Document De1mLaOOyXYwJmkMN54xg0b4

DECEIVED SEP 8 1969 UCC CALIDRIA KING CITY. CA. TECHNICAL SERVICE REPORT THE EVALUATION OF ASBESTOS T-135 AS A PARTIAL --heflkcement poR' TmNiuM"Dmn5"nr a-- pA^e^ma^I^g furnisW for Weyerhaeuser Corporation Plalnwell, Michigan August B, l^b9 by G. L. Dickson Group Manager - W. L. Carrick Project No. H52-M33 August 29, 1969 A 1 725 1 UNION CARBIDE CORPORATION Chemicals & Plastics Research and Development Department Niagara Falls, New York 1^302 SUBJECT This report covers the results of the paper machine evaluation of Union Carbide's Asbestos T-135 on Weyerhaeuser's (P)ainwell, Michigan) Number 2 machine, August 8, 1969. The purpose of this trial was to illustrate the effectiveness of T-135 as a partial replacement for titanium dioxide in a normal papermaking furnish, and to show the resulting economies from such a substitution. TRIAL RESULTS This trial demonstrated the ability of Asbestos T-135 to partially replace titanium dioxide in a high opaque offset paper furnish. Dur ing this trial, 20 pounds of T-135 were substituted for 25 pounds of titanium dioxide (per 1350 lb. of furnish), resulting in a savings of approximately $2.70 per beater, or $4.00 per ton of furnish. No operational problems developed during the time Asbestos T-135 was in the system, and product quality equaled that of the pre-trial period. As no attempt was made to determine the optimum replacement level of T-135 for titanium dioxide in this system, it is felt that the poten tial money savings may be considerably greater than what was reflected by the present work. Guidelines governing the maximum degree of replacement can usually be established after a moderate amount of experience has been gained with T-135. DISCUSSION The evaluation of our material was performed during the produc tion run of a 50-lb. white opaque offset paper. Previous to the addition of Asbestos T-135 to the system, their normal furnish was utilized. (Refer to Table I and the Mill Trial Data Sheets for com plete furnish and operating information.) Because of a problem involving lower than usual wax pick tests, the trial was delayed until furnish changes were made to overcome this condition. Twenty pounds of opened T-135 (1/2 bag) were added to each beater in place of 25 lb. of titanium dioxide (1/2 bag). Based on a beater capacity of 1350 lb. of furnish, this represents an addition level of 1--1/2% T-135. No other furnish changes were made during the subsequent trial except minor ones which were considered in line with normal production varia tions. Wet end and reel samples were obtained during both the pre trial control period and trial proper. These samples were subsequently analyzed at Union Carbide's facilities in Niagara Falls, the results being presented in Tables II-IIC, Calculated retention values, based on these analytical data, are reported in Table III-IIIB. For con venience Table IV contains a summary of Weyerhaeuser's quality control report during these times. A 17 252 CONCLUSIONS This trial showed that Asbestos T-135 can be utilized success fully as a partial replacement for titanium dioxide in this mill's . normal furnish. The only precaution observed during this trial was to introduce the T-135 to the furnish after the rosin size had been precipitated by alum. Product quality remained virtually unchanged during the trial period. Opacity was 0.6 points lower (94.8-94.2) but was counterbalanced by a similar increase in sheet brightness (81.9-82.5). This resulted in spite of a substantial drop in ash content, from 18.3% to 15.8J. The lower ash level was the result of less pigment being added to the system in the form of broke as pigment retention was improved slightly during the trial. (Refer Table III) This was especially true of asbestos which was retained better than the other mineral materials present. With additional experience it is felt that even more significant furnish savings should result from the optimum use of Asbestos T-135 on this mill's three paper machines. The present savings of $4.00 per ton of furnish was computed as follows: (1) Titanium dioxide savings 25 lb. 6 22<fc/lb $ 5.50 (2) Asbestos T-135 costs 20 lb. l4*/lb $ 2.80 (3) Net Savings Per 1,350-lb. beater Per 2,000 lb. of furnish $ 2.70 $ 4.00 G.L. Dlckson/bsn -2- A 17 25 3 T-135 25 lb . tita n iu m d io xid e . . lb or f 20 d te m achine. su b stitu 01 u 4-> m oo Eo 3 CE or O CO rH 43 OV 33 o cr ou cd a a. o 3 05 .* -3 OC h3 CQ O Ch VO in o rH fo inn t igso hm .e r y fro m fu r - o lo w e r a s h u uo bO u C 0) rH ec rH rH a) 43 TJ C 0) O on H uc V (h 43 3 <0 H 3 in CO 0) *--1 OC Eh1 TJ 43 0) 43 U CO 0) C TJ rH fci EO rH rH C 43 0) <H C 0) > 43 a c HH O oco o o h a> K> OO V rH H f. o o a cd e 43 E 43 o E-H a rH t-l 3 a> 43 V u0*0^ <0 o *4 O C 43 CO CJ o cO 3 U O rH 43 h V o. rH 3 >> >> 43 c 43 *3 43 43 as (.H K t. rH rH rH 3 CO rH O O rH 43 *3 * *4 V cc0 CO as rH cca 3 %h 05 0> O *4 O O' rH CO > rH u u43 0) O 43 *3 43 43 rH fc. rH o 3 0) as o o a 3 *3 3 3 rH C E CO rH rH *3 *3 < Cd 05 CO t. Eh C o a rH cu 3 V. rH as rH fci 43 u3 CO 3 C as 43 to VO in VO in CVJ rH CVJ rH CVJ CVJ CVJ rH rH rH o o OV OV OV OV OV rH rH pu bo *n3 O-Hf c3 to fc Oou ao 00 CVJ 05 r-v om jBj fiOn TC3 OH 3 Io 05 Eh Cl. < v-/ m cvra oH c 3 Eh O a. o o CO CO CO CO CVJ CVJ CVJ on a- CVJ cn 4T CVJ CVJ CVJ cn cn cn 3T 3T a' O CM O OOJ oo CO o in o in o o in o in c-- FURNISH SCHEDULE >to 035 rH O oc o o o o ooo E CO 3 Eg a A 1 7254 gg 43 05 43 O 05 rH o cn in cn o CVJ in in in rH cn in 3 3 bC bC o o cn in VO VO VO 3 3 rH rH TABLE II Stuff Box Analyses August 8, 1969 Reel No. Reel Time t* Aah TiO? Pre-trial Control Period 144 11:30 AM 145 12:20 PM 146 1:00 PM 147 1:40 PM 148 2:50 PM 149 3:30 PM 150 4:10 PM 151 4:45 IW 152 5:40 PM 153 6:20 PM Average 23.60 24.45 24.75 24.20 24.17 24.90 22.18 20.24 20.63 21.69 23.08 11.59 11.55 11.52 10.86 11.05 10.82 8.67 7.90 8.39 8.91 10.13 Transitional Period 154 6:50 PM 155 7:35 PM Average 20.61 20.44 20.52 8.81 8.11 8.46 Asbestos T-135 Trial 156 8:30 PM 157 9:15 PM 158 9:50 m 159 10:30 PM 160 11:05 PM Average 19.18 I8.98 18.82 18.86 19.09 18.99 7.19 7.07 7.18 7.02 7.69 7.23 $ AsbestoB T-135 0 0 0 0 0 0 0 0 0 0 0 0.68 1.11 0.90 1.42 1.54 1.54 1.54 1.54 1.52 A 1725b Reel No. Reel Time 144 11:30 AM 145 12:20 PM 146 1:00 PM 147 1:40 PM 148 2:50 PM 149 3:30 PM 150 4:10 PM 151 4:45 PM 152 5:40 PM 153 6:20 PM Average 154 6:50 PM 155 7:35 IM Average 156 8:30 PM 157 9:15 PM 158 9:50 PM 159 10:30 IM 160 11:05 PM Average TABLE IIA Headbox Analyses August ti, 1969 ' % %* Consistency Ash Ti0o Pre-trial Control Period 0.959 1.185 O.996 0.976 0.963 0.958 0.937 0.872 0.920 0.952 0.972 32.68 34.43 34.18 33.07 33.58 3^.77 31.85 28.37 28.33 30.16 32.14 15.91 16.74 16.83 15.46 15.76 15.91 12.45 10.85 11.65 12.50 14.41 Transitional Period 0.912 0.866 0.889 28.17 27.57 27.87 Asbestos T-135 Trial 0.806 0.832 0.816 0.840 0.821 0.823 26.09 25.60 24.86 24.92 25.35 25.36 11.61 10.34 10.98 9.64 9.47 9.79 8.35 9.60 9.37 $ Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 0.74 1.35 1.04 1.60 1.79 1.66 1.79 1.85 1.74 ^17 256 Beel No. Reel Time 144 11:30 AM 145 12:20 PM 146 1:00 IM 147 1:40 IM 148 2:50 PM 149 3:30 PM 150 4:10 PM 151 4:45 IM 152 5:40 PM 153 6:20 PM Average 154 6:50 PM 155 7:35 PM Average 156 8:30 PM 157 9:15 IM 158 9:50 PM 159 10:30 PM 160 11:05 IM Average TABLE UB Tray Water Analyses August 8, 1969 * ** Consistency Ash TiOp Pre-trial Control Period 0.314 0.363 0.346 0.332 0.30^ 0.373 0.370 0.276 0.229 0.313 0.322 55.62 56.16 57.21 56.99 56.86 56.17 53.39 52.51 54.22 51.98 55.11 Transitional Period 26.63 28.19 27.50 28.31 27.90 25.20 21.36 20.91 23.07 22.41 25.15 0.262 0.252 0.257 51.88 51.03 51.46 Asbestos T-135 Trial 0.215 0.217 0.224 0.277 0.264 0.239 50.30 49.92 46.30 46.78 47.13 48.08 21.95 19.72 20.84 19.00 19.64 15.41 17.15 16.74 17.59 $ Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 1.11 2.40 1.76 3.14 3.33 3.02 3.20 3.26 3.19 A 17 257 TABLE IIC Reel Samples Analyses August 8, 1969 Reel No. Reel Time ** Ash Ti0o Pre--trial Control Period 144 11:30 AM 145 12:20 PM 146 1:00 pm 147 1:40 PM 148 2:50 PM 149 3:30 PM 150 4:10 PM 151 4:45 IM 152 5:40 PM 153 6:20 IM Average 19.36 i9.ll 19.86 19.89 18.90 19.79 17.77 16.88 16.34 17.34 18.52 8.05 8.62 8.67 8.51 7.44 7.62 6.43 5.96 5.98 6.87 7.42 Transitional Period 154 6:50 PM 155 7:35 PM Average 17.13 16.52 16.82 6.36 6.18 6.27 Asbestos T-135 Trial 156 8:35 PM 157 9:15 PM 158 9:50 PM 159 10:30 PM l6o 11:05 PM Average No Sample 15.72 5.45 15.82 5.41 15.67 5.29 No Sample 15.74 5.38 $ Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 0.43 0.92 0.68 1.29 1.36 1.42 1.36 A 17258 TABLE III Over-all Filler Retention (Reel/Stuff Box x 100) Reel 7. 7. No. Reel Time Ash TiOo Pre-trial Control 144 145 146 147 148 149 150 151 152 153 Average 11:30 a .m. 12:20 p.m. 1:00 p .m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 p.m. 4:45 p Q1 5:40 p.m. 6:20 p.m. 82.0 78.2 80.2 82.2 78.2 79.5 80.1 83.4 79.2 79.9 80.2 69.5 74.6 75.3 78.4 67.3 70.4 74.2 75-4 71.3 77-1 73.2 7o Asbestos T-135 - - - - - 154 155 Average Transitional Period 6:50 p.m. 7:35 p.m. 83.1 80.8 82.0 72.2 76.2 74.1 63.2 82.9 75.6 Asbestos T-135 Trial 156 157 158 159 160 Average 8:30 p.m. 9:15 p.m. 9:50 p.m. 10:30 p.m. 11:05 p.m. No Reel Sample 82.8 77.1 84.1 75.3 83.1 75.4 No Reel Sample 82.9 74.4 90.8 88.3 92.2 89.5 A 17259 TABLE III-A One-Pass Filler Retention (Reel/Headbox) x 100 Reel 7. 7. 7. Asbei No. Reel Time Ash TiO? t-i: Pre- trial Control Period 144 145 146 147 148 149 150 151 152 153 Average 11:30 a.m. 12:20 p.m. 1:00 p.m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 p.m. 4:45 p.m. 5:40 p.m. 6:20 p.m. 59.2 55.5 58.1 60.1 56.3 56.9 55.8 59.5 57.7 57.5 57.6 50.6 51.5 51.5 55.0 47.2 47.9 51.6 54.9 51.3 55.0 51.5 _ - - Transitional Period 154 155 Average 6:50 p.m. 7:35 p.m. 60.8 59.9 60.4 54.8 59.8 57.1 58.1 68.1 65.4 Asbestos T-135 Trial 156 157 158 159 160 Average 8:30 p.m. 9:15 p.m. 9:50 p.m. 10:30 p.m. 11:05 p.m. No Reel Sample 61.4 57.6 63.6 55.3 62.9 63.4 No Reel Sample 62.1 57.4 72.1 81.9 79.3 78.2 A1726C TABLE III-B Wire Retention 1 ~ <c Tray water/0 Headbox) x 100 Reel Total 7. 7. No. Reel Time Solids Ash Ti0,, Pre-trial Control Period 144 145 146 147 148 149 150 151 152 153 Average 11:30 a.m. 12:20 p.m. 1:00 p.m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 p.m. 4:45 p.m. 5:40 p.m. 6:20 p.m. 67.2 69.4 65.3 66.0 68.4 61,1 60.5 68.4 75.1 67.1 64.9 44.3 50.0 41.9 41.4 46.6 37.1 33.8 41.4 52.4 43.3 43.2 45.2 48.4 43.2 37.7 44.1 38.3 32.3 39.0 50.7 41.1 42.2 7e Asbestos T-135 - Transitional Period 154 155 Average 6:50 p.m. 7:35 p.m. 71.3 70.9 71.1 47.1 46.1 46.6 45.7 44.5 45.1 56.9 48.3 51.1 Asbestos T-135 Trial 156 8:30 p. m. 157 9:15 p.m. 158 9:50 p.m. 159 10:30 p .m. 160 11:05 p.m. Average 73.3 73.9 72.6 67.0 67.8 71.0 48.6 49.2 48.9 38.1 40.2 45.0 47.4 45.9 56.8 32.3 43.9 45.5 47.7 51.5 50.1 41.1 43.3 46.8 A 17 26 1 726 QUALITY CONTROL DATA August tt, 19b9 ft It 5 II It It ft It Jbi C C 0) M ft* - cm 1 rH 2 ino cm o o m oo fna - m m a ma rH 22 oo in in CM CM oo m -o CM rH o m rH 1 U n bO to H 0) ft c CQ iH -H iH CO 1 X. CO <c 1 CO iH 1 VO <H Jsi X CJ <0 *H S ft* m rH >> 4-> rH H o +i cd a in o o\ u a) CM a H +1 iH cd rH o to ^H C fc. E 3 rH rH a> > 0) 3 CT Cd a o > ft 0) E o bC -P Co s J o in ooo o o o o o\ 1 1 1 l * . rH CM CM CM CM CM CM rH ooooao co co co coco otnoooinooooocn mooao ovovs \covo vo t--co (MHHHHHrHHHHHH a o TJ *H O ft HHNHHCMPOfiVnncnCM ^H 0) rlHHHHHHHHHHH ft* t* V ft* rH cd c H o t* inininoinoinoino inco H E-i 1 ininininininaa m-a-.a-.a- H V OVCVOvOVOVO\OVOVO\CTvO\CCv CO ft c ft* cd t* E-i m c- mo osmoNssc^ (MCMCMOCMCMHHOCMCMH a-a-a-a-a-a-a-a-a-a-a-a- oo CM CM COCO OOO vo vo VO HrlH mm m HHH in o cm O' JO CV ON CT\ mr- m a cm m rr jo o o in o c 1 1 | CM cm cm mn CO co co oo cc OOO o in c .1*1 vo in invo in r-~ iH rH rH rH rH r-- cd ft * ma m m i mrir rH rH rH rH rH rH r- m rH 1 EH n ooo in in o o c O -p .5T JH" -3" jo m.=r vo lt CO ON ON ON ON On CN On O a> CO < t-- mo O O O m pr O CM CM mm mcM cv jtjj* ^^5: o m H bC CO -H J 0) 03 3: o in cm m cm o co o in co nsos OOHO\OOCOCONOOC\ in in ina- inina-a-a- inina- cm moo r-l co ov in-o c~cooo in co oo c-- ir C-CO o rH OV OO O C a a in in a a \n it rH <L) a> -h c: E-* HI CdD) O!l az zl CJ 0) a CO s E= = = = = = = = cd a oooo ooooinoo inmcMOa inrona-a cm o> O hcmh iH cm ma- a- invo cd H rlrl ft 0> > < a- a- invo t-co ovo >h cm m a-a-a-a- a a a in in in in rH rH rH rH rH rH rH rH rH rH rH E= a o in in m 0) vo r-- id ft 0) > < a in in in rH rH E= = a cd o m mo rH in o m in in oa o m cr-- COOVOr^vi Orlr'HH CMr vo c--ra in in in OVO invo rH CM VO VO cr VC iHrlrH rH H H H r-- 3d C C 9) w eu 1 = in O CM o -3* - ON rH P oi bO oi uc CD o in o l m CM CM CO CO oo in CM CO s: M 01 <1 oo 1 VO l VO rH rH GO in rH 301 xo (Q 1 3 0h| CM rH rH CM CM CM rl rl rl rH r( rH P o o ino o cm o sr jt cn-=r jt a) On on On ON ON ON TABLE IV (CONTD U0) a o o o o t'-rn iH oC0 3 9^9 79 P w x: H faC 05 -H cd a> 36 oj moo o cm oo O on On On rH on l/N-3- J3- -=r ITN-sr E A 17263 <H 0) K0) *H- o o o o in bo i.n....i.n...m....c.n.j..o..ua i-H cm m^r in > < > l invo t--oo V o| VO VO VO VO VO OS Si rl H iH rH rl o A 17264 a, C3u <-->*^S T03) t. c c E0h) **Q*-' hOH 0D), u > o rl ti #H ' t.Q'O 3 T3 *h K B id *smin Eh C OwQ h O H hH | s: oiisti CO 4-> sj EhHh c hh n US 3WJ o w H w 4J ra C C ra ^ n dn e v 0 014) 0 33 OEh Q>*HbKOH<M< h cm ir in vo E 40->) ra > CO co h4HJ ra rEah a ra OEuh JaX 4o-> CO cu 2o o o hH U ra Er0a CO 1 Kid =a5 M Ct. UNIO;j CARBIDE CORPORATION MINING A METALS DIVISION MILL TRIAL DATA SHEET August 8, 1969 I. company location and date OF triai Weyerhaeuser Co. 4 Plalnwellj Mich.-- II. company representatives and titifs Glen Ketchum, Project Engineer,-------- ;-- Lou Burd, Stock Preparation Superintendent, Emil Wamee, Paper Mill Superintendent III. UCC representatives R T. Scott and G, L. Dickson iv. trial objectives (in order of impnrtnnf)Evaluatlon of Asbestos T-H5 as a partial replacement for titanium dioxide V. product identification Type of Product--!--White OffsetCoated AQHp'No Grade Nm Montgomery opaaue blue white Basis weight 50 and 60 lb. Daily Production 75.000 lb.I h./hour 3 >000 Total Daily Production of Mill" (Tissue and Board) No. of Plys" VI. MACHINE DESCRIPTION Type of Mnrhin Fourdrlnler. open headbox. dandy roll Machine No--------- i(Cylinder) No. of Cylinders-- Machine Speed----- _______________ (Tissue) Reel SpeedTM (Tissue) % Crepe~Wire Me<th Plastic Wire Width___________________________________Machine Trim 90-1/2 Inches Size Pr* Horizontal 8-10< Starchrnind>TM Double stack: Vellum Finish - 1 & 0 Smooth Finish - 5 & 6 A 1726b 1 VII. AUXILIARY EQUIPMENT loftnen Typo 1 Jordan, Iwllwi Aftei* beater chfest Landing (amp.) 80 Saveall (Type)Disc--------- !------ !--i--Flow Rate------------------------ =--------------------- VIII. STOCK PREPARATION - Continuous or Botch Type Beater and fnpnrity Hollander at__about 1350_lb.1_________________ No. of Beater Chests and Capacity.1 Jeater Chest at_. about _27_00_,lb. Machine Chest Capacity___________ "----------------------------------------------------------------------------Stock Freeness (Mach. Chest and Stuff Box)_____ "____________________________________ Headbox f*nnti<tnry 08--12%__________________________________________________ Makeup pHMachine pH_____ ^ 5--^ 8 IX. FURNISH MAKEUP* Basis (Ib./ton, etc.)_____________________________________________________ Fumlah Constituent Fiber Components: % Pound* ________ Short fiber 20-?0< ____________________________ ________ Broke________ 70-80S __________ : Retention Aid Wet end starch __________ __________ Approx. 0.5 lb./ton Not recorded Defoamer Dves_________________ __________ __________ Not recorded As required _fles.Iii_sls_________ Alum__________ Qpaciflera______ i_ See attached schedule * For board systems Include furnish for oach medium - topliner, undorlinor, fillor, and backllnor. AV7266 2 X. ASBESTOS ADDITION - Pellet Repulper (Type). None required Asbestos Grnrim Tt135 Open I ft* No. Point of AriHitinn- Hollander.. beater Pounds of Asbestos AHHwH 30 pr ton BDF__5. per beater Per cent asbestos addition on BDF. per hour 1-1/2* XI. SUPPLEMENTARY INFORMATION Quality Control Data Record Stock Prep. Log Sampling (in order of importance) PHdi S Ivtvntion Trials Reel Stuff box Board Trials Tray Water Vat Tissoo and Tawsl Stuff box Reel Headbox 250-ml. sample Stuff box Headbox Try 500-ml. sample Reel Saveall effluent Saveall effluent Saveall influent Saveall influent Identify samples by name, date, time Wet samples should approximate 500 ml. Weight of BD filter pad is required for all vat, tray, and saveall samples. A 17267 3 XII. TRIAL LOG (Comments including changes in furnish and operating conditions) 8/7/69 Number 2 machine on 40- and 50-lb. Montgomery opaque, smooth finish. 8/8/69 10:50 a.m. Change to 50 lb. Montgomery opaque, vellum finish. One beater furnished with Asbestos T-135 by mistake. Trial delayed because of low wax pick test results. 1:00 p.m. Slight problem with foam. 3:30 p.m. Short fiber component of furnish increased from 20? to 30? in order to improve wax pick. 5:00 p.m. Smoothing press raised because of minor buildup on roll. 6:30 p.m* Asbestos T-135 trial initiated. First beater dumped with twice the required amount of T-135 in order to shorten transition period. 7:30 p.m. Smoothing press lowered. No problem with stock buildup. 5:15 a.m. Change to 60-lb. Montgomery opaque, vellum finish. IW '9 6? Date DISTRIBUTION LIST Messrs. M. P. Ballmer - B. K. Barton W. L. Carrick F. D. Dexter G. L. Dickson B. D. Dobbs T. E. Dougherty C. F. Gray W. V. Gutzmer P. G. Horecka R. T. Larkin J. K. Marshall J, S. McReynolds R. A. Miller G. J. Norberg E. J. O'Keeffe T. R. Orme s J. L. Myers/ J. A. Riddle H. B. Rhodes R. T. Scott N. J. Setter J. Sidlovsky R. M. Tong C. A. Wilson W. S. Young Miss. J. Ulrey New York Chicago Bound Brook New York Niagara Falls Cincinnati New York New York Chicago Detroit Seattle Charlotte Houston Atlanta Charlotte Dallas Los Angeles King City King City Niagara Falls Detroit New York New York Hew York Chicago New York Bound Brook k 17269