Document DxOKwL7p2K1qV2p49vd4Ky8d

ARD 004349 9 FROM REVIH ROLAN CONSTRUCTION DIVISION ROCKDALE CONSTRUCTION TO MEMORANDUM 1989 April 24 RE: PLANTWIDE ASBESTOS SURVEY RESULTS Attached are the results of a asbesto# conducted 19M January through 19SyMareft by Kevin Rolan, Alcoa Construction which includes the following: 1. Removal priority groupings of individual buildings, areas, quantity of asbestos containing materials (ACM) and estimated costs for removal and reinsulation. Removal priorities are defined below. ASBESTOS REMOVAL PRIORITIES Priority "AM Required 1. High Exposure Area 2. Damaged or Friable Materials ( 3. Maintenance or Project Related Priority "lav 1. ACM secure; Encapsulated or Non-Friable Pgtority 1. ACM Inaccessible/Secured 2. Plant map with plan view of existing steam, water, and electrical systems which contain ACM's. 3. Detailed drawings of individual buildings and areas (where available) containing ACM as marked on drawings. KEVIN ROLAN KR:lc Attachments cc: T.J. Hormuth R.E. Clark E.B. Parker KEVIN.m ARD 004350 (<v ><( 3 ASBESTOS SURVEY SUMMARY - PRIORITY "A" REMOVAL BLDG 1 AREA APPROX L.F. EST. COST (1 4 A-6 A 5F 4B-6B 8A-10A 9F 8B-10B 12A-14A 13F 12B-14B 16A-18A 17F 16B-18B 20A-22A 21F 20B-22B 24A-26A 25F 24B-26B 35 45 47 48 48-52 Ctyd 49 50 Potroom Restroom Potroom Lunch/Restroom Potroom Restroom Potroom Restroom Potroom Lunch/Restroom Potroom Restroom Potroom Restroom Potroom Lunch/Restroom Potroom Restroom Potroom Restroom Potroom Restroom/Lunch Potroom Restroom Potroom Restroom Lunch/Restroom Restroom Restroom Lunchroom Restroom Shower Storeroom Carpenter Shop Paint/Pipe Shop Courtyard Area Shower Shower 176 25 176 176 25 176 176 25 176 176 25 176 176 25 176 176 25 176 600 500 600 180 200 300 300 $ 6,330 598 6,354 6,330 598 6,354 6,330 598 6,354 6,330 598 6,354 6,340 598 6,344 6,340 582 6,372 11,617 11,561 17,229 7,409 11,220 5,616 7,134 APPROXIMATE TOTAL 5,000 LF $ 151,490 (1) Cost includes ACM removal and reinsulation. ARD 004351 ASBESTOS SURVEY SUMMARY ~ PRIORITY "B" REMOVAL BLDG I 1 32 Ext) 34 34-1 44 51 52 54 56 58 59 60 64 66 isage SYSTEM Rectifier Rod Room Exterior Pipe Ingot Passageway Maintenance Shop Electrical Shop Coke/Pitch Carbon Press Carbon Handling Carbon Handling Carbon Handling SPL Storage Storeroom Boiler Room APPROX L.F. 100 1,500 1,000 100 340 800 200 200 350 800 500 300 150 500 300 165 EST. COST (1) $ 2,281 40,359 28,003 2,347 11,856 22,786 5,597 9,034 9,083 20,133 12,152 9,681 5,501 19,460 11,855 3,648 APPROXIMATE TOTAL 7,500 LF $ 212,866 (1) Cost includes ACM removal and reinsulation. AftO 004352 ASBESTOS SURVEY SUWAEY RE; "FLAMASTIC* TYPE FIRE RETARDIMG IHSPLATICH PRIORITY "C" REMOVAL The following buildings are electrical control buildings which contain "Flamastic" brand type of asbestos laden fire retarding insulation. The following listing is considered a priority nc" removal due to condition of insulation and outage requirements needed for removal. BLDG 1 19X 23F 32X 52X 58X 59X 93X 160X 161A 161B 162X 163A 163B SYSTEM A-398's Potrooms Rod Room Green Mill Area Ring Groover Carbon Transfer Mill Water System Carbon Bake Line 7 A-398 Line 7 A-398 Carbon Bake Line 8 A-398 Line 8 A-398 TOTAL APPROXIMATE TOTAL APPROX L.F. 90 30 285 200 100 50 80 125 125 125 75 125 125 EST. COST (2) $ 26,231 13,115 58,325 50,302 44,438 12,035 17,899 16,510 30,242 27,003 45,210 30,242 26,231 $ 397,783 1,500 LF of Asbestos Containing Mat. (2) Cost includes ACM removal only. ARD 004353 83 ASBESTOS SURVEY SUMMARY - PRIORITY "C" REMOVAL BLDG 1 33 80 81 SYSTEM A/C 6 Piping APPROXIMATE TOTAL APPROX L.F. EST. COST (1) N/A (422 CF)-800 M/A HO DRAWINGS 90,394 800 LF 90,394 (1) Cost includes ACM removal and reinsulation. ARD 004354 St Ml ' ......imn"fg* DATA/COST SUMMARY Removal Priority "A" Removal Priority "B" Removal Priority "C" Removal Priority "C" ("Flamastic" ACM) APPROXIMATE QUANTITY ACM 5.000 L.F. 7.500 L.F. 1.000 L.F. 1.500 L.F. TOTAL ESTIMATE COSTS ESTIMATE COSTS $ 151,490 $ 212,866 $ 90,394 $ 397,783 852,533 KEVIN.1 ARD 004355