Document DvbaLBnkkYBX5kOXBkg7LRjgo

iNTRPCOMPANr CORRESPONDENCE a.as `V DALE A. DELISLE - MASSENA RED. PLANT J. r. Amos, G-4-9; T. M. McCracken, E-L-2 R. e. Benton - E-L-12 February 2, 1990 SELECTION AND MONITORING OF ASBESTOS REMOLITION/REMOVAL CONTRACTORS As I indicated, we have been working on a procedure for selecting and auditing asbestos demolition/removal contractors (Draft enclosed). Should it be necessary to undertake asbestos removal projects at Massena prior to the issuance of the COM, it would be prudent to use the enclosed information in your selection/auditing process. Tom McCracken is taking on responsibility for asbestos projects on a division basis. I suggest that you contact him for further guidelines. HMC/mjm Enc Homer M. Cole TXTTNER RMC0082036 SUBJECT: SELECTION AND MONITORING OF ASBESTOS DEMOLITION/REMOVAL CONTRACTORS GENERAL POLICY It is Reynolds Metals Company's policy that all asbestos demolition/removal work performed at Company facilities strictly \ conform with applicable health and environmental lavs and regula tions. To ensure compliance with this policy, asbestos demoli tion/removal work at Company facilities is to be performed only by properly qualified asbestos demolition/removal contractors and all such work is to be monitored on a daily basis. This procedure outlines the steps to be followed by Company facilities in selec ting an asbestos demolition/removal contractor and in monitoring the contractor's work performance. SELECTION OF ASBESTOS DEMOLITION/REMOVAL CONTRACTORS Preoualification Only qualified contractors may be used to perform asbestos demolition/removal work at Company facilities. For purposes of this procedure, a contractor will be deemed to be qualified to perforafcasbestoa demolition/removal work only if it is on the list of qualified^ asbestos abatement contractors developed and main tained by Corporate Industrial Hygiene. Qualified contractors TX TWER HMC0082037 must possess all required federal, state and local licenses and certifications and must have a demonstrated history of satisfac tory performance in asbestos demolition/removal projects* Corporate Industrial Hygiene will provide a copy of its list of qualified contractors (as well as any updated list) to the Cor porate Purchasing Department for transmittal to all facility pur chasing representatives. Facility purchasing representatives are to utilize this list whenever soliciting bids for asbestos demoli tion/removal contracts. Only in emergency situations, where time is critical and a qualified asbestos demolition/removal contractor cannot be re tained on a timely basis, may Company employees be utilized to perform asbestos demolition/ removal work. Even under these cir cumstances, only qualified individuals may be utilized, and the procedures outlined in the Industrial Hygiene Directive of July 27, 1988 must be followed. Copies of this directive are available from Corporate Industrial Hygiene. To be deemed qualified, a Company employee must have success fully completed a* fWe^d^yAe^ EPA-approved asbestos super visor's, course. Only in emergency situations, where qualified Compaiqfaf^loyees are not available to perform the work, may a contractor which has not beenliqualified by Corporate Industrial Hygiene be utilized to perform the work. /wjUC \ of fa# -2- AKJ d C txtiner RMCQ082038 Btd Solicitations Tha facility purchasing representative should solicit at least _______ bids for each asbestos demolition/removal project to be performed at the facility. The bids are to be solicited from qualified asbestos demolition/removal contractors. However/ other contractors may also bid/ provided that they promptly complete and return the Asbestos Demolition/Removal Contractor Performance Questionnaire described below. A copy should be promptly sent to Corporate Industrial Hygiene for its review, and it will advise the facility purchasing representative whether the contractor is qualified to perform the work. The bid solicitation must set forth the scope of work in detail. The scope of work should include the type, amount and location of the asbestos, along with any additional relevant information regarding the project or the asbestos. Before sending out the bid solicitation package, the facility purchasing representative should check with the Law Department attorney responsible for purchasing matters,to determine the proper contract document(s) to be used for the project. The bid solicitaCioikr package should include a copy of the contract document vtri<dKth* successful bidder will be required to sign. 7X TIMER RMC0082039 Bidders should be advised to include with their bids any exceptions they propose to make to the contract terms. All pro posed exceptions to the contract terms must be reviewed JL the Law Department before the contract is awarded. The bid solicitation should require each bidder to submit the following documentation with its bid: 1. A completed Asbestos Demolition/Removal Contractor Per formance Questionnaire (a copy of this Questionnaire is attached to this procedure as Exhibit A). A copy should thjfn be forwarded to Corporate Industrial Hygiene for fehetT files. This questionnaire must be completed even if one was previously completed for another project. 2. A completed Asbestos Demolition/Removal Contractor Work Plan Questionnaire describing how the asbestos demoli tion/removal will be done (a copy of this^uestionnaire is attached to this procedure as Exhibit B). 3. The bidder's detailed removal specifications for the project in question. Documentation establishing that the bidder has obtained all required contractor, supervisor and worker licenses. -4- TXTWER RMCQ082040 5. For each employee of the bidder who will be assigned to the project, documentation establishing that medical examinations have been performed within the last 12 months and indicating whether the physician detected a medical condition that would place the worker at an increased risk of material health impairment from exposure to asbestos. . For each employee of the bidder who would be placed at an increased risk of material health impairment from exposure to asbestos, (a) documentation establishing that the employee has been fit tested with negative pressure respirators within the last six months and (b) a physician's written opinion as to whether there are any limitations on the employee's use of respiratory protection. 7. Documentation establishing the competency of the employ ees of the bidder who will be collecting the air sam ples. * a. Documentation establishing the competency of analytical laboratory to be utilized by the bidder (per Appendix A off the OSHA Asbestos Standard). -5- txtiner RMC0082041 Selection Of Contractor Th facility will select the asbestos demolition/removal con- ' tractor from those qualified bidders who submit all of the docu mentation identified above. However, before th awarded, the successful bidder's proposed work reviewed to verify that it complies with all applicable federal. state and local laws and regulations applicable to asbestos demo lition/removal projects. This review is to be performed by either a qualified facility employee or by a qualified outside consultant. In order to be qualified to perform this review or to monitor the contractor's performance, the Company employee must have successfully completed aflfie QayTMyt langur EPA-approved asbestos supervisor's course and the outside consultant must have been approved by Corporate Indus trial Hygiene to review work plans and to monitor asbestos demoli tion/removal projects. Corporate Industrial Hygiene will develop and maintain the list of qualified consultants and will provide a copy of this list (as welL a* a copy of any updated list) to the Corporate Purchas ing Department for transmittal to all facility purchasing repre ss-* sentatxvea^ Th* Corporate Purchasing Department will also provide facility purchasing representatives with a list of those qualified consultants which have entered into blanket professional service agreements. 6 TX TIMER RMC0082042 MONITORING OF THE ASBESTOS DEMOLITION/REMOVAL CONTRACTOR'S PERFORMANCE Daily Monitoring The facility where the work is being performed is responsible for monitoring the contractor's performance to ensure that (a) it complies with all applicable federal, state and local laws and regulations pertaining to asbestos demolition/removal and (b) the approved work plan is being fully carried out. This monitoring is to be accomplished either by a qualified Company employee or by a qualified consultant. Monitoring is to be performed on a daily basis and is to begin as soon as the asbestos demolition/removal project commences. Monitoring should occur at random times each day in order to limit the contractor's ability to predict when the moni toring will occur. In some situations, it may not be possible to see clearly into the contractor's work area. Under these circumstances, the * Company monitor should enter the work area in order to monitor the contra^d^'s performance. The Asbestos Demolition/Removal Contractor Performance Audit i^rS' ***** Report is to be completed each day by the Company ftonitfbij^during the course of the monitoring. This report, a copy of which is -7- TXTNER RMC0082043 attached to this procedure as Exhibit C, sets forth the specific items and areas to be checked by the Company monitor. Copies of the daily reports are to be forwarded to Corporate Industrial Hygiene on a weekly basis. The Company monitor should immediately stop any work practice or situation (such as a breach in a containment barrier, inade quate worker decontamination or a breakdown of the negative air machines) which could result in the release of asbestos fibers into the workplace or environment. The contractor should be required to immediately correct any such practice or situation, and the work should not be permitted to resume until the practice or situation has been corrected to the Company monitor's satis faction. All such incidences are to be reported in writing to Cor porate Industrial Hygiene as soon as possible after the situation has been resolved. If there are any questions as to whether a project should be stopped, the Company monitor should immediately contact Corporate Industrial Hygiene for further guidance. monitor must collect at least two air samples daily. The samples are to be collected outside the containment room--one sample at the entrance to the clean room and another sample at the exhaust of the negative air machines. In addition. 8 TXTWER RMC00820U if a regulated area has been established, at least one air sample is to be collected daily at the boundary between the regulated area and the normal work area. r* t ' ' * V * t ' * * Hr r c/.r If any air sample reveals asbestos levels at or above 0.1 f/cc, the Company monitor should immediately stop the demoli- tion/removal work/aed*then review the contractor's work practices \ with the contractor. The contractor's work practices must be modified in order to reduce asbestos levels to less than 0.1 f/cc. Final Inspection After the asbestos demolition/removal project (including final cleanup) has been completed, the Company monitor should con duct a visual inspection of the work area. The inspection should take place before final clearance air sampling. The inspection should include entry into the work area to check for visual con tamination on surfaces from which asbestos-containing material has been removed. Additionally, the Company monitor should inspect for any asbestos or asbestos-containing material which may have been "caughte^r'oiii equipment or other surfaces. -A high intend Lj I la sir* Ughte* ej^pid- be used fee inspecting corners and ethci lUCCIRted -9- TX TIMER RMC0082045 Once the work area has passed visual inspection, the Company monitor should perform the final clearance air sampling. The pro ject vill be deemed to be complete when aggressive air sampling shows airborne asbestos levels of 0.01 f/cc or less. If there are any questions concerning the daily monitoring or final inspection^ the Company monitor should promptly consult with Corporate Industrial Hygiene. bjm purch asbestos rmc/policy ' 10 - TXTWER RMC0082046 GLR AFT This "Asbestos Abatement Contractor Questionnaire" should be filled out and submitted by all contractors each time they bid on an asbestos abatement project. In this way, we can insure that our files are kept up to date. If you have any questions, please contact Corporate Industrial Hygiene. TXTINER RMC0082047 ASBESTOS ABATEMENT CONTRACTOR PERFORMANCE QUESTIONNAIRE (Use back of fora, if more spaca naadad) Company Nana; Addraaa ContactJElMflni Telephone; ( )/ 1) Ara you currantly licanaad by any regulatory or governmental agency for the purpose of handling aabestoa materials, a. g., removal, encapsulation, enclosure, demolition, ate.? NoYes If Yea, please list. 2) Ara you currantly licensed by the state in which the project is located? NoYes________ If Yea, provide a copy of the license. 3) List 3 previous asbestos abatement projects which you have completed. Include a brief description of each project, the name and telephone number of the owner or contact person. 4) Have you completed any removal projects involving asbestos containing thermal system insulation? YesNo______ If Yes, please describe. 5) Has your company or any of your companies ever been cited by a federal, state, or local regulatory agency, relating to asbestos notifi cations or abatement activity, including deficient notices? No_____ Yes_____ If Yes, please describe. 6) Has your company or any of your companies' principals ever incurred penalties for non-compliance with an asbestos abatement project's specifications, including but not limited to liquidated damages or overruns in scheduled time limitations and resolutions or noncompliance with the work practice standards of 40 C.F.R. Part 61, Subpart M? No__ Yes if Yes, please list all penalities and describe the circum stances. ___________________ 7} Has your company or any of your companies ever been involved in an asbestos abatement project which was terminated prior to completion? NoYes If Yes, please describe. __________________________________ TX UNER RMC0082048 ASBESTOS ABATEMENT CONTRACTOR PERFORMANCE QUESTIONNAIRE PAGE 2 8) Ha* there bn any asbestos-related stat* or federal lagal proceeding/ claim in which your company has participated or is currently involved? NoYe#______If Yes, please describe. 9) Does your company carry liability insurance? NoYes_______ If Yes, please describe the coverage. 10) How long has your company been involved in asbestos abatement activities?; 11) Have all of your employees who are involved in asbestos abatement projects successfully completed an EPA approved training or refresher course on asbestos abatement within the pest 12 months? Yes No___ Please name the training group and location where the training too* place. I certify that the above statements arm true to the best of my knowledge. Date: Signature Title_____* 7X TIMER RMCQ082049 1 DRAFT ASBESTOS ABA1 ? CONTRACTOR WORK FLAW QUESTIONNAIRE This completed fora must accompany your submittal. All negative rasponses must bs explained. Any additional inforaation that you would like to submit can be attached to this document. I. Work Area Preparation Will preparation of work area be necessary? If yes, answer remaining questions. If no, please explain and proceed to Section II. Will caution signs be posted and banner tape be established in such a way to prevent accidental or unauthorized entrance? will the electrical power and HVAC system in the area be shut down? Will sanitary facilities and eating areas be provided outside regulated areas? Will all movable objects be vet wiped or HEPA vacuumed prior to removal from work area? Will'all nonmovable objects be vet wiped or HEPA vacuumed prior to being covered with a 4 mil. poly? Will all surfaces be vet wiped or HEPA vacuumed prior to covering with poly? Will all windows, doors, elevator openings, ducts, grill openings and any other openings between the work area and uncontaminated areas outside the work area be covered with 4 ail. poly? II. Containment Room Will a containment room be used? If yes, answer the remaining questions. If no, please explain ' and proceed to Section III. Will floors be covered with at least two layers of & mil. poly? Will walls be covered with at least 2 layers of 4 ail. poly? Will seams be located in such a fashion as to minimize the number and be no closer than six feet? TXTINER RMC0082050 2 Will floor poly extend at laast 12" up the sidewalls? Will vail poly ovarlap floor poly by at least 12" bayond wall/floor joint? Will vail poly be adequately secured to prevent pulling away froa wall? Will vails be constructed for the containment room (openings greater than 4' x 8'), will the framing consist of wood or metal? Will 3/8" plywood or sheathing be used on the work side of openings greater than 4' x 8'? Will negative air machine(s) be used to maintain negative pressure inside enclosure? will checks be aade to insure negative pressure is maintained inside the enclosure (smoke tubes or 0.01" water gauge difference between inside and outside)? Will the negative air machines be of the centrifugal type? Will the negative air machines have an . air-handling capacity of 1,000 - 2,000 ft. /min. under clean filter conditions? Will there be at least 4 air changes per hour? Will the negative air machine(s) be located so as to insure that clean outside air is brought in through the decon unit and thru the work area before being exhausted to the outside? Will the negative air machines be equipped with the necessary filters (prefilter, intermediate filter, and HEPA filter)? Will the filter(s) be replaced as necessary or when the pressure drop reading exceeds 1" water gauge? Will the contaminated filters be properly disposed of as asbestos-containing material? III. Decontamination Facility/Area Will a decontamination (decon) facility be necessary? If yes, answer remaining questions. no, please explain and proceed to Section IV. If TXTWER RMC0082051 3 will the dacon facility be a prafab unit? For the dacon facility, will there ba an airlock batvaan tha equipment rooa and shower rooa and tha ahovar rooa and daan rooa? Will tha air locks ba foraad by overlapping tvo shaats of poly at tha axit and antranca ands? Ara tha air locks foraad by overlapping tvo shaats of poly at the axit and antranca ands? Will thara ba at least three feat of space batvaan tha entrance and axit? Will 2 layer 6 ail. opaque or white poly ba used for tha dacon unit walls? Will 1/4" - l/2N plywood ba used for tha dacon unit walls? Will three layers of 6 ail. poly ba used for tha dacon floors? Will tha water froa tha shower rooa filtered ba through a 0.5 - 1.0 aieron filter prior to discharge? Will tha dacon facility ba designed so that antranca and egress to tha work ares is through tha dacon unit? Will eaergency exits ba established and clearly aarkad? If dacon area is used, will workers ba required to dacontaainata thaasalvas in that area before leaving? IV. Waste Container Load Out % Will a waste container load-out ba necessary? If yes, answer raaaining questions. If no, please explain and proceed to Section V. 17* ' ` Will waste container load-out facility be constructed with appropriate air locks? Will the waste container load-out unit be maintained under negative pressure? V. Glove Bag txtwer RMC0Q82052 4 Will glove bag procedures ba usad? If yes, ansvar remaining questions. If no, proceed to Seciton VI. Will the glove bags ba constructed of at least 6 ail. poly? will the glove bags ba checked for tightness (smoke tube or squeeze test) prior to beginning removal of ACM? Will amended water be used to keep ACM wet? Will HEPA vacuum cleaner be used to deflate bag after removal? Will the remaining surfaces be cleaned at least twice after ACM removed? Will lock-down spray back material be usad to seal any remaining fibers? Will the glove bag be properly labeled for disposal? VI. Open Air Removal Will it be necessary to utilize "open air" removal techniques? If yes, answer remaining questions. If no, please explain and proceed to Section VII. will a regulated area be established based on valid air sampling data? Will the ACM be kept thoroughly wet during entire removal process? Will the ACM be allowed to drop from surface to floor or other surface? Will the ACM be wrapped with 6 mil. poly prior to removal? > Will other procedures be used to minimize release of fibers? If yes, please elaborate on back. Will 6 mil. poly be placed underneath ACM being removed or repaired? VIr. Waste Disposal Will all waste be bagged wet? Will there be any sweeping of AC waste? TXTINER RMC0082053 5 Will vast* b double bagged in labeled 6 mil. poly bags? Will drums be used as a final storage container? Will drums have locking rims? If vasts is not bagged or placed in drums, will it be double wrapped and seams taped with duct tape? If not removed daily, vill the ba waste be stored in a secure locat Will the outside of bags/drums be cleaned of all residue? Will any waste with sharp edges be placed in the plastic bags? VIII. Air Sampling will sampling be conducted by an outside third party? Will sampling be conducted by trained personnel using required techniques? Will fiber counts be performed by accredited laboratory? Will preabatement sampling be conducted? Will post abatement sampling be conducted using aggressive air sampling techniques? Will at least 1200 liters of air be collected for pre and post abatement sampling? Will daily area samples be collected inside the containment enclosure? v Will samples be collected using 25 mm filters at a flow rate of 0.5 - 2.5 liters per minute? .. Will the area samples be.collected at a frequency of 1 sample per 1000 ft. of enclosed area with a maximum of 5 samples per work area? Will at least 1 daily area sample be collected outside the enclosure, at the entrance to the clean room? TXT1NER RMC0082054 6 Will at least 1 daily area sample be collected outside the enclosure, at the exhaust of the hepa ventilation system? Will personal samples be collected daily and in such a fashion as to adequately characterize the exposure of each worker? Will personal sampling be conducted for both the 8-hour time-weighted average and the 30-minute excursion limit? Will air sampling pumps be calibrated before and after use with a representative filter? IX. Respiratory Protection Is there a written Respiratory Protection Program? Does it contain all the elements of the OSHA required Respirator Program (1910.134)? Will respirators be selected on the basis of air sampling data? Will initial work be conducted with workers wearing atmosphere supplying respirators? Does the training cover all types of respirators offered by you? Will fit testing for air purifying respirators be performed initially and every six months? Will all respirators be used during the project NIOSH/MISHA approved for asbestos exposures? Does training adequately cover proper use, fit care and limitations of respirators? Rave employees been provided necessary medical exam to determine ability to wear respirators? The designated Respirator Program administrator is: Clothing Will protective clothing be necessary? If yes, answer remaining questions. If no, please explain and proceed to Section XI. TXTMER RMC0082055 7 Will disposable full body suits be provided to workers? Will the suits be removed prior to leaving the work area where there is no decon unit? Will the suits be taped at cuffs and legs? XI. Medical Surveillance Has a medical surveillance program been established? Does it include a physical exam (PET, X-Ray, etc.) Does it include the questionnaire contained in 1926.58? Is physician's written opinion given to employees and available for inspection? XII. Training Is there documentation as to the type and level of training provided to workers? Is there documentation as to the provider of training? Does training cover health effects of asbestos? Does training cover methods to recognize asbestos? Does training cover relationship between asbestos and smoking? Does training cover all aspects of 1926.58? Does training cover proper work practices to control release of asbestos fibers? ' Does training cover proper procedures for exiting work area through decon unit including donning and removal of protective clothing and respirators? Does training cover procedures for emergency . - situations? XXII. Emergency Situations Are procedures included which cover duties and actions during emergencies (rupture of containment room, fire, medical)? TX TIMER RMCQQ82Q56 8 Will plant personnel ba proparly notifiad in a timely fashion? Do you hava a list of all applieabla amargancy rasponsa teams in tha area? Will a written report ba sent to plant in event of emergency? XIV. Site Security Will work area ba adequately cordoned off to prevent accidental or unauthorized entrance? Will a daily log ba kept of all entrances into work area? Is plant management being notifiad immediately of any unauthorized entries into work area? During off work hours, will work area be secured to prevent unauthorized entrance? will your personnel be kept on site during off work hours? will your personnel be available during off work hours? For projects with decon units and containment barriers, will entry be restricted to the decon unit? XV. Recordkeeping Have adequate records been kept of employee training? Have adequate records been kept of respirator training and fit testing? , Will adequate records be kept of air monitoring reports? Have records been kept of medical surveillance? Will adequate records be kept of emergencies? Will a copy of all records, logs, and reports pertaining to the project be provided to plant at completion of project? Will daily job progress reports be kept and submitted to plant management weekly? TXTINER RMC0082057 9 Th record* custodian for thi* project will be: The records will be maintained at: Date___________ Signed, TITLE -A .yg'. TX TIMER RMC0082058 pRArt The enclosed audit document is to be usad only by proparly trainad personnel (i.e., hava auccaaa fully comp 1atad an approvad 5-day asbastos suparvisor couraa) to audit tha parforaanca of asbastos abataaant contractors. Tbis qualified individual may ba a Reynolds Metals Company in-plant parson or an experienced outside parson. The audit of tha contractor's performance should ba dona daily and at random times. The appropriate sections of the audit document should ba filled out at these times and copies forwarded to Corporate Industrial Hygiene on a weakly basis. For those projects where it is not possible to see clearly into the work area, it will ba necessary to enter the work area to audit the contractor's performance. Any work practice or situation which could result in the release of asbestos fibers into tha workplace or environment (e.g. breach in containment barrier, inadequate worker decontamination, breakdown in negative air machines, etc.) must be stopped and corrected immediately. A report detailing this incident is to be- prepared and sent to Corporate Industrial Hygiene in Richmond as soon as possible after the incident has been resolved. If there is any question concerning the need to stop a project, contact Corporate Industrial Hygiene immediately for guidance. Once the asbestos project (and the final cleanup) has been completed, the trained individual must conduct a visual inspection of the work area prior to the beginning of the final clearance sampling. The inspection will require entrance into the work area. The individual inspecting the work area should look for visible contamination on all surfaces from which asbestos-containing material has been removed. In addition, he/she must look for material which might have been "caught** on equipment or other surfaces. A high intensity flashlight would be helpful for inspecting corner^ and other recessed areas. Once the work area has passed the visual inspection, the final aggressive clearance sampling can be conducted. The project will be considered complete when the results of the aggressive air sampling indicate airborne asbestos levels arttO.Ol f/cc or less. Any questions concerning the use of this document should be directed to Corporate Industrial Hygiene. TXTINER RMCOO82O50 1 DRAFT ASBESTOS ABATEMENT CONTRACTOR PERFORMANCE AUDIT I. Work Area Preparation Y/N Y/N Y/N Y/N Y/N Y/N Y/N Is preparation of work area necessary? Are caution signs posted and banner taps established in such a vay to prevent accidental or unauthorized entrance? If yes, answer remaining questions. If no, proceed to Section II. Is the electrical power and HVAC system in the area shut down? Are sanitary facilities and eating areas being provided outside regulated areas? Are all movable objects being wet wiped or HEPA vacuumed prior to removal from work area? Are all nonmovable objects being wet wiped or HEPA vacuumed prior to being covered with a 4 mil. poly? Are all surfaces being wet wiped or HEPA vacuumed prior to covering with poly? Are all windows, doors, elevator openings, ducts, grill openings and any other openings between the work area and uncontaminated areas outside the work area being covered with 4 mil. poly? TXTINER RMC0082060 2 IX. Containment Room Y/N Y/N Y/H Y/K Y/N Y/N Y/N Y/N Y/N Y/K* Y/N la a containsant rooa being used? Zf yea, answer the remaining questions. It no, proceed to Section ZZZ. Are floors covered with at least two layers of 6 ail. poly? Are vails covered with at least 2 layers of 4 ail. poly? Are seaas located in such a fashion as to minimize the number and be no closer than six feet? Does floor poly extend at least 12" up the sidewalls? Does wall poly overlap floor poly by at least 12" beyond vail/floor joint? Zs vail poly adequately secured to prevent pulling away from vail? Are vails constructed for the containment rooa (openings greater than 4' x 8'), will the framing consist of wood or metal? Zs 3/8" plywood or sheathing being used on the work side of openings greater than 4' x 8'? Are checks being made to insure negative pressure is maintained inside the enclosure (smoke tubes or 0.01" water gauge difference between inside and outside)? Are negative air machine(s) used to maintain negative pressure inside enclosure? TX TIMER RMC0082061 3 Y/H Y/H Y/K Y/H Y/H Y/H Y/H Ara the negative air machines of tha centrifugal typa? Do tha nagativa air aachinas hava an air-handling capacity of 1,000 - 2,000 ft.3/*in. undar claan filtar conditions? Ara thara at laast 4 air changas par hour? Ara tha nagativa air machine(s) locatad so as to insura that claan outsida air is brought in through tha dacon unit and thru tha work araa bafora baing axhaustad to tha outsida? (This check should ba performed using vantilation smoke tubas.) Ara tha nagativa air aachinas aquippad with tha necessary filtars (prafiltar, intamadiata filtar, and HEPA filtar)? Ara tha filtar(s) raplacad as nacassary or vhan tha prassura drop raading axcaads 1" vatar gauga? Ara tha contaainatad filtars proparly disposad of as asbastos-containing matarial? zzz. Dacontaaination Facility/Araa Y/H Zs a dacontaaination (dacon) facility nacassary? Zf yas, ansvar raaaining questions. Zf no, proceed to Section ZV. */* Y/H Zs dacon facility a prefab unit? For a dacon facility, is thara an airlock between tha equipaent rooa and shower rooa and tha shower rooa and claan rooa? Y/H Ara tha air locks formed by overlapping two sheets of poly at tha exit and entrance ends? TX TIMER RMCOO82O02 Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N 4 Zs there at laast three feet of space batvaan tha antranca and axit? Ara 2 layer 6 ail. opaque or white poly used for tha dacon unit walls? Zs 1/4" - 1/2" plywood used for tha dacon unit walls? Ara three layers of 6 ail. poly used for tha dacon floors? Zs tha water froa tha shower rooa filtered through a 0.5 - 1.0 aicron filter prior to discharge? Zs tha dacon facility designed so that entrance and agrasa to tha work area is through tha dacon unit? Are emergency exits established and clearly narked? Zf dacon area is used, are workers required to dacontaninata themselves in that area before leaving? ZV. Haste Container Load Out Y/N Y/NS Y/N Zs a waste container load-out necessary? Zf yes, answer reaaining questions. Zf no, proceed to Section V. Zs waste container load-out facility constructed with appropriate air locks? Zs waste container load-out unit naintained under negative pressure? TX TINER RMCOO82O03 5 V. Glove Bag Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Are glova bag procaduras being used? If yes, answer remaining questions. If no, proceed to Seciton VI. Are the glove bags at least tf ail. poly? Are glove bags checked for tightness (smoke tube or squeeze test) prior to removed of ACM? Is amended water used to keep ACM wet? Is HZPA vacuum cleaner used to deflate bag after removal? Are the remaining surfaces cleaned at least twice after ACM removed? Is lock-down spray back material used to seal any remaining fibers? Is glove bag properly labeled for disposal? VI. Opan Air Removal Y/N Y/YL Y/N Y/N Is it necessary to utilize "open air" removal techniques? If yes, answer remaining questions. If no, proceed to Section VII. Has a regulated area bean established based on valid air sampling data? Is ACM kept thoroughly wet during entire removal process? Is ACM allowed to drop from surface to floor or other surface? Is the ACM wrapped with 6 mil. poly prior to removal? TXTINER RMC0082064 Y/N 6 Is 6 ail. poly placed underneath ACM baing removed or repaired? VII. Waste Disposal Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Is all vasts bagged vet? Is there any aveeping of AC vasts? Is vasts double bagged in labeled 6 mil. poly bags? Are drums used as a final storage container? Do drums have locking rims? If vasts is not bagged or placed in drums, is it double vrapped and seams taped vith duct tape? If not removed daily, is bagged/drummed vasts stored in a secure location? Is the outside of bags/druns cleaned of all residue? Is any vasts vith sharp edges placed in plastic bags? VIII. Air Sampling Y/Mcj Y/N Y/N Is sampling being conducted by an outside third party? Is sampling being conducted by trained personnel using required techniques? Are fiber counts performed by accredited laboratory? Is preabatement sampling being conducted? TX TIMER RMC0082065 Y/M Y/H Y/K Y/H Y/K Y/K Y/K Y/K Y/K Y/Wr 7 Is post abatement sampling baing conducted using aggrassivs air sampling techniques? Ars at lsast 1200 litsrs of air baing collactad for prs and post abataaent saapling? Ars daily arsa saaplss baing collactad insida tbs containaant andosura? Ars saaplss baing collactsd using 25 aa filtsrs at a flow rata of 0.5 - 2.5 litars par ainuta? Ars tha araa saaplss at a collactsd frsquancy of l saapla par 1000 ft.2 of andosad araa with a maxibus of 5 saaplas par work arsa? Is at lsast l daily araa saapla collactsd outsida tha enclosure, at tha antranca to tha daan rooa? Is a!t lsast 1 daily araa saapla collactad outsida tha anclosura, at tha axhaust of tha HZPA vantilation systsa? Ara parsonal saaplas collactad daily and in such a fashion as to adequately characterize tha exposure of each worker? Is parsonal sampling baing conductad for both tha 8-hour time-weighted average and tha 30-ainute excursion limit. Ara air saapling puaps calibrated before and after use with a representative filter? TXT1NER RMC008206B 8 XX. Respiratory Protaction Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Za thara a vrittan Respiratory Protaction Program? Doaa it contain all tha alamanta of tha OSHA raquirad Respirator Program (1910.134)? Ara raapiratora aalactad on tha baaia of air aaapling data? Is initial work baing conductad with vorkara wearing ataoaphara aupplying raapiratora? Doaa tha training covar all types of raapiratora offarad by contractor? Za fit tasting for air purifying raapiratora performed initially and avary six months? Ara all raapiratora usad during tha projact NIOSH/MXSBA approved for aabastoa exposures? Does training adequately covar proper use, fit care and limitations of respirators? Are amployaas provided necessary medical exam to determine ability to wear respirators? Zs there a designated Respirator Program administrator? TX TIMER RMC0082067 9 X* Clothing Y/N Y/N Y/N Y/N Is protsctivs clothing nscsssary? Ars disposable full body suits provided to workers? Ars the suits to bs removed prior to leaving the work area where there is no decon unit? Are the suits taped at cuffs and legs? XI. Medical Surveillance Y/N Y/N Y/N Y/N Has a medical surveillance program been established? Does it include physical exam (PFT, X-Ray, etc.) Does it include questionnaire contained in 1926.58? Is physician's written opinion given to employees and available for inspection? TX TIMER RMC0082068 10 XZI. Training Y/N Y/N Y/H Y/N Y/N Y/N Y/N Y/N Y/N Zs there docuaentation as to tbs typs and lsvsl of training providsd to workers? Zs thsrs docuaentation as to tho provider of training? Doss training eovsr hsalth offsets of asbsstos? Doss training eovsr aethods to recognize asbsstos? Doss training eovsr relationship bstvssn asbsstos and saoking? Doss training eovsr aspsets of 1926.58? Doss training cover proper work practices to control release of asbestos fibers? Doss training cover proper procedures for exiting work area through dscon unit including donning and raaoval of protective clothing and respirators? Does training cover procedures for eaergency situations? \ TXTWER RMC0082089 11 XXIX.> Xaergency Situations */ Y/H Y/M Y/H Art procedures includad which covar duties and actions during emergencies (ruptura of containnant rooa, firs, aadlcal)? Ara plant parsonnal baing proparly notifiad in a tinely fashion? Doas contractor hava list of all applicabla aaargancy rasponsa teaas in ths araa? Is written raport baing sant to plant in avant of aaargancy? XIV. Sits Security Y/H Y/H Y/H Y/H Y/- Is work araa adequately cordoned off to prevent accidental or unauthorized entrance? Is daily log kapt of all entrances into work araa? Is plant aanagaaent being notified inaediately of any unauthorized entries into work araa? During off work hours, will work araa be secured to prevent unauthorized entrance? Are contractor personnel being on site during off work hours? TX TIMER RMCQ082070 Y/H Y/H Ara contractor personnel available during off work hours? For proj acts with dacon units and containment barriers, will entry be restricted to the decon unit? XV. Recordkeeping Y/H Are adequate records being kept of employee training? Y/H Are adequate records being kept of respirator training and fit testing? Y/H Are adequate records being kept of air monitoring reports? Y/H Are adequate records being kept of medical surveillance? Y/H Are adequate records being kept of emergencies? Y/H Zs a copy of all records, logs, and reports pertaining to the project being provided to plant at completion of project? % Y/H Are daily job progress reports being kept and submitted to plant management weekly? TXTINER RMC0082071 In addition to complying with applicable Federal, State, anti local regulation*, contractors will subnit detailed specifications on tbs asbestos abatement project. Tbasa specifications must include infomation on the construction and operation of containnent barriers, decontamination rooms, negative air, glove bags, and other work practices designed to minimize the release of asbestos fibers. Details of the sampling program and analytical laboratory accreditation and procedures for handling emergencies must also be included. All sampling data and incidents must be reported daily to Corporate Industrial Hygiene. Contractors must also provide documentation on state licensing, supervisor and worker training, the respirator program, and medical surveillance. Enclosed is an Asbestos Abatement Contractor Checklist that may be used as a guide in the development of the asbestos abatement specifications. This document will be used by our Corporate Industrial Hygiene staff when reviewing the specifications and should be considered minimum guidelines. Any specifications not fulfilling the above minimum requirements will result in the contractor being removed from the bidding list. Tha^asbestos abatement project will be considered complete whea th results of the agressive air sampling studies indicate airborne fiber levels of 0.01 f/cc or less. Any questions concerning the us* of this document should be directed to Corporate Industrial Hygiene. TX TIMER RMC0082072