Document DM9jQp04j313r4yoag7boXy9M

UNION CARBIDE CORPORATION SOLVENTS lnO CCATiNGS DIV'SON PO BOX a 71. TEXAS CIT T TEXAS 77532 Cs 7 1 November 21, 1983 Mr. H. W. Williams, Jr. Texas Air Control Board 5555 West Loop, Suite 300 Bellaire, TX 77401 Ref: Union Carbide Corporation Renovation Notification to Mr. Eli Bell, Texas Air Control Board. Austin. Dated September 7. 1988 Dear Mr. Williams: Due to scheduling problems, the completion date of the asbestos renovation at Building 133 as stated in our letter referenced above needs to be extended to December 16, 1988. All other aspects of the job will remain the same, and the handling of asbestos containing material will conform to the requirements in 40 CFR 61.147 and 61.152 as before. Yours very truly, 4. Ppu!zm. A. Perihan Yalcunkaya Industrial Hyg.' ie Director APY:IW:Ashesl3 3 Attachment bcc.: J. R. Dement c. L. Dudnick - 500 M. E. Durdin J. B. 'Evans - 500 R. B. Jan ik K. W . Klyng R- E. La Cour G . M- Whipple - 500 K. G . Strawn J - H. Will i.ams UCTCI817J 1 i UNION CARBIDE CORPORATION SCX.VENTS AMO COATINGS DIVISION PQ BOX .P'71. TEXAS CITY. TEXAS 77SSS 0471 INDQSTRIA EM E September 7, 1933 Mr. Eli Bell Executive Director Texas Air Control Board 6330 Highway 290 East Austin, TX 78723 Re: Renovation Notification Dear Mr. Bell: This is to notify you, as required by 40 CFR 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below: Approximately 1500 linear feet of insulation will be removedfrom lines located in Building 133 at 3301 5th Avenue South, Texas City, Texas 77590. The equipment is approximately 40 years old. Removal of the insulation is scheduled to start on October 8, 1988, with completion on November 21, 1988. All asbestos containing materia? will be removed using negative pressure enclosure'. The insulation will be sealed in properly labeled impermeable plastic bags prior to removal from the area. Procedures to be employed during removal, clean-up, and disposal will conform to the requirements in 40 CFR 61.147 and 61.152. All asbestos containing materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, Texas. Yours very truly, A. Perihan Yal oi nT-ya Industrial Hygiene Director APY:IW:Asl00888 cc: Dr. E. R. Ibert - GCACD, La Marque bcc: J. R. Demen\ C. L. Dudnick - SCO M. E. Durd.in J. B. Evans - 500 R. B. Janik K. W. Klyng R. E. La Cour G. M. Whipple - 500 K. G. Strawn J. H. Williams UCTC 18172