Document Ed2Krzz5wqZ42Lj4L4xXrrnqn
INTEROFFICE COMMUNICATION
June 2, 1971 Westlake, Louisiana
TO:
subject:
Mr. J.D. Burns - Saddle Brook
Environmental Health Report Continental VCM Plant - June 1971
A) Status of Active Budget Items
1) Plant Primary Treatment System Revisions
The oil skimmer has been operational for the past month and has ap parently lowered the COD readings appreciably. It appears to work well and collects several hundred gallons of oil per month. The steam stripper system was started up and the pump, mixer, and pH control systems were tested satisfactorily. The system has been shut down waiting installation of new overhead piping and a carbon condenser for the steam stripper. It will probably be restarted during July 1971 and put into full operation then. No slop EDC was removed from T-2 pit this month.
2) Secondary Waste Treatment System
The selected contractor for earthwork and concreting was not able to be bonded and a one-month delay resulted because of these bonding problems. Alternate contractors are now being checked for bonds. All bids have been received on the instrument installation and instrument building construction and the contractors picked. Because of bonding delays, the excavation work will probably start around June 15, 1971 and the entire project should complete during December 1971.
3) Slop Caustic Collection System
Piping is proceeding well on this project and the tank has been hydrotested. The system should be completed during June 1971.
4) Copper Removal System
This system will be hooked up on a temporary basis during the catalyst replacement outage and will be tested. The concrete pit and trench have not been constructed and will not be available. However, a good test of the system should be possible using temporary hookups. Pinal completion of all work on this project will be after October 1971.
B) Current Developments
1) Analytical Work
Considerable laboratory work on special tests for the 1899 Refuse Act forms was done. Two samples were also sent to Ponca City for addi tional tests which could not be run by the plant. "BOD bottle tests"
CCR 000060532
have shown increased EDC removal of up to 957., but averaging around 85%. COD levels have dropped this month due to the skimmer being put into operation, plus more stable plant operations. No work has been done on the C-500 vent CI2 analysis question, due to the water analysis mentioned above. A special water sample has been sent to Betz Labs to analyze for slimicide levels (a cooling tower treatment) in the final plant effluent.
2) 1899 Refuse Act Permit
The 1899 Act Permit forms were received by mail on May 10. Revised forms are expected in the mail shortly. The VCM Plant will have to report on 45 variables in this report, many never tested previously. If lab analyses by Ponca City can be completed by June 7 (as is ex pected) the completed forms will be mailed to Saddle Brook for hand ling by June 18. Many variables will be reported on the basis of a single test, and will be so noted on the permit.
A "Letter of Certification" from the State Stream Control Commission was requested and has been received, so only EPA and Corps of Engineers approval will be required for the final permit. Most likely problem areas on the permit will be pH, Cr, Cu, EDC and BOD levels in the plant effluent. A three-stage implementation plan is shown on the permit application and the final stage will solve the BOD, EDC and pH oroblems. Chromium and copper levels will not be affected by any of the present plant projects. The State "Letter of Certification" has approved the above three-stage implementation plan.
JDM-BS cc: LNV-DOP-RDG-RHG-PLF-GBJ
John D. Minott Senior Process Engineer
CCft 000060533
0-
Date
ppm ppm ppm ppm EDC VCM ETCl Cl2
C-500 STACK GAS AT 'SES - MAY 1971
ppm HCl
ppm
Mole %
Mi sc. Ethylene
Organics
Mole %
co2
Mole %
2
Mole % Mole % CO Methane
5/5 3530 1000 7100 30 6050 130
0.47
1.65
3.10
Tr
Tr
5/12 2420 687 4861 37 5450
-
0.51
1.77
1.67
0.14
.05
5/20 1062 420 2932 27 5450
-
0.20
1.49
3.77
0.09
.09
5/26 1865 663 2864 27 6000
-
0.31
1.73
5.34
0.86
0.28
Remarks
nh3 z 0.1 ppm N NH3 = 0.1 ppm N
PLANT WATER EFFLUENTS - MAY 1971 24-Hour Composites
PH Date
ppm E0C
ppm VCM
ppm ETCl
ppm ppm
ppm ppm ppm
For other
Total Susp. CRO4
mates organics Solids Solids
ppm PO4
ppm Cl
ppm Fe
ppm Cu
ppm BOD
ppm COD
Color Apha
Turbity J.T.U.
Temp
F
Flow gpm
5/3 4.2 1398 Nil
16 722
160
10452 1540 0.8 8.5 5040 5.0 1.6 1310 1680 20
< 5 87.7 400 *
5/10 6.2 1470 23
10 699
141
10400 200 6.0 3.3 6400 0.6 0.15 1310 480 :>30
47 87.8 31v
5/17 2.5 2144 33 5/23 2.4 1509 Nil
Nil 704 20 685
244 82
9924 8492
612 6.0 48.0 260 2.3 3.0
9400 15.0 4000 9.2
2.8 1312 880 25
0.32 -
1280 80
40 84.7 400 ** 5 85 0 533 ***
n r> X)
o o o o O' o
Crr Ui
REMARKS: * **
***
NH3 = 56 ppm N Sulfate = 180 ppra-j NH3 = 46 ppm N NH3 = 72. 6 ppm N; Sulfate r 160 ppm
1
Water Sampling
Air Sampling
Primary Water Treatment
Secondary.Waste Treatment
0500 Prescrubber
`Copper Removal System
Low Pressure Con densate Collection System
Dry Crude Tank Fume Scrubber
Slop Caustic Collec tion System
, Chromate Removal System
New Exchanger for C-1Q1
' SCS09ooo ^
'J/W* 1st Quarter
January t^ December 1971
/ijwu ov/y
________ 2nd Quarter_________________ 3rd Quarter
OCT 4th Quarter
^rocess^Enginee^jn^and^^abaraj^ory : Rebuild of Steam StriDDer
miivn
Construction Construction
Construction
Startup Test