Document DMkogXrJwqqXY1VeponXXMG9Q
U.S. Environmental Protection Agency, Region 4 61 Forsyth Street SW, Atlanta, GA 30303 Water Compliance Inspection Report
FACILITY DATA
NPDES ID: NCG050081
Effective Date: 06/01/2023
Expiration Date: 05/31/2028
Facility Name: Teknor Apex
SIC Code: 3087 - Custom compounding of purchased resins
Address: 3518 Dillion Road, Jamestown, NC 27282
On-Site Representative:
Robert West Plant Engineer O: 336-454-1174 Email: rwest@teknroapex.com
Marvin Gaines Plant Manager O: 336-454-1174
Responsible Official:
Marvin Gaines Plant Manager O: 336-454-1174 Email: MGaines@teknorapex.com
INSPECTION ENTRY DATES/TIMES
Entry Date/Time: 01/15/2025 at 09:00 AM
Exit Date/Time: 01/15/2025 at 11:00 AM
Isaiah Reed, P.E. o: 828-296-4618 e: Isaiah.Reed@deq.nc.gov
NAMES OF STATE INSPECTORS
Margeory Castellanos o: 336-776-9724 e: Margeory.Castellanos@deq.nc.gov
AREAS EVALUATED DURING INSPECTION (Check those areas evaluated)
X Permit
X Self-Compliance Program
Pretreatment
X Records
Compliance Schedule
X Pollution Prevention
X Facility Site Review
Laboratory
X Storm Water
X Effluent/ Receiving Waters
X Operations & Maintenance
Combined Sewer Overflow
Flow Measurement
Sludge Handling/ Disposal
INSPECTION SUMMARY
Sanitary Sewer Overflow
This was a joint EPA and NC DEQ stormwater Compliance Evaluation Inspection (CEI) focusing on the requirements of the North Carolina General Permit for Storm Water Discharges Associated with Industrial Activities (General Permit No. NCG050000).
INSPECTOR SIGNATURE JEREMY JUDD Date: 2025.04.09 08:14:42 -04'00' Digitally signed by JEREMY JUDD
Jeremy Judd, Environmental Engineer
LONNIE DORN
Digitally signed by LONNIE DORN Date: 2025.04.10 10:27:53 -04'00'
Lonnie Dorn, Life Scientist
AHMAD
Digitally signed by AHMAD DROMGOOLE
DROMGOOLE 15:42:14 -04'00' Date: 2025.04.14
Ahmad Dromgoole, Section Chief Waterways and Wetlands Enforcement Section
OFFICE/PHONE NUMBER
USEPA Region 4/ECAD-WEB-WWES 404-562-9505
USEPA Region 4/ECAD-WEB-WWES 706-355-8683
USEPA Region 4/ECAD-WEB-WWES 404-562-9212
Page 1 of 6
NPDES Industrial Stormwater Worksheet (North Carolina - General Permit No. NCG050000)
GPS Coordinates Receiving Water(s) or MS4 Site Acreage
Email on NOI
1. FACILITY LOCATION INFORMATION
Latitude Deep River
35.989 N
4.6 acres
SIC Code
emorris@teknor apex.com
msegee@teknor apex.com
Date of NOI
Longitude
Discharge to 303(d) or TMDL waters
3087
-79.937 W NO Weather Condition
07/07/2023
Sunny, clear
2. SITE DESCRIPTION
Industrial activities take place indoors. There are no industrial activities, processes, or operations that occur outside. Materials and non-operating equipment are stored indoors within the main warehouse facility.
There is a loading / unloading truck area located at the southern side of the warehouse facility, which includes six (6) loading docks that have a small, protective rain cover shelter.
There is one (1) solid waste municipal trash dumpster with lid located at the west side of the warehouse facility.
There are three (3) stormwater outfalls, but these discharge locations generally collect stormwater runoff from paved parking lot / vehicle usage only areas.
The company was previously known as Viking Polymers.
3 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND SUPPORTING DOCUMENTS
PLAN TOPICS - Section B of Permit
YES NO N/E
SWPPP available on-site
The SWPPP was made available on-site as well as a copy was emailed to EPA SWPPP Certification Signature/Date
Part B.16 X
Part B.1 / Part H
The SWPPP was prepare by Mark Segee and approved by Ed Morris. The SWPPP was originally prepared on February 18, 2014. The SWPPP was last revised on June 19, 2016
Responsible Party / Pollution Prevention Team named in SWPPP
X Part B.1
Section 7 of the SWPPP details the responsible party, which needs to be updated to reflect current
X
staff members.
General Location Map
Part B.2
The SWPPP and the Site Map do not include a general location map detailing the facility in location to Jamestown, NC and its proximity to the Deep River. X
Page 2 of 6
3 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND SUPPORTING DOCUMENTS
Site Map
Part B.3
X
A site map was made available for review during the inspection as well as emailed to EPA.
Narrative Description of Industrial Processes Listed in Section 1 of the SWPPP
Part B.4 X
Evaluation of Stormwater Outfalls Section 2 of the SWPPP
Part B.5 X
Stormwater BMP Summary Section 2 of the SWPPP
Part B.6 X
Secondary Containment Plan
Part B.7
Not Applicable - No large storage of containment tanks located outside that require a secondary X containment plan
Spill Prevention and Response Procedures Section 3 of the SWPPP
Part B.8 X
Solvent Management Plan Not Applicable
Part B.9 X
Preventative Maintenance and Good Housekeeping Program Section 4 of the SWPPP
Part B.10 X
Employee Training
Part B.11
Section 6 of the SWPPP.
X
Note: Only the managers have received employee training though. It is recommended that a training
program be developed, implemented, and maintained on an annual basis and for new hires to all
staff who may conduct industrial activities, operations, or procedures.
Representative Outfall Status
Part B.12 X
Devices Exempt from Analytical Monitoring
Part B.13 X
Annual SWPPP Review and Update
Part B.14
There is evidence to indicate that the SWPPP has not been reviewed or updated on an annual basis
since 2016.
Notice to Modify the SWPPP
Part B.15
The facility has not received any notice from NC DEQ to modify the SWPPP.
X X
QUALITATIVE MONITORING OF STORMWATER DISCHARGES - Section D of Permit
YES NO N/E
Visual Inspections
Part D.1
Section 5 of the SWPPP Documents of recent inspection were made available for review during the inspection. Qualitative Monitoring Response
X Part D.2
Section 5 of the SWPPP X Documents of recent inspection were made available during the inspection.
ANALYTICAL MONITORING OF STORMWATER DISCHARGES - Section E of Permit
YES NO N/E
Page 3 of 6
3 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND SUPPORTING DOCUMENTS
Required Baseline Sampling
Sampling results were made available for review during the inspection Tier One Response - Status Tier Two Response - Status Tier Three Response - Status
Part E.1 X
Part E.6
X
Part E.7
X
Part E.8 X
SUBMITTAL OF DISCHARGE MONITORING REPORTS - Section F of the Permit Qualitative Monitoring Reports
Monitoring Report Retention
Part F.9
YES X
NO N/E
Part F.10 X
OTHER OCCURENCES THAT MUST BE REPORTED - Section I of the Permit
YES NO N/E
Visible Sediment deposition in a stream or wetland
Part G Table 7
X
Oil Spills
Part G Table 7
X
Hazardous Substances
Part G Table 7
X
Anticipated bypasses
Part G Table 7
X
Unanticipated bypasses Noncompliance with the conditions of the Permit
Part G Table 7
X
Part G Table 7
The facility at the time of the inspection did not currently have any significant concerns or issues with X noncompliance with meeting the conditions of the Permit.
Page 4 of 6
4. FIELD EVALUATION & PLAN IMPLEMENTATION
Pollutant Sources
Note location, quantitative description, design issue, O&M deficiencies, and pollutants offsite
Loading/Unloading Area
One (1) designated area for vehicle truck loading/unloading at the south end of the warehouse facility
Outdoor Storage
No outdoor storage of materials
Outdoor Manufacturing/ Processing Operations
Not Applicable
Treatment/Storage/Disposal Areas
Only one (1) municipal trash disposal container with lid located on west side of warehouse facility.
Sediment & Erosion Controls (BMPs)
Not Applicable
Spills / Leaks Handling / Good The outside of the warehouse facility was very clean and orderly. No evidence of spills
Housekeeping
or leaks on the pavement or at the outfall locations.
OPERATIONAL REQUIREMENTS - Section C of Permit Operation and Maintenance of Treatment and Control Systems
YES NO N/E Part C.1
The stormwater outfalls appeared to be in very good condition. X
The parking lot and unloading / loading area was very clean, orderly.
Stormwater Control Measure Clean Out
Part C.2
X
No sediment was observed leaving the facility or at any of the three (3) outfall locations
Residuals Management
Part C.3
X
There was no observations or evidence of residuals from the outfall locations.
Corrective Actions
Part C.4
X
No corrective actions were required or noted during self-inspections of any outdoor control measures
Page 5 of 6
5. OUTFALL, STORMWATER DISCHARGE & RECEIVING WATER OBSERVATIONS
OUTFALL, STORMWATER, DISCHARGE, & RECEIVING WATER
Number & location of stormwater discharge(s)/outfall(s) consistent with SWP3
YES NO DESCRIPTION X Yes, the SWPPP and site plan matched the three (3) outfall locations.
Evidence of off-site accumulation of pollutants observed in receiving water
X No sediment or pollutants observed in the receiving waters downstream of the three (3) outfall locations
Non-stormwater discharge observed
X No non-stormwater discharge was observed
Exit interview conducted with: Marvin Gaines and Robert West
Preliminary findings discussed during the exit interview included: EPA discussed 1) reviewing and amending the SWPPP on an annual basis, 2) developing a more extensive training program, and 3) researching the requirements for the stormwater no exposure certification.
Photo Log is attached.
Page 6 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
aerial image - Teknor Apex.jpg 1/15/2025 05:30 PM Aerial image of industrial site. Note: Due to technical difficulties with the digital camera, no GPS coordinates were collected associated with the photos taken during the stormwater inspection.
Page 1 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
DSCN 1588 1/15/2025 10:15 AM Location of Outfall No. 3 - discharge to Deep River
Page 2 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
DSCN 1589 1/15/2025 10:17 AM Municipal Trash compactor with lid/cover
Page 3 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
DSCN 1590 1/15/2025 10:20 AM Location of Outfall No. 1 - discharge to Deep River
Page 4 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
DSCN 1591 1/15/2025 10:21 AM Designated area for vehicle loading / unloading activities
Page 5 of 6
Facility Name:
EPA Division: EPA Branch: EPA Media:
Photo ID: Date Stamp: Time Stamp: Description:
PHOTO LOG
Teknor Apex
ECAD Water Stormwater - Industrial
DSCN 1592 1/15/2025 10:22 AM Location of Outfall No. 2 - discharge to Deep River
Page 6 of 6