ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
**-K
MONTH OF:
February, 1983
DATE OF REPORT: March 15, 1983
c: JF, CRM, PEM, PJK, RDJ, WFH, CRS f RAF, RAM, AHS T. G. Grumbles - Houston, L. A. Legendre- Ponca City
ALL SAMPLE RESULTS:
Chemical
VCM Lead
< PEL No.
80 89.9 10 100
> PEL OVEREXPOSURES No. %
9 10.1 00
Total Particulates OVEREXPOSURES: Job Class General Mechanic
General Mechanic
General Mechanic
General Mechanic Yard Supervisor
Dryer Utility
4 100 Exposure 2.7* ppm, VCM
6.0*, ppm, VCM
6.3*, ppm, VCM 11.6*, ppm, VCM
1.2*, ppm, VCM
1.4 ppm, VCM
00
Source
Employee blanked out D-700 reactor in preparation for cleaning and an agitator blade change.
Employee blanked out lines in preparation for installing a recovery compressor in the old unit.-
Employee removed a relief valve from a compressor in the VCM compressor shed.
Employee replaced a compressor in the new unit recovery area.
Employee checked VCM exposure levels resulting from a leaking compressor in the VCM compressor shed.
Employee worked as a fire watch in the old unit. Several flange leaks occurred during the time.
ABDOO136663
OVEREXPOSURES- (Continued)
Job Class Chief Operator
Exposure 1.8 ppm, VCM
Yard Operator Chief Operator
2.0* ppm, VCM 3.9* ppm, VCM
*Respiratory protection worn.
Source
Employee walked through the old unit dump Sweco area while a coarse batch was being dumped.
Employee worked on leaks in the VCM comDressor shed.
Employee cleaned and blanked 708 tank (emission recovery) in preparation for maintenance.