UNION CARBIDE CORPORATION
CHEMICALS AND PLASTICS
ENGINEERING SOUTH CHARLESTON, WEST VIRGINIA
MEMORANDUM
February 22, 1973
pEB 23 1273 ;
! J. POTTER
R. Farmer 8. G. Garrett D. R. Matheny/G. R. Monk J. J. Potter, JrN C. J. Swan, Jr. (6)
D*oy Altr Ut9 No,
Copies
D. V. Moody, Jr.
C. C. Neely J. H, Rapp J. L. Simpson
INSULATION-DESIGN CRITERIA 8PIRIT8-GRAIE ETEAROL REFINEMENT ETHANOL PLANT BO. 12 TEXAS CITY. TEXAS
Following are the recommended material and thickness specifications for
each anticipated service condition:
Temperature ,
Material
Insulation
Service
Range
Specification Thickness
Process - Piping and Equipment
Above 50'F
2*( TIM-101-515
Process - Piping Process - Equipment Process Equipment - Subjected
to Cyclic or Thavout Temps.
Below 50*F
Below 50*F Below 50*F normal (up to 400*F thawout)
lA^2*
1M 1M-B
TIM-111-515 TIM-111-515 TIM-111-515
Utility Piping (Steam, Water, Air, etc.)
50*F to 250#F
- 3A
V
* . ..
Utility Equipment (Steam, Water, Air, etc.)
8team Traced Lines or Equip.('4)'
50*F to 250*F All temperatures
^3) 2a(1)
TIM-101-515
Personnel Protection - Piping
135*F to 250*F
Personnel Protection - Equipment 135*F to 250*F
^3)
UCTC 17273
* *' "v >
2
< - yt
Service
Personnel Protection - Piping or Equipment
Temperature Range
250*F and above
Material Specifications
2A^
Insulation Thickness
TIM-1U2-515
Fixe Protection - Piping and Equipment
Fire Protection - Piping Fire Protection - Equipment
Hates
Above 50*F
50*F and below 50*F and below
u(1)
u(2) 1M
TIM-133-515
HM-134-515 TIM-13U-515
(1) All valves, fittings and other Irregular surfaces shall receive a mastic weather barrier.
(2) Aluminum Jacketing used In services operating below 50*F shall have a baked-on acrylic enamel finish on the outside to prevent condensation.
(3) On small equipment where spraying of urethane would be Impractical, Material Specification 2M may be used.
(k) For steam operating at 400*F or less, copper tracing shall be used. For steam operating above itOO'F, stainless steel tracing shall be used.
Because of restrictive regulations Imposed by the Occupational Safety and Health Administration (OSHA), the Texas City Plant has adopted a policy stating that no new asbestos-containing Insulations shall be Installed on new Installations. Material Specification 2A presently approves calcium silicate products which still contain asbestos fibers. By the time material procure ment Is necessary, asbestos-free products will be readily available; there fore, the material for Specification 2A should be one of the following:
Ksylo 10-AF
- Owens-Coming Flberglas Corp.
Thermo-12
- Johns-Manvllle Corporation
Super Caltemp, IJype HA - Pabco Industrial Products
This criteria is being issued for simultaneous review and preparation of` Insulation and Beat Tracing Schedules. Any comments should be directed to
*
.*