or their authorized agent, and shall be accompanied by evidence of. authority to sign the application.-
Section.201-ISS - Standards for Issuance
No construction permit shall be granted unless the applicant submits proof, to the Agency that:
a) .The emission source or air pollution control equipment will be constructed or modified to
; operate so as not to capse a violation of the Act or of this Chapter; and
b) ' If subject to'a future compliance dale, the applicant has an approved-compliance program and project completion schedule in accordance with the provisions of Subpart H.
Section 201.i$6- ' Conditions
' The Agency may impose such conditions In a , construction permit as may be necessary to , accomplish the purposes of the Act. and as are , not Inconsistent with the regulations i pronulgated by the Board thereunder. Except as
herein specified, nothing in this Chapter shall be deemed to.limit the power of the Agency In 'this regard. Such conditions may tqelode conditions specifying any testing operations that may be conducted under .the construction `permit.'
'{Source: Amended at 1 Ml. Reg.124. effective ihsly 28. 1979)
Seettuu'WtttSTr"' Contents' uf-Appi Icat loirfur-' Operating Permit
An application-far an operating permit shall conOifS'.as a mfhfnam. lKe tfSCa antf'ChfbrtisaCTdn -. Specified in Section 20I..152. Each application shall.list all Individual emission sources for which a permit Is sought. Any applicant may seek to obtain from the Agency a permit for epch emission source., or such, emission'sources as are - similar In design or principle of operation or function, or for all emission sources encompassed in an Identifiable operating unit. To- the extent that-the above- specified data-and--- -information .lias-previousTy been submitted to the Agency pursuant "to this Subpart. the data and Information needrwt'BeresuBmfrredT provided.----- however,1 that 'the applicant miist certify that - the-data and Information previously submitted retains truer correct and -current.-- Ah- application for an operating'peimlt. shall contain a description of the startup procedure for each emission source, the,duration and frequency of stirtups; thetypes-anirquantHler ~ or emissions during startup, and the applicant's - efforts to minimize any such startup emissions, duration of- Individual startups., and-.frequency. of startups.. The Agency may. adopt.proceAires which require data and Information in addition to and inamp-HfStation- of- the-matterspecifiedIn the first sentence of this Section, which are reasonably designed to determine compliance with this'. Chapter. and ambient air quality standards,' and whlch set forth the format by whicli all data and 'information shall be submitted.-
I
Section 201.1 M . Incomplete. Applications
An application- shall riot be deemed to be filed until the applicant has submitted all Information and completed application forms required by Sectfixv mrisrarnfr-procedurey- adopted and effective pursuant hereto. Provltad, however, that If the Agency fall* to notify tlie applicant within 10 days.after .the f tttap-#-a*prpHt*-KpMMl1oa- Uul-Ut. application Is incomplete.aiid.of the reasons the Agency deems'It Incomplete, the application shall be deemed to have been filed as of the dale of such purported filing. The applicant way-treat-the-Agency^s-noWf-lcat-loo- M>at--ai>-- application Is Incomplete as a denial of the application for purposes of review.
-6-