Document EGODe9vmqeM7ozbMvj5nVgxn

CYANAMID Request For Capital - Expenditures/Retirements DIVISION OR COMPANY Ivmer ATlON Chicaao JOB TITLE Product Plant Division J.O. CONTROL POINT 097 Replace drum dryer enclosure REPORT INC CLASSIFICATION C-l DATE APPROVED 5/29/84 blVI JOB OROER NO. PP-1003 SUMMARY OF AMOUNTS DESCRIPTION LOCAL CURRENCY. ESTIMATED PROJECT COST DISMANTLEMENT EXPENSE TRANSFER EQUIPMENT GROSS AMOUNT FOR APPROVAL l e s s t r a n s f e r e q u ip me n t :L.E:SS: SALVAGE CjM^fRAD'Er.fN' ^tiDWANCE NET GASH REQUIRED <g o f -3027) U.S, DOLLARS $8000 $8000 "| $8000 I RETIREMENT DATA DISMANTLEMENT LESS SALVAGE 2,000 TOTAL - CHARGE RESERVE 2.000 DESCRIPTION AND REASONS REQUIRED Funds of ECONOMICS as called for in General Procedure Memo#3 Attachment C* (Attoch calculations) ECONOMICS PERIOD REV.# REVISION DETAIL {GROSS AMOUNTS) \ AMOUNT CUM. AUTHORIZATION NAT (p r o f it /s a v in g s ) TOTAL INVESTMENT % ROI (ON TOTAL INVEST.) INTERNAL RATE OF RETURN PAYOUT OF NEW FIXED CAPITAL, $8000 are requested to fabricate and install a sheet metal enclosure for the carbonate drum dryer. J/I SUMMARY OF ESTIMATED COST - DetoiJs on GOF-3027 ITEM NO. DESCRIPTION ESTIMATE NO. 0201 Fabricate and install drum dryer en closure STARTING: DATE COMPLETION DATE MATERIAL LABOR ENGINEERING t o t al 670 7320 10 $8000 ITEM NO. Dr. Cr. Dr. NET CASH REQUIRED 670 ACCOUNTING TREATMENT $8,000 $2,000 $2,000 Equipment (320) Equipment (320) Depr. Reserve DEPR.RATE PR^^r s 7-1/47, ^ 7320 APPROVALS NA^E 10 /)pri-zU6in>^s7 " / m & w I&m L[t<r. ^ftgOUNTING TREATMENT / ECONOMICS APPROVED BY DIVyCONTROUEfi [CHCK fiOX(ES]J POST AUDIT PERIOD P.OST AUDIT DUE DATE DIVISION PRESIDENT/DIRECTOR DISTRIBUTION CORPORATE OFFICER _ $8000 DATE </*$/</ >7Vj - r J/?f / fy NA 3006 REV. S-77 T:'~ 5-77 PROPOSED WORK AND COST PP-1003 5/29/84 Page 2 of Funds of ________ ______________$8000 are requested to fabricate and install a sheet metal enclosure for the carbonate drum dryer. PRESENT SITUATION Basic lead carbonate budgeted for 1.24 m lbs. in 1984 must be processed thru the plant's only steam double drum dryer. The drum dryer enclosure installed in 1937 has deteriorated with age to a point where it can no longer be repaired. Large openings emit dust to the work area which add to the plants in dustrial hygiene problems of air borne lead dust concentrations. JUSTIFICATION This is a replacement of a physically exhausted dust enclosure. The replacement will reduce airborne lead dust, and thus help to reduce lead blood levels. The new enclosure will present an im proved appearance and aid in plant housekeeping. DETAILS OF PROPOSAL The present enclosure will be Scrapped. A new sheet metal en closure will be fabricated and installed. PRODUCTION FACTORS This proposal will not alter product quality or production rates. CONTINGENT FUTURE COMMITMENTS The proposal will not require additional funds to complete. N14578.01 CYWI 25- 7247 2 t ALTERNATIVES CONSIDERED No additional alternatives were -considered. RISKS No operating risks are involved. PP-1003 5/29/84 Page 3 of 5 CONCISE SUMMARY Replace a physically exhausted dust enclosure for better dust control and improved appearance. CYWX 25-0007242 COMMERCIAL FACTORS **'***( oo*- te*7 lev. 7/a t /m DEfAIL SHEET HE ET NO. 1 JOB ORDER NO. COMPANY Polymer Product Division ITEM OR CODE NO. DESCRIPTION 0201 Replace Drum Dyer Enclosure LOCATION Chicago EQUIPMENT OR MATERIAL* 670 7320 PP-1003 5/29/84 Pagp S nf 5 (? (y f ENCf, MECI1. VC1,. io: 8000 0194 DISMANTLEMENT Drum Dryer Enclosure (31900-01) AQUH ITION DATE VALUE DISPOSITI )N 1971 2000 est Scrap N14578.03 CYWX 25-0007244