CAPITAL EXPENDITURE AUTHORIZATION
"BAKE PRODUCTS
278 ..LOCATlON__AUI,piNG1..pHiq........_nO._. ............
; : - : .
- . - ,7f ......... PRODUCT ct
: 1`26-76 . PrSfitMaintenLce j_Friction Products .S 1'794
t --n:_ __ rtvcusr____T average annual peters___=>5-->y.ri'*f:'r-
: Partial #10
< 50,700
i Purchase one (1) adhesives pumping system, complete with follower ; plate from the Aro Corporation. (See attached quote.)
; we were cited by OSHA for being in violation of section 1910.106, paragraph (E) (2)(IV) (D) of the Occupational Safety and Health
;yStandards. This standard prohibits the use of air pressure to
transfer flammable materials from portable containers. This citation must be abated by 3/1/76.
. ';Transfer adhesives by means of gravity only. Unfortunately using
-------
this technique would result in reduced productivity because of the
material being highly viscous and requiring a great amount of
additional time to transfer it into the pressure vessel.
iI-I------. -:------r
i
v. S
TOTAL 1r494
Cas." a* 7.494
300 30U
I 1,794 ; 1,731
t,i *
COn-oO-wE
DIVISION CONTHOUl* PQO#[tTt ACCOUNTING
MAR 001700
1-26-76 APS
p
Section 1910.106 paraqraph (E) (2) (IV) (D) reads:
'Flammable or combustible liquids shall be drawn from or transferred into vessels, containers, or portable tanks within a buildinq only throuqh a closed piping system from safety cans, by means of a device drawinq throuqh the top, cr from a container or portable tanks by qravity throuah ar. aoproved self-closinc valve. Transferring by means of air oressure on the container or portable tanks shall be crohibited."
We were insoected by OSHA on 8-14-75, from which we received a citation recardinq violation of the above on our bond line. This citation must be abated by 3-1-76. Failure to abate nay -r.cur an additional penalty of up to SI,000 for each day the violation continues.
7, therefore, recommend that this CEA by aporoved as soon as possible.
SOLUTION
Purchase one (1) adhesives pumpinq system, complete with fcllower plate from the Aro Corporation to transfer bondincr c^-er.t from portable 55 gallon drums to stationary pressure
ssel.
D.VIAT IV?
Transfer adhesives by means of gravity only. Unfortunately, usir.cr this technique would result in reduced productivity because of the material beina highly viscous and requiring a great amount of additional time to transfer it into the oressure vessel. Also, additional waste of material would result because of tendency of material to adhere to sides
~TOTES
Aro Corporation
$1,494.00
Electrostatic Engineering
$1,988.50
N'o other firms were available in this locality to provide quotes.
If
MAR 001701
t
QUOTATION
QUOTATION________ _1_
DATE.
THE ARO CORPORATION
400 CMTCKPMSC STMET. MVAN. OHIO 43S0E
11/27/75
CODE.
ARO
REF. YOUR__________________________________
( Drizzly Friction Products Maremont Cor?. 706 West Caroline St. Paulding, Ohio lj.5379
; Attn: Al Staszak
1
J
DATE
Gentlemen: The following prices are quoted as those in effect at this time.`In the event of increased material or labor costs. *e :i>e'\e
the right to increase the prices set forth in this quotation immediately and without prior notice of such increase. There;:':;: material shipped will be invoiced at the increased price. On orders for extended delivery, we reserve the option of scpr:>:: c comparable new models and grant you the privilege of accepting such new models or cancelling the unshipped portion penalty. Thank you for the opportunity of submitting this quotation. Our price and specifications are as follows:
ARO QUANTITY NUMBER
YOUR
number
DESCRIPTION
Friction Adhesives Two Post Ran System
PRICE
P = iCE
LIST EACH NET EACH
|
1 6U.0-169 1 6ii.0-170 1 66 21^9 1 65116 1 91790
1 2821*3 1 650-1*89
Tw6 post lift Mounting plate Follower plate Hose kit Muffler FRL Pump 23:1 Ratio
Total
$3^2.CO 00
' Iro.lO ; j j 15.30 "r(7 r.'cus
7'o.:o
1^9^. -u
1 650-U53 1 2821*3
Standard punp system
Pump 10:1 Ratio FRL
1
j
i
!it1 1 1
Si 32. :o . 7 _ ZO
l
TERMS ---------------- 30------------------------------------------
F O 3. 8RYAN. OHIO
REMARKS:______ _______________________________
APPROXIMATE
..
DELIVERY oatp Two-xhree wee/s
Robe rt Ri e treran
-----------------------------------------------------------------------------------------BY------------------------------------------------------------------------------------
________
MAR 001702
= v rsaa p-i3/69
THIS QUOTATION SUBJECT TO TERMS AND CONDITIONSON REVERSE SIDE
SO>N'0 1%
ELECTROSTATIC ENGINEERING. INC.
3003 NOflTmo*
rOPT WTN. INOIAN* A&03S
2l9-4S-<3&?
November 14, 1975
Mr. A1 Staszak Maremount Corp. 700 V. Caroline Street Paulding, Ohio 45879
Dear Mr. Staszak:
We have checked with your supplier and they informed us the Pliobond is closer to 50,000 than 35,000 CPS. They felt this type of material should be pumped with an inductor plate, direct to the dispensing unit. In view of this, we don't feel the 5:1 rate pump will fill your pressure pots at an adequate rate.
We are however quoting the system as you requested, also a larger pump sjEtem.
System One, as requested: 1 5:1 Monarch 1 Elevator, material plate 1 Air regulator
$430.00 429.00 32.50
$891.50
System Two, our recommendation: 1 20:1 Bulldog pump 1 Elevator - material plate 1 Air regulator
$1300.00 604.50 84.00
$1988.50.
Very truly yours,
ELECTROSTATIC ENGINEERING, INC.
Warren Greene Sales Engineer
WG : fb
MAR 001703