Document EMXVRJDYmvxGkoa8b24MMpXg
VCM CONTINUOUS MONITORING LOG SHEET
LOCATIONS:
NEW REACTOR MODULE
OLD REACTOR MODULE
Circle one of the above
VCM TANK FARM
Date
. r- yVLABORATORY
2
NAME
TIME
0700 0600 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 0100 0200 0300 0400 0500 0600
OLD REACTOR MODULE
STREAM LOCATIONS
1
1. 401 VCM Receiver 2. Recovery System, 2nd Floor 3. Dump Sweco 4. 3rd Recovery Compressor 5. Incinerator 6. Middle Receiver 7. Bottom of D-300 8. Top of D-400 9. Bottom of D-500 10. Top of D-600
Allmond 2131
NEW REACTOR MODULE
STREAM LOCATIONS
.1 Bottom of 741
2. Top of 742 3. Bottom of 743 4. Top of 744 5. North of Dump Sweco 6, K. O. Tank Pumps, 1st Floor 7. Bottom of Middle VCM Receiver 8. Rec. VCM Transfer Pumps 9. Middle Rec. Comp., 2nd Floor 10. Fresh VCM Charge Pump
VCM TANK FARM
STREAM LOCATIONS
.1 South Unloading Station
2. Middle Unloading Station 3. North Unloading Station 4. Compressor Shed 5. Process Control Room 6. VCM Storage Tanks - 201 & 202 7. Respirator Air Filter Outlet 8. Dryer Line 46, Blend Tanks, 1st Fir, 9. Dryer Line #6, Activ,, 1st Floor 10. Respirator Air Filter Inlet
LABORATORY UNIT
STREAM LOCATIONS:
i. Vinyl Bagging Machines 2. Quality Control Lab 3. Compound Lina 1 Blenders 4. Compound Line III Blenders 5. Development Lab 6. Welex Deck 7. Dry Blend Control Room 8. V-10 Blend Tank 9. Middle of East Warehouse 10. Shrink Wrap Unit (East WhseL
VAB.0001053319