Document Ea6rKR0avajmywz2BxvE80mn

AR226-2418 C-8 SAMPLING FORECAST RCRA CORRECTIVE ACTION PERMIT O VERIFICATION INVESTIGATION (VI) WORK PLAN - FALL 1991 - WHAT IS THE VI ? WHY ARE WE DOING IT ? - 30 WATER SAMPLES TO BE ANALYZED - 40 SOIL SAMPLES TO BE ANALYZED - ALL C-8 SAMPLE ANALYSES COMPLETE BY 1/15/92 O RCRA FACILITY INVESTIGATION (RFI) ESTIMATE - FALL 1992 - WHAT IS AN "RFIW ? - ASSUME 4 PERMANENT WELLS AROUND ANAEROBIC DIGESTION POND SWMU. SAMPLE WELLS TWO TIMES PER YEAR. - ASSUME 4 PERMANENT WELLS LOCATED BETWEEN ADP AND OLD LUBECK WELLS. SAMPLE WELLS TWO TIMES PER YEAR. - 6 ADDITIONAL SOIL CORE SAMPLES TAKEN FROM ANAEROBIC DIGESTION POND SWMU. ASSUME 3 SAMPLES PER CORING = 1 8 SAMPLES. _ 16 WATER SAMPLES AND 18 SOIL SAMPLES TOTAL ESTIMATE OF OTHER SAMPLING NEEDS IN 1992 - 48 WATER SAMPLES (NO GW MONITORING AT LETART AND DRY RUN) - ADD 64 MORE WATER SAMPLES IF WE DO QUARTERLY MONITORING AT LETART AND DRY RUN - O SOIL SAMPLES - RJZ007655 EID933883 C-8/WATER MEETING AGENDA : (THURS, NOV. 7- B21 LCR) GLOBAL C-8 ISSUES - ROGER ZIPFEL VERIFICATION INVESTIGATION - DAN WEBER C-8/WATER FUTURE SAMPLING NEEDS, BOTH WW & COMMUNITY - DAN WEBER CLIENT SERVICES - CH2MHILL - CHICK PHILLIPS C-8/WATER METHODS DISCUSSION - CH2MHILL, JEWELL SMILEY - EXP. STATION, MARI BETH KRUEMPELMAN PATH FORWARD - MIKE MCCLUSKY EID933885 RJZ007657