Document Dg2XJwjME1D5RVKqmN308qoa

ait to: 3. Box 2697^ Paso, Texas 79926 PLAINTIFF'S EXHIBIT c INDUSTRIAL CONTRACTORS AND RIGGERS, INC. 7155 Industrial Avenue P.O.Box 1611 (915)779-3931 El Paso, Texas 7S948 June 3, 1977 H, H. Robertson Aabridge Division 14th Street Aabridge, Penn. 15003 Gentlemen: Enclosed, find one copy each of the following listed drawings: *EG6 - North Wall Elevation (H. H. Robertson} 5 53 - Hopper Enclosure - North Wall (SWIC 6 R) #EG8 - West Wall - Half Elevation (H. H. Robertson) SEG9 - West Wall - Half Elevation (H. II, Robertson) Drawings No. EG6, No. EG8, and EG9 are approved with changes shown. Drawing No. 5a is Southwestern Industrial Contractors & Riggers, Inc. erection drawing fcc^Kopper Enclosure on north end of building, supplied for your information in preparing siding sheets. Siding for Hopper Enclosure will be 24 Gage Galbestos to match siding at Converter Building. Note that roof of Hopper Enclosure i3 on "Hold", pending design of mech anically operated roof section to allow hopper charging from exterior of Converter Building. Detail for bent flashing and closures will follow shortly. Very truly yours, KEW/js Enclosures - as stated H. E, Wickes Project Manager RDberfcon June 10, 1977 Southwestern Industrial Contractors and.Riggers, Inc. P.0. Eox 26976' 21 Paso, TX 79926 Attention: Mr. H. Wilkes S ub J ect: ASARCO Smelting Works El Paso, TX W.O. 75775-G ,, Your P.0. 6IO-365 Gentlemen: We have received our drawings EG-6-8, and 9 but have not received drawings EG-1, 1A, 5> 7> 10, and 11. Without these drawings, we cannot complete our detailing nor prepare shop fabrication bills of material. As soon as the above drawings are returned, we will give you. our best shipping date which in all probability will be five weeks after receipt of drawings. Very truly your3, H. H. R&BERTSON COMPANY /A/'Blishak, Ass.'t Manager ' Production Control Department dir H. H. Rcberrscn Cc"*.cany A--b'icc* Oi/Vcn !4*h S*rttt A--b'ic-s. Pe-ns, /cr.10 15003 4*. 2-266^040 > INDUSTRIAL CONTRACTORS AND RIGGERS, INC. 7155 Industrial Avenue P. 0. Box 1611 (915) 779-3931 El Paso. Texas 79948 / miUt: June 139 1977 H. H. Robertson Anbridge Division 14th Street Anbridge, .PA 15003 . .; V; ;. ' J ; ATTNr Mr. D. L. Honey ' ;` Gentleness Enclosed, find H. H. Robertson drawings No. EG5 and NCe. G7,, These drawings are approved as noted. .............................. Hold flashing and closure for areas or sections not verified. Flashing and closure details to follow. Very truly yours, EZV/ja Enclosures-as stated Project Manager .* .* *.r INDUSTRIAL CONTRACTORS AND RIGGERS, INC. 7155 Industrial Avenue P.O.Box 1611 (915) 779-3931 El Paso, Texas 79948 ---June 17, 1977 H. H. Robertson Anbridge Division 14th Street Airbridge, PA 15003' ATTN: Mr. Benton Early Manager of Engineering RE: Your W.O. 75775 Our P.O. SEP 610-365 ASARCO - El Paso Smelting Works Gentlemen: Enclosed are the remainder of H. H. Robertsons' sheeting drawings; #EG1 SEG1A #EG10 SEGll - Sections, Flashing - Sections, Flashing - Half Elev. - East - Half Elev. - East - Information to follow; 1. Sheeting details underneath tuyere punching platforms. 2. Sheeting details @ tuyere enclosures and set back enclosure between line #6 and 7. 3. Additional closure and flashing (In addition to that shown on SEG1 and EGLA) 4. No. of stock size sheets to order for special details. Items #1 and 2 will be received within 5 days.. Items #3 and #4 will be received within 7 days. Very truly yours. HEW/js Enclosures - as stated Project Manager