Document Ed89qLM89BNr6jNg8vaxb1KEL
Inspection Date 07/13/2023
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Date(s): Media Program: Regulatory Program(s)
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number Facility Contact:
07/13/2023 Water CAFO
, AR , AR Howard
Owner
FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC:
3601542 ARU00 N/A 112210 0213
Personnel participating in inspection:
Juan Ibarra
EPA/R6ECAD-AA
Lucas Bomar
EPA/R6ECAD-AA
Inspector Inspector
EPA Lead Inspector Signature/Date
Supervisor Signature/Date
6ENFORM-019-R8.2 (02/12/2020)
JUAN
IBARRA
Digitally signed by JUAN IBARRA DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=JUAN IBARRA, 0.9.2342.19200300.100.1.1=68001003637961 Date: 2023.08.25 08:04:08 -05'00'
{Inspector name}
Digitally signed by ESTEBAN
ESTEBAN HERRERA HERRERA
Date: 2023.08.25 09:28:21 -05'00'
{Supervisor name}
Date Date
1
Inspection Date 07/13/2023
Section I - INTRODUCTION
PURPOSE OF THE INSPECTION
EPA Region 6 inspectors Juan Ibarra and Lucas Bomar arrived at
at 0948 on July
13, 2023, for an announced inspection. The inspection was announced the day before the inspection
because the farm had ceased swine farming operations and we needed to obtain access permission to
inspect the closed yet still permitted farm. We spoke with
/owner by telephone on July
12 and 13, 2023 to gain permission to inspect the farm site, but
was not present during
the inspection. During the phone conversations, I explained to
that this was an EPA
inspection to determine the facility's site conditions and lagoon management since his closure of the
farm. The facility is regulated under the requirements found within the facility's Arkansas Department
of Environmental Quality (ADEQ) Regulation No. 5 AFO general permit. As his facility is closed, no
review of the Comprehensive Nutrient Management Plan (CNMP) took place. For biosecurity purposes,
the inspectors parked the GSA vehicle at the driveway entry, toured the site on foot and wore Tyvek
suits and over-boots. There were no other biosecurity or disease issues of concern at the farm.
FACILITY DESCRIPTION
has a current ADEQ permit
effective May 1, 2012. The permit
allowed for 960 sows, 4 boars, and 1206 weaner pigs contained within two barns. However, according to
, the farm closed approximately two years ago. And, at the time of the EPA site inspection, the
farm had six barns instead of the two mentioned in the 2012 ADEQ permit. The two lagoons described
within the permit have a combined operational storage capacity of 1,441,237 gallons with 20" of
freeboard.
Section II - OBSERVATIONS
The farm closed and depopulated the swine approximately two years ago, according to
.
However, the farm did not notify and submit a lagoon closure plan to the ADEQ within 60 days (of the
closure) as required by their ADEQ permit, Part II Specific Conditions (paragraph 21).
The farm has six empty swine barns and two lagoons, although the ADEQ permit only mentions that the farm has two swine barns. Each lagoon is equipped with a pole marker, and the embankments were mowed and showed no evidence of erosion or a discharge. The north lagoon's pole marker showed that the wastewater level was approximately 3" below the pump-out mark, and the unit had approximately two feet of freeboard. There was a pump located on the embankment with a PTO shaft that would be driven by a tractor. The south lagoon's pole marker showed that the wastewater level was approximately 10" below the pump-out mark and had approximately four feet of freeboard. The embankments of the south lagoon also showed no evidence or erosion or a discharge.
2
Inspection Date 07/13/2023
Section III - AREAS OF CONCERN
AOC 1: When the farm closed approximately two years ago, the owner did not submit a closure plan for the lagoons to the ADEQ within the required 60 days of closure as required by their ADEQ permit, Part II Specific Conditions (paragraph 21). This requirement also requires that the owner submits a certification from the NRCS that the lagoons were closed in accordance with NRCS standards.
AOC 2: The closed farm has six swine barns while the ADEQ permit only mentioned that there were two
swine barns. There is a disconnect between the number of barns that
has and what his permit
allows. He may have expanded his farm operation without providing for a major permit amendment.
However, the farm is now closed as of approximately two years ago.
Section IV - FOLLOW UP
None
Section V - LIST OF APPENDICES
Appendix 1 - Photo Log - Four photos taken 7/13/2023 and Digital Globe aerial photograph
3