BERRY CONTRACTING, INC.
Industrial Constructors
p. O. BOX 4858
1414 CORN PRODUCTS ROAD
CORPUS CHRISTI, TEXAS 78408 AC 5IJ 884-0073
October 31, 1972
Coastal States Petrochemical Company P. 0. Drawer 521 Corpus Christi, Texas 78403
Attention: Mr. R. J. Adams
Gentlemen:
Due to increases for Pipefitters since May 14, 1971, we wish to advise an increase in your cost for force account work done by Berry Fabricators in our shop. The following rates are now in effect for pipework:
For pipe work by pipefitters Foi^overtime (3>time and one-half, add $3.75/M.H. For overtime ^double time, add $7.50/M.H.
$11.50/M.H.
The above rates are your total cost for each manhour worked, and
include all costs for equipment, building and facilities, utilities,
tools, taxes and insurance, oxygen and acetylene, carbon steel weld
rod, overhead and profit. Your total cost for shop work performed
would simply be the actual applicable manhours worked times the
rates quoted above.
*
We trust the above proposal is attractive to you, and look forward to working with you on any shop fabrication needs.
Yours very truly.
BERRY CONTRACTING, INC.
RWR/jh
R. W. Black
CED0006205
Bfc.iRY CONTRACTING, IN_
Industrial Constructors p. O. SOX 48S8 1414 CORN PRODUCTS ROAD CORPUS CHRIST!, TEXAS 7B408 AC SI I 184-037]
October 31, 1972
Coastal States Petrochemical Company P. 0. Drawer 521 Corpus Christi, Texas 78403
Attention: Hr. R. J. Adams
Gentlemen:
Due to increases for Pipefitters since Hay 14, 1971, we wish to advise an increase in your cost for force account work done by Berry Fabricators in our shop. The following rates are now in effect for pipework:
For pipe work by pipefitters For overtime (2time and one-half, add $3.75/M.H. For overtime @doub!e time, add $7.50/M.H.
$11.50/M.H.
The above rates are your total cost for each manhour worked, and Include all costs for equipment, building and facilities, utilities, tools, taxes and insurance, oxygen and acetylene, carbon steel weld rod, overhead and profit. Your total cost for shop work performed would simply be the actual applicable manhours worked times the rates quoted above.
We trust the above proposal is attractive to you, and look forward to working with you on any shop fabrication needs.
Yours very truly,
BERRY CONTRACTING, INC.
RWB/jh
R. W. Black