Document Eda2ovG55VpqvND882oo7BbNL

QUALITY CONTROL MANUFACTURING MANUAL PAGL 1 ,0F_ 3 STANDARD CONTROL TEST NO*'100' Rev- c DATE OF ISSUE_ _ _ _ _ _ _ _ _ July 25' 1974 WRITTEN BY_ _ _ _ _ _ _ _ AlL. G. Feldman Mt. ---------- APPROVED RV ft-C.Ericson/T.Ii.Lyall QUALITY CONTROL OPERATING INSTRUCTION SUBJECT: MONOKOTE Set Time Contxol PLAINTIFF'S EXHIBIT REVIEWED OATE INITIALS A. Objectives.- 1. To provide the Plant Manager with an established pro cedure Cor worsting with gypsum suppliers to purchase raw material which will give MONOKOTE set characteristics that meet CPD finished goods specifications. 2. To provide the Plant Manager and Manufacturing Management with control limits to be applied to set time data which will result in immediate corrective action when any changes in the manufacturing process produce non-standard finished product performance. 3. To provide each manufacturing plant a permanent, chrono logical record of the set characteristics of finished MONOKCTE which will serve as a valid basis for dealing with field performance complaints and product liability claims. B. Quality-control Procedure: 1. Our gypsum suppliers will furnish a quality report (including C-7A set times and receipts of new vermiculite samples) to the Zonolite Plant Manager with each truck load shipment (sample attached). Each Plant Manager will maintain a chronological file of these reports. Reports will be retained in this back-up file for at least one (1) year. 2. A copy of the Quality Control set time chart will be sent to the gypsum supplier, on a monthly basis, in order to keep him informed of current MQNOXOTE set times. This is especially important in ' the event that set times continually fall outside the set time specification ranges. The Plant Manager will also keen the nvpsuL supplier supplied with samples of vermiculite by sending a 4.1 cu. it". "^>ag Of VtilUlCuirte (representative of the material incorporated in that day's MUN0KJ5PE production) every two months. Included with the bag of vermiculite will be an attached form that will tell the gypsum supplier to throw away all remaining vermiculite samples and only to use the material in the new sample' bag for set time testing (sample attached) during the neat two months. ^ O' 3 m Wt o Page 2 of 3 A-100, Rev. C C. Gvpsxm Quality Control Responsibilities; Cambridge 1. Technical performance specifications for all gypsum purchases by CPD for use in MONOKOTE will be established by Central Research and Manufacturing. These specifications will be communicated to Purchasing and to all Manu facturing Plant Managers in the standard format of a raw material specifi cation for ZOU (formulated gypsum). 2. The ZOO raw material specification will include a tabulation of ZOO sup pliers meeting ZOO technical requirements, for each Zonolite Manufacturing Plant. Manufacturing plants purchase ZOU only from approved sources. ZOO purchases, among competing but approved suppliers shall be determined by Central Purchasing on the basis of commercial considerations. 3. New gypsum suppliers must be qualified through Central Quality Control. Supplier t Our gypsum suppliers will be responsible for controlling the set time of the ZOO they furnish so that the finished product set time ojfljMar MONqkote production falls within specified limits. Th?^tarSardTest Method C-7A la thermal rise BlelhcHrTnJWrKSfJT^BTOrRe furnished standard samples of vermieulite aggregate will be used by our suppliers as the method of deter mining set time of zoo. Plant . 1. Responsibility of the correlation of supplier reported ZOO sets and finished MONOKOTE set characteristics, as well as initiation of action to adjust ZOU sets to correct out-of-specification finished MONOKOTE sets, is the direct responsibility of the Zonolite Plant Manager (who will deal directly with the-supplier'9-Plant-Manager). If-unusual difficulties are_enconntgred, the Zonolite Plant Manager should request assistance from the Division Quality Assurance Manages. 2. Zonolite plants will not be required to run ZOU set times as long as supplier reports are being received and finished MONOKOTE set characteristics are normal. D. MONOKOTE Set Time Control: 1. Set time testing will be done using mixed mortar samples prepared to carry out the vicat and wet mortar density tests C-3 and C-4. Plants will be expected to make one set time chart per operating shift. This testing pro cedure is described by Test C-B. . 2. Set time data will be recorded on the face of the Recorder Chart as required by Test C-8. c, o o Uvl Page 3 of 3 A-100. Rev. C 3. Recorder Charts will be retained in a chronological file for at least 6 months. A typical chart will be selected and mailed to the Division Quality Assurance Manager along with the Quality Control chart monthly as required by Instruction A-101. 4. Any MONOKOTE batch tested which falls outside of the control limits should be immediately retested. If a retest still indicates a set time outside of the control limits, the Plant Manager will taJce the following action: 1. Check for possibility of the use of an old gypsum lot number in the product. 2. Inform Central Quality Control and General Plant Manager responsible. 3. Inform the gypsum supplier. 5. In addition to the control limits, each plant formulation will establish shipping limits which will give more latitude than the control limits. No batch beyond the shipping limit may be sent out without approval from the General Plant Manager. 6. If the retest falls outside of the shipping limits, the batch will be classified "HOLD FROM SHIPPING". ( 7. To determine disposition of ''HOLD'' batches, inform Central Quality Control and the General Plant Manager. They should a]so be contacted when batches are 'held from shipping* or when strong trends toward non-specification performance show in the control charts. , 6P030 1552 LGF:br 7/25/74 '1 Attachment #1 A-100, Rev. C 2QO Quality Report Ship Date______ From ________ _______ ____ ______ Plant Order __________ _ Shipped to__________________________ Plant Bag Code Change in vermiculite sample since last shipment Standard vermiculite sample dated Yes/No . Retarder level change since list shipment 1 Yes /No Increase/Decrease Amount #/Ton Normal Consistency Base Stucco Set Time (Hrs:Min) Max. Temp Rise F. Max. Min. Min. Average Average Copies to: Manager Receiving Plant, W. R. Grace & Co. (internal copies) GP030 1553 Attachment #2 A-100, Rev. C CONSTRUCTION PRODUCTS DIV19IOW r Vermiculite Sampling Fora FROM: W. R. Grace Co. Zonolite Plant TO: ZOO Gypsum Supplier On this date______ ______________ a 4.1 cubic foot bag of vermiculite ia being sent to you. This particular sample is to be used for all vend* calite accelerated set tine evaluations (07A) performed during the next two-month period of time. All other samples of verm.tr.ul ite should be discarded upon receipt of the new samples. Receipt of the new vertniculite sample should be acknowledged by noting this occurrence on the standard Quality Report 9ant to Zonolite plants. ^1 0E043 LGF:br 7/25/74 A