QUALITY CONTROL MANUFACTURING MANUAL
PAGL 1 ,0F_ 3
STANDARD CONTROL TEST NO*'100' Rev- c
DATE OF ISSUE_ _ _ _ _ _ _ _ _ July 25' 1974
WRITTEN BY_ _ _ _ _ _ _ _
AlL. G. Feldman
Mt. ----------
APPROVED RV ft-C.Ericson/T.Ii.Lyall
QUALITY CONTROL OPERATING INSTRUCTION SUBJECT: MONOKOTE Set Time Contxol
PLAINTIFF'S EXHIBIT
REVIEWED
OATE
INITIALS
A. Objectives.-
1. To provide the Plant Manager with an established pro cedure Cor worsting with gypsum suppliers to purchase raw material which will give MONOKOTE set characteristics that meet CPD finished goods specifications.
2. To provide the Plant Manager and Manufacturing Management with control limits to be applied to set time data which will result in immediate corrective action when any changes in the manufacturing process produce non-standard finished product performance.
3. To provide each manufacturing plant a permanent, chrono logical record of the set characteristics of finished MONOKCTE which will serve as a valid basis for dealing with field performance complaints and product liability claims.
B. Quality-control Procedure:
1. Our gypsum suppliers will furnish a quality report (including C-7A set times and receipts of new vermiculite samples) to the Zonolite Plant Manager with each truck load shipment (sample attached). Each Plant Manager will maintain a chronological file of these reports. Reports will be retained in this back-up
file for at least one (1) year.
2. A copy of the Quality Control set time chart will be sent to the
gypsum supplier, on a monthly basis, in order to keep him informed
of current MQNOXOTE set times. This is especially important in
'
the event that set times continually fall outside the set time
specification ranges. The Plant Manager will also keen the nvpsuL
supplier supplied with samples of vermiculite by sending a 4.1 cu.
it". "^>ag Of VtilUlCuirte (representative of the material incorporated
in that day's MUN0KJ5PE production) every two months. Included with
the bag of vermiculite will be an attached form that will tell the
gypsum supplier to throw away all remaining vermiculite samples and
only to use the material in the new sample' bag for set time testing
(sample attached) during the neat two months.
^ O' 3 m
Wt o
Page 2 of 3 A-100, Rev. C
C. Gvpsxm Quality Control Responsibilities;
Cambridge
1. Technical performance specifications for all gypsum purchases by CPD for use in MONOKOTE will be established by Central Research and Manufacturing.
These specifications will be communicated to Purchasing and to all Manu facturing Plant Managers in the standard format of a raw material specifi cation for ZOU (formulated gypsum).
2. The ZOO raw material specification will include a tabulation of ZOO sup pliers meeting ZOO technical requirements, for each Zonolite Manufacturing Plant. Manufacturing plants purchase ZOU only from approved sources. ZOO purchases, among competing but approved suppliers shall be determined by Central Purchasing on the basis of commercial considerations.
3. New gypsum suppliers must be qualified through Central Quality Control.
Supplier t
Our gypsum suppliers will be responsible for controlling the set time of
the ZOO they furnish so that the finished product set time ojfljMar MONqkote production falls within specified limits. Th?^tarSardTest Method C-7A
la thermal rise BlelhcHrTnJWrKSfJT^BTOrRe furnished standard samples of vermieulite aggregate will be used by our suppliers as the method of deter
mining set time of zoo.
Plant
.
1. Responsibility of the correlation of supplier reported ZOO sets and finished MONOKOTE set characteristics, as well as initiation of action to adjust ZOU sets to correct out-of-specification finished MONOKOTE sets, is the direct responsibility of the Zonolite Plant Manager (who will deal directly with
the-supplier'9-Plant-Manager). If-unusual difficulties are_enconntgred, the Zonolite Plant Manager should request assistance from the Division Quality Assurance Manages.
2. Zonolite plants will not be required to run ZOU set times as long as supplier reports are being received and finished MONOKOTE set characteristics are normal.
D. MONOKOTE Set Time Control:
1. Set time testing will be done using mixed mortar samples prepared to carry
out the vicat and wet mortar density tests C-3 and C-4. Plants will be
expected to make one set time chart per operating shift. This testing pro
cedure is described by Test C-B.
.
2. Set time data will be recorded on the face of the Recorder Chart as required by Test C-8.
c, o o
Uvl
Page 3 of 3 A-100. Rev. C
3. Recorder Charts will be retained in a chronological file for at least 6 months. A typical chart will be selected and mailed to the Division Quality Assurance Manager along with the Quality Control chart monthly as required by Instruction A-101.
4. Any MONOKOTE batch tested which falls outside of the control limits should be immediately retested. If a retest still indicates a set time outside of the control limits, the Plant Manager will taJce the following action:
1. Check for possibility of the use of an old gypsum lot number in the product.
2. Inform Central Quality Control and General Plant Manager responsible.
3. Inform the gypsum supplier.
5. In addition to the control limits, each plant formulation will establish shipping limits which will give more latitude than the control limits. No batch beyond the shipping limit may be sent out without approval from the General Plant Manager.
6. If the retest falls outside of the shipping limits, the batch will be classified "HOLD FROM SHIPPING".
( 7. To determine disposition of ''HOLD'' batches, inform Central Quality Control
and the General Plant Manager. They should a]so be contacted when batches
are 'held from shipping* or when strong trends toward non-specification
performance show in the control charts.
,
6P030 1552
LGF:br 7/25/74
'1
Attachment #1 A-100, Rev. C
2QO Quality Report
Ship Date______
From
________ _______ ____ ______
Plant Order
__________ _
Shipped to__________________________ Plant Bag Code
Change in vermiculite sample since last shipment Standard vermiculite sample dated
Yes/No .
Retarder level change since list shipment 1
Yes /No Increase/Decrease
Amount #/Ton
Normal Consistency Base Stucco
Set Time (Hrs:Min)
Max.
Temp Rise F.
Max.
Min. Min.
Average Average
Copies to: Manager Receiving Plant, W. R. Grace & Co. (internal copies)
GP030 1553
Attachment #2 A-100, Rev. C CONSTRUCTION PRODUCTS DIV19IOW
r
Vermiculite Sampling Fora
FROM: W. R. Grace Co. Zonolite Plant
TO: ZOO Gypsum Supplier
On this date______ ______________ a 4.1 cubic foot bag of vermiculite ia being sent to you. This particular sample is to be used for all vend* calite accelerated set tine evaluations (07A) performed during the next two-month period of time. All other samples of verm.tr.ul ite should be discarded upon receipt of the new samples. Receipt of the new vertniculite sample should be acknowledged by noting this occurrence on the standard Quality Report 9ant to Zonolite plants.
^1 0E043
LGF:br 7/25/74
A