May 2, 1973 Ra: 2137
Mr. R. P. Gagnon BLACK LAXE
Call: By: Date - Talked to:
Technical Call Report
Capco, Van Buren, Arkansas
C. E. Stiafken
April 26 - 27, 1973
Davis Weaver, President Sibley Thonas, Manager Paul Cooper, Superintendent Cecil Clark, A-C Superintendent Lin Roberts, Q. C. Supervisor
Davis Weaver has again informed me that the following are estimated fiber requirements for both the Ragland and Van Buren plants through 1973:
Van Buren Ragland
4T-3 400-4lo"6T/M0 400-430
SR-3
35-40 ST/MO 0
Total, remaining 8 mos. 3200-3400S1
3005T
The nev manager, Sib Thomas, is the former short-term plant engineer, and although he has an engineering degree, his knowledge of fiber and cement and his experience in asbestos cement processing is limited at this tine. He is however, .technically oriented, and I have the impression that he ie capable of absorbing tha requirements of the job.
flLV 0016384
2
Paul Coopar was the former Plant Accountant at Van Buran and is learning about fiber and cement. Z do not know how much ha understands about asbestos cement production.
Cecil Clark, purely a production man, controls the process, but is also only beginning to learn the technical aspects of the job.
Lin Roberts is in charge of the laboratory and aside from Davis Weaver, appears to have best chemical background among the staff members.
At the time of my visit Z discussed the following major items with the staff:
a) The laboratory control Sag Test and its correllatlon with green pipe strength and ultimate pipe strength.
b) Cement chemistry 1) oxides 2) phase compounds (C3S, C2S, C3A, C4AP) 3) gypsum 4) loss on ignition
c) Importance of cement standardisation and the adhering by cement producers to specifications
d) Asbestos fiber 1) grades and classifications 2) crudy and open fibers 3) flberixing and surface area 4) physical testing
a) Process problems 1) slurry suspension in the cylinder vats 2) slurry dewatering 3} green pipe strength
I expect to make a return visit to both the Van Buren and Ragland plants in about two months.
CBS:rg ccj EAFarrell
MJMessel
C. E. 8tiefken