Document EdR9BwjY3q4XgJRREoXOqbqn4

Texas Department of Health David R. Smith, M.D. Commissioner Robert A. MacLean, M.D. Deputy Commissioner October 11, 1993 Public Health Region 8 601W. Sesame Drive Harlingen, Texas 78550 (210) 423-0130 Leonel Vela, M.D., M.P.H. Regional Director 1 PLAINTIFF'S i t r EXHIBIT KR'C-62 Mr. David C. Cantu Environmental Technician KOCH Refining Company P.O. Box 2608 Corpus Christi, Texas 78403 Dear Mr. Cantu: Your company's asbestos abatement operation at KOCH Refining Company, off of Suntide Road, Corpus Christi, Texas, (Process Unit) conducted by Gilman Insulation, Inc., Corpus Christi, Texas, was inspected for compliance with the requirements of 40 CFR 61 Sub part M EPA National Emission Standards for Hazardous Air Pollutants on October 8, 1993. Enclosed is a copy of the site evaluation checklist. The checklist outlines the job areas inspected and indicates the areas of compliance and/or noncompliance. The overall evaluation indicates that this project is in compliance with existing departmental rules. Thank you and your staff for the courtesy and cooperation extended to me during the inspection. If we can be of any further assistance, please do not hesitate to call us at (210) 423-0130. cc: Rudy De Leon, Supervisor Gilman Insulation, Inc. P.O. Box 4074 Corpus Christi, Texas 78469 KOI8583 EPA REGION VI ASBESTOS DEMOLITION AND RENOVATION (D/R) FIELD DATA COLLECTION CHECKLIST I. GENERAL INFORMATION (from notification) Site Name:/^4Date/time of inspection: ft/of/rtfz Location: aft?Inspector(s): tST'e&z* PpfaPrfJL?-j/2s. Notification Received? (Jes)) (ID #, date): ^306 09/z,j//<;f'2 Reason for Inspection: / Routine Compliance Inspection y Citizen Complaint_______________ Suspected Non-notifier___ State Oversight/Joint____ Other____ (explain) Establish identity of Owner/operator(s): a. Owner name: j<3ccL gefihfiifCrwfJvb. Main contact pevriswowni,yaand title: jl ''Ttei/rd! C. C./iJ-h< . *u/ir&t^y~ /ccl, , c. Mailing address: P-6'fcdC z&df d. Telephone number:(V/2^ (Lrrfos ctteSs-fl, r 7/^3 Prime Contractor (provide the following information for each contractor related to the D/R qob): a. Company namzrfPtoarfiZttSuL-fi'Zh b. Jiain contact person and title: hsixcy^ I , S<jjAa^r/i<,or^ c. Mailing address: r-0-!?(i<c/o7</' d. Telephone number:(015)85^=8860- Corpus CihtZ$b\ oB SS4-4%<e Activity Description: , a. Is more than one project occurring at the facility? Yes___ No V (If yes, complete a separate checklist for each or differentiate accordingly.) b. Type of activity: Demolition___ Ordered Demolition___ Planned Renovation v/ Nonscheduled Operation___ Emergency Renovation___ * ,, c. Describe: the project: uJfc.itu. s -- Indicate its current phase: pre-___ during^ post-___ abatement Describe type of abatement occurring (e.a., removal, encapsulation, etc.) :(l^ *&**** ^3S PlJ-MZILjL Abatement starting date [145(b) (3)(C)(ix)]: Ending date:_________ *y ///*if /o/W//$<fj II. REMOTE OBSERVATIONS ,/ 1. Visible emissions to the outside air? Yes__ No^ If yes, describe specific location (e.g., door, window, waste storage area, etc.) referring to remote observation sketch. ;______________________________ / 2. Suspect ACM debris observed outside removal area? Yes__ No_ If yes, describe [e.g., location, estimated quantity, condition (intact? crushed? wet? dry?)] _____ ;_______________;____________________ ______________ _ 3. Are vehicles being used to haul suspect ACWM properly marked? Yes__ No^ CmcOo -- o S7U>y,U~MHl,, 5fkJrh /r&te'~zn$r? (Z&dfQ ^7. 4. Land use surrounding site (Residential___ , Schools___ , Businesses___ , Industrial_\/, Other___ ): a. Distance to the closest residence/public building from the D/R site: b. Number of residences or occupied buildings on adjacent properties or 1 ots:,;____________________________________ c. Distance to pedestrian walkway, street, or thoroughfare from site: d. Additional information indicating potential public exposure: 5. Building/Structure Information 7 " a. Use: Office__, Retail__ , Industry/^, School__, Other_________________ _ b. Brief physical description of building involved in D/R: No. of floors___ Dimensions (sq ft)__________________________________ __ _________ _ c. Year constructed: Year(s) renovated: Using the space provided, draw a sketch of the suspected abatement area. Draw the building or other source of suspect ACM, waste storage area(s), location(s) of debris, land use surrounding site, vehicles of importance, etc. Estimate and indicate dimensions and distances as accurately as possible on the drawing. KOI 8585 ? o PRE-INSPECTION INTERVIEW * "-'V ^ fi/Lt*- ", jU/TV /vrw'/''Jr >'<'*--- "' 7_ 7 1. Credentials shown: [145(c)(8)] - Agency identification - Medical monitoring certification ___ ___ * > 2. Name and position of person(s) being interviewed (include company name): RwfU, So&afVfesf. ftfgjYeshj (<i, ^3) ?5-{'6)ieJ4 K.. l/'M/W4. /CPCjZ' /erf~/Wu* Describe' any changesf/modifications/discrdpancres in the information irf the =i 4. notification [145(b)(3)(A), Prime Contractor (B), (C)]:Attn) . ________________ a. Contractor's responsibilities at job: *f- b. Number of employees involved in job:35-_____________________________ ' -r c. Number of on-site employees trained in asbestos removal: 3s~ . d. Name of Supervisor (if different from 5b.): *uS^ tXe^Lecn e. What type of asbestos training has the supervisor had? CshbuJ^ Date of last training: V~oh^ ft, f^rt3 _________ : r-- / f. On-site Representative 1) If applicable, name of on-site representative who has had required training in the provisions of the NESHAP regulations, training course and date (effective 1 year after promulgation of the revised NESHAP) ri45(b) (3)(c) (xiii)]: /&4 De. les _________________ 2) Is evidence regarding this individual's training posted apd available for inspection at the demo/reno site: [145(c)(B)]:YesV^_ No__N/A Subcontractors or any other party on site (e.g., hygienist, consultant, etcT) who controls or supervises the D/R project. a. Company name: b. Main contact person and title: c. Mailing address: d. Telephone number:() City State Zip Code e. Responsibilities at job:________________ ________________ ___ f. Number of employees involved in job: g. Number of on-site employees trained in asbestos removal: h. Name of supervisor:_______ ;____________________________________ _ i. What type of asbestos training has the supervisor had? IY. SITE INSPECTION OBSERVATIONS A- Insulation:*360^ TU Pipe / - felt___ - air cell___ - premolded * - asbestos cement Block___ Surfacing Materials: Plaster___ Spackling Compound___ Stucco___ Joint Compound Spray on: - Acoustical___ - Decorative___ - Insulative___ Miscellaneous: Ceiling tiles___ Category I Nonfriable ACM: Packings___ Gaskets___ Asphalt Roofing Products___ Resilient floor coverings: - Vinyl/asbestos tile___ - Asphalt/asbestos tile___ - Linoleum 3 KOI8586 (\) ____ Category II nonfriable ACH: Extrusion panels___ Putties___ Clapboards/shingles___ Sealants___ Millboard___ Adhesives (mastics)___ Vinyl wall paper___ \ Concrete/asbestos pipe Pegboard___ Paints and coatings___ Laboratory bench tops___ Tsxtilss* fire blankets___ laboratory aprons___ theater and welding curtains___ gloves___ Others: ____________________________________________________ B. Quantity Determination [145(a)] Complete Attachment A (Quantification of ACM) and the following: 1. Linear footage of ACM present on pipes: 2. Square footage of ACM present on other facility components: 3. Cubic footage of ACM off facility components where the amount of ACM previously on pipes and other facility components is unknown: 4. Method of measuring or estimating amount of ACM present: Yes No N\A Demolition C. Emission Control Procedures [145(c)] ___ 1. Facility ordered demolished (removal not required) [(c)(4)]: If yes, a. Governmental agency ordering demolition: ___ b. Portion of facility containing ACM adequately wet during wrecking? c. Visible dust emissions: ___ 2. Category I nonfriable ACM not in poor condition and not t - friable? (removal not required) [(c)(1)(i)]: l" 3. Encased in concrete (removal not required): If yes, adequately wetted whenever exposed during demolition? [(c)(l)(ii)]: ___ ___ 4. ACM not discovered until after demolition began and cannot be safely removed (removal not required) [(c)(l)(iii)]: If yes, adequately wet at time of inspection? ___ 5. Is the facility being demolished by intentional burning? ___ ___ If yes, has all ACM (including Categories I and II) been removed before burning? [(c)(10)]: . ___ ___ 6. Category II nonfriable with low probability of becoming crumbled, pulverized or reduced to a powder during demolition? (removal not required) [(c)(1)(iv)]: ___ 7. Is ACWM being generated during an ordered demolition or demolition where RACM is not required to be removed? If yes, is the ACWM kept: ___ ___ a. adequately wet after demolition? ___ ___ b. wet during handling and loading for transport to a disposal site? NOTE: (Sealing in leak-tight containers or wrapping not required - may be transported and disposed of in bulk.) DEMOLITION or RENOVATION ___ ___ 8. Unit/section removal? If yes, answer the following: a. ACM adequately wet whenever exposed? b. Lowered to floor and ground level without disturbing ----- ------------ ACM? [(c)(3)(i)&(ii)]: 4 KOI8587 No N/A ------------- ___ ___ ___ ___ ------------- . 9. Stripping in place? if yes, answer the following: a. ACM adequately wet while being stripped and until collected and contained or treated in preparation for disposal? [(c)(6)(i)]: b. Lowered to floor and ground level without disturbing ACM? [(c)(6)(H)]: c. Transported to ground via. leak-tight chutes or containers if removed or stripped >50 feet above ground level and not removed as units or in sections? [(c)(6)(iii)]: 10. Temperature at point of wetting below 32*F? If yes, answer the following [(c)(7)]: a. Regulated facility components being removed as units or sections? b. Visible emissions to the outside air? c. Required records kept regarding cessation of wetting? d. Records available for inspection? 11. Has the owner/operator been granted an exemption from . Wetting? [(c)(3)(A),(8)]: a. Reason for exemption b. Who granted the exemption? [(c)(3)(B)(3)(ii)]: ___ ------------___ ___ ___ ___ ___ ___ ___ ___ ___ c. Is one of the following emission control techniques in use? Local exhaust ventilation and collection system [(c)(3)(B)]: Glove-bag system Leak-tight wrapping Equivalent approved method (with approval kept at the worksite) d. Are there visible emissions to the outside air? 12. Is Category I nonfriable ACM being sanded, ground or abraded? If yes: a. Are visible emissions produced? b. Is the ACM adequately wet? c. Is a local exhaust and ventilation and collection system being used? 13. Are Large facility components being removed without the ACM being stripped? [(c)(5)]: If yes, a. Is the ACM being disturbed or damaged in any way? b. Is the component encased in a leak-tight wrapping labeled appropriately during-all loading and unloading operations and during storage? D. Evaluation of Wetting [150] 1. Is there a water or wetting agent supply? 2. What equipment is used to apply it? aw 3. Is water or a wetting agent observed'being sprayed on' suspect ACM during: ___ ___ a. removal of units or sections? ___ ___ b. stripping? ___ ___ c. government-ordered demolitions? ___ ___ 4. Is there visible dust (airborne or settled), or dry suspect ACM or ACWM debris in the immediate vicinity of the operations? [(a)] ' KOI8588 5 No N/A 5. Upon examination of some removed ACM, does the full depth of the ACM appear to have been wetted? 6. Describe how the ACM changes when it is wetted (color,' texture, weight, other) 7. Is ACM awaiting containerization adequately wet throughout? If not, describe:___________________________________ _ 8. Is ACM in bags or other containers adequately wet? (follow sampling procedures detailed in "Asbestos NESHAP Demolition and Renovation Inspection Procedures Field Manual") If not, describe: 9. Are there any open or ripped waste bags in the waste storage area? How many?___ Are the contents of these bags adequately wet? E. Waste Disposal [150] ___ ___ ___ ___ 1. Are there visible emissions to the outside air? [(a)] 2. Is there any suspect ACM dust or debris on the ground? If yes, describe the quantity and location of the material and collect samples for analysis (sketch and photograph as necessary); ______ `________________________ _ __ _ :__ ___ ___ ___ ___ ___ ___ ___ 3. Is the owner/operator choosing an alternative to the "no visible emission" standard? If yes, which of the following options is in use? a. Treat with water and put into'leak-tight, labeled containers: Is the ACM adequately wet? Are the containers leak-tight? Are the containers properly labeled? b. Process into nonfriable forms Alternative method approved by Administrator Description of alternative method:_ Approving Agency: Name and title of approving official: ___ _____ 4. Are containers of ACWM destined for off-site transport labeled with the. name of the waste generator and the location of its generation? ___ _____ 5. Is all ACWM (excluding Category I Nonfriable in good condition) disposed of properly as soon as is practical? ___; _____ 6. Are vehicles used in the transport of ACWM marked appropriately during loading and unloading? [(c)] 7. Waste Shipment Records [(150)(d)] The following information may not be available on site: ___ a. Are appropriate waste shipment records maintained? [(d)(1)] ___ ___ b. Has a signed copy of the waste shipment record been received by the generator from the waste disposal facility within 35 days? [(d)(3)] '* ___ ___ c. If such a signed copy has not been received, has the status of the ACWM been determined? [(d)(3)] KOI8589 6 Yes No N/A ___ ___ @i !-;v d. Has the generator notified EPA in writing within 45 days if a signed copy of the waste shipment record has not been received from the disposal facility? [(d)(4)] e. Are copies of all waste shipment records (including the signed copy sent by the disposal facility) maintained for two years? [(d)(5)] f. Comments: V. OSHA REQUIREMENTS Containment Barrier? /Ye^/No Respiratory Protection? rfes/No Decontamination Unit? <Js/No Glove Bag? Q$s/No Secondary contamnent in place where glove bags are used? Yes/No Signs posted? <dSvNo Number of cfm rating of local exhaust ventilation units: ________________ _ Estimated size of containment area: ___________________________________ Hygienist company:. On-site representative:__________ , ________ ,____________________' Weather conditions: , iJ,VL u docd&- - - -- YI. POST INSPECTION IHTERYIEW Summary of Recommendations/Discussion with Owner/Operator: Whenever a violation of the asbestos NESHAP is suspected.document occurrence in field notes and with photographs and take samples as needed to prove ACM was involved. Use Attachment B for documenting sample information and Attachment C for documenting photograph information. KOI8590 7 VII. ADDITIONAL COMMENTS yllggyl 8 KOI8591