MALLORY CAPACITOR COMPANY
ritfhkMi'nf r, It,
* m i\r,
MfltfU II, WiwItlntiuiA NU iMtHfitqailK llltfbint tOVIMh 1Vhi|fHiil AlT^tttO'kMlt/IVii Uif
I 141
tUAtn MWI1.Y TO* I'm! orilw Unit 3TB. In^tanapmih, HmUaiii 43100
Personnel exposure to PCB's in our plant is confined to the impregnation room.
Presently, exposure is either one of two forms:
A. Liquid
Capacitors, after completion of the impregnation cycle, are removed from the tank by use of a lift truck, with all exteraal surfaces of capacitors, as well as metal baskets containing capacitors and inner walls of impregnation tanks, covered with oil.
They are transported to and transferred from the lift truck to a roller conveyor where operators wear rubber gloves and aprons. The lift truck and conveyor is equipped so that practically all
spillage or drippings of Aroclor is contained.
B. Vapors
The fill hole is solder-closed on the roller con veyor. The capacitors are then transferred to other baskets which are attached to an overhead conveyor, which travels through a trichlorethelene wash, and then through a gas fired oven to test for leakers. The overhead conveyor is continuous and later presents finished units to the final test.
The station at the ''solder-fill hole" closing oper ation is ventilated so that operators do not inhale an excessive amount of fumes. Operators wear rubber gloves and aprons at every station where wet capacitors are handled prior to trichlorethelene
cleaning.
Recent air sampling indicates atmosphere to be less
than .5 rag/m3 with most samples reading approximately
.2 mg/m3.
,
A new proprietary process, scheduled to be fully in
operation by April 30, 1976, will result in having all external
surfaces, including capacitors, baskets and inner walls of
impregnation tank, completely free of Aroclor liquid prior to
opening impregnation tanks.
MQNS 049328
This process has been successfully implemented and is in operation on 20% of our impregnation tanks presently.
When completely implemented (April 30), all external sur faces of capacitors, baskets and inner walls of the impregna tion tanks will be completely free of Aroclor liquid and vapors should approach "O."
Plant management is particularly apprehensive toward announcing an employee physical program.
They argue that such a program in a community the size of Waynesboro, Tennessee (population 1,700-1,800) by its complexity requires a longer implementation time. That the new process, scheduled for comply '* on on April 30, results in a closed system with minute e ts of vapor
They further argue that time required to implement an employee physical program may approximate date of withdrawal of Aroclor from the marketplace by Monsanto.
Questions:
1. With the above knowledge and description of today's pro cess under which the TLV atmosphere readings are under .5 mg PCB/m3 as compared to OSHA TLV of 1.0 mg PCB/m^, and anticipating that under the new process, which will be implemented by April 30,, 1976, that the concentration of PCB's will be .1 mg/nH or less, do you feel that employee physical exams aiu warranted?
2. NIOSH is currently surveying Aerovox, examining their employee health records over the past 25 years. Our Waynesboro plant has been in. operation approximately six year8.
Should a decision regarding the instituting of physicals be delayed until the NIOSH-Aerovox investigation is avail able?
3. Concern regarding dioxanes has been raised, on heating PCB's.
Under what conditions are they formed? Is air and oxygen also required? If so, are dioxanes a concern under Mallory's present impregnation process? Under Mallory's new impregnation process.
3/16/76
CI'D/pld
MONS 04932