TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
AUGUST 19 7C ROCLOR WASTES
cootidentsal' ResQ^etigl destroy
X'
Reaulatory Action
In early August, the Alihan* Water Improvement Coumiasion informed the plant that PDA had furnished then with fish flesh analyse* Iron samples taken in the Chocoolocco-Coosa River Watershed, Indicating appreciable level* of Aroclor a* well a* DDT metabolites. Mercury wa* alto preient at low level*. The plant'* previous informational contact* with AKIC had prepared them for receiving thi* news. Due to a high l*vel of public concern about a ban on fishing in *cM state streuas having high mercury level, an in tensive program wa* started ijnaediately to correct remain ing major Aroclor discharges. This program will be discussed with AWIC in September.
Current Level
Aroclor losses during August increased to a level of 7280 ppb in plant effluent, equal to B8_ l/day- This increase correspond* to high turbidity of the effluent from lime stone inert material aa the settling capacity of the final acid treatment pit haa deteriorated since last clean-out. Process research studisa indicate that removal of aolida will raault in removal of Aroclor.
Plant Effluant Suspended Aroclor Control
The Aroclor department eunp was put into service on August 12, three weeks ahead of target, and is controlling at the 100 ppb level in department effluent waters. Second phase is feting separated and a high-Arocior scum is being col lected on susp surface. An experimental mechanical skimmer will b* installed in Septaaber for evaluation in removal of this jcu*) teste with polyelactrolitea in agglomerating thi* scum were not productive.
HONS 033880
"TUe ^eeeieew
W*>*e*l**
CONFIDENTIAL INFORMATION
la
*f Weeilsle
O^T
't*el mi M> 4*<ms( Felevee* 1
d**v
leaieidwl'l e. 14 * ewer er few e**e--Mw. TW. nee>i *~ee mi ^e --< wmUl4*
Ce--erOfcwwe **!** evei ee4
*e iwie^it^ iailtal W <aawa>aMa law Ml sale kaae<H. fM'S'la-i ** eHweln 4*m>**Im ( <wlHh
W tH Iwaaw dtSe--* Ha d a * .
'
WATER_PCB-SD0000017604
2.
rInal Effluent Treatment
July er.d AUguat sample# (ron Aroclor >aurcii indicated that the final neutralization pit i now a major remaining source of plant effluent levels. Previous practice in pit ciaanout has not been edaqueta to remove accumulated material, and limestone inert aolid# apparently ara an effective adsorbent in the pit environment. A tvo phaae program based on these facts is undarvayi 1) a aacond, unconfcaainated pit will be put into sarvica by nid-Septenber to permit shutdown and decontamina tion of the permanent pit and to develop procedure* for alternate operatiencleanojjJ^yithout loss of neutralization or solids-settling capability. Concurrently, grosa introductions of Aroclor into the sewer system sre being stopped with the Aroclor department sump, now operating and house keeping procedures, and cleanout of potential collection points in the sewer system. This program is targeted for mid-September completion end should roduca plant affluent to the 200-300 ppb level that is lean in source point water phase analyeas. An initial reduction in water use 100 gpra out of 700 gpm has baeh accomplished through a checkoff list.
2) Longer term, immediate steps ara being taken to develop feasibility and costs of effluent solids-Aroclor reduction through continuous coagulation and clarification. Major vendors in the water treating field are being consulted with a final proposal targeted for December 1. Six projects for water reduction and improved housekeeping are underway and are being ex pedited.
1. Installation of concrate pads and curbs in major spill areas to replace chat.
2. Reus* water in Aroclor department still jets and blow-tank scrubbers (reduce vater-Aroclor contact target - 100 gpta) .
3. Reuse water in Muriatic Acid department fume acrubbera and absorber final scruhbar and divert acid aevar through Aroclor department Sump. (Reduce watsr-Aroclor contact target - 100 gpm) .
4. Upgrade HC1 off-gae organic! ramoval lyatea to improve efficiency.
5. Provide a collection system for carbon tower apent carbon to pravant spilla to sawar.
6. Further water reduction* by rerouting Parethion phosphoric acid wastes.
Bulk Waste Disposal
Data ha* been gathered on ail solid materials to be collected and disposed of. This data has been reviewed and will serve a* the baais for scoping a col lection system and incinerator, A report will be issued in September on the use of fuel oil to dilute Montar for improvements in handling and pumping for incineration.
V. R. Haupt