On Decenber 10, 1976, a meeting to discuss the draft permit recently sent to General Electric was held in this office with the following:
M. Phillips R. Lester B. R. Williams
0. C. Woods W. M. Jernigan T. M. Miller
General Electric
General Electric General Electric Georgia EPD Georgia EPD Georgia EPD
G, E. was concerned over the requirement for daily PCB analyses. It
was confirmed that daily means seven days a week even though they normally operate at full capacity only five days a week. The seven could be changed to five if the results shew no irratic.results on the weekends with the reduced plant operations.
They presented the following comments on each discharge:
Discharge 002
The min contamination is probably from personnel tracking it in the plant. All manufacturing wastewater will te diverted to the spray pond by January 31, 1977. After this they estimate the PCB concentration will be 10 ppb average for .any wet weather runoff.
Discharge 004
lhe storm sewer piping between the oil house and the boiler loom and eventually to the spray pond will, be repiped to overhead to eliminate any possible infiltration in the oil house area. A septic tank will be used os the pump sump. Over the Christmas shutdown the spray pond will be cleaned. After the above is acconplishcd, they estimate the average I'd! concentration will bo 8 ppb and 10 r.-pb during dry wathor and :;Lor..i ru-.off cor.:'i Li. r.:;.
HONS 030539
Nemo to U?-U from 'J'l'll Re: General Elce' c, Roms Pago 2 December 29, 1976
Discharge 003
Any areas adjacent to waste pyranol tank and sound lab found to be con taminated will be pavod to prevent leaching. A shed will be built over the drum storage area. The welding gun cooling water will bo diverted to the sanitary sewer to eliminate any dry weather flow. The above will be convicted by February 28, 1977. After February 28, they estimate the average PCB conccntration in the runoff will be 20 ppb.
Discharge 001
Soil borings were taken throughout the adjacent 15 acres at varying depths up to a maximum of five feet. It will take until March 31, 1977, to interpret soil sampling data.
Samtary Discharge
The pipe from the oil house will be blocked and repiped overhead to prevent any infiltration. All clothing of workers in PCB containing areas will be covered by aprons and rain suits. The aprons and rain suits will be disposed of as a solid waste when soiled. Employees working with PCB will be required to clean their hands with waterless cleaner and wiped on rags, which are dis posed of as solid waste.
Occasionally a transformer is overfilled with pyranol in the main plant. The spillage is collected but the outside has been washed into the sanitary sewer. In the future the transformer will be plaoed over a drip pan. The spill will be washed off with solvent into the drip pan. The drip pan will be cleaned with fuller's earth and rags.
They estimate the concentration of PCB in the sanitary sewer outfall after July 1, 1977 will be 15 ppb. Present plans for composite sampling of the sanitary sewer is for time proportioned collection until April 1, 1977, when a flow proportioned sample will be collected along with a flow reading.
Other comments on the draft permit were as follows:
P.10,B. Other Conditions, S3 - They would like to change the report on July 1, 1977, to a status report and the first annual report on technology to be due December .1, 1977.
P.10,B. Other Conditions, i!4 - The equipment for treasuring intensity and time for rainfall will not be delivered until April. In the interim the total daily rainfall will bo measured.
P.11,C. Schedule of Compliance, Sl,o. They do not feel this can be attained by July 1, 1977 for 001, 003 and 004.
P.ll.C. Schedule' of Compliance, ifl,i. Clarification of wlvil this right recjui.ro vat: requested an 1 discussed.
M0NS 030540
M.'Jio to Vu-U from '.""d Res General Elec, .c, !* I'ago 3 December 20, 1976
G. E. requested at least an ndd.1tional 30 clays tor submitting nnnitoring reports for a total, of 45 from end of reporting period. A 15 day extension was indicated as being the maximum we could allow.
The appeal process was explained. TMM:bk ' cc: City of Rome file