Document EGODe9vmqeM7ozbMvj5nVgxn
CYANAMID
Request For Capital - Expenditures/Retirements
DIVISION OR COMPANY
Ivmer
ATlON
Chicaao
JOB TITLE
Product Plant
Division
J.O. CONTROL POINT
097
Replace drum dryer enclosure
REPORT INC CLASSIFICATION
C-l
DATE APPROVED
5/29/84
blVI
JOB OROER NO.
PP-1003
SUMMARY OF AMOUNTS
DESCRIPTION
LOCAL CURRENCY.
ESTIMATED PROJECT COST
DISMANTLEMENT EXPENSE
TRANSFER EQUIPMENT GROSS AMOUNT FOR APPROVAL
l e s s t r a n s f e r e q u ip me n t :L.E:SS: SALVAGE CjM^fRAD'Er.fN' ^tiDWANCE
NET GASH REQUIRED <g o f -3027)
U.S, DOLLARS
$8000
$8000 "|
$8000 I
RETIREMENT DATA
DISMANTLEMENT LESS SALVAGE
2,000
TOTAL - CHARGE RESERVE
2.000
DESCRIPTION AND REASONS REQUIRED
Funds of
ECONOMICS as called for in General Procedure Memo#3
Attachment C* (Attoch calculations)
ECONOMICS PERIOD
REV.#
REVISION DETAIL {GROSS AMOUNTS)
\ AMOUNT
CUM. AUTHORIZATION
NAT (p r o f it /s a v in g s ) TOTAL INVESTMENT
% ROI (ON TOTAL INVEST.) INTERNAL RATE OF RETURN PAYOUT OF NEW FIXED CAPITAL,
$8000
are requested to fabricate and install a sheet metal enclosure for the carbonate drum dryer.
J/I
SUMMARY OF ESTIMATED COST - DetoiJs on GOF-3027
ITEM NO.
DESCRIPTION
ESTIMATE NO.
0201
Fabricate and install drum dryer en closure
STARTING: DATE
COMPLETION DATE
MATERIAL
LABOR
ENGINEERING
t o t al
670
7320
10 $8000
ITEM NO.
Dr. Cr. Dr.
NET CASH REQUIRED
670
ACCOUNTING TREATMENT
$8,000 $2,000 $2,000
Equipment (320) Equipment (320) Depr. Reserve
DEPR.RATE PR^^r s
7-1/47,
^
7320
APPROVALS
NA^E
10
/)pri-zU6in>^s7
"
/
m & w I&m L[t<r. ^ftgOUNTING TREATMENT / ECONOMICS APPROVED BY DIVyCONTROUEfi [CHCK fiOX(ES]J
POST AUDIT PERIOD
P.OST AUDIT DUE DATE
DIVISION PRESIDENT/DIRECTOR
DISTRIBUTION
CORPORATE OFFICER
_
$8000
DATE
</*$/</ >7Vj - r J/?f / fy
NA 3006 REV. S-77 T:'~ 5-77
PROPOSED WORK AND COST
PP-1003 5/29/84 Page 2 of
Funds of ________
______________$8000
are requested to fabricate and install a sheet metal enclosure
for the carbonate drum dryer.
PRESENT SITUATION
Basic lead carbonate budgeted for 1.24 m lbs. in 1984 must be processed thru the plant's only steam double drum dryer.
The drum dryer enclosure installed in 1937 has deteriorated with age to a point where it can no longer be repaired. Large openings emit dust to the work area which add to the plants in dustrial hygiene problems of air borne lead dust concentrations.
JUSTIFICATION
This is a replacement of a physically exhausted dust enclosure. The replacement will reduce airborne lead dust, and thus help to reduce lead blood levels. The new enclosure will present an im proved appearance and aid in plant housekeeping.
DETAILS OF PROPOSAL
The present enclosure will be Scrapped. A new sheet metal en closure will be fabricated and installed.
PRODUCTION FACTORS This proposal will not alter product quality or production rates.
CONTINGENT FUTURE COMMITMENTS The proposal will not require additional funds to complete.
N14578.01
CYWI 25-
7247
2
t
ALTERNATIVES CONSIDERED No additional alternatives were -considered.
RISKS No operating risks are involved.
PP-1003 5/29/84 Page 3 of 5
CONCISE SUMMARY
Replace a physically exhausted dust enclosure for better dust control and improved appearance.
CYWX 25-0007242
COMMERCIAL FACTORS
**'***(
oo*- te*7 lev. 7/a
t /m
DEfAIL SHEET
HE ET NO.
1
JOB ORDER NO.
COMPANY
Polymer Product Division
ITEM OR
CODE NO.
DESCRIPTION
0201
Replace Drum Dyer Enclosure
LOCATION
Chicago
EQUIPMENT OR
MATERIAL*
670 7320
PP-1003 5/29/84
Pagp S nf 5
(? (y f
ENCf, MECI1.
VC1,.
io:
8000
0194
DISMANTLEMENT Drum Dryer Enclosure (31900-01)
AQUH ITION
DATE
VALUE
DISPOSITI )N
1971
2000 est
Scrap
N14578.03
CYWX 25-0007244