Document DxOKwL7p2K1qV2p49vd4Ky8d
ARD 004349
9
FROM REVIH ROLAN CONSTRUCTION DIVISION ROCKDALE CONSTRUCTION
TO MEMORANDUM 1989 April 24
RE: PLANTWIDE ASBESTOS SURVEY RESULTS
Attached are the results of a
asbesto#
conducted 19M January through 19SyMareft by Kevin Rolan, Alcoa
Construction which includes the following:
1. Removal priority groupings of individual buildings, areas, quantity of asbestos containing materials (ACM) and estimated costs for removal and reinsulation. Removal priorities are defined below.
ASBESTOS REMOVAL PRIORITIES
Priority "AM
Required
1. High Exposure Area
2. Damaged or Friable Materials
( 3. Maintenance or Project Related
Priority "lav
1. ACM secure; Encapsulated or Non-Friable
Pgtority
1. ACM Inaccessible/Secured
2. Plant map with plan view of existing steam, water, and electrical systems which contain ACM's.
3. Detailed drawings of individual buildings and areas (where available) containing ACM as marked on drawings.
KEVIN ROLAN
KR:lc
Attachments
cc:
T.J. Hormuth R.E. Clark E.B. Parker
KEVIN.m
ARD 004350
(<v ><(
3
ASBESTOS SURVEY SUMMARY - PRIORITY "A" REMOVAL
BLDG 1
AREA
APPROX L.F.
EST. COST (1
4 A-6 A 5F
4B-6B 8A-10A
9F 8B-10B 12A-14A
13F 12B-14B 16A-18A
17F 16B-18B
20A-22A 21F
20B-22B 24A-26A
25F 24B-26B
35 45 47 48 48-52 Ctyd 49 50
Potroom Restroom Potroom Lunch/Restroom
Potroom Restroom Potroom Restroom Potroom Lunch/Restroom Potroom Restroom Potroom Restroom Potroom Lunch/Restroom Potroom Restroom Potroom Restroom Potroom Restroom/Lunch Potroom Restroom Potroom Restroom Lunch/Restroom Restroom Restroom Lunchroom Restroom Shower Storeroom Carpenter Shop Paint/Pipe Shop Courtyard Area Shower Shower
176 25
176 176
25 176 176
25 176 176
25 176 176
25 176 176
25 176 600 500 600 180 200 300 300
$ 6,330 598
6,354 6,330
598 6,354 6,330
598 6,354 6,330
598 6,354 6,340
598 6,344 6,340
582 6,372 11,617 11,561 17,229 7,409 11,220 5,616 7,134
APPROXIMATE TOTAL
5,000 LF
$ 151,490
(1) Cost includes ACM removal and reinsulation.
ARD 004351
ASBESTOS SURVEY SUMMARY ~ PRIORITY "B" REMOVAL
BLDG I
1 32 Ext) 34 34-1 44 51 52 54 56 58 59 60 64 66 isage
SYSTEM
Rectifier Rod Room Exterior Pipe Ingot Passageway Maintenance Shop Electrical Shop Coke/Pitch Carbon Press Carbon Handling Carbon Handling Carbon Handling SPL Storage Storeroom Boiler Room
APPROX L.F.
100 1,500 1,000
100 340 800 200 200 350 800 500 300 150 500 300 165
EST. COST (1)
$ 2,281 40,359 28,003 2,347 11,856 22,786 5,597 9,034 9,083 20,133 12,152 9,681 5,501 19,460 11,855 3,648
APPROXIMATE TOTAL
7,500 LF
$ 212,866
(1) Cost includes ACM removal and reinsulation.
AftO 004352
ASBESTOS SURVEY SUWAEY
RE; "FLAMASTIC* TYPE FIRE RETARDIMG IHSPLATICH
PRIORITY "C" REMOVAL
The following buildings are electrical control buildings which contain "Flamastic" brand type of asbestos laden fire retarding insulation. The following listing is considered a priority nc" removal due to condition of insulation and outage requirements needed for removal.
BLDG 1
19X 23F 32X 52X 58X 59X 93X 160X 161A 161B 162X 163A 163B
SYSTEM
A-398's Potrooms Rod Room Green Mill Area Ring Groover Carbon Transfer Mill Water System Carbon Bake Line 7 A-398 Line 7 A-398 Carbon Bake Line 8 A-398 Line 8 A-398
TOTAL
APPROXIMATE TOTAL
APPROX L.F.
90 30 285 200 100 50 80 125 125 125 75 125 125
EST. COST (2)
$ 26,231 13,115 58,325 50,302 44,438 12,035 17,899 16,510 30,242 27,003 45,210 30,242 26,231
$ 397,783
1,500 LF of Asbestos Containing Mat.
(2) Cost includes ACM removal only.
ARD 004353
83
ASBESTOS SURVEY SUMMARY - PRIORITY "C" REMOVAL
BLDG 1
33 80 81
SYSTEM A/C 6 Piping APPROXIMATE TOTAL
APPROX L.F.
EST. COST (1)
N/A (422 CF)-800
M/A
HO DRAWINGS 90,394
800 LF
90,394
(1) Cost includes ACM removal and reinsulation.
ARD 004354
St
Ml '
......imn"fg*
DATA/COST SUMMARY
Removal Priority "A"
Removal Priority "B"
Removal Priority "C"
Removal Priority "C" ("Flamastic" ACM)
APPROXIMATE QUANTITY ACM
5.000 L.F. 7.500 L.F. 1.000 L.F. 1.500 L.F.
TOTAL ESTIMATE COSTS
ESTIMATE COSTS
$ 151,490
$ 212,866
$ 90,394 $ 397,783
852,533
KEVIN.1