Document DvaO7yepk73K6eGYGr0QdaL7n

UNION CARBIDE CORPORATION CHEMICALS AND PLASTICS P.O. BOX 3, HOUSTON, TEXAS 77001 March 15, 1976 Brown & Root, Inc. P. 0. Box 3 Houston, Texas 77001 Attention: Mr. T. J. Feehan Subject: Contract No. 511-729098-4 Amendment No. 7 ____ . Gentlemen: It is proposed to amend the contract between Union Carbide Corporation and Brown & Root, Inc. dated as of June 11, 1973 as follows: 1. Effective January 1, 1976 substitute "Schedule V, first four (4) pages dated November 15, 1975" attached hereto and made a part hereof for "Schedule V, first four (4) pages dated July 11, 1974"; Effective July, 1975 add the following "Schedule V-A, Pricing l >r Petro-Chem Warehouse Services" attached hereto and * ^hereof; A. Effective JulyT' page no. D-2": 5 add the following to "Schedule I, Part D, Columns List of Items Pricing Schedule for Petro-Chem Warehouse Services set forth in Schedule V-A 3. Effective November 30, 1975 substitute "Schedule II Part C dated November 30, 1975", attached hereto and made a part hereof for "Schedule II Part C, dated May 1, 1974"; 4. Effective April 4, 1975 substitute "Schedule II, Part B dated April 4, 1975", attached hereto and made a part hereof for "Schedule II Part B, dated March 13, 1973"; 5. Effective February, 1976 substitute "Project Management Salaries" attached hereto and made a part hereof in "Schedule II Part A" for "Project Management Salaries" dated June 1, 1974 as a part of "Schedule II Part A". 6. On paragraph one (1) of Article XI substitute "C. A. Foster" for "L. M. Roth". 7. Add the following to "Schedule I, Part A page no. A-4": Columns List of Items(1) (2) (3) 26 (a). Use of Third Party Computer Services. X 28. Use of contractor owned aircraft as approved by engineer at the rates in effeet at -the-time of-usev X 8. Revise "Schedule I Part A, Page No. A-4, Item 25 (c)" to read as follows: "Reproductions produced by commercial facilities shall be at contractors cost". As herein amended all of the terms and provisions of the subject contract, as heretofore amended, shall remain in full force and effect. If the foregoing amendments are acceptable to you, please execute the original and two copies as indicated, returning the two copies for our files. Very truly yours, UNION CARBIDE CORPORATION bjm Agreed to and Accepted this J&-_day of_ By: __ _ , 1976 Revised November 15. 1975-'! Effective January 1, 1376 SCHEDULE V BROWN & ROOT, INC. RENTAL RATES FOR CONSTRUCTOR-OWNED EQUIPMENT 1 A3sY Revised November 15, 1975J Effective January 1, 1976 DESCRIPTION RENTAL RATES FOR CONSTRUCTOR-OWNED EQUIPMENT SIMILAR TO MONTHLY RATE Crane, 150 Ton Crawler (Manitowoc 4000) $ 5,600 Crane, 75 Ton, Crawler (Manitowoc 3900) 3,985 Crane, 70 Ton, Crawler (Lima 75C) 3,985 Crane, 45 Ton, Crawler (Link-Belt LS-108B) 3,395 Dragline, 1-1/2 CY, Crawler (Northwest 6) 2,325 Dragline, 3/4 CY, Crawler (Northwest 25D) 1,745 Motor Crane, 45 Ton (Northwest 41) 2,650 Shovel, 2-1/2 CY, Crawler (Northwest 80D) 2,645 Backhoe, 3/4 CY, Crawler (Insley HC 560) 1,920 Crane, Hydraulic, 11 Ton (Gal ion 110) 1,190 Crane, Hydraulic, 15 Ton (Pettibone 30) 1,415 Crane, Hydraulic, 5-1/4 Ton (Drott 85 RM2) 880 Backhoe/Lrdr, Wheel Tractor (MF-50) 825 Gradall, Crawler, 1 CY (Warner&Swasey G8000) 3,050 Trencher/Ladder Type, Crwlr (Parsons 310) 3,300 Trencher/Ladder Type, Crwlr (Davis 300) 685 Tractor, Crwlr, Dozer 385hp Tractor, Crwlr, Dozer 270hp (Caterpillar D9G) (Caterpillar D8H) 6,700 4,215 Tractor, Crwlr, Dozer 180hp (Caterpillar D7E) 3,010 Tractor, Crwlr, Dozer 125hp (Caterpillar D6C) 2,495 Tractor, Crwlr, Dozer 42hp Frt-End Lrdr, Crwlr, 1-3/4 CY (International TD-6) (Caterpillar 955K) 1,020 1,640 Frt-End Lrdr, Wheel, 1-3/4 CY Motor Scrpr Haul Unit, 30 CY (Caterpillar 950) (Caterpillar 631) 1,870 4,920 Motor Scrpr Haul Unit, 20 CY Grader, Self-Propelled (Caterpillar 621) (Caterpillar 12F) 2,755 1,515 Revised November 15, 1975 | Effective January 1, 1976 DESCRIPTION RENTAL RATES FOR CONSTRUCTOR-OWNED EQUIPMENT SIMILAR TO MONTHLY RATE Truck, Read Dump, 14 Cy (Euclid 91FD R22) $ N/A Ripper, Hydraulic, Multiple (Catepillar D9) 950 Disc, 30" Diameter (Rome TRH 24-2) 400 Compactor, Self-Propelled (Caterpillar 824B) 2,750 Compactor, Self-Propelled (Caterpillar DW20) 2,200 Vibratory Roller (Essick VR 72) 880 Pneumatic Roller, 30 Ton (Ingram 1154) 1,600 Water Pump, 6" (Marlow 6E4A) 360 Water Pump, 4" (Marlow 4C7) 280 Water Truck, 8000 Gal. (Caterpillar DW21) 3,170 Concrete Pump/Truck-Mounted (Challenge 60CY/HR) N/A Forklift, 10,000 Lb. (Hyster P80A) 600 Forklift, 6,000 Lb. (Hyster P60A) 515 Mortar Mixer 406 CF (Western 550) 100 Masonry Saw, 14" (Clipper BE143) no Hoist, Triple Drum, Diesel (Clyde) 660 Hoist, Single Drum/Air 2000# Lathe, Metal Shop, 20" (CP 2000) (L&S 2013 AVS) 135 N/A Lathe, Metal Shop, 16" (L&S M1610) N/A Lathe, Metal Shop, 12" (L&S 1408 AVS) N/A Lathe, Metal Shop, 10" Drill Press (L&S 46P) (Delta 70-1-401) N/A N/A Shaper, 12" (Sheldon 8000S) N/A Cut-Off Saw, Metal Hole Punch/Metal, Thru 1-1/8" (Stone 160) (Federal M44 OBI) 220 N/A Revised November 15, 197S Effective January 1, 1976 DESCRIPTION RENTAL RATES FOR CONSTRUCTOR-OWNED EQUIPMENT SIMILAR TO MONTHLY RATE Wood Saw, Radial, 7-1/2hp (Delta 33-763) $ 145 Table Saw, Wood, 10" (Delta 455) 95 Band Saw, Wood, 20" (Delta 350) 105 Rebar Bender, Electric (Alamo MOD-B) 550 Pipe & Bolt Thrdg Mach, 4" (Oster 784) w/Quad Head/Dies 575 Pipe & Bolt Thrdg Mach, 2" (Oster 545) w/Quad Head 150 Magnetic Drill, 3/4" to 1-1/4 (Thor U35) 125 Transit, Surveyor w/Tripod Level Surveyor w/Tripod Optical Level w/Tripod Jackhammer, Air, 50-65# (Zeiss TH43) (Zeiss 750020) (K&E 713015) (I-R J50A) , 100 50. N/A 75 Paving Breaker, Air, 50-70# Clay Spade, Air Rock Drill, Crawler Concrete Bucket, 1 CY Concrete Bucket, 2 CY Bucket, Drag, 3 CY Bucket, Drag, 1-1/2 CY Bucket, Drag, 3/4 CY Sp Paint Apparatus/Complete Sandblast Apparatus, Comp. Welder, Electric, 300 AMP Welder, Gasoline, 200 AMP Welder, Aircomatic Saw, Concrete Air Compressor, 600 Cfm (I-R PB6) (I-R 175) (CP G-900) (Cemtco 6B703) (Insley 694) (Manitowoc) (Hendrix) (McGinnis) (Binks 835408) (P&G 600 Lb) (Lincoln) (Lincoln) (Airco 3DVR-24B) (Clipper C-363M) (Chi. Pneumatic) 70 55 N/A 95 140 425 200 135 95 190 80 135 250 225 760 IWoV^) Revised November 15, 1975 | Effective January 1, 1976 . RENTAL RATES FOR CONSTRUCTOR-OWNED EQUIPMENT DESCRIPTION Air Compressor, 250 Cfm Air Compressor, 125 Cfm Tar Pot Tamper, Gasoline Tamper, Air Truck, Winch, 1-1/2 Ton Truck, Flatbed Dump,1-1/2 Ton Truck, Fuel/Grease, 1-1/2 Ton Truck, Pickup, 1/2 Ton Sedan, 4-Door, A Trans., A/C Station Wagon, Auto Trans. SIMILAR TO (Chi. Pneumatic) (Chi. Pneumatic) (CRC 165) (Barco) (CP 4 RV) (Ford) (Ford) (Ford) (Ford) (Ford Custom) (Ford) MONTHLY RATE $ 400 215 65 275 50 450 400 730 175 190 200 Union Carbide Corporat Contract No. 511-716440044-4 I ADDENDUM NO. 1 SCHEDULE IV PART C PIPING ISOMETRIC GRAPHICS PROGRAM PRICING SCHEDULE BROWN & ROOT, INC. Cost of using the Piping Isometric Graphics Program is based upon a per sheet basis. The cost for each Piping Isometric sheet generated on the plotter will be: $35.00. This cost is based on the standard Brown & Root, Inc. furnished supplies, materials and presentation format. Computer and/or Plotter runs where input data errors are diagnosed by the program will not be billed. This cost includes; keypunching, verifying, Computer and plotter time. The cost does not include preparation of the input data, checking of input data, checking piping isometrics and reproduction of plotter generated material. Preparation and checking of input data will be billed as Engineering costs in accordance with the terms of the Contract. Reproduction costs will be billed in accordance with the terms of the Contract. Costs for programming required Piping Service specifications into the Piping Isometric Graphics Program will be billed as Engineering costs in accordance with the terms of the Contract. In order to produce effective graphic presentation and minimize manual input and drafting efforts, each isometric sheet is restricted to a maximum of 120 input cards. A piping isometric sheet will normally require approximately 70 cards. Any additional cost not specified above but attributed to job requirements will be billed on a time and material basis in accordance with the Contract August 12, 1975 CLASSIFICATION EFFECTIVE OATE: November 30, 1975 BROWN & ROOT, INC. PETROLEUM AND CHEMICAL GROUP SALARY RANGES FOR FIELD NON-MANUAL PERSONNEL PER MONTH PROJECT MANAGER ASSISTANT PROJECT MANAGER GENERAL SUPERINTENDENT ASSISTANT GENERAL SUPERINTENDENT CRAFT SUPERINTENDENT PIPING SUPERINTENDENT PAINT SUPERINTENDENT EXCAVATION SUPERINTENDENT LABOR SUPERINTENDENT INSTRUMENT SUPERINTENDENT ELECTRICAL SUPERINTENDENT BUILDING SUPERINTENDENT MECHANICAL SUPERINTENDENT BOILER ERECTOR SUPERINTENDENT RIGGING SUPERINTENDENT INSULATION SUPERINTENDENT WELDING SUPERINTENDENT MASTER MECHANIC ASSISTANT CRAFT SUPERINTENDENT AREA COORDINATORS SUBCONTRACT COORDINATOR ADMINISTRATIVE MANAGER SENIOR CHIEF FIELD ENGINEER ASSISTANT CHIEF PROJECT FIELD ENGINEER CHIEF CONSTRUCTION INSPECTOR CONSTRUCTION INSPECTOR COST/SCHEDULE SUPERVISOR PROJECT CHIEF FIELD COST ENGINEER PROJECT CHIEF FIELD SCHEDULER SENIOR FIELD ENGINEER ASSISTANT FIELD ENGINEER SENIOR ENGINEERS - ALL CLASSIFICATIONS ENGINEERS - ALL CLASSIFICATIONS ENGINEERING DRAFTSMEN OFFICE MANAGER PERSONNEL MANAGER CHIEF ACCOUNTANT ACCOUNTANT BUYER INVOICE AUDITORS CHIEF TIMEKEEPER CHIEF WAREHOUSEMAN SAFETY SUPERVISOR SAFETY INSPECTOR MEDIC CLERICAL - ADMINISTRATIVE SECRETARIAL STENOGRAPHIC KEYTAPE OPERATOR WAREHOUSEMAN $2200 - 3500 2100 - 3000 1800 - 2800 1700 - 2600 1600 - 2500 1500 - 2100 1400 - 2000 1300 - 1900 1600 - 2500 1800 - 2800 1600 - 2300 1400 - 2000 1300 - 1900 1600 - 2300 1500 - 2100 1500 - 2100 1600 - 2200 1500 - 2000 1500 - 2100 1200 - 1900 $4.50 - 8.75 p/hr 1500 - 2100 1250 - 1750 1250 - 1750 1000 - 1400 1350 - 1850 $5.00 - 6.55 p/hr 1250 - 1750 1300 - 2000 1000 - 1700 800 - 1400 $4.75 - 8.10 p/hr $4.00 - 6.55 p/hr $3-50 - 6.50 p/hr $4.00 - 6.15 p/hr $4.50 - 8.10 p/hr Rates subject to periodic review and adjustment UNION CARBIDE (\^ SCHEDULE II FART B BROWN & ROOT, INC. PROCUREMENT DEPARTMENT JOB CLASSIFICATIONS AND SALARY SCHEDULES Rev. April 4, 1975 BROUN & ROOT, INC. PURCHASING DEPARTMENT SALARY RANGES CLASSIFICATION Purchasing Manager Purchasing Supervisor Senior Buyer Buyer Traffic Manager Traffic Supervisor Traffic Coordinator Expediting Manager Expediting Supervisor Senior Home Office Expeditor Hone Office Expeditor Subcontracts Manager Subcontracts Supervisor Senior Subcontracts Administrator Subcontracts Administrator Administrative Supervisor Purchase Order Typist Clerk Typist B Clerk Typist A Secretary B Secretary A PER MONTH $1750 - 2700 1375 - 2225 1200 - 1950 950 - 1600 1600 - 2400 1200 - 1750 1100 - 1750 1600 - 2400 1200 - 1750 1100 - 1750 900 - 1600 1750 - 2700 1375 - 2225 1200 - 1950 950 - 1600 1250 - 1600 600 - 800 525 - 650 550 - 800 500 - 750 600 - 850 February, 1976*- , BROWN * ROOT, INC. PETROLEUM ANO CHEMICAL GROUP SALARY RANGES FOR PROJECT GENERAL MANAGEMENT PERSONNEL CLASSIFICATION PROJECT GENERAL MANAGER ASSISTANT PROJECT GENERAL MANAGER PROJECT CONTROL MANAGER ASSISTANT PROJECT CONTROL MANAGER PROJECT ADMINISTRATOR PROJECT ACCOUNTANTS/AUOITORS PROJECT PROCUREMENT COORDINATION MANAGER PROJECT PROCUREMENT - ALL CLASSIFICATIONS COST COORDINATOR SCHEDULE COORDINATOR LOGISTICS COORDINATOR PROJECT SCHEDULERS PROJECT COST ENGINEERS - ALL CLASSIFICATIONS ENGINEERING COORDINATORS STAFF SPECIALISTS PROJECT ESTIMATORS SECRETARIAL CLERICAL - ADMINISTRATIVE CLERICAL - TECHNICAL DRAFTING - ALL CLASSIFICATIONS PER MONTH $2400 - 3600 2200 - 3300 2000 - 2700 1800 - 21*00 1800 - 2700 1100 - 2L00 1600 - 2500 1100 - 2500 1800 - 2700 1800 - 2700 1500 - 2500 1100 - 21*00 1100 - 2700 T500 - 2400 1050 - 2500 1100 - 2600 $3.50 - 6.50 p/hr $3.00 - 6.55 p/hr $4.00 - 8.50 p/hr $4.50 - 8.75 p/hr Rates subject to periodic review and adjustment February, 1976 ^q!\\ SCHEDULE II, PART A BROWN 4 ROOT, INC. PETROLEUM AND CHEMICAL GROUP SALARY RANGES FOR PROJECT GENERAL MANAGEMENT PERSONNEL CLASSIFICATION PROJECT GENERAL MANAGER ASSISTANT PROJECT GENERAL MANAGER PROJECT CONTROL MANAGER ASSISTANT PROJECT CONTROL MANAGER PROJECT ADMINISTRATOR PROJECT ACCOUNTANTS/AUDITORS PROJECT PROCUREMENT COORDINATION MANAGER PROJECT PROCUREMENT - ALL CLASSIFICATIONS ' COST COORDINATOR SCHEDULE COORDINATOR LOGISTICS COORDINATOR PROJECT SCHEDULERS PROJECT COST ENGINEERS - ALL CLASSIFICATIONS ENGINEERING COORDINATORS STAFF SPECIALISTS PROJECT ESTIMATORS SECRETARIAL CLERICAL - ADMINISTRATIVE CLERICAL - TECHNICAL DRAFTING - ALL CLASSIFICATIONS PER MONTH $2400 - 3600 2200 - 3300 2000 2700 1800 - 2400 1800 - 2700 1100 - 2400 1600 - 2500 1100 - 2500 1800 - 2700 1800 - 2700 1500 - 2500 1100 - 2400 1100 - 2700 1500 - 2400 1050 - 2500 1100 - 2600 $3.50 - 6.50 P/hr $3.00 - 6.55 p/hr $4.00 - 8.50 P/hr $4.50 - 8.75 P/hr Rates subject to periodic review and adjustment. DATE: October 8. 1975 BROWN & ROOT, INC. COMPANY OWNEO PLANES ALL COSTS ARE BASED ON ACTUAL FLYING TIME Plane Gulfstream 770G Passengers 11 + 1 in jump seat Speed 275 Range 2,500 Landing 4,000' hard surf Costs $450/hr Saberliner 73G 6 450 1,500 4,500' $500/hr hard surf Hawker Siddeley 873G Dehavilland 125 7 400 ,1,500 4,500' hard surf $500/hr Fairchild 172C 16 250 2,000 4,500' $435/hr hard surf or turf Cessna Citation 192G 6 340 1,000 4,000' $305/hr hard surf or turf Merlin 193G 6 240 1,000 3,500' $225/hr hard surf or turf Rates subject to periodic review and adjustment.