Document DMBmpZq3rvXXRjeKjLeNR0bZQ
uL.: M io-' k .ui'.'iuv
*x- ^AWili'AClUKIMG SPECIFICATION
Colorneotos Sidewall Shingles
- i 'J - ' FAGS NO.
i of Wuutenan ii ^23-2.23
1 Of 1
Formulas;
r,Dn T?, TQ
Dover White - Cedargraia Texture, All Styles <mm
6D20 Fibre *
Formula Bo. 1 2 . 3 4 5 6 7 300 300 300 300 300 300 300
PS 1061 TFpe I Btd. Portland Cement 470 470 470 470 470 470 470
PS 1281 J-M Spec. Silloa Flour
300 300 300 300 300 300 300
Shingle Scrap (Bote 1}
500 475 450 423 400 375 350
Minimum Batch height
i?ro 1545 1520 1495 1470 1445 1420
Other 0 -apa (Hots 2)
100 123 130 175 200 225 230
Rot 1: (a) Sl.gle Sorap should he blended 1 part normal cured to two parte of steam cured.
From 0 to 10C$ of the Shingle Sorap may he replaced by any of uts
following approved Mineral Fillers: tiastic Filler, Limestone Dust, Limestone Aggregate,- Ground Trap Kook, Qreyetone and Traucit ?ipo Scrap and Sock Wool Shot.
(b) Book Wool Shot mat be introduced at the Shingle Scrap grinders and must be evenly distributed throughout the sorap.
Eote 2: (a) Wet Machine Scrap, Corrugated Transits Scrap or Transits Pipe Carat may be added to the formulas above up to the amounts shown.
(b) U'f to 75$ of material froa the Dust Collectors and/or "f5y of wackine Drop from the earn cr other machines producing similar stock may be f-dded to the above formulae.
Caution;
%
2X
The use of scrap should be planned so that it will not be neceecary to shift more than two successive formulae at eny time. Violent shifts should not be made.
TO
J-M /?fo
FILE / :
Form 333-2 PLd. in U.S.A,
'CINHDAICIASTEES -RpEri,'ScOnN.,. Z^oa-" S,,xmh_e_mw_x_t_wc_o_xr_^r_ve..,p_cx_tp_u_nw_oim..._..eenu^c_ ,la-trur-ei.-<o add P.S.
authority 1 - Current Purck. Specs.
FOR CHANGE v'v r t t *
i a r\ cern1*_
SUPERSEDES:
cm. Q.C.
MG'?. Q.C.
Pa.?e - Qf 42V2.^\'iWai b-BO-^S
--
SUFS. pro;:. Q.C. su?v.
FlKT
pg.a
numbers
MT-000207 NOV 5 1959
y %r ir\Ufys* IL r*r*./v"'*fJiV-\ *ii*wI r;\. SPECIFICATION
CmicrosS^usvalx Lhlnglokj Dover White, Cedargrain -
All Styles
SPEC MO. PAGE NO.
Hir ' /<- r!rQ'"P.n 423-2.2lt1 of 1
Formulas;
T2J1 308
CMIN
Formula So.
1
2
3
4
6D20 fibre
?oo 300 300 300
P.S. 1061 Type I Std. Portland Cement 501 501 501 501
X P.S. 1281 J-M Speo. Silica Flour
333 333 333 333
Shingle Scrap (Bote 1, 2}
45c 425 400 375
Minimum Batch Weight
1534 1559
----------------------Other Scrap (Bote 3)----------------- 10G-- 125
1534 1509 150----175
Bote 1: (a) Shingle Scrap should be blended 1 part normal cured tc 2 part: -teem cured.
Proa 0 to 100 lbs. of the Shingle Scrap may be replaced by any of the following approved Mineral Fillers: Mastic Filler, Limestone Bust, Limestone Aggregate, Ground Trap Bock, Graystone and Transits Pipe Scrap and Book Wool Shot.
(b) Bock Wool Shot must be introduced at the Shingle Scrap grinders and must be evenly distributed throughout the scrap.
Hot 2"
At Waukegan Plant, when Fiberizer is in operation, an additional 100# of Shingle Scrap may be added to the formulae Above.
Rote 3' (a) Wet %ohlne Scrap, Corrugated Transits or Transit Pipe Scrap nay be added to the formulas above up to amounts shewn.
(b) Up to 75# of material from the Dust Collectors and/or 75# of Ifcohine Drop from the same or other machines producing similar stock may ha eddsd to tie above formulas.
Caution:
The use of scrap should be planned so that it will not be necessary to shift more than two successive formulas.
XT
Form 333-2 PM. In U.S.A.
INDICATES_RnscrVM. X - Shew correct nomenclature & add P.S. numbers
CHANGE
- ' vt,' _ Esmove reference to pA3f-94?A Ft'ive.
AUTHORITY X - Current Purch. Specs.
r
r (
MANUFACTURING SPECIFICATION
J n ..riot,
It Eli Eagles
r-
0'?d'4 (j'C 'ill *"*
...... Sty .e>'
Cf-O PAGE HO.
1'"'
1 1
r-r r- f(>'J\i
| 1 of 1
Formulas:
B J&S0
CANCELIH)
Pcrrm&a l?o.
1a.
6D20 Fibre
300
P.3. 1061 Type I Std. Portland Ceasent
i!52
2 300 452
J
300 452
4 300 452
J-M Bull: Silica Flour
382 382 382 382
Shingle Scrap (Hots 1, 2)
450 425 400 375
Minimum Bato i Weight
.1564 155S 2-534 1509
Other Scrap (Bo- 3)
100 125 t 150 \-75
Hote 1; (a) Shingle Scrap should "be blended 1 part normal cured t-c 2 parts eteam cured.
Fro 0 to 100 lba. of the Shingle Scrap hay be replaced by any or the folloving approved Mineral Fillers: I-iaetio Filler, Lliceetone Dust, Limestone Aggregate, Ground Trap Hook, Graystcm and Tyansite Pipe Scrap and Kook Wool Shot.
(b) Rock Wool Shot must be introduced at the Shingle Scrap grinders and muBt be evenly distributed throughout the scrap.
Kota 2'
At Waukegan Plant, vhsa Fiterizor ia in cpration, an additional 1CC$ of Shingle Scrap ray be added to the formulas above.
hota 3: (a) Vet %ohioe Scrap, Corrugated Transit or Transits Pipe Scrap say be added to the formulas above up to asiountc shorn.
(b) Up to 75$ of EAtevial froai the Bust Collectors and/or 75$ of Kaohino Drop from the saics or other machines producing similar stock may be added to fee above formulas.
Caution:
The use of scrap should be planned so that it will not be neceae&ry to shift more than tvo aucceseive formulas.
i 1 i
Return to
c
x-
INDICATES CHAKGE
--REASON1'
X-Show lX-Show
Silica ubo of
to Cement ratio O.85 bulk Silica Flour
^ESEAR,H
AUTHORITY X-PP-Rob-423-B6j Prodl IfjjrJ^hg. 041-34-60 enacted 10-24-61
FOR CHANGE J.X-Correction
s
SUPERSEDES:
Page 1 of same
sued 11-5-59
__
MT-000174
DiR. MGR. S'JPR. p..oc. ! r>.:n O.c. O.C. o.c.
!| O'-'' 9i liVJHD
10-26-60
MANUFACTURING SPECIFICATIOM
UrG.Or'IlPfjtCIJ Ci.r. -,v
trio NO. PAGE :JO.
423-2.2-.
7ovi->r I'hito -
Texture* Ail. Stylee ^%
Poranlag;
"!>" Tftps
w Oxk't_i'L. iiO 1
r C,
3
<?
56
*7 \
6D20 Pibre *
300 300 300 300 BOO 300 300
PS 1061 typ T 3td. Portiatd Ce Hit
#*
7-M Bulk Silica Hoir.'
Shingle Scrap (koto ` }
415
355 5*37
jj&uircua Batch Visit
1570
415
355 i*ts; 1545
415 355 450 1520
415 355 425 14S 5
415
355 V!-lr/l~rf i*1 -i -1*vr\
415 355 375 1445
415 355 35C 14 0
Other Scraps (Ech~ 2}
10G 125 150 175 20 25 250
Koto 1: (a) Shiogi Scrap ihcul h'3 blended 1 p:.rt corir 1 cured to u;r. stoG'Ji cured.
c<
Prow 0 to ICOj- of the Shingle Scrap ;riy he ^pieced aoy c vie following approved I-'.ineral Fillers; itoetlc Filler, Idr.51rt-.on3
juimeeteue Aayrjujiue/ Oronni. Trap Fool.., Greystcce e.r.i iScaotit.* Pipe Scrap and Kook fool Shot.
(b) Itoolc Wool Shot rust he Introduced at .the Shinjle' So:n p g
Diust be evenly distributed throughout the scrap.
2i, <j '
'Sets 2; (a) Vet iixjhiue core-p. corrugated 'iVanc ite Scrap or Tr&h&ite Pipe Scrap i aay to .'.aided to the yoruul&fl above up to the chcuutc shotm.
j ( b) Up to 75-- a:;' nvvcsrd&l rrcu the Trust Collectora e-vm/or 757 of 7.: chine
Drop Srca the i'toe or otosr xc.eiiit.ec. prcducung siad-Ur stock r,_dy bs added tc the e':ovo for; mlan,
C-'.utloa: j
The v.ea to* scrip should be planned 30 that it vill rot he ueeesoary in
bhlft ticre the.a \:.ro mooe/.Airo icrooul'.s a*o f..oy tim. 'TioXsr.t shifts ehould rot to mc-.s.
j RETURN to
CO 1 J-M RESEARCH
--EJLE-ROOj^---
SNOiC/.ViS_,
X-Shov Silica to Ceoant ratio O.85
ChAKGE
'IZ-Show bulk SilicA^lour
1
/! authd,X-P?-fo8 423-36; Prod. LS vhg. 041-34-60 enacted 10-24-60 i]i I'OP. h'-iAi'.'Gi IX-Correction ________
1
V.' toil:: Uj/-,. ' - same
MT-000206
10-26-60 '
J-)hns MANUFACTURING SPECIFICATION
*i * ,
Dover White Sidewall Shingles New Colorbestos Process
SPEC NO.
PAGE NO.
PRODUCTS:
Dover White - Cedargrain, #105 and #109 Styles
Kanviile ? RS-F-5
.1
BASS FORMULAS:
*DB Type
Formula Ho.
12
6D20 Fibre
300#
Portland Cement
415
Silica Flour (Hote A) 355
Shingle Scrap (Note l) -522
Minimum Batch Weight 1570#
300# 415 355
JZ5
1545#
355 J5o 1520#
355 1495#
355 Joo 1470#
355 _23S 1445#
355 _jqo 1420#
Other Scraps (Hote 2) 100 125 150 175
200
Hote A: Use "I" Bldg. Silica Flour when available*
225 250
Note 1:
Proa 0 to 100 lb. of the Shingle Scrap may be replaced within the scope of basic formulas by any one of the following
approved Mineral Fillers: Mastic Sand, Limestone Dust, Lime* stone Aggregate, Ground Trap Rook or mil Fines, Graystone. Reclaimed Granules, Rock Wool Shot or Transit Pipe Scrap ground to small alee.
Mote 2: (a) Wet Machine Scrap, Corrugated Transite Scrap, or Trensite Pipe Scrap (large also) may be added to the formulas above up to the amounts shown.
(b) Up to 75 lb. of material from the Dust Collectors and/or 75 lb. of Machine Drop from the same or other machines producing similar stock may be added to the above formulas..
Caution: The use of scrap should be planned so that It will not be
necessary to shift more than two successive formulas at any time. Violent shifts should not be made.
Hote 3:
6D2Q Fibre is considered to be standard. 6D28 Fibres may be
substituted for 6D20 Fibre In whole or In part on a pound for
pound basis. Kunro 6 Grade Fibre may also be substituted In
proportions up to 3/3 of the total fibre content of tho base
mix.
___________________________________
MT-000185
y INDICATES pr.criM. *-- ('WAMftr --REASON:
Increase Silica-Cement Ratio to .85 RETURN TO
AUTHORITY FOR CHANGE
Product Proposal Research 423-86
J-M RESEARCH
SUPERSEDES:
Page 16f seme Spec, issued 2/19/59 FILE ROOM
f nr 1
Ind.DIR. MGR. SUPR. PROD. PLKT.
I /-Elis,,Q.C.
C.C.
Q.C. SUPT.
FIN. ^U,B.
DATE ISSUED 10/27/60
Form 333-2 Ptd. tn U.S.A.
I
MANUFACTURE !u SPEO'RCAJIOM
Hole...berr.-cc rillsu.l?. Ehin-vLea
SPEC NO. PAGE NO.
| 123-2.23 1 0.7 1
Rover White - Oedapgraiu '.IVcture, AIL Styls3
Formulas;
''l1' Tyre
A,
5 6^7
.Tomola Ho. 1 2 3 4
61320 Fibre
310 300 300 300 300 300 300
t
#
i'ype II wtd. Portland Ceir.sp.t 415
l-k` Bulk Silica Flour
Shingle Scrap (Kota 1)
355
500
415
355
47?
U5
355
450
415
355
425
415 355
*00
415 355 375
415 355 350
Micisrin latch Weight
1370 L5k5 1520 1195 1470 Hup J.420
Other Scraps (Koto 2}
ICO 125 150 175 C0 225 270
Kote 1: (a) Shingle Scrap uhould he beaded 1 part denial cured to t.*o partrj of
etaaa ourca.
From. 0 to lOOy of ths Sb iDylc Be rap may v,.* -epla-jed. by any of the following approved kinerai Pillara: i-jae-Sia E'iLXer; Iciiictcuo Uu&b, Liiu-atoaa Aggregate (Ground Tre.;? Kook, Grej-choaa and Traaoita Pipe Sarap and Rook Woo?. Saov.
(1;) Rook VooL Shot uiuat 03 iatro;,u3 su at .fch ftfelcslo' Scrap e.-inAers- era cuis'i be uveuly Aiovri'e-jttsi t.LkOugiioufc the eorap.
K>r
r -c n-
5^-; ,1 v-* -v.. >
i-. -y
."he -hcrvi
(hi Up vc ?3;,: 0:" uati-rial free. tue Ri:.ot Coll* 3 vert &ad/ ex* 75." of C.'-cuae
Crop frox the ears or other i".?.Chinee prcAvains siKahar ev.c-ol-: vjxy "b 3
rrfcs v.ee. 0:. corap ehrv.lc. Co plhc uhirfu :ur vf..-i rjo ctcoo;;o:i.-~j ohc i'.'.,. r.rt ':c
: vhiiv it -.rill r.ot he use*?' eery to .ac at ay:/ tlrs.. T:\oLeat' tkifee
MT-000205
CHANGE5 ~Ra'S0K Sh0V
n CeiEOilt
ALTi-.OSiTY FOR-CI-.'NGL
Lieges')"1 a Letter 11-10-60; React. Bulletin 11-15-60
oU1 r..!-
ieuu*.i 10-26-60
5. ..
RETURmO" WRESEARCK--ftt"R0OM--
u_i-.ro
MAKUFACTURiKC-i SPECIFICATION
Dov*r White, Ceeaygraln Moli
c SPEC MO.
PAGE NO.
423-2.24 1 of 1
Formulae;
"B" Type
h7V3-'W
w Formula So. L 2 3 4 f
61520 FIbra
300 300 300 300
Typo II3t&. Portland. Ceai*a'-
452 452 452
cr
J-M Bull: Silloa Flour
382 382 382 382
Shingle Scrap (Hot 1, 2)
4J0 425 400 375
r Minimum Batch Weight
3-584 1559 1534 J.509
Other Scrap (Bote 3)
100 125 1^0 175
Koto 1: (a) Shingle Scrap should be blended 1 part normal cured tc 2 parts steam cured.
From 0 to 100 Iba. of the Shingle Scrap nay be replaced by any of the foilcrying approved Mineral Fillers; Mastic Filler, Limestone Bust, Limestone Aggregate, Ground Trap Book, Gmystooe and Transits Pipe Scrap and Book Wool Shot.
(b) Book Wool Shot mist be introduced at the Shingle Scrap grinders and must be evenly distributed throughout the eor&p.
Hots 2-
A.t Waukegan Plant, when Fiberixer is in operation, an additional IGOfr of Shingle Scrap say b added to'the formulae above.
Kote 3J (&) Wet ^aohine Scrap, Corrugated Transits or Transits Pipe Scrap u;' be added to th formulas above up to amounts sbx.wn.
(b) Up to 75# of material from, the Bust Collectors mi/or .75# of I-h-ohlna Brop from. the ease or other machines producing siiiilar etcwk iiiay la added to Ha ah ora fc-rraiiap.
Caution:
The ueo of scrap should le planned so that it vill not be necessary to shift more than tv;o successive fciiuulae.
MT-000173
X-
INDICATES chakge
-R1;SOfc
Show Typo n Cement
AUTHORITY FOR CHANGE
Liggett'a letter 11-10-60; Enact. Bulletin 11-15-60
RETURN-IOJJOESEARCH.
SUPERSEDES:
Dir?. MGR. Q.c. Q.C.
Page 1 of earns spar -issued 10-26-60
SUFR. Q.C.
PROD. SUPT.
wTLNT. I
I'od -
FIR. jJ-m-ii]ji\cr .
3'msp.
T&\> Forerr
DrtTE
ISSUED
FILE ROOM
11-17-60
Johns-Manville MANUFACTURING SPECIFICATION
PRODUCT:
Colorbestoa Sidewall Shingles Dover White
PLANT & D1V. SPEC NO. PAGE NO.
Asbestos B.P. 1 on 3
Dover White Sidewall Shingle* - #109 (Straight butt) only.
I. FORMTIAt
1. Baae Mix
- See Spec. RS - 2
2. SLlicone Water Repellent Solution - See 3je. RS - 6 1-
n. IH3THPCT1CBS FOR GRHK BOIL MiCHDffi OPERATIOKS:
1. Apply want water (130-160 F) to the machine belt, together with a light ******g of sand toprevent eticking of stock to the belt.
2. Drop ained *teek on to the aoving belt, adjusting the picker roll se that the weight of 15 slabs at the take-off will weigh 56 lbs. (+ 2 lbs).
3. Bess stock under nagnet, then through series of perforated rolls and the saoeth farcing roll (gauge at 20 pel).
4. Apply sufficient vara water free water bases to pr* rly wet the stock.
5. Bus the wetted stock through esooth press rolls Immediately befi slitting and cutting the stock to slabs.
FORMJIAt D07SR WHITE VEHESRi
P. S* Kq^
Ingredients
__ =k 50
--___
p3 ^ ^ CA 1001
Vn 7xd
$3386
7FQ4 Asbestos Fiber White Portland Oement
#10 Dry Ground Whiting
,, m x Oi 1281
J.H. Special Silica Flour
o rn 2d; CA 3126
ELtanox RA" - 168
O g ^ a 1272
80 Muh Sand
soo m
Veneer Mixing ItnieWwt
Batch
140?
525
770 420
70
J4L
2065 lbs.
-1-
6.8
25.4
37.3 20.3 3.4
-fcJL
100.0*
Adi oaterials in the order shown to the top mixer of the veneer mixing
system and mix far 15-20 minutes. Drop the batch into bottom mixer and feed continuously through the Riots Disintegrator, ftcm which point the mixed veneer is screw-conveyed, to tbs feed elevator above the Seisetro Screen.
H o oo
00 00
Apply the veneer (as above) to slabs, adjusting the rate ef feed through
the Seleetro Screen se that a uniform coverage of between.22.5jfco 24.3 lb per 100 sq. ft. of baao sheet area will result .v ^
Far control purposes this will be between 7-1/4 to 7^3/4 oss per 2 sq. ft.
Form 333-2 Ptd. Hi O.SA
x_ -reason.- AH a&oothgrain IJpps Shingles and #105 Slype obsoletsd..
AUTHORITY FOR CHANGE
------- .... SUPERSEDES:
DIR. MGR. Q.C. Q.C.
!Del. - GJUH. to H.C.L. of 11///60.
-
-
------------------------------------------------------ w---------------------- -------------
Page 1 (3/13/57) & Ihge 2 (6A7/59) of Spec. RS-S-1 (Cedargrain Design)
supr. ! rsoo. Q.C. j SUPT.
PLOT. RN.
j$r K\, l.B_.
Dept G.P.L.
1961
I
...
u vi.ikj-i'.anisic,
MANUFACTURING
SPECIFICATION
Dover White Sidewall Shingles New Colorbestos Process
**LAi !t in L'lV. 1 ["anville up
SPEC NO.
RS-F-R
PAGE NO.
1
PRODUCTS: Dover White - Cedargrain, #105 and #109 Styles
BASS FORMULAS:
Formula Mo.
7
7R06 Fibre 6D20 Fibre Portland Cement Silica Flour(fete A) Shingle Scrap(Note 1)
300# 415 355
500
300# 415 355
475
300# 415 355
450
300# 415 355
425
goo# 355 400
IS'
355 375
300# 415 355
350
Minimum Batch Wt. 1570# 1545# 1520# 1495# 1470# 1445# 1420#
8
300#
200 464 396
640
Other Scrap; (Note 2)
100 125 150 175 200 225 250
Note A: Use "I" Bldg. Silica Flour when available
Note 1:
From 0 to 100 lb. of the Shingle Scrap may be replaced within the scope of basic formulas by any one of the following approved Mineral Fillers: Mastic Sand, Limestone Dust, Lime
stone Aggregate, Ground Trap Rock or Mill Fines, Graystone, Reclaimed Granules, Rock Wool Shot or Transite Pipe Scrap
ground to small size.
Note 2:
(a) Wet Machine Scrap, Corrugated Transits Scrap, or Transite Pipe Scrap (large size) may be added to the formulas above up to the amounts shown.
(b) Ift> to 75 lb. of material from the Dust Collectors and/or 75 lb. of Machine Drop from the same or other machines producing similar stock may be added to the above formula s.
Form 333-x; Ptd. in U .$ A
Caution:
The use of scrap should be planned so that it will not be
necessary tc shift more than two successive formulas at any
time. Violent shifts should not be made.
"' `*
' .........-
,
Note 3:
6D20 Fibre 1b considered to be standard. 6D28 Fibres may be
substituted for 6D20 Fibre in whole or in part on a pound
for pound basis. Munro 6 Grade Fibre may also be substituted
in proportions up to 1/3 of the total fibre content of the
base mix.
RETURN TO .
MT-000184
^. -..-.REDSi:oECAARDCHu-.
x~~ change3 --reason Show formula with 7R06 Fibre Substitution FITF
AUTHORITY
, ,, ,,
#139
for change L. L. Liggett* s letter to W. P. Fischer 5/16/61 also Bulletin
SUPERSEDES:
DIR. MGR. Q.C. Q.C.
SUPR. Q.C.
Page 1 of jMLme Spec, issued 10/27/60
PROD. supt.
PUIT. W-U'Lnd.
FIN.
1 DATE 1 ISSUED
6/9/61
Johns-Manville MANUFACTURING SPECIFICATION
r
PRODUCT:
Colorbestos Sidewall .Shingles Dover White
PLANT &. DIV. SPEC NO. PAGE NO.
Asbestos Q.F. 423.1 (3) 1 on 3
Dover White Sidewall Shingles - #109 (Straight butt) *- Standard.
I. FORMULA 1
#105 (Wavy Butt) - Whan specially ordered. &WL':
1. Base MLx
- See Spec. 423 (RS-2)
2. Silicone Water Repellent Solution - See Spec. 423.0 (HS-6)
II. GENERAL IM5THOCTIOES FOR MACHINE OPERATION:
1. Apply warm water (130-160 F) to the machine belt, together with a light coating of sand to prevent 3ticfeMng of stock to the belt.
2. Drop mined stock on to the moving belt, adjusting tbs picker roll so that tbs weight of 15 slabs at the take-off will weigh 56 lbs. ( 2 lbs).
c 3. Pass stock under magnet, then through series of perforated rolls and the
smooth fcanning roll (Gauge pressure of the smooth roll at 2 - 5 psi)
4. Apply sufficient vara water from the water homes to properly wet tl stock.
5. Pass the dampened stock through the smooth press roll immediately before slitting and cutting the stock to slabs.
FORMJIA* DOVER WHITE VENEER:
/
P. S. No.
Ingredients
Batch JJLL RETURN TO
CA 1001 63386
GA 1281 CA 3126 CA 1272
7F04 Asbestos Fiber White Portland Cement #10 Dry Ground Whiting JM. Special Silica Fleur Tltaooac "A" - 163 SO mash sand
140 lbs.
525
472700
70
140
Nl6.8J, RESEAR(j)
25.4 37.3
FILE ROOM
20.3
3.4 6.8
2065 lbs. 100.Og
NOTE: The above veneer ia used on L^rmatcne "Shasta White" and "Singlo", and cm Rock Shake "SabWhite" and "Jonquil", with the exception that
7B06 fibsr is substituted for the 7FG4.
c Veneer Eforinq Instructions:
Add materiala in the order shown to the top
mixer of the veneer mixing system and mix for 15 - 20 minutes. Drop the batch into the bottom mixer and feed, continuously through the Plata disintegrator, from which point the mixed veneer is screw-conveyed to the feed elevator above the Selactro Screen.
Hooo1 OO
Adjust the rate of feed through the Selectro screen so that a uniform
coverage of between 22,5 to 24.3 psr 100 sq,, ft* of base sheet will result. For control purposes this will be between 7-1/4 to 7-3/4 oes. per 2 eq,, ft.
x-- cmngeP ~reas0N: X* To show veneer used on Permtone & Rock Shake light colours.
forHwange
temagemat (On Rigid Shingle Developments)
SUPERSEDES: Page #1 dated 3/20/
DIR. MGR. SUPR. PROD. PLNT,
o.c.
C.C.
Q.C. SUPT.
FIN.
Deviation Notice #542 dated January 14, 1963
Dept.
I.E.
G.P.L.
DATE ISSUED
January 24, 1963
MT-000172