Document Dv8ErREvBV58O8315DbgJDeDN
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
JUN 2 5 2019
CLEAN AIR ACT INSPECTION REPORT Scientific Protein Laboratories LLC (SPL ), Waunakee, Wisconsin
Albana Bega, Environmental Engineer AECAB (MI/WI)
Sarah Marshall, Section Chief AECAB (Ml/WI)
File
BASIC INFORMATION
Facility Name: Scientific Protein Laboratories LLC (SPL)
Facility Location: 700 E Main Street, Waunakee. Wisconsin
Date oflnspection: May 3, 2019
EPA Inspector(s): 1. Albana Bega, Environmental Engineer 2. Alexandra Letuchy, Environmental Engineer
Other Attendees 1. Bruce A. Greer, P.E., Manager - Environmental Health and Safety, SPL 2. Kevin R. Tebrinke, P.E., Vice President, Engineering, Maintenance & Health and Safety, SPL
Contact Email Address: greerb@splpharma.com
Purpose of Inspection: CAA compliance
Facility Type: bulk pharmaceutical ingredient manufacturing
Regulations Central to Inspection: Synthetic Minor, Non-Part 70 Operation Pem1it
Arrival Time: 09:30 Departure Time: 13:00
Inspection Type: IZI Unannounced Inspection
D Announced Inspection
OPENING CONFERENCE
IZI Credentials Presented IZI CBI warning to facility provided
The following information was obtained verbally from Mr. Greer and Mr. Tebrinke unless otherwise noted.
Company Ownership: In 2014 SPL was acquired by the Chinese company Shenzhen Hepalink Pharmaceutical Co., Ltd. Process Description: SPL is a bulk product biophannaceutical manufacturing company of active pharmaceutical ingredients. It is a global supplier of Heparin and Pancreatin enzymes. SPL claimed its process information as confidential business information.
TOUR INFORMATION
EPA toured the facility: Yes
The facility was operating nonnally at the time of inspection.
Data Collected and Observations: The following were observed during the tour: Raw material warehouse Heparin line Tank farm
Photos and/or Videos: were not taken during the inspection. Field Measurements: were not taken during this inspection.
RECORDS REVIEW
Heparin Process Line P05 - Figure No. 4 Pancreatin Line 2 - Figure No. 5 Milling P25 - Figure No. 7
CLOSING CONFERENCE
SIGNATURES
Report Author:
A>1.__.,-r
Date: 6 / )._ r-( l,f
Section Chief: ~ Date/, /J.!S);f
t I
Page 2 of 2