Document Dvrq2XJ3RZ2vgQe064XgY6vyn

Monsanto t'-'t Itetjaij'&r.H,**'. r*S"'-^' v?-=71>r ":Anniston Plant.................... TECHNICAL SERVICES. DEPARTMENT MONTHLY REPORT w Anniston C. K. Eastman A. J. Koenig J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams General Offices Summary January, 1969 Cost Improvement Results . 1968 453,720 492,600 1969 January 574,075 Estimated Actual 13,430 18,450 92.37. 73% H. C. Carder R. Robirds . Danna (5) P. B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail Organic Division Solid Aroclor projects transmitted were: 1. Yield improvement instrumentation 2. Montar 5 flaking 3. Solid Aroclor in Liquid Aroclor system. Installation is 907. complete. Liquid Aroclor capacity falls to 36 M lbs/ytf. as Solid Aroclor is made in the Liquid Aroclor system. Preliminary work indicates 0.05% Biphenyl content of Santowax C can be attained. FDA approval of Aroclor 5460 needs low chlorinated Biphenyl content. Second HB-40 autoclave capacity sufficient to meet 1969 fore casted product demand. DSW 377702 OTHER LOCATIONS Agricultural Division D. W. Jackson-WGK T. M. Patrick- So.2nd.St, A. H. ForstenAlvin,Texas ( Staley Grade HCl project continues to be expedited. Instal lation of entrainment knock-out pot has been targeted for 3/1/69 to help alleviate current difficulties in making water white acid. Sulfur Recovery purification process was reviewed and first plant Project Safety Review was held. Project description package in preparation for transmitting to CED week of February 3. AN-306 REV. 11/1/1968 COMPANY CONFIDENTIAL INFORMATION "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its-proper disposal." STLCOPCB4099435 Company Confidential 2. Agricultural Division (Continued) Parathion Recovery unit dismantled for inspection. Tentative amendment submitted for approval for testing increased Acetone Recovery from condensation reactors. Design and Drafting Staley Grade Acid drawings forwarded for review. Solid Aroclor instru mentation (ph. II) design complete, drafting underway. CED Liaison Biphenyl /Aroclor bag flattener guards designed. This completes work in this area. ositirrva STLCOPCB4099436 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT Sol.Aro. Li-Still SpG. AFE *.015 Sp.Solid Aro. Lower 5060 ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TAR 2250 2250 2250 2250 2250 2250 2250 2250 2250 ACT TAR 2600 ?6oo ?6oo, 2600 2600 2600 2600 2600 2600 ACT 1500 -- Sol.Aro.-Still TAR Coolout temp. ACT AFE 3015 Sol .Aro. -Chlortor TAR Batch End ACT AFE 3015 SW/R Composition TAR ACT AFE 3016 Solid Aro. TAR Montar 5 Flake ACT AFE P949 Sol.Aro. TAR Blend 4465 ACT 160 170 160 170 160 170 160 170 160 390 390 390 390 390 390 390 390 390 2750 2750 2750 2750 2750 2750 P750 P750 1080 1080 1080 1080 1080 1080 1080 1080 2500 P500 2500 2500 2500 2500 2500 2500 2500 2500 P500 P500 1690 Sol.Aro.-Verti- TAR cal Still Cond. ACT AFE P3P4 Sol.Aro.Cl2 TAR T/C Dock ACT AFE 2542 Cl2 Pit.Down No TAR Unload ACT CED 1851 Solid Aro.-Flake TAR & Drum ACT CED 1450 Liq.Aro. TAR 48-5J M #/yr. ACT AFE 2545 Liq.Aro."No.2 TAR Still Entrain Sep. ACT AFE 5095 Liq.Aro.-Montar TAR Disposal ACT AFE 2952 Warehouse TAR ACT CEA 1452 Liq.Aro.New TAR Burners #3 Still ACT 70 80 70 90 70 70 940 940 950 950 940 950 940 950 940 950 5000 3000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 5000 3C>0Q - - - - - - - - - - 0 3000 3000 1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 Biphenyl Relocate TAR No. 1 Preheat ACT CEA 1892 HB-40 2 A/C's TAR ACT AFE 5102 500 500 500 500 500 500 500 500 500 500" 500 500 1500 000 ooo 3000 3000 3000 3000 3000 3000 3000 3000 3000 2230 3000 DSW 377704 STLCOPCB4099437 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT Bi0 Improve Tower Treat. AFE ^155 Improve Pit. Power Factor ANNUAL JAN FEB i.,- ^ -i ... -i TAR ACT MAR APR MAY - ii I" 450 JUN JUL AUG SEP OCT NOV DEC , i " > .................. i " -- i 459 450 450 450 450 450 450 TAR ACT 9QQ 900 900 900 900 900 900 900 Central Air System TAR ACT 1000 1000 1000 1000 Optimize Rx Time PNP Reduce Mole Ratio NaOH/PNCB PNP New Wash Water Pump - PNP AFE 2998 Automatic pH Control PNP HC1 Filter Pump TAR ACT TAR ACT TAR ACT TAR ACT TAR ACT ?500 2500 2500 ?500 2500 2500 2500 2500 2500 2500 2500 4000 4000 4000 4000 4000 4000 4000 4000 4000 50 50 50 50 50 50 50 50 500 500 500 330 330 540 33 New Blow Tank HC1 150,000 Gal.-HCl Storage Tank AFE 2468 Produce Staley Grade Acid AFE ^076 Cl2 Pit. Shutdown CEA 1851 Hg Recover from Residue TAR ACT TAR ACT TAR ACT TAR ACT TAR ACT 200 200 200 200 200 200 200 1760 1760 1780 1760 1760 1780 1760 1760 1780 780 790 780 780 790 8880 8880 8880 8880 8880 8880 8880 250 250 250 250 5910 O 00 Hg Wash Tank AFE 2802 TAR ACT TAR ACT 250 250 250 250 0 TAR ACT DSW 377705 STLCOPCB4099438 AG DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUNJULAUG SEP OCT NOV DEC Cooling Tower TAR 4$0 420 410 410 420 420 410 420 420 Repiping ACT AFE 2598 5.000 Optimize N2 & TAR 6600 67 00 6700 6600 6700 6700 Cl2 Levels ACT 40.000 Increase Waste TAR 400 500 500 400 500 ^00 400 ^00 500 Acid Sales ACT 4.000 Chlorinator R.I. TAR 250 250 250 250 250 250 ACT AFE 2244 5.000 EVOP Condensation TAR 750 750 500 500 750 750 Rx. ACT 0 4.000 Cl2 Unloading TAR 5000 5000 5000 2000 2000 2000 ACT CEA 1851 42.000 Recycle Wash TAR 290 290 290 290 290 290 Water ACT AFE 2960 5.500 Parathion Recovery TAR 5800 5800 5800 ACT AFE 2655 70.000 Reduce Acetone TAR 45OO 4500 4500 Losses ACT 51.600 Formulations TAR 1600 1600 1600 1600 1600 1600 ACT AFE 2897 9.600 Change Cooling TAR 125 125 125 125 125 125 125 125 125 HsO Item 7j7 ACT AFE 5067 1.500 Well H^O to Jets TAR 500 500 500 ACT 6.000 TAR ACT TAR ACT TAR ACT TAR ACT DSW 377706 STLCOPCB4099439 AROCLOR E. E. Bowles, C. R. Mcllwain, (V. R. Haupt) Company Confidential 3- Evaluate QuaterphenylPolyphenyl Effects on Solid Aroclor Yields - 1969 Savings - $63,200 NFC - $14,000 ' TSD Objective B-8 (a) Design package for installing nuclear gage instruments transmitted to Planning and Scheduling week of January 27. Project will increase Solid Aroclor 5460 yield. Second part of project, Still Condenser Coolant Control, will be transmitted by 3-1-69. Make Solid Aroclor Meet 1969 Forecast' TSD Objective in Liquid Aroclor Systemi______________________________________________ B-8 (b) Design package transmitted to P & S January 8. Piping was installed week of January 27. Some tracing and insulation work remains. Demonsatrate Montar 5 Flaking.NFC Savings - $11,500 TSD Objective - $10,000_________________________________ B-8 (c) Transmitted to P & S 2/3/69. Project will allow flaking of Montar 5 on old Solid Aroclor flaker. Justification is drum savings. Debottleneck Evaluation TSD Objective Liquid Aroclor Stillsii B-8 (i)_______________________________________________________ The use of a portion of the Liquid Aroclor system by the Solid Aroclor Department will reduce the Anniston Plant Liquid Aroclor capacity by 28%. Starting in Feb ruary the capacity of the Anniston liquid system will be 3,000 M lbs./month. Project 3093 to install an entrainment separator on No. 2 still has been approved for $4,500. Drafting is scheduled for second quarter 1969 with completion tar geted for December, 1969. Other means of increasing the capacity of remaining liquid system components are being evaluated. Drum Flushing Quality NFC - $60.000 TSD Job No. 872 ______________ A progress report was issued in Janaury, 1969. No further work is planned on this project until priority is established by the Business Group. DSW 377707 STLCOPCB4099440 BIPHENYL-SANTOWAX Company Confidential 4. W. G. Niemeyer, J. W. McGee (V. R. Haupt) Debottleneck Biphenyl Stills to 87.6M lbs/yr. Capacity Increase TSD Objective B-7 (a)______________________________________ Santowax C surge tank and column feed pump have been set. The revised stairway was installed over the new Santowax C surge tank. Related piping is in progress. Santowax area piping to be completed in February. No. 1 Furnace Upgrade Capacity TSD Objective Liaison (CEA-1892)Increase________________________ _______B-7 (c) The 300,000 gallon benzene storage tank is complete and was hydrotested on January 28. Three small leaks were found and will be repaired on February 3. Piping work in the tank area is in progress. Improve Santowax R Quality with New Distillation Column Quality TSD Objective B-7 (d) The quality of the Santowax R overhead product continues to swing as expected. We cannot expect consistent Santowax R quality until additional instrumentation is installed on Project No. 3OI6. Delivery on some instruments ordered on Pro ject 3OI6 has been delayed. Unless Purchasing can expedite these items the project will not be installed until March 1969. Santowax with Low Biphenyl Content for FDA Solid Aroclor_______ Quality;B-7 (b) TSD Objective ________ A 16 hour plant test run was made to determine if the biphenyl content in Santo wax C could be reduced to 0.05% or less. The test indicated that it can be done; however, more work is planned to demonstrate consistent long term limits of cap ability. HB-40 V. R. Haupt Installation of 2nd Autoclave to meet Product Forecast__________ Savings - $36 M NFC - $16 M;B-12 (b) TSD Objective Routine operation of the larger autoclave with larger batch sizes indicates 900 M lbs/mo. capacity using the one larger autoclave. Hydrogen supply prevents operating both autoclaves at the same time. This demonstrated rate will meet 1969's product forecast now and when hydrogen source is changed to Biphenyl department by-product upon shutdown of the Chlorine department in May. DSW 377708 STLCOPCB4099441 CHLORINE D. W. Dudley (A. G. McCarty) Company Confidential 5. Reduce Mercury Usuage TSD Objective to 0.75 lbs. Hg/Ton ClaSavings $1.700 _____________________ B-6 (b) Mercury-acid wash tank now in operation. Mercury "butter" is being accumulated in wash tank. To date no "butter" has been acid washed. Project is anticipated to achieve full savings of $1,700 before plant shutdown. Brine . TSD Objective Dechlorination_________ __________ Saving - 0_____________________________ B-6 (c) No further work is anticipated on this project before plant shutdown. Central Chlorine CED Liaison TSD Objective Unloading;Savings - $55.500_________________________________________ CEA 1851 Design is 90 % complete. Construction slated to begin in first week of Feb ruary. Project start-up still estimated'as May 1, 1969. HC1 0. J. Norris, G. L. Moore (A. G. McCarty) Production of Staley Increased Sales Grade Acid__________ 'Savings - $9,400B-10 (c) TSD Objective Project 3076 given top priority in drafting during January. Review drawings have been completed and project transmittal is scheduled for 2/7/69. Portion of project to install catch tank in HC1 gas line will be expedited: - most opti mistic date for installation - 3/1/69; most probable 3/15/69. This catch tank will allow gas by-pass purge valve to be closed contributing to as high as 800,000 lb/mo. increased recovery. Coaleser will be ready for intermediate organics removal, installation 5/1/69 as scheduled. Muriatic Acid StorageSavings - $21,200______ TSD Job No. 497 Tank construction complete. Rubber lining will be completed as soon as warmer weather permits. PNP 0. J. Norris, G. L. Moore (A. G. McCarty) DSW 377709 Debottleneck to Capacity 1.8 M#/mo.;Savings - $27,500_______________________________ TSD Job No. 482 Random reactor letdown problem appeared and was corrected around the middle of the month. Main cure for problem this occasion appears to be reduction in condensor temperature to 100C. Small PNCB charge (7400#) was also used. Pre sently charge is up to 7600# and letdown continue excellent. PR&D testing to STLCOPCB4099442 Company Confidential 6. PNP (Continued) establish a base operation point on 7. organics, 7. NaPNP, etc. in charge tank temporarily delayed until cause for data spread (8.87. to 21.3% on organics) is established. This information is critical to determining exact nature of the randomly recurring letdown problem. Study of Molar TSD Objective Ratio NaOH/PNCBSavinas - $56.000 B-9 (c)_______________________________ Approved tentative ammendment received from St. Louis. However, on agreement between TSD and production has been reached to hold tests until rate capabilities for Niran requirements arqmet. . Revise MIP Plant review completed 1/9/69. Final draft being typed prior to final review with TPM. NIRAN K. G. Hale, D. W. Dudley, (A. G. McCarty) Demonstrate Parathion Savings - $17,500 TSD Objective Recovery_________________ 10-157. Reduced C.O.D, LoadB-5 (a) Work began in late January to remove coalescer for inspection of elements. Coales cer will be pulled the first week in February. One vendor proposal for a pre-coat type filter has been received and will be evaluated in early February. Parathion Formulations Savings - $10,000TSD Job No. 845 Increase in sales forecasts for formulated Parathions from 369 M gallons to 417 M gallons in 1969 has necessitated a crash project to increase blending capability. Project is slated for start-up April 1. Project schedule and rush notification was issued January 24. Project proceeding as scheduled. Acetone Recovery__________ Savings - $12.900 ______ TSD Job No. 869 Tentative amendment to Niran process of January, 1969 to recover $50,000/yr. in acetone and reduce C.O.D. waste load 40-507. was submitted for approval 1/10/69. Early approval of the amendment will enable plant test on Niran prior to turn around. DSW 377710 STLCOPCB4099443 NIRAN (Continued) Company Confidential 7. Sulfur Recovery $5Q0,000/yr. Savings from Residue 40% Reduction in SOgB-5 (d) TSD Objective Anniston TSD is preparing a package transmittal for the Sulfur Recovery Project. The package will include the pilot separation test report, the report by Bird Machine Company, the PR&D process report, and a transmittal write-up covering additional details (objectives, facilities, etc.). The first plant safety review for selection of locations was held on 1/21/69. The PR&D process report was reviewed in plant on 1/17/69. Submerged Pump for Refractive Index Savings $1,500 TSD Objective Control of Chlorination(Potential Automation)B-5 (c) Submerged pump was pulled and inspected due to potential glass damage upon starting if pump was corroded. Still no evidence of corrosion. The pump will be re-instal led by mid-February. Tests will begin by late February. Fume Collection System Reduce Atmospheric TSD Objective in Parathion DepartmentCorrosion ___________________ F-10 A new fan of Atlac 382 to replace damaged, PVC coated original, has been ordered. Scheduled shipment date is 3/1/69. Transmittal on new foundation and transition pieces to adapt new fan is scheduled for 2/15/69. ENGINEERING DESIGN AND SERVICES Mechanical/Electrical/Instrument Design and DraftingJ. C. Price. J. A. Veazey, R. L. Brewer. J. K. Rennie. V. T. Langdon, (W. F. Taffee Issued design package for AFE 3O36, acidic spring water sewer. TSD guideline for control of TSD Mechanical expense budget was reviewed and approved. Projects were approved for modification of agitator interlocks in Parathion depart ment ($9700.00 total) and automatic alcohol feed to Thio Acid reactors ($3860.00 total) Design is scheduled for fourth quarter 1969. E & I design was completed for Staley-Grade Acid and for Solid Aroclor Instrumentation (Phase II). A meeting was held with George Hunt, Electrical section of S&PP, to define scope of S&PP recommendation to test electrical feeders, interlocks, etc. Design packages transmitted to Maintenance to cover PpSg conveyor access ladder, deluge system at soda ash tank (Niran). PNP reactor and acioifier agitator alarms and Niran cubicle sight windows. DSW 377711 STLCOPCB4099444 Company Confidential 8. UTILITIES ENGINEERING J. C. Price (W. F. Taffee) Forwarded AFE 5155, Improve Biphenyl Cooling Tower Treatment, for approval. Estimated savings $5400/yr. Evaluation completed and AFE 2821, Steam Meters, issued covering four (4) new meters in distribution system which are required for accurate utilities cost control in departments. Forwarded review drawings for AFE 2988 - Biphenyl Gas Meter, and AFE 5067 - Cooling Water on Niran Item 727. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) Design package covering lights on 5th street forwarded to Maintenance for construction, POLLUTION CONTROL E. G. Wright (W. F. Taffee) Reporting Pollution Abatement TSD Objective F-l _______ A method was devised with Accounting whereby pollution control expenditures are kept up to date. The 1968 figures are available and can be transmitted to Paul Hodges as soon as forms are received from St. Louis. A.I.A. Meeting Community and Govt. Relations________ TSD Objective F-2_______ Attended meeting of Associated Industries of Alabama January 22. Meeting was to discuss the A.I.A.'s position in the upcoming congressional session. Waste Audits Pollution Abatement TSD Objective Ft5 Visited the W. G. Krummrich plant to observe flow measurement technique using lithium chloride dilution method. We will use this method for determining flows during waste audits. Also visited J. F. Queeny plant to discuss their experience in departmental waste audits. Air Sampling Program Pollution Abatement _____________ ______________________________________ TSD Objective r-5 Initial testing of trial S0P analyser Indicates interference from other acidic compounds. Additional investigation underway. Contact with Regulatory Agencies Community and Govt. TSD Objective RelationsF-2___ Visited Anniston sewage treatment plant twice. They are continuing to experience occasional difficulty in handling their total solids load. Invited chemist from the city plant to our laboratory to observe demonstratipn by vendor of Polymers for increasing clarification efficiency. OS\N 377712 STLCOPCB4099445 POLLUTION CONTROL (Continued) Company Confidential 9. Install Solids Removal Equipment at Waste Treatment Plant; Pollution Abatement TSD Job No. 808 Project revision forwarded to management in January. Some preliminary screening tests were run on some polymers which might be used as a filter aid. Choccolocco Creek Pollution Abatement TSD Objective Biological Survey_____________ ______________ ,________________________ F-4 Drs. Gunning and Suttkus of Tulane University completed low water phase of con tinuing survey of Choccolocco Creek during week of January 26, 1969. Their report . is expected in March. ' Waste Treatment All wastes were effectively treated during January, although there are indications that we are very near the upper limit of our treatment plant capacity. Some pro blems were also encountered due to the high solids loading at City Waste Treat ment. Average daily values for Monsanto's effluent are as follows: Average Daily Specifications PNP 1 ppm 5.0 COD < 8 ppm <200 Parathion .08 ppm 1.0 BOD 5.0 ppm_____ <200 PROCESS AND QUALITY ANALYSIS W. B. Dunlap Quality The Plant Quality Score was 89.5, down 5.0 from December, with YTD (January only) score of 89.5 against a target of 95.0 minimum. Below average levels continued in Liquid Aroclors and Niran, with excellent uniformity in Caustics and PNP. Studies relating product quality with raw materials are continuing in P2S5 and PNP. PaS5 Raw Material and Potential Savings Process Surveillance$50,000;Job 877 TSD Objective C-l Job number assigned with work to start in 1st quarter. Correlation of raw mater ials with P2S5 quality being conducted by Production Supervisor. DSW 377713 STLCOPCB4099446 PROCESS AND QUALITY ANALYSIS (Continued) Company Confidential 10. Parathions - Correlate Potential Savings TSD Objective C-2 Intermediate and $88,000 Job 878 Parathion Isomers,______________________________ ______________ ;_____ Job number assigned with work in progress. Laboratory has set up routine analysis of Parathion isomers, and a determination of isomer content of extremely low-assay intermediate. PNP - Monitor Critical Potential Savings TSD Objective C-3 Process Variables$60,000_____________________________________Job 879; Job number assigned with work in progress. Process variables are being explored in team effort with Process Engineer and Laboratory through a testing-surveillance study. Solid Aroclors - Potential Savings Statistical Surveil- $50,000 lance of Critical Variables__________________________________ TSD Objective C-4 880 Job number assigned to replace TSD Job 83I. Work is planned to start in second quarter following installation of control equipment. DSW 377714 STLCOPCB4099447 Company Confidential 11. PLANT LABORATORIES G. W. Miller PROCESS RESEARCH AND DEVELOPMENT J. T. Bell For the month, 94 working days of the possible 95 were directed toward the projects outlined in the 1969 PR&D Program. At present, all projects appear to be progressing as planned. The study of Blend Scavenger Refinement (Aroclor) may be excluded from the program and replaced by an investigation to recover the benzene value of quaterphenyls and higher homologs by an aluminum chloride catalyzed rearrangement. , HB-40 Biphenyl Hydrogen Purification Alternate Hydrogen ______ Source ______ ;J. L. Brown The investigation has been terminated and the pilot unit returned to Chemical Design, Inc. p-Nitrophenol Reduce Cycle Times W. H. Howard J. T. Bell Analysis of samples taken from the PNF charge tank during 10 batches of constant charges, reaction times etc., has been undertaken to establish variations present in material levels. Analysis of 216 recycle water is to be included with the projected completion date scheduled for 2-14-69. Aroclor 1272 Sample Preparation ______ for Sales G. L. Arnett A 30 lb. sample has been prepared. A comparison of Iron and Aluminum chlorination catalysts were completed along with material balance studies. A report is under preparation and project completion will be in advance of the 2-10-69 projected date. Sulfur Recovery Sulfur Refinement for Reuse_______________ I. Ransaw W. H. Howard A report has been prepared and is in the process of being issued. An investigation into the chlorination of wash water to lower waste treatment has been initiated. Blend Scavenger Refinement (Aroclor) Improved Aroclor _________ Electrical Properties J. L. Brown Techniques to improve the electrical properties of phenyl glycidyl ether have as yet been unsuccessful. Absorption on Porocel and Silica Gel resulted in no improvement and the use of a 500 volt d.c. potential for the removal of ionic contamination resulted in only slight improvement. Analysis indicates that the concentration of chloride, sodium and potassium ions is very low or nonexistent. DSW 377715 STLCOPCB4099448 Company Confidential 12. PLANT LABORATORIES (Continued) ANALYTICAL AND QUALITY CONTROL S. 0. Kemp A series of 20 samples were analyzed by GLC to determine yield loss from the Biphenyl/Santowax still. Analytical difficulties involving HB-40 sales to General Cable Corporation are being resolved and no business loss is anticipated. Special tests and specifi cations were agreed to by Mr. S. Mickeloski of the General Cable research labs, Bayonne, N. J. during a recent visit by R. N. Brell and G. W. Miller. Complaint Report Quality Number Material Customer Reason l-A-69 Muriatic Acid Merck Color YTD Quality Complaints/100 Shipments 0.17 Target 0.20 Service None YTD Service Complaints/100 Shipments 0.0 Target 0.20 DSW 377716 STLCOPCB4099449 Company Confidential 15- COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT Personnel 1. V. R. Haupt, G. W. Miller, and J. T. Bell met in St. Louis for meeting on Solid Aroclor Research Tuesday, January 7. 2. W. G. Niemeyer promoted to TSD Senior Engineer effective February 1, 1969. Recruiting 1. Mr. T. W. Lawrence, MS Chemical Engineer graduate in 1965 from Auburn University, accepted an offer for position as Process Engineer. Development 1. J. C. Landwehr attended TSD Superintendents' Conference January 13 and 14. 2. J. C. Landwehr went to St. Louis on January 20 for the initial chairman meeting for the 1969 Innovation Exchange Program, Wednesday, January 22. 3. W. F. Taffee attended annual meeting of Coosa-Alabama River Improvement Association in Montgomery, Wednesday, January 22. 4. E. G. Wright attended a meeting of the Air and Water Resources Committee, Associated Industries of Alabama in Birmingham, Wednesday, January 22. / Visitors 1. Director of Manufacturing for the Ag Division Crop Protector Business Group, W. R. Robirds, D. E. Cayard, and B. B. Blocker visited. 2. TSD participated with accounting in a review of visibility of Central Division Computer System, R. F. Brooks and M, Tesson from Queeny. DSW 377717 STLCOPCB4099450 PROCESS IMPROVEMENT NEW PRODUCTS . DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. 70 60 50 40 p555* 30 20 20 10 0I --J-- L 1 ______L 1 1 - PLANT IMPROVEMENT ASSIST OPERATIONS SPECIAL ENGINEERING SERVICES TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND ABSENCES 20 10 0 50 40 30 ----i^ 20 DSW 377710 10 ______ J __ L_L__ Jan. Feb. March Apr. May June July Aug. Sept. Oct. Nov. Dec. STLCOPCB4099451 IN MAINTERANCE FOR CONSTRUCTION Company oontraenciax TSD PROJECT SUMMARY STLCOPCB4099452 ANALYTICAL SAMPLES LABORATORY ADMINISTRATION ANALYTICAL MANPOWER ( Manpower/sample $/Manhours % Total Plant Operating Cost (, Overtime % . LABORATORY ADMINISTRATION ( ANALYTICAL SAMPLES 60 1967 1968 --r 56 L r 52 i i 48 i A. 44 1 40 1 M 2400 2300 2200 ANALYTICAL MANPOWER 2100 2000 1900 1800 1700 (. 0.6 Manpower/sample 0.4 0.2 11.00 10.00 $/Manhours 9.00 8.00 7.00 -------- \---------- \ l 1 1 1 1 j| r1 A 1 1 i , 1 ` 1 ii l 1o 1 1 1 1 l_ % Total Plant Operating Cost i2.0 1.5 1.0 0.5 ___1____L.'rJ___ M ertirr.e % N * -- STLCOPCB4099454