201.142. shall be combined with the requirements of this Subpart.
(Source: amended at 12 111. (cj. (lit. effective Hatch 22. 1908)
Section 203:203'. Construction Permit Requirement, and'Application
a)rA construction permit Is required prior to . actual construction of a major new source or . major .modification.
b) Applications for constructIon permits . required under this Section, shall contain sufficient Information to demonstrate compliance with 35 llV. Adi. Code 201 and the requirements of this Subchapter including. ' but. not limited to. Subpart C.
c) The permit shall Include conditions specifying the manner in which the requirements of Subparts 9 and t. of this Part are satisfied.
d) No permittee shall violate any condition contained In a construction permit issued for a new major stationary source or, major modification which 1$. subject to this Part.
b) A major `stationary source that is a u;:f for volatile organic compounds shal' be considered major for ozone.
1 c) The reconstruction of a major stationary source will be treated as the construction of
. a new major stationary source if the fixed -. capital cost of new components exceeds
approximately half of the fixed capital cost of an enfirfeTy new stationary source.
.. Determining whether reconstruction will occur Is based on the following:
1) Fixed capital cost shall mean the capital needed1 to provfdeaTl the depreciable
. components: -
- 2) The fixed` capital cost for the replacemewts-ln-comparlson-to-the" flicetf
capital cost that would be required to construct a comparable entirely new source:. .
3) The estimated life of the source after
the replacements compared to the life of
! a comparable entirely new source: and
. xJ
.<.. *Y
..
.4) Theextent to which the components being...... j replaced cause or contribute .to the , emissions from the'sdurce.
(Source: Amended at 12 111. Reg, 8118. . effective March 22. 1988)
Section 203.204 Oura.tlon of Construction Permit (Repealed)
d) For purposes^of' thhrMart';- ttrr foglttye emissions of a stationary, source shall not be
i. - included -In. determining- whether It is a major . stationary source/ unliiss wre~source belongs... ..
to one of the following categories of / stationary sources:
(Source: Repealed at 12 111. Reg. 6118. effective March 22. 1988)
Section 203.20S Effect of Permits
The Issuance of a permit for a source subject to the requirements of this Part shall not relieve any person of the responsibility to comply fully with applicable provisions of the Environmental Protection Act (Act) (111. Rev. Stat. 198S. ch. Ill 1/2. pars. 1001 et seq.). this Chapter, and any other applicable requirements under local, state, or federal law.
(Source: Amended at 12 1V1. Reg. 6118. effective March 22/ 1988)
Section- 203.206 . Major Stationary Source
a) The.following constitutes a major stationary
source:
1
1) Any stationary source.of air pollutants which emits, or has the potential to
emit. 100 tons per year or more of any pollutant for which pollutant the area Is
a nonattainment area.
2) Any physical change that would occur at a stationary source not qualifying under
paragraph 1 as a major stationary source. If the change would constitute a major
stationary source by Itself.
i 1) Coal cleaning plants (with thermal dryers);
- 2) - Kraft pulp mills:
".!) Pbrttandrcement planterTM
' 4) Primary zinc smelters;
r'5) Iron-and steel- mllTs: .
6) .Primary aluminum -ore reduction-plants;.
2) Primary copper smelters: .
, 8) Municipal incinerators capable'of
charg-tny more'thair-TSO -tons* b^ refusfr-per"
.- day;
"
.9) Hydrofluoric, sulfuric. or nitric acid
plants; 1 .
10) Petroleum refineries:
Ml) lime plants;
-.12).Phosphate rock processing plants;.
13) Coke oven-batterlei;
=14) Sulfur recovery plants;
>15) Carbon black plants (furnace processor-
16) Primary lead smelters:
17) Fuel conversion plants;
18) Sintering plants;
19) Secondary metal production' plahtsf -
20) Chemical process plants: 21) Fossil-fuel boilers (or combination
thereof) totaling more than 250 million
Up per hour heat- input; - -r.;
22) Petroleum.storage and transfer units with
. a total storage Capacity exceeding
300,000 barrels;'
2-3) Taconite ore processing plants:
. 24) CTarys"ftber~pnjcess'rngr p'laTrtT;---
25) Charcoal production plants:
- 28 -