In rwlwlag bom of the asbestos saupllng data you bare recently sent us, it occurred to as that you uay not here a copy of the OSBA Stapling Bata Sheet for asbestos. This outlines tbs inner in which OSHA Industrial hygienists are to evaluate asbestos exposures. Since these procedures win be hsed to detendne if we are or are not in costpllnnce, I would recowssofl that us alse mm tbs saas criteria.
Hope yon find the data sheet useful.
Thds B. Booney TBB:sh Attachuent cc: Mr. C. F. Scott, Pt. Oowfort
ARCH 18711
t*
*. <
Substance;
OSHA SAMPLING DATA SHEET #2 (REVISED)
6/27/72 *
Asbestos. Standard; 29 CFR 1910.93a(b), (I) and (3) of June 7, 1972
8-hour time-weighted average: 5 fibers, longer than 5 micro.meters, per cubic centimeter of air.
Ceiling concentration: 10 fibers, longer than 5 micrometers, per cubic centimeter of air.
Analytical Method;
Fibers counted at 400-450 magnification, using phase contrast illumination, with sample mounted in high-viscosity solution of membrane filter material.
Sampling Ecuipment;
Personal sampling pump plus Millipore type AA Filter (37rara, 0.5 u pore size). Face cap is removed and filter used open face during sampling. Sample rate: 2 1/m. (liters per minute)
/ Sample Size: (V
Minimum period of 15 minutes for evaluation cf ceiling limit. Several
samples of up to 4 hours for evaluation of 5-hour average. Samples
with a visible deposit may be too heavy to count. Compare with a clean
filter. Heavy concentrations of visible- dust in the air (100 to 500
fibers/cc) may require short sampling periods of only 5 minutes, or less.
Planks:
With each batch of samples submit two fibers which are subjected to exactly the same handling as for the samples except that no air is drawn through them. Label these as blanks.
Shipping:
The cassettes in which the samples arc- c: il<
should be shipped in a
suitable container, designed to prevent demise in transit.
Imm,inert Ferrer Situat i or. s :
Gene-rally r.c-t app 1 icnblt.
ARCH 18712
i/27/72
OSHA SAMPLING DATA SHEET 2 (REVISED)--Continued
Serious Violation:
More than 5 fibers longer than 5 micrometers, per cubic centimeter of air, for an 6-hour time-weighted average, or an individual sample of more than 10 fibers, longer than 5 micrometers, per cubic centimeter of air. The times permitted at 10 fibers longer than 5 micrometers peT cubic centimeter can be obtained from the attached graph. Times permitted at liber counts between 5 and 10 fibers (including 10 fibers) can be worked out with the C./T. formula using the 5 fibers standard as the 8-hour time-weighted aveiagi.
C 1
T 1
Nonserious Violation: Not applicable.
De Minimus Violation: Not applicable.
C +n
T r.
>
1
oMlfi/'Z:'
AH'
A/a/C
'r
2 ARCH 18713
|lWTOar7.;^-;1973 : -V `i^i ' -
!---^^^COBFn
DR. V. H. BABBODK-BSlRJ. I " 7
MR C. L. GBEEH^^SwG. X MR. H. P. ABMJ*fKOUT - BLDG. I
l
MR. R. C. Jld!EMACK ;-; BLDG. X
MR. C.^f^COIT^SIW.?X '
H. BARBODR^ODG. I ^ :
Rambikur -- Bldg. R-141 , Mr. T. B. Bonney -- Pittsburgh
Cleaning up floor after working on trough
17
0.47*
*Millapore filter holder accidentally slipped off hose and dropped on floor. Some sample was lost.
i i ii
ARCH 18714
TOM FLORES OPERATIONS January 2, 1973 CONFIDENTIAL
DR. V. R. BARBOUR - BLDG. I \ MR. C. L. GREEN - BLDG. I
\ MRl F. J. rtABRT - BLDG. R-139 \ MR. R. C. McCORMACK - BLDG. I
\MR. O'. F. SCOTT - BLDG. I DR,rV. R. BARBOUR - BLDG. I
: dtrr cc frr-A-.- Raablkur - Bldg; ..... Hr. T. B. Bonney - Pittsburgh
REr ASBESTOS DUST TESTS
|
Two tests were run In Refining during December for ubwtos fibers. One in
the storeroom and the other one at R-31.
\
In both tests the employee doing the work was wearing the sampler. Results are shown below.
ACTIVITY
AREA _________
Using power sweeper to sweep aisles where asbestos materials are stored
Storeroom
TIME Min.
32
CONCENTRATION Flbers/ml
0.1925
Tying asbestos pipe Insulation to liquor line
R-31
30
0.29
TOM FLORES
/ />P
ARCH 18715
TOM FLOTIES
r ...........
.. DR. V. H. BARBOUR - BLDG. I MR. C. L. GREEK - BLDG. I MR. E. P. ARMINTROUT - BLDG. I MR. R. C. McCORMACK - BLDG. I MR. C. F. SCOTT - BLDG. I DR. V. B. BARBOUT - BLDG. I - FILE
cc: Mr. A. A. Rambikur - Bldg. R-141
RE: ASBESTOS DUST TEST AT BLDG. 54E
A dust test was taken on December 4, 1972 at Bldg. 54E while John Manville Brand Superex Block insulation was being cut. The employee was weaving the sampler while cutting the Hi-Temp block. Sampling period was 48.5 minutes.
tM,i
Some of the dust was visible on the filter so two slides were prepared, one as is, and the other one with the surface dust knocked off. The results are shown below.
SAMPLE As is
TIME 48.5 min.
Dust knocked
off
48.5 min.
COUNT
first second
first second
CONCENTRATION
3.53 fibers/ml 3.31
4.74 fibers/ml 4.66
Fibers are difficult to count wben there is a lot of material on the slide.
TOM FLORES TFrdjv
ARCH 18716
TOM FLORES OPERATIONS November 29, 1972
DR. V. H. BARBOUR OPERATIONS
RE: ASBESTOS DUST TESTS AT MARINITE SHOP
Two tests were run on November 27, 1972 using 0.8>u. pore size millipore filters and monitiare sampling pumps.
One sampler was carried by Craftsman o^terating router. The other sampler was held in the dust collector fan exhaust.
SAMPLE
LOCATION_________
TIME
CONCENTRATION
1 On Craftsman Shaping Marinite 2
30 rain. 1.22 Fibers/ml 1.40 Fibers/ml
3 Fan Exhaust
25 min. .75 Fibers/ml
TOM FLORES TFrdjw
ARCH 18717
R, PODHORA POINT COMFORT OPERATIONS
December 18, 1974
I
TO MR. F. J. MABRY
MR. F. A. SHARKEY
cc: Mr. R. G. Kuerner Mr. C. L. Green Mr. A. A. Rambikur Dr. L. F. Brennecke Dr. M. F. Jones Mr. H. J. Loesch Mr. N. V. Lubbers Mr. W. W. Browne Mr. R. M. Rose Mr. J. N. Rumble Mr. F. D. Carter Mr. C. J. Engels Mr. N. W. Neeley/Mr. Cliff Watson Mr. T. B. Bonney - Pittsburgh
RE: CALL FROM MR. RAY SKINNER - OS HA - CORPUS CHRISTI DECEMBER 16. 1974 AT 2:45 P.M.
1. Mr. Skinner reported the mercury samples taken on the lower level of R-300 were well below the limits.
2. The sodium hydroxide sample results at R-45 precipitators were about one hundred times below the TLV.
3. The asbestos sample results for Building 13E Marinite Shop were 3 fibers/ c.c. Mr. Skinner plans to run these tests again, possibly sometime after January 1, 1975. We tested December 3, 1974, and obtained less than 0.1 fibers on the TWA.
4. A partial report on coal-tar-pitch volatiles indicated that the benzene extraction fraction was so low they were unable to identify benzo-a-pyrine.
Remaining test results to be received are fluorides and the balance of coal-tar-pitch samples.
REP:vh
t R. E.
ENVIRONMENTAL CONTROL
ALCOA
ARCH 18718
r-49t (RIV . !'*)
FRGV. E. J. MULLIGAN POINT COMFORT OPERATIONS
TO MR. T. B. BONNEY PITTSBURGH OFFICE
July 21, 1967
RE; SAFETY INDOCTRINATION FOR CONSTRUCTION EMPLOYEES Enclosed is a copy of the regulations which are given to new construction
employees and discussed with them at the time they start to work on the job. I forgot to give it to you the other day when we talked about it.
E. J. MULLIGAN EJM:nsr Enclosure - 1
ALCOA
ARCH 18719
hQ o //irx
Of?** 1'i -
SAFETY INDOCTRINATION FOR CONSTRUCTION
We want to welcome you as Contractors' employees to our job site. We want to take a few minutes to acquaint you with our safety rules and some of
tfhe conditions of our Operations which are probably unfamiliar to you. Even though
you are not working directly for us, you must abide by our safety rules.
Everyone has a personal responsibility to look after his own safety. We want
to help you do it.
All Contractors should hold Tool Box type safety meetings on a regular weekly
basis. I.Personal Protective Equipment
A. Safety hard hats are required at all times while on the plant site--in case of construction employees, plastic hard hats are required.
B. Safety glasses are required. Also, goggles must be worn when exposed to
chemical splash, grinding, chipping, or breaking into pipe lines; goggles must be on person at all times. C. Approved respirators will be provided to each employee by his employer and
will be in the employee's possession at all times.
D. Emergency showers, eye wash fountains, and wool blankets are available at
various locations. LEARN THESE LOCATIONS--they are marked by a GREEN LIGHT.
II. Plant-Wide Regulations (Must be followed wherever you are in the plant.)
A. Horseplay is not allowed. This is a place where men earn their living and
we operate a business. Horseplay will positively not be tolerated.
B. No riding in vehicles with arms and/or legs outside body; no standing in
vehicle or on running boards; and no riding on fenders or cab of vehicles.
The speed limit is 15 MPH. There are some places in the plant where even
slower speeds are necessary. All vehicles must stop at plant gates for
inspection.
ARCH 18720
C. Housekeeping - All debris generated during each day must be collected for
removal to the disposal area. Nails in boards must be bent down or removed.
Page 2
Collecting points are worked out between the Contractor and the department.
It is the Contractor's responsibility to take the debris to disposal area.
D. When working overhead, area beneath should be protected by signs or guard
or should be roped off.
E. Guard area below when throwing things from above.
III. General Equipment and Material Considerations
A. No power driven equipment permanently installed in the plant is to be started
or stopped unless the Contractor has been authorized to do so. In no case
will any of the construction employees operate or attempt to operate danger
tagged equipment (Show sample sign and explain why.).
B. No connections to plant services--gas, steam, water, air, or electrical--
without prior arrangement with engineer, and then any connections will be
made only after a permit has been issued and signed by the operating foreman.
C. On site, fire fighting equipment must be maintained in good condition and
not blocked by equipment. Avoid fire hazards byj storing combustibles care
fully and cleaning up frequently. Special care must be exercised when
welding or cutting operations are being performed. In case of fire or
need of an ambulance, call Station 212. You will find this number marked
on all plant telephones.
D. Do not locate construction buildings or equipment under overhead power lines.
E. Electrical - All portable electric tools must be equipped with a three-wire
positive grounded power supply. Substantial insulation should be provided
to protect employees from temporary or permanent wiring or apparatus.
When working in areas of proximity to bare electrical conductors, arrange
ments for safeguarding must be made in advance with the Electrical Engineer
before work can be started.
F. The use of explosives is prohibited unless specifically authorized in writing
by the appropriate Works Manager.
G. Protective caps must be installed on all oxygen and acetylene bottles when
not in use. While being used, they must be securely fastened.
ARCH 18721
Page 3
IV. Specific Chlor-Alkali Rules and Procedures
A. No smoking, matches, or open fires shall be permitted except as established
by engineer (hydrogen explosion danger).
B. No cutting or welding shall be done unless a permit has been issued by
Chlor-Alkali Shift or Department Foreman or Alcoa's Engineer.
C. Confine yourselves to your one work area (explain why).
D. No eating, gum-chewing, or tobacco chewing is permitted in the cell building
due to vapors.
E. Caution against wearing watches.
F. The wooden floors in the cell building were installed to reduce any likely
shock hazard; but, since it often becomes wet (from normal cell flushing),
non-conductive rubber-soled shoes or rubber pull-overs are required within
the cell building. This applies to the operating cell room only.
G. Cell buildings (ground or operating floors) have the following rules:
1. Objects 24" or more must get approval of engineer or department foreman
to take into cell building (explain).
2. Objects 4' or longer must receive same approval as above and then must
have man at both ends (mag swing and electricity).
The above two items apply to operating cell rooms only.
V. Chlorine Precautions
A. Chlorine (throughout the department) is a toxic gas that is a respiratory
irritant. Symptoms of extreme exposure are retching and vomiting, followed
by difficult breathing.
B. Protection against chlorine
1. Respirators are to be carried by all personnel working in this area.
These provide only short period protection and are intended to be
used only for escape purposes. If chlorine in air causes coughing
or sick feeling, immediately put on respirator and leave the area
going cross-wind. Do not re-enter until the cause is corrected
(explain why cross-wind).
ARCH 18722
Page 4
2. Wind Direction: You will quickly learn to observe wind direction When coming on and during your work periods. If caught in a high contaminated area--use your respirator and always run cross-wind. There are three (3) wind indicators in the Chlor-Alkali Department-- LEARN THEIR LOCATIONS.
VI. Warnings and Emergency Procedures A. Warnings upon Chlorine Escape: Chlor-Alkali personnel are knowledgable of rescue procedure for anyone who may be caught in highly concentrated areas. This has priority over any operational consideration. However, our warning system should prevent anyone becoming trapped--if he knows the warning arrangements and heeds them. Upon any emergency, an announce ment over the Public Address System will be made. "Emergency in (area)." Areas include the cell building, chlorine area, brine dechlorination, and dock. Upon hearing any such announcement, quickly leave the affected area if you are in it; if not in the immediately affected area, observe for possible coming danger in your area. In any event, be sure your area is upwind from that of the escapage. B. In addition to the above verbal warning announcements, this department has an automatic warning buzzer system which is activated any time large concentrations of chlorine escape (such as in a power failure). This would normally preclude the verbal warning which serves to pin point the escape area. These two systems then both complement and supplement each other. C. Action upon Noting Chlorine Gas Escape Victim 1. First of all, any such victim would likely be first discovered by operating personnel who are instructed to perform rescue duties prior to stopping any chlorine leak. However, construction personnel should be familiar with the following rescue procedure:
ARCH 18723
Page 5
a. Carry victim to uncontaminated area. IF BREATHING: b. Place on back with head and back elevated, keep warm and allow
him to rest in this position (^purpose of wool blanket locations). c. Call First Aid ambulance. IF BREATHING HAS APPARENTLY CEASED: d. Immediately administer artificial respiration. e. Call First Aid ambulance as soon as possible if by yourself.
If someone else is with you, send them. D. Acids and Caustics
1. Remove soaked clothing. 2. Flush with water. 3. Go to First Aid. E. Mercury 1. Wash hands and face thoroughly after exposure. 2. If spilled on clothing, remove from cuffs, pockets, before leaving
cell building. GENERAL SUMMATION: The Chlor-Alkali Department is as safe a place to work as we have at Point Comfort Operations. This is illustrated by the record of our regular operating employees. It is a safe place to work as long as the prescribed conditions are followed.
ARCH 18724