Document Dvz9k07r88dgNypQd0YKXwKr5
BRANCHES BEP/JiilEMT - PLANT REwUISITICEIS October 17th, 1958
1782 Tulsa, Okla, #6043 - New Branch Installation Expense Carpentry, Signs, etc*
5,238.03
1804 Hopewell, Va. #579? -! Remodeling Expenss - Electrical Work, Painting, Sign, site*
951.16
1805 Dayton, 0, #1576 labor fit Materials to Construct ICO Wallpaper Bias
70aC0
1806 Los Angeles, Calif* #6543 - Paint Branch Fixtures
85.00
1807 Ashland, Ky. #1043 - Sew Branch Installation Expense - Carpentry, Signs, etc*
5,339*10
1808 Morehead City, N. C. #5031 - 1 MN-52 Electric Stick-Out Sign, 1 NM-45-5-24 Porce
lain Facia Sign, fic Sign Erection
805.40
180? La Mirada, Calif. #8027 - 1 Color Mixing Table
75.00
1810 Daytona 3each, Fla. #2334 - 1 Sundry Display Table
104.31
1811 Athens, 0, #1643 - 2 Units Type "A" Wall Shelving
191.60
1812 Phoenix, Aria, #81*68 4 Repairs to Air-Conditioner
51. 74
1813 Altoona, Pa. #1103 - 1 Brush Bar
101.76
1814 Memphis, Term. #6556 f 1 Hand Truck
13.. 3?
1815 West Haven, Conn. #1*622 - 2 Units Studio Shelving & Materials for Walluaper Bax
140.C0
1816 Tulsa, Gkla. #6333 - 1 H" Royal Typewriter, plus F.E.T. Sc S/T
2li3.00
1817 Wheeling, W. Va. #1145 - 2 Sections Standard Wall Shelving, Material & Labor to
Hove Wallpaper Cascade & Build Wallpaper Bar, 1 Heating Unit, including Install. 1818 Lawrence, MaS3. #1*756 Labor & Materials to Construct Wallpaper Bins
839.1*0
i5o,,co
1819 Duluth, Mina. #3223 - I Repaint 12'-6" x 32* Wall Sign, less 503 by Advt. Department
56.00
1820 Atlanta, Ga. #21*11* - Repairs to Delivery Truck
54*90
1821 Monroe, La. #7317 - 1 MIi-52 Electric Stick-Out Sign & Erection
360.C0
1622 Port Chester, N. Y. #4179 - 2 Wrapping Counters
200.00
1823 Dubuque, la. #3822 - 2 Divided Cabinets for Spray Equipment Parts
55.80
1824 Santa Barbara, Calif, j #8508 - 1 National Electric Adding Machine, Plus 'F.E.T. $ S/T 212.75
1625 Alton, HI. #6883 - 1 M21-45-5-20 Porcelain Facia Sign, Remove Old Sc Erect Mew Sign
1(29.70
1826 Fairlawn, N. J. #4969 - 24 Phet Heavy Duty Shelving Support, Shelves, it 1 Drum Cradel 332.50
1827 Angleton, Tex. #7015 f Labor Sc Materials to Construct additional Warehouse Shelving,
Sc 1 Dearborn Heater, Less amount Approved on P. R. #671 for Heater
232. lib
1828 Ft. Lauderdale, Fla. #2336 - Repair Speedometer on Delivery Truck 1829 Searcy, Ark. #6013 - 1 ea. Stanley Marsh Mitre Machine Saw, Joiner & Point Driver
28.75 9U.50
1830 Westbrook, Me. #i|?79 - 10 Sections 30n x 30" x 5,-3" Steel Shelving
315.10
1831 Stockton, Calif. #8522 - 1 #30 1-Gal. Paint Conditioner with Counter Base fit .adapter 1832 Paragould, Ark. #6935 - 48 Lineal Feet Case Goods Steel Shelving
1212(97..860?
1833 Toledo, 0, #1805 - 1 #30 1-Gal. Paint Conditioner with Counter Base & Adapter
116.10
1834 Santa Cruz, Calif. #8929 - 1 Miller Double-Can Paint Shaker with Timer fit Adaptor
126.22
1835 Sunnyvale, Calif. #8063 - Replace 5 Ballasts in Fluorescent Fixtures, include Labor 130.00
1836 Wilmington, Del. #5039 - 1 ea. 4-Drawer File fit Hand Track, 2 Fire Extinguishers
105.54
1837 Davenport, la. #3113 4 1 Rolodex File
39.95
1838 Houston, Tex. #7742 - 1 ea. HH-45-5-13 t MK-45-5-2U Facia Signs fit Erection
685.90
lfl39 Huntsville, Ala. #2417 - 1 30" Electric Wallpaper Trimmer
161.1(0
182*0 Bradenton, Fla, #2362 * 1 13" Royal Typewriter, plus F.E.T. fit S/T
253.84
l82jl Ft. Pieroe, Fla. #2634 - 1 11" Royal Typewriter, plus F.E.T. S/T
2li5.6S
182(2 Memphis, Term. #6313 4 1 New Tire fit Wheel for Delivery Trade Sc 8-Ply Tire & Tube, Wheel 58.71
181*3 Lowell, Mass. #4865 - 2 2-Tube 8* Fluorescent Fixtures
19.50
lBljU Cleveland, 0. #1047 - New Branch Installation Expense - Electrical Work, Signs, etc. li,1(51.0?
181(5 Eenmore, N. Y. #1046 4 Mew Branch Installation Expanse - Carpentiy, Signs, etc.
6,1(98.1(3
181a7 Lina, 0. #1808 - Emergency Repairs to Eleetric Stick-Out Sign
311.66
181(8 Dayton, 0. #1763 - 1 Manager's Dedc
85.00
l81i9 Franklin, Xnd. #3045 1 Mew Branch Installation Expense - Painting, Carpentry, etc. 4,631.79
1850 Birmingham, ala. #2026 - Over-run on Plant Requisition #1626
108.00
1851 Wilmington, Del. #586? - 1 Rapistan Power Conveyor, 2 10* Sections Gravity Stsel
Conveyor, 2 45 Curve]Sections, 5 Adjustable Stands, Delivered & Installed
1,490.50
1852 Hollywood, Calif. #8504 - Paint Interior of Branch, including Fixtures 1 Coat
400,,OQ
1853 Pensacola, Fla. #2323 4 install MM-40 Sign transferred from Tu^regee, Ala. Branch
65.00
1854 Texarkana, Ark. #7326 - Branch Move Expense - Painting, Signs, Carpentry, etc.
5,991.35
1855 Acdereon, S. C. #2374 - 1 4-Drawer File
49.94
1856 3nnnghaa, Ala. #9425 - Emergency Repairs to Delivery Truck 0007-SWP-000025434A. 78.85
N 25084
s .Branches Department ~ Plant Requisitions
Cont.
1857 Torrance, Calif. #8520 - Paint Ceiling, Walls & Fixtures 1 Coat
250.00
1858 Ft. Worth, Tex. #7714 - 1 .Pedestal Base with Suction Feet
39.60
185? New Cl#, mane sota #jo46 - New Brandi Installation Expense - Carpentry, Painting, etc4,959o35
1860 St. Louis, Mo. #6855 - 1 11" Royal Typewriter, plus F.E.T. & S/T
243.00
1861 Ravenna, 0. #1011 - 1 Brush Bar
101.76
1862 Everett, Wash. #8014 - 1 #33 5-Gallon Paint Conditioner
307o50
1863 Renton, Wash. #8013 - 1 #33 5-Gallon Paint Conditioner
307.50
1864 Waukesha, Wis. #3842 - 2 Sections Type "a" Wall Shelving
191.80
1865 New London, Cohn. #4002 - 5 Sections 18" x 36" x 7-3" Steel Shelving
76.75
1866 Monterey, Calif. #8961 - Paint Walls & Woodvoric, & 1 Wallpaper Rack
115.00
1067 Atlanta, Ga. #2343 - Repairs to Delivery Truck
51.34
1868 Houston, Tex, #7022 - 1 ea. Mitre Machine, Vise & Mat Cutter
314.50
186? Tau^a, Fla. #2588 - lj 2-T Westinghouae Room-Type Air-Conditioner & Installation,
Carpentry Work, Ashpahlt Tile Floor
613.30
1870 Queens Village,, N Y.j #4175 - Replace Steel Wheels on Hydraulic Track with Fbrnica 146.45
1871 Ottumwa, la. #3816 - 1 Manually-Operated National Adding Machine
138.00
1872 Fond du Lac, Wis. #3811 - Gas Conversion Gait, including Installation
255.00
1873 Homestead, Fla. #2946 - Paint Interior Walls, & Fixtures (l Coat)
liiQ.OO
1874 Warner Robins, Ga. #2028 - New Branch Installation Expense - Carpentry, Signs, etd 4,584.27
1875 Lackawanna, H. 7, #1048 - New Branch Installation Expense - Electrical Work, etc. 5*851.39
1876 Austin, Minn. #3047 -i New Branch Installation Expense - Painting, Signs, etc.
5,283.54
1877 Champaign, HI. #3176 - 8 Top Sections for Studio Shelving
516,00
1878 Salisbury, Md. #5938 j- 3 Display Tables, 2 Chrome Chairs, Carpentry & Elec. Work
306.00
1879 Opper Darty, Pa. #5875 - 1 MM-45-5-24 Porcelain Enamel Facia Sign, Removed Old,
Erect Mew Sign, Repair Stick-Out Sign, & Paint Interior Walls 2 Coats
635.40
1880 Dallas, Tex. #9709 - 1 55-Gallon Drum Truck
69.70
1881 Los Angeles, Calif. #8029 - Mew Branch Installation Expense - Carpentry, etc.
6,943.22
1883 Lafayette, Ind. #3893 - Overrun on P. R. #1791 for Additional Electrical Work
52.00
1884 Royal Oak, Mich. #1007 - Additional cost of Erecting MM-52-A Electric Stick-Out
Sign due to Addition of Structural Steel Required by Cods
75.00
S885 Wabash, Ind. - Paint Walls, Ceiling h Fixtures 1 Coat
220.00
1886 Detroit, Mich, #1295 W Pro-Rate. Share of Cost of Acquiring Parking Space for304
1,587.00
1887 Danielson, Conn. #4027 - Labor & Materials to Construct Additional Wallpaper Bins
60.00
1888 Kansas City, Mo. #6211 - 1 2-Wheel Hand Truck
15.00
1889 Haywood, Calif. #8571 - Additional Wall Shelving to Accomodate Mew Lines
70.00
1890 Detroit, Mich. #1118 f Cost of Erecting Stick-Out Sign tramferred from Feradale
310.00
TOTAL
$77,286.99
0007-SWP-000025434B
0007-SWP-000110568