Action Steps to be Taken as a Result 0F the VCFTStanHord
Effective October 5, 1974
(Loiflivo, 0<4nt/tion, u* Ovpcilmanl}
DISTRIBUTION:
J. T. Barr C. E. Blades W. R. Byrnes T, L. Carey R. Fleming H. L, Jaffe R Jones
J, D. Kramer A. K. McHilllan
J. B. Maerker G, 0. Hantell
J. C. Novak
E. Prlmeau
F, 0. Ryan
J, T. Sebastianell1 W. M. Smith G. B. H. Speed -- E. M. Spurlock
J. M. Tlnnon H. L. Watson
The following work assignments were finalized as the result Of a discussion with Hr. Fleming this morning.
It is requested that the person responsible for each action point (the first name listed, If more than one) report his proposed time schedule to J. T. Barr as quickly as possible, so that an overall OSHA compliance schedule can bo prepared.
ACTION
RESPONSIBILITY
1. Determine the Regulated Area ImmedlaUly (that area whore VCM concentrations exceed one
and five ppm limits as per standard).
J. D. Kramer* at Calvert City R. Jones* at Pace, Florida T. Modovlch at So. Brunswick
G. J. Hantoll at Trexlertown Labs and Middlesex Labs
2. After the regulated area has been prescribed, determine the
number of "authorized" employees who
will need breathing devices as re quired by Jan. 1, 1975. Prepare an extraordinary expenditure for
system and respirators.
Same as 1
3. Prepare signs for entrance to regulated areas; hazardous operations; PVC resin waste
containers and VCM containers.