Document DZGMwk7zngynyarRvKDmRd04
T. H. Huffman
From: Date:
Subject:
D. C. Skokna August 27, 1990
ABERDEEN MONTHLY PROGRESS REPORT AGGHST, 1990
There was one first aid case reported in July. The plant received a Five Standard Star rating from the International Loss Control Institute as a result of the June audit. This is the highest rating that is available on a baseline audit.
On 7/5/90, the plant employees reached eleven years since the last lost time injury. At month's end, the plant completed 4044 days (5,381,143 manhours) since the last lost time injury.
FY 1990 Key Statistical Information
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Operations
July
40.4 90.7 98.3 0.99805
5.8 96.6
5.7 98.7
1.1 79.1 < 1.9> 33.4 40.0
Y.T.D.
376.9
88.6
97.4
1.0010
60.2 98.1 44.4 99.4 14.7 86.5
< 7.1>
248.6 634.0
Operation in the resin unit was very smooth. Tie-ins for the cleanwall project were completed in the Old Module. An additional six railcars of low calcium 5305 were produced for Klockner.
Production was relatively low and finished inventories rose in the flexible compound unit. Line V operated ten days. PLENEX polymers development used fifty-five hours of Line I run time.
Costs
Variable costs were favorable primarily due to low VCM usage and a favorable product mix in the flexible compound unit, partially offset by an unfavorable product mix variance in the rigid compound unit.
VAB.0001190005
T. H. Huffman 8/27/90 Aberdeen Monthly Progress Report - July, 1990 Page 2
<2M
1. All of the plant's natural teams met during July. 2. Bob Seymour visited Northern Electric.
D. C. Skokna Plant Superintendent rah
+P
****mmmmmm
VAB.0001190006
DISTRIBUTION Houston
J. D. Burns
X
ENTIRE REPORT
R. T. Ferrell
X
T. H. Huffman
X
C. J. Matson
X
D. F. Harman
X
H. R. Flammer
X
R. R. Smith B. J. Bean
X X
R. H. Gerlach
X
R. D. Gamblin
X
W. L. McClain
X
J. P. Stokes
X
Austin
R. L. Poe
X
H. J. Hall
X
LCVCM Plant LCCP Plant LCLAB Plant
H. D. Garrison R. A. Conrad J. Friend J. W. Ware
X
X X X
Baltimore
Hammond
L. R. Bauer J. Pavao
X X
Blane Premiere Aberdeen
C. R. Miller
P. L. Foote
RWS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, MRK, DAB, DAM, RBN, JEN, JDO, REP, BLT
X X
VAB.0001190007
mm
SAFETY - B. L. Trego
First Aid OSHA Recordable
Total Injuries
July
Fiscal Y.T.D. 1990
Fiscal Y.T.D. 1989
Number of Restricted Workday Cases Number of Lost Workday Cases
Injuries bv Department
0
0
3
0
3
0
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
Non-Occupational Injuries
Lost Workday Cases Days Lost
Safety Record
Last lost time injury - 7/5/79
Days since -
4,044
Employee hours since - 5,381,143
On July 31, 1990, the employees of the Aberdeen plant completed 4044 days with no lost time injury.
The major topics for July safety meetings were CPR and Off-the-Job Safety.
VAB.0001190008
SAFETY - Continued
The Vista Plant received a Five Standard Star Rating from the International Loss Control Institute as a result of its June safety audit. This is the highest rating the plant could receive with a baseline audit.
Routine dosimetry results for the month were:
<_________________________
Wunber
Percent
VCM Lead Total Particulates
78 100.0
11 100.0
4 100.0
Fvmber
0
0 0
Percent
0.0 0.0 0.0
Monthly Iniurv Summary First Aid
Department Maintenance
Abrasions to abdomen and right forearm
*
VAB.0001190009
QUALITY
T. J. Arbeiter
100% of the plant's natural teams met during the month of July.
Bob Seymour made an MBWA visit to Northern Electric, Bay Springs, MS. He was accompanied by Mark Washington.
The Plant Manager's Natural Team began planning the third annual Quality Appreciation Day to be held during September.
The Plant Manager's Natural Team communication survey results are in. Our employees have told us the most important communication items are (in order):
1. Benefit Changes
2. Training and Education Available to Employees
3. Promotions, Advancements, Successful Bids
4. Customer Communications Regarding Product Quality or Service
5. Aberdeen Q-Scorecard
Their favored methods for receiving this information are (in order):
1. Bulletin Board
2. Newsletter
3. Calendar of Events
4. Safety Sign
5. Employee Meetings
The Plant Manager's Natural Team is now working on ways to measure the effectiveness of communication.
The Vinyl Operations Supervisor's Natural Team has set a goal for reducing pond resin. The plant averaged 200M pounds per month pond resin for the first nine months of FY90. The new goal for FY91 is 100M pounds per month. Achievement of this goal could increase cash
flow by $200,000 per year!
The Aberdeen plant Q-Scorecard as of July 31 was 10.65. Cost control, waste minimization, and safety continue as our highest scoring line items. Our improvement areas are natural team scores, Cpk calculation and linkage.
VAB.0001190010
COST VARIANCES - D. C. Skokna
Variable Costs
Product
July. 1990 Variance. $M Total
PVC Flexible Compound Rigid Compound
PVC -
Total
$59.9 74.1
< 93.6>
< 0.4> $40.0
<$394.2> < 87.2> < 104.0>
3.6 <$581.8>
<$334.3> < 13.1> < 197.6>
< 3.2>
<$541.8>
Favorable VCM usage and a favorable product mix were partially offset by variance due to off-grade.
Off-grade production was <0.0165> pounds per pound versus a standard off-grade production of <0.03719> - 56% below budget. However, lower than budget off-grade production results in a net negative efficiency variance because debox resin is credited at
28.5C pounds versus its standard production cost of 21.3C per
pound. In July, we were "penalized" $71.5M due to this system quirk. Year-to-date the net negative efficiency variance due to reducing off-grade production by 33% is $253M.
Flexible
Most of the variance is due to product mix.
Most of the variance is due to product mix
Plasticizer - S0.4M Unfavorable
Price
- VCM - Resin to Rigid Compound - Resin to Flexible Compound - Fhthalic Anhydride - Calcium Stearate
- Ti02
- Alfol Alcohols - Natural Gas - All Other Prices Variances
Total
M
<$434.8> < 110.8>
< 84.4>
< 22.3>
< 18.0>
11.2
24.4 28.1 24.8 <$581.8>
K
VAB.0001190011
PMMp
COST VARIANCES - Continued Fixed^Cost Variances - $33.3M Favorable
- Payroll andBenefits - MM&C - Miscellaneous - TI&D - Clearances
Total
<$ 5.6> 72.0
< 25.6> < 5.0> < 2.5>
$33.3
Payroll and Benefits
This category was essentially at budget.
M. M. & C.
Low activity and delay of scheduled resin unit turnarounds caused this category to be favorable.
Miscellaneous
- Moving, Home Assistance - $24.2M Unfavorable.
- Operating Supplies - $15.2M unfavorable ($13M was mischarged and should be in Processing Supplies.)
- Packaging Supplies - $31.0M Favorable.
VAB.0001190012
VINYL - J. D. Olson, J. M. Vlnoskl
The Vinyl Department had no first aid or OSHA recordable injuries during the month of July.
The monthly safety meeting topic was "First Aid and C.P.R". General
1. Work continued on the BUS-80 injection system with tie-ins completed in the Old Module during the month. Early dismantling of the chem wash system began with the removal of the backflush filters which will be used on another project.
2. Another six railcars of decalcified 5305 resin were shipped to Klockner. Calcium levels were three to four ppm, slightly higher than previous shipments. Causes for this rise will be determined prior to the August shipments.
3. The resin raw materials in the 744 account were valued at $298.0M.
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
Reactor Downtime
u
40.4 1303.2
102.2 935.0
30.2 90.7 95.8 97.1 98.3
YTD
376.9 1239.8
97.2 8833.0
29.1
88.6
82.0 92.8 97.4
Hours
Operational downtime (recovery scheduling conflicts, New Module rinse/charge water conflicts, waiting for Q.C. data before
charging, 0-ring leaks, no place to dump,
rinsing chem wash tanks).
423.5
Maintenance downtime (PVA ram valve repair on D744, cooling water line repair on D500, Old Module VCM charge pump seal replacement, installation of BUS-80 charge nozzle on D700, condenser drilling on D742 and D743, condenser drilling and hydroblasting on D745).
269.5
*
VAB.0001190013
VINYL - Continued
Drver Downtime
Reactor limited production.
Operational downtime (centrifuge plugs, dryer cleaning, and flameouts).
Maintenance downtime (activator and centrifuge maintenance, screw conveyor repairs).
% of Total Downtime 23.4 56.8
19.8
Key Maintenance Work - J. B. Autrey, J. B. Hegwood
Reactors 742, 743 and 745 were shut down during the month for condenser drilling because of cooling control problems.
Number five dryer was shut down during the month for repairs to one of its Trunion rollers. The Trunion roller was re placed and the dryer was put back in service.
Reactors 700 and 745 were shut down during the month for installation of new nozzles for the new BUS-80 system, during which time the annual safety disk replacement was performed on reactor 700.
Number five centrifuge was shut down during the month for
repairs. The thrust bearing cap failed, allowing the scroll
to wear against the top flange plate. The Bird was removed
and replaced with a spare.
The damaged Bird is being
repaired for a spare.
Number five Bird centrifuge was shut down during the month for motor and starter replacement. The motor starter went to ground and burned out. The motor had to be replaced because of bad bearings and windings.
There was one major valve changed out in the reactor area during the month.
VAB.0001190014
mw
COMPOUND - J. E. Nickerson, K. G. Akins
Safety
The Compound Department worked without injury in July. The topic of the monthly safety meetings was "Off-the-Job Safety".
General
Further formulation testing for PLENEX polymers consumed fiftyfive hours on Line I. Line V operated just ten days in July to control inventories. Flexible compound inventories rose 338M pounds in July.
Rigid compound rates were up 1MM pounds over June. Screener maintenance and rescreening a railcar of product were responsible for fifty-seven hours of downtime.
Lower plasticizer rates in June reduced the amount of 610P avail
able for shipment and internal usage. Due to processing problems
and an attempt to maximize 610P shipments, inventories of byproduct
intermediate grew significantly over the past two months. There-
, in July, much more production time than normal was devoted
to VRP/RAE production.
Consequently, plasticizer rates were
reduced. Only .88MM pounds of prime plasticizers were produced
during July. It is expected most of VRP/RAE will be recovered by
the middle of August.
Operating Compound Production - Davs
Line I
30
Line III
30
Line V
10
Total
% Prime
Capacity Utilization Factor
Downtime
Line X
Production (M Lbs.)
Month
Fiscal Y.T.D-
1832 3647 _31 5798
96.6 .747
61
122
32 215
19701 34784
5756 60241
98 .771
Hours
- Product Changes - PLENEX Polymer Testing - Miscellaneous Maintenance - Quality Problems & Control
Line III
- Product Changes
li
- Miscellaneous Maintenance
109
55
19
11
99
16
VAB.0001190015
*
COMPOyyp - Continued
Product Changes Miscellaneous Maintenance Startup/Shutdown Werner & Pfleiderer Maintenance
68
14 13
9
Operating
Month
Fiscal Y.T.D.
Rigid Compound
31.0
% Prime
Capacity Utilization Factor
5653 98.7 .946
182
44360 99.4 .835
Downtime
Hfi.urs
- Product Changes - Screener Maintenance &
Product Rescreening - Miscellaneous Maintenance - Quality Problems & Control
61
57 33 33
Operating __Bays____ Month
Production (M Lbs.) Fiscal Y.T.D.
Plasticizer
31.0
% Prime
Capacity Utilization Factor
1118 79.1 .470
36
14718 86.5 .684
Key Maintenance Work - J. B. Autrey, J. B. Hegwood
Plasticizer reactors R-l, R-2, R-3 and R-4 were shut down during the month for cleaning of their vacuum jets. The vacuum jets were cleaned because of an
ive calcium carbonate builduo.
Plasticizer reactors R-3 and R-4 were shut down for repairs to their agitator shafts during the month. The shaft key that holds the agitator blades on is continually failing. Some modifications were made to the key to alleviate the problem.
Line I and Line III were shut down during the month for repairs to their rotary steam joints. The rotary steam joints were replaced in both cases.
VAB.0001190016
ENGINEERING - R. E. Folk, S. C. Hillman, N. R. Kane
PROJECTS
GENERAL
5305 Decalcified Resin
The design and estimate have been completed for permanent ion exchange systems in each reactor module. The AFE for this project is being prepared.
Cleanwall Technology
The AFE has been approved and construction is being expedited. Startup of the system and operator training are expected to be completed in August.
Production Model Building
Production model building for OASIS continues. Debbie Tollison attended meetings in Houston to resolve issues about these models. Work is beginning on building customer specific models.
The First Fiscal Quarter 1991 Capital Budget was submitted to Houston on August 20. AFEs for all first quarter projects were included. The IRR for the total budget is 18%.
New Hire
Joe Ganc from Penn State will begin as a process engineer in early September.
VAB.0001190017
ENGINEERING R.E. POLK, S.C. HILLMAN, N.R.-
g g
8 <n NHIIII
5? g
g Ug %
g g
M
INIII IIII UItIIIl
IIIIMIIIIIIIIIIIII
s
g g
^g
cton
cn
$
cn
g
i g
&
C
s
Xa 115
g UJ
d
M8
3
ill*
g 3
8
3 S cn
s (J Q S
5d
8
sfcfe tso* 8|C
;l|
*
g S
;;i
* s g
8
g
gs
BS
s
cn
3g
g jX
8888
Uu
p*c* xi
8i
IUm4p
8
;g
8aa
fig S
ss
a.!*
g
n"
*g
X
tf
S -1
-1b!
8 5s
s
JZ a SE gg g il|s
g8
cn
g
8ms
X
pBNB
cn
8
a* cn
cn cn cn cn 08 jg re
cn cn
cn
to cn
*i8S8~~a~ig5iS
= 3u 8 to! cn m
ggggg^gg^^SCggSSgg
x3
9
to*
g
3 g
*s8iSs||Iggagg^slS|st | g 8 8
3
8 8
to tai
g
co co ^ 3 cn 3
5Ba
XK
Si s8
iixiiiSEE
8*n cn
g SS 3
cn
*s
8
cn cn
*
SCsO in uIi io
u g UJ
g i
8g
33
d -
3
g g
g
8
g s! 5
i
cn
g
g dg
8g
3si S fc toi
P
88
8 S Sgg
a S81
s s; a
*
pcmXpp
S
iisl 8:
28
sli
NSOO
N510 H520
L530
PLAWT HATER SYSTEM
NEST IHCINERATOR REPLACEMENT
NISCELLAREOUS CAPITAL PROJECTS < I15H
FURNITURE UNO OFFICE EQUIPMENT
ENGINEER!!* IS IN PN08NESS.PROJECT COMPLETION IS PLANNER FOR iM-1991.
DELIVERY OF THE INCINERATOR IS PLANNER FOR2/91.PROJECTCONPLETION IS PLANNED FOR 5/91
ENGINEERIN6 IS IN PR06RESS ON 32 PROJECTS.
EQUIPMENT IS ON ORDER.
VAB.0001190018
*
ENVIRONMENTAL - F. G. Jeanson
Water
All wastewater discharge parameters were met for the month of July.
A bioassay test was set up for the first week in August.
Waste
Waste shipments for the month included:
>
One bulk load of floor sweep was shipped to CWM in Lake Charles, LA.
A federal appeals court ruled Alabama's law banning hazardous waste shipments to CWM's Emelle landfill is an unconstitutional restriction of interstate commerce. We still cannot ship hazardous waste to Alabama until final appeals have been made.
This ruling Would apparently mean the end of a similar law passed by the Louisiana legislature.
An evaluation was made of sending hazardous waste to an alternate site in Ohio and Oklahoma.
Suoerfund
An order was received from the State this month to do a remedial investi gation of our Superfund sites. The order requires a submittal of a remedial investigation plan to the State within thirty days of the effective date of the order (7/17/90). Conoco has DuPont Environmental Remediation Services (DERS) preparing this plan. DERS expects to have the final issue the first part of August.
A meeting will be set up in August with the State to review the remedial investigation (RI) plan.
Arrangements for Vista to pay a portion of the RI plan were negotiated.
DERS was also commissioned to write up comments on the original report issued by NUS. These comments were completed, reviewed by Conoco and Vista, and will be sent out early in August.
Air
A construction permit was received from the State for the VCSM project which includes a vinyl production increase of 40MM pounds. Our new max imum production when the VCSM project is compete is 500MM pounds.
Additional modeling will also be completed. Scott Environmental will do two additional dispersion model 'test cases with lower overall plant VCM emissions. These cases will be completed in August.
VAB.0001190019
mmmm
mm
ENVIRONMENTAL - Continued
Miscellaneous I attended a third, third landban seminar held by the CMA. The 1991 waste hauling budget was completed this month. The semi-annual SFCC plan survey was completed.
I
VAB.0001190020
July. 1990
Fiscal Y.T.D.
A. Unadjusted EUI
<1.5%>
B. Adjusted EUI
<1.9%>
C. BTU/Lb. Product
2498.0
D. Total Energy Consumption MMM BTU 132.43
< 6.9%> < 7.1%>
2625.0 1314.36
A. Maintenance
There were eleven energy related items completed in July, 1990. Ten of these items were steam leak repairs. The remaining one was steam trap repairs.
Baling
Combustion July. 90
No. 1 No. 2 No. 3
(1) 83.2% 82.9%
83.4% 83.3% 83.0%
Boiler number one was not operated during the month.
VAB.0001190021
J . Beall
Donald Barclay - transferred from Supply and Transportation-Houston to Director of Administrative Services-Aberdeen
Jack Little - transferred from Director of Administrative Services--Aberdeen to Director of Administrative
ro i nay i me
Don Whatley - from Compound Operator back to Utility (Jerry Jenkins came back to Compound Dept.)
Larry Frye - bid from P-1 Operator to Maintenance Helper.
None
Bobby Ward - terminated.
None
VAB.0001190022
Aberdeen, Mississippi
Salaried Employees Hourly Employees Total Employees
Employees (Hourly) New Employees Terminations
DEPARTMENTS Warehouse
en. Plant Maintenance Laboratory Compound Vinyl Plasticizer
PAR 16 13 41 24 40 33 5
80 * 171 251
JULY, 1990_______________ MONTHLY PERSONNEL REPORT
Minority Employees //, Z
Salaried Hourly Total
a 65 72
1QZ
38Z 29Z
0 1
EMPLOYEES MIN. EMP
16
24
p
33
Hourly Min. Hired Z Min. Hired
Hourly Min. Term. Z Min. Term.
0 0 0 0
Z MIN.
HIRES YTD TERM YTD TURNOVER YTD
a . xi o n0 a0 a0
0
a0
Q
Number of Applicants:
Month
0 Year to Date
APPLICANT BREAKDOWN
J'f Minority0
Z Minority
// Female
0 Z Female
0
0 0
This total includes 2 Co-op students and
2 Summer Process Engineers.
Hires (Hourly):
Month 0
Year to Date 0
Terminations (Hourly):
Month l Tear to Date___1
Overall Turnover
.6Z
Projected Annual Turnover 1Z
VAB.0001190023
i
J
PARTHENTAL HOURS ANALYSIS REPORT
Btribuuqn l is t rus, jfc , jvu, department HEADS, FILE
7 / 2/9D THRU 7/29/9$
O1 i
19 t 91 9
1 i <D 1 9 I O 1 9 *|
00CM 00f*N*
1 j
NO in
i i
00 00
1 1
00 CM
1 1
9 CM |
NO ro
CM
CM
ronO 1 CM i l I |
i0n0
CM
\
in i o CM
CM * I1
to
in ro ro
00
ro
CM ro
ro
U CD CO
CJ
CO
oOo\\
H
Ul
V
I
I
*
<r
UJoZ
CO CO
o
cn
UoiUo) Ul
coco
N
CO
CO
2>
CO
CD
o
UJ
s
CO CO
r- J .V
CO t
I
OI
CM I t f
I
in
00
in
to
in t 'O
ro
I
I
NO
cm
in ii in
in
to
OI o
ii *
i
ro
i
m
to i o 1
l On 1 9 J 9 1 O 1
00 i 9 l i to 1 9 1 9 1 1 9
mi m I
i 9 1 CM 1 to 1 9 1 9 1 1 9
9) 9t
a in i 9 1 O
a CM 1
1o
9 1 ro i On j 9 t o
tin InO
CO CO
00 4
ON oo
CM CM
j in ii o
in* ii
i
i
CNI I CM
I 00 \
CM
I
* It
in in
I1 CM tn
ro iii
iii tn
i -o
ii ^
i
GO I 00
*l
CM I CM I CM
I I
moo *
ro
* tiii in iitii
9 1 9 1 in i in 1 in i in
in
*
1 1
in4
1 1
CM
i
CM
1
CM
a
CM
ro 1 nO 1 On i
1 CM a ro
CM 1 On a 00 l N 1
i n*
CM \ i a CM 1 a
I
IItI o I
1CM I CM I I I
iii ii
cm
\ I
o
oI CO
I #
in
n J
in
ii
CO CM 1 in
^ !i NO
CM I
CM I
I
I
I
Ul
I
I I
iiiiitii
I
I I
i
1
I I
t
I
i
HIM
IS
a
1 in a a
i CD 1 ro i a
E
? 1 NO i i
iro |4 IPO
in r-i
11
9
1 i
1t
1 I
9 9
4r
1
|1
CM
I 1
9
a a
1 1
On
1 1
N"
1 1
1 i CM a \ f
(in 1 CM |4 1
tin
CM CM
oo
00
in Oh
CM
in m in o in
CM
CM CD cm
CM On
ro
in o*
in
CM
ro
aa 1 i 1 i a a in a 1
ro a i
i ia 1 a CM i in i CM a
i iin
ro
in a 1 a a 1 i1i ma1
i NO 1 CO a a CM 1
fs- 1 CO i On a
1
a CO 1
i CM a NO 1
i 1 in i in i a
ifaia
iin ICM 1CM iro a iro ICM
CO
ui
CO
s
t
Ui
ai
tits
I I
CD I
IM UJ U
g
I I
3
*i s!
otno
4 4
CO
COCO CO
5 Zl
M
VAB.0001190024
M*
i
Z 10 003 1 0 -40C 1 --ro i oo <E O 1 NO OZ 1 CM <r i
II I
IO I o
00
t
I -o I 00 *o CM n
i ro \ ro
no M
io
o io I
NO t 0 I CM
fi
l
uinni
l
i
o*
ro
ro
nO in
ro ro
irIO
I CM
CJ r- i -o i oo m in CM ii ro- iii rcom*
On n ro
m ro i ro i *
CM ro i
I
i1<00r
I iro
i \i
i i i
iu ii tl
zr--
1 kt
U<C
1i11
OminO4
ifi1
ro4
i1if
^5* ro4
*r
11 l
oCM ro
oo CM CM o NO
ro i CM Os i
i CM CM I
i nr
100
t4
iro
Ii
i
i
cn
m in
ro ino>o ii o
ro
CK ro
Cl
ro
in NO
in oo
0 I ro i
4i
tft
LU
UJ
w u~ accn*o
>* 0 UJ -On
<CO)S <c oetv
o crco M*
cn
i *3
<* --00
QCSttCM -i ttOiCd
LU
i CD i cn ro i m
i i i CJ*
ro O
in
CM !>
i
cn
n <K
cn ro cn
irno
i in
I CM
\*
ro
I
I
CM
i
^
I I
ti
CO i
CM rO
O CM CM
On
ro CM
inuli cn
in 4
OO
1 1 1 1
in Is"
m
|N
i0
i in
i i
r-w
i i
*
o tE ro
**1 O 1 CM
1 1
1
in rS<J
1 1 1
o Os
1 1
1
in CM
V
in
CM
in
LU
cn cn
1 i i CM 1 CM 1 c- t 1 nO
i ro
ro
I CM
CM
i
ro
CM \1 ^ l
1 Os i in i ro i CM 1
1 NO 1 in 1 ro i *- i ro i NO 1 ro
CD ro
1
1 4- 1 On 1 ro i r- t CM i Os 1 0
ro
Uoicncn
I t I
cn Q
cn CJ
in
cm
in
t in in in in
i CM
in in CM tn in
I*
i in
oo ro
in
i ro m On Os oo
i i CM
00 ro
i
I
H I
>H
o
C\ 0\
o i in i
4
i c*- i j -i
CD i in oo
o
i in 00 CM i ro in
i
i
in oo CM
ro
m in
i fc 1
1 t 1
i 1 i
i uio 1 o
to MQC | 4 H-Z i *r
occn 11 0000 1--QC 1 CM tnz 1 ^
in CM
1 1
o
i i
0 in
1 1
o o
l 1
in fN-
1 l
O
1 1
O o
1 1
in^ - |
i
<z> in
1 t
in
o in ro NO
1 in 1 00 1 ro 1 ro 1 in
i i i i i
NO rw oo oo CM
1 1 nO 1 CM 1 ro 1
1 l l l
Os ro 0
l 1 1 1 i
CM in 0K CM
1 1 1 1 1
On OO
1 1 1 1 1
in On On
1 1 1 1 1
ro CM NO
1 1 1 1 1
in in CM NO
ti
ii ii f LU 1
! 3C j
Hi
I UI I
I -- I
$
ii at i
!$i&
cn 3i Ui
0
cn
i
in i in i
<i i CM CM
I in i in i
i0 in i 0
ro i 0 in i
i * i
i 0 t0 i0
CM i 0 ro i
i i * *
*
in CM
4
i i
0 04
*O
irnw
i i
i
i
i
i i
trynf
i Ui
QC
i i
D_u1
LU i LU
r-si a Z
i
CJ i
t
i
cn i UJ
i
i LU
a
nO
ro
4
CM
n* ro
in
4
CM
in CM CM 00 CM in
ro
CM
CM
omo
444
in * CM On 0in
tn o u-
cn tn tn
****** <*
VAB.0001190025
ADMINISTRATIVE SERVICES - D. A. Barclay Safety
There were no safety instances for the month of July. Cost Savings
Savings due to competitive bidding were $5,243 for July. Savings due to prompt payment discounts were $1,768 for July. Training New OASIS coding was taught to all personnel.
* VAB.0001190026
* i vV >,. ..J'uv-iL
UIIHN CIMCAL FL1IT SII!f!K AlALTSiS JUT 1999
H0IT1
POBLIC 1PT/ITC KICI/TOLL-SI1P1KITS I! PKOMCTS...........................................................
UItSSIilI-PIIiCUUfill
21,724296,,694159 1,414219,,151919 174,(119
Hlunniuiui ccoommmm--nitcuuou 919,949 1,115297,,5(1919 99
119 B9SIIISS
12,699 9 9
liineu ccookwpomhi--piaiucia6U 2,615969,,417919 1,946,1599 99
TT0OLLLLI8IK6 -- PMAClIA6KB
99 09 92565,,729969
Fusncmi
269,169 9 212,926
total 29,267,912 11,997,741 1,276,929
ro
PV1LIC IFT/ITC............................. nci/rou 2K2,,(1S(4I,,1$1(25 924,,912165,,215191 2,111,4(09 2114,,222772,,294429 119,,499152,,217219 99
69,972 9 9 229,,951946,,219999 9,229(11,,57919) 99
99 99 7,113694,,859695 1,5(4,441 2,275,019 1,682,839 2(4,114,542 119,294,894 11,118,685
-SIIPIUTS I! WM-
BILK: IIiKLnSUil11CIBMLI MCt0jNo8PLI0T9tIB
FU5T1CIX1I
TOtlL JOLT FKrBuUiIGSSiiiDITIBICcuIoIciInlotmTmTDitn
TOTAL TTD fiction: nITPILSLoII1XnSIITILcIKCoiCmmt0JImOP0L9TItD TOTAL JOLT mlmKuISimuTH iuccocitmnotmm!TBmt TOTAL TT9
iailcax
cisronx
PICIIF
CCAOXHI1OIII
16211990 19991 419258
299 29 65
1,42163222136 26117219
1,862 299
CP9SICT100HP8B CCAOIMI1OIII
2593
7166
9
99
28 191
5164445949 867
TOFC COITAIIII Al/OPS
09
90 9 9 09
5 91
9
60
15
22316799 712292823
95
9
991
99
6529 21
273 935 5 1 124
TOTAL 223119852 285
2,34116973268
2,959
TOTAL 1211293
0
144
1,9219295724 1,338
VAB.OOOl190027
*.
LABORATORY - J. M. Edwards, Jr.
A. Safety - There were no safety incidents in the Laboratory during July. The monthly safety meeting topic was "Off-the-Job Safety Training" taught by Jerald Uptain.
B. Customer Contacts - There were two customer contacts during July.
Richard Williams accompanied Eric Ingram and Ken Walker to Flexible
Technologies in Abbeville, South Carolina.
They successfully
trialed two cadmium-free compound formulations without having to
make significant changes to their equipment.
Jim Edwards and Richard Williams accompanied Mark Eramo to Hi-Tech Cable in Starkville to follow up on a quality complaint. They pointed out two occurrences this year when they saw I.R. values on the finished wires drop to an uncomfortable level. Austin and Aberdeen are working to regain Hi-Tech's confidence in our resin and Q.C.
C. Customer 0. C. Problem Reports
7/03 Exxon. Houston. TX
Exxon reported that a tank car (NATX 78222) shipment of 610P plasticizer was very cloudy. The plant made three process changes and the lab started checking in-process samples for clarity to prevent recurrences.
7/11 Vvtron Corporation. Loudon. TX
Vytron reported stronger than normal odor from 17462 NAT 50516 causing workers to get ill. It is suspected that high alcohol con centration in VRP plasticizer caused the unusually strong odor. In-process alcohol content testing of all plasticizer batches was started to prevent recurrences.
7/18 Exxon. Argo. Illinois
Exxon reported high suspended solids content in a bulk truck of 610P plasticizer. Another process change was made to prevent recurrences and a decision was made to put temporary dedicated supervision in the plasticizer plant and retrain the operating
7/24 Pniroval. Inc.. Mishawaka. IN
Uniroyal reported seeing wet clumps in the top of a 5385 truck shipment. The truck was returned. Condensation from warm resin had collected at the top of the compartment and dripped down on the resin causing the clumps.
VAB.0001190028
mm m
LABORATORY - Continued
0. Requests for Corrective Action
There were no requests for corrective action during the month of July.
E. Product Waivers
Customer
Dayton Extruded Plastics
RP-151 WHT 145
Reason Color
No. 1 R/C
Exxon F. RVCM Summary
610P
Clarity
1 H/T
RVCM of In*Process Samples
The following is a summary of residual VCM
on in
samples.
None of the
daily
exceeded 400 ppm RVCM during the month of July, 1990.
Number of Samples Average RVCM, ppm
RVCM of Shipment Sai?p|p-f
Reactor Slurries
930 137
5265
24 0.227
5305
65
0.221
The following is a summary of the residual VCM analys is of shipment samples for the month of July, 1990.
Product
Number of Samples
5265 5305 5385 5395 5415 Dry Blend Debox Pond
27 87 74
8
50 58
4
0
0.088 0.090
0.201
0.060 0.048 0.042 1.657
mm
VJMM
mmmm
mm
VAB.0001190029
LABORATORY - Continued
6. Resin Process Capabilities (based on dryer "regulars")
mi
S2J25
5385
5395
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.)
% thru 140 Mesh Drytime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size,
microns
1.67 0.92
---------- ----
4.93
2.22
1.67 0.96
--
0.52
--
---------- ----
---- --
140
1.20
2.33
1.22
1.83 4.17 2.67 0.70
--
0.63
-- ------ ---------
138
1.31 0.85
2.47
2.50 0.96
----------- ----
1.40 1.67
-- --
12.6
161
1.03 1.19
13.67
5.67 0.95
--
0.72 1.67
2.02
---------------
0
145
H. Flexible Compound Quality Summary
5415
1.14 1.04
4.56
6.33 2.67 0.17 3.56 1.67 3.87 1.81
0
172
Adjustments
j.Is l 111
Hardness Color Hard Particles Contamination Dicing Cross Contamination Streamers
5.0 <0.09> 5.0 <0.09>
! Rigid Compound Quality Swrnnarv
Rejections M J,bs
40.9 7.1
26.4 15.6
11.2
5.4 106.6
<0.72> <0.13> <0.47> <0.28>
<0.20> <0.10>
<1.89>
Torque Rheometry Color Color & 40 Mesh
Total
J. Miscellaneous
M ,_ (11Rejections Lbs
12.7 4.7
34.5 51.9
<0.23> <0.08> <0.62> <0.93>
1. The old Instron tensile tester, donated to Mississippi State University, was installed and calibrated. Dave Cox and Bobby Jenkins trained three teachers on its use and how to maintain it.
i
VAB.0001190030
mm
w m HMip
LABORATORY - Continued
J. Miscellaneous - continued
2. A database file (in Symphony) was started to store incoming raw material analyses. This is part of the new process of checking raw material shipment certificates of analysis against Vista specifications before unloading.
3. Jim Edwards attended an all-week seminar in flexible compound technology in Austin R&D.
All lab personnel were certified in "Basic Life Support" by the American Heart Association Cardiopulmonary Resuscita tion and Emergency Cardiac Care. This was a four-hour course taught by Ginny Belk.
5 All six laboratory natural teams met once during the month of July.
h
VAB.0001190031
mm
T
RESIN Ship Date 7/10/90 7/10/90 7/13/90
7/16/90 7/20/90
7/20/90
SAMPLE SHIPMENTS JULY 1990
Product
5265
5305
5385 5415
5465
5265 5305 5385
5305
Amount
300 lbs.
t
50 lbs.
50 lbs. 50 lbs.
50 lbs.
5 lbs. 5 lbs 5 lbs
2 lbs.
Customer ETS H1SHAM ZABIAN E. I. DuPont Rintec Corporation
Capitol Wire & Cable Azrock Industries
NATIONAL PLASTIC AND BUILDING MATERIAL INDUSTRIES
COMPOUND Ship Date 7/06/90
7/09/90 7/11/90
7/25/90 7/30/90
Product
461-119A WHT 461-119B BLK
34642 NAT
461-120A WAT CL 461-120B WAT CL
27251 BLK
18031 WAT CL
Amount
Customer
1500 lbs. 1500 lbs.
Central Plastics, Inc.
100 lbs.
CONDUCEN
1300 lbs. 1500 lbs.
Flexible Technologies
100 lbs.
Philatron International
100 lbs.
Fiberchem Inc.
DRYBLEND Ship Date 7/24/90 7/27/90 7/31/90
m
Product RP-151 WHT 145 RP-151 WHT 145 378-143 BLU 170
Amount 2X2 lbs. 2X2 lbs. 100 lbs.
Customer Dayton Extruded Plastics Dayton Extruded Plastics Pyramid Plastics
VAB.0001190032
PLASTICIZER Ship Date 7/20/90
Product VRP
Sample Shipments/July 1990 Page 2
Amount 1 gal.
Customer Plasticolor Inc.
VAB.0001190033
NUMBER OF NJURIES
ABERDEEN CHEMICAL PLANT INJURIES
(Twefco Month Running Totota)
TOTAL INJURIES
O OSHA RECORDABLE
VAB.0001190034
*mm
&
h
ABERDEEN ENERGY CONSUMPTION P BTU/LB
j mmmmmmmmu*
en/me
T
VAB.0001190035