Document DM6vvR6644O0xj62eQm7R4n3d

MONSANTO COMPANY ANNISTON, ALABAMA STANDARD OPERATING INSTRUCTIONS FOR AROCLORS Revised: July 196A Copy No. / --' Prepared by: J. H. Molloy Production Supervisor R. G* Moody Production Superintendent Ci\ CONFIDENTIAL 0OS5 A1AAJ HONS 05962A OPERATING INSTRUCTIONS AROCLORS DISTRIBUTION Plant Manager Production Superintendent Production Suparvlaor Maintenance Superintendent Technical Service) Standard) Departaent I 1 10 1 1 2 HONS 059625 OPERATING INSTRUCTIONS AROCLORS INDEX SECTION A - SYNOPSIS OF PROCESS SECTION B - SAFETY AND HOUSEKEEPING SECTION C - DETAILED INSTRUCTIONS I. Chlorlnators & Slewing Tank Operation a. Batch Chlorinator Oparatlon b. Contlnuoua Chlorinator Operation c. Blowing Tank Oparatlon d. Method of Running Specific Gravity e. Method of Running Hold Polnte f. Method of Running Softening Polnte g. Chlorine Vaporiser h. Trouble Shooting Chlorinator A Blowing Tank Operatl II. Arodor Stllle, Earth Treatment, and Filtration a. Charging & Start-up of Arodor Stills b. Stopping the Distillation c. Drawing Bottoms d. Earth Treatment of Aroclors a. Filtration of Aroclors f. Trouble Shooting Arodor Stills, Earth Treatment, and Storage Oparatlon III. Loading Refined Aroclors a. Spotting Tank Cars b. Filling Tank Care c. Filling Drums IV. Flaking Aroclors V. Crushing Aroclors VI.. Milling Aroclors VII. SpeAal Pyranol Mixes A a. Inerteen PPO b. Arodor 1260 - Toluene c. Arodor 1262 - Toluene d. Arodor 1262 - Xylene e. A13B3B SECTION D EMERGENCY PROCEDURES HONS 059626 OPERATING INSTRUCTIONS aroclors A. SYNOPSIS OF PROCESS General Aroclors are the reaction products formed by chlorination of Biphenyl and/or Terphenyla using Ferric Chloride catalyst. The by-product HC1 gas produced Is absorbed in water to produce Muriatic Acid. Crude Aroclors are producad in the chlorinators, air blown, distilled, earth treated, filtered, and loaded for shipment. Aroclor Is a trade name used to designate chlorlnetion products of Biphenyl, Terphenyla or mixtures of the two. The physical properties vary from light free-flowing liquids to crystalline and non-crystalline solids. Depending on the degree of chlorination and the composition of the raw materials, Santowax R, and mlxturss of Biphenyl and Santowax R, or Biphenyl and Santowax C, yield products of Increasing viscosity up to non-crystalline resins. A numerical system of nomencleture, consisting of four digits, has been developed for Identifying the Aroclors. The thousands digit denotes the raw material used In the chlorination. The figure 1--- Indicates 100* technical grade Biphenyl. The hundreds digit denotes vhether or not the product Is distilled. The l--- Indicates undistllled, end the figure 2--- Indicates distilled. The tens and units digit denote the approxi mate percentage of chlorine contained In the finished product. For example, 1260 le a distilled chlorinated Biphenyl containing 601 chlorine. There are deviations from the above nomenclature when Solid Aroclors are produced. These are listed below: 1. Aroclors 6065 and 4465 Aroclor 4065 la the crude and 4465 le obtained by distillation. The starting raw material contains 40* Santowax R and 601 technical Biphenyl. This la chlorinated to 651. 2. Aroclors 5060 and 5460 Aroclor 5060 la the crude from which Aroclor 5460 Is distilled. The starting raw materiel is 1007. Santowax R which Is chlorinated to 60*. 3. Aroclor 5042 and 5442 Aroclor 5042 la the crude from which Aroclor 5442 la distilled. The starting raw material Is 1001 Santowax R which la chlorinated to 42*. 4. Aroclor 2565 This Is an undistllled product. The starting raw material consists of 25* Santowax C and 757. technical Biphenyl. This la chlorinated to 65*. MCNS 059627 OPERATING INSTRUCTIONS AROCLORS 2. SYNOPSIS OF PROCESS (Cont'd.) Chlorlnator Are* Thar* are four batch operated chlorlnatora and one continuous operated chlorlnator aystaei. The contlnuoue ayateie consists of four batch chlorlnators cascaded with overflow from one unit to the next. The product from the last stage la the finished crude Aroclor. Batch chlorlnatora are charged with 3,000 lbe, of Biphenyl and/or Terphenyl with 1>| lba. of Ferric Chloride catalyst. Chlorine gas added through a distributor plate reacts with the raw material to release HC1 and heat. The HC1 gas goes to the Muriatic Acid Department. Heat la taken away by water cooling coile In the chlorlnator. The specific gravity of the crude la checked every two hours until the chlorination is complete. In the continuous chlorination system Biphenyl Is fed to the first stage and chlorinated. Crude Aroclor overflows to the second stage, etc., - until the final product overflows from the lest stage. Each chlorlnator Is held at a different level of chlorination with the last stage being the final crude Aroclor desired. Normally Aroclor 1142 Is produced In this system. Crude Arodors from the batch chlorlnatora end the continuous aystsm ere transferred to e blowing tank to be air blown for one (1) hour einlnua before distillation. Still Area Llauld Aroclore Aerated Aroclore from a blowing tank or a feed tank le charged to a still, hydrated lime le added, a vacuum of 720 mm Hg (40 am Hg absolute) le applied, the still furnace la fired, and the Aroclor le distilled Into a receiver. The distillation Is seml-contlnuous since ten (10) receivers are distilled prior to drawing bottoms or residue from the still. Every two receivers are treated with 40 lbs. of earth for three hours and then filtered. The finished product Is transferred to storage tanka prior to loading Into drums or tank cars. Solid Aroclore Solid Aroclore are distilled In a similar manner to Liquid Aroclore except for 1168. Aroclor 1168 Is not air blown and le charged directly to the still from the chlorlnator. A vacuum of 4 mm Hg absolute Is applied for distillation. One receiver of 1268 Is distilled prior to drawing bottoms In the still. All other Solid Arodors have 2 or 4 receivers distilled prior to drawing bottoms in the stills. Solid Aroelors are not earth treated or filtered. They are drumsMd directly from the receiver or ere fleked (Aroclore 1268 end 5460). MOMS 059628 HOUSEKEEPING HONS 059629 OPERATING INSTRUCTIONS AROCLORS SAFETY AND HOUSEKEEPING Safety of operation* In the Aroclor Plant depends on the individual operator. Materials being handled and operations must be observed closely to guerd against the following: Cause & Action to Prevent 1. Chlorine Gat Chlorine gas la a very toxic corrosive gae. Leake or high pressure can occur to liberate it. Action to Prevent: a* Report Chlorine gee exposure immediately for treatment with Antidote* Milk may be used In mild cases to relieve throat Irritation. Oxygen from the resuscitator In the Dispensary Is available. b. Keep gat mask In good condition. Keep a good canister In the mask. Use these type masks only In Chlorine concentrations to 2-31 Chlorine In air. Co Use a Scott Air Pak In concentrations of Chlorine gaa above 3Z In air. Thra* units are available In the Arodor-Biphenyl Department. . d. If caught In Chlorine gas without a mask, hold your breath and go cross wind until you are out of range of the gaa. Place a handkerchief over your nose In small quantities of Chlorine. Report all Chlorine leaks for repair immediately* Make temporary repairs with tape if possible* f. In case of a major Chlorine leak the source of Chlorine gas must be stopped. Notify the Chlorine Plant immediately If the pressure on the Chlorine manifold exceeds 30 psig. Cut off liquid Chlorine from the car. 2. Thermal Burn* Contact with hot uninsulated product llnaa at the chlorlnatora and still areas. Contact ,wlth uninsulated steam Unas and open steam. . Contact with hot Aroclors from broken lines or leaks. Contact with open flames at stills or from heating lines In the department. MONS 059630 OPERATING INSTRUCTIONS AROCLORS 2. B. SAFETY AND HOUSEKEEPING Action to Prevent: 2. Thermal Burnt (Cont'd.) a. Know that contact with equipment and product will cause a thermal burn due to the high temperatures. Make changes In operations with this hazard in mind. b. Know the first aid treatment for burns. Cold Water Treatment (See Appendix A Emergency Section) c. Wear gloves and long sleeve shirts with the sleeves rolled down when operating. Gloves and clothing can make the difference between first and second degree burns. d. Report unln8ulteed lines for repair of Insulation, e. Use only steam lines with hose and hose clamps in good condition. f. The following operations are hazardous and should be done with care: (1) Catching samples at the Aroclor chlorinator circulating pumps. (2) Sampling the Solid Aroclor still receiver. (3) Drawing bottoms on the Aroclor stills. 3. Explosion An explosion could occur in the chlorlnators by slugging liquid chlorine to the dis tributor or shutting off the water dis charge valve on the chlorinator cooling coil. Slugs of Liquid Chlorine could react fast enough to cause excessive pressure in the vessel. A rupture of the chlorinator could occur. Closing the water discharge valve on the chlorinator cooling coil Isolates water in the coll. As the reaction occurs releasing heat, the water will vaporize and could split a coll and tank. Action to Prevent: a. Observe operation of the Chlorine vaporizer and do not let liquid Chlorine get into the rotameters. Pipe lines will be frosted. MGNS 059631 OPERATING INSTRUCTIONS AROCLORS 3. SAFETY AMD HOUSEKEEPING 3* Explosion (Cont'd.) 4. Falls HONS 059632 b. In case Chlorine feed lines ere frosted, close liquid Chlorine feed valve to the vaporiser. Check steam addition to the vaporizer. Inspect operation of the vaporiser. Do not start up until source of trouble has been located. c. Do not close valve in water discharge line from the chlorinator coll. d Observe temperature of the ehlorlnetor periodically and be sure it is not too hot (180C maximum). Slipping on cement floors, stairs, Aroclor on floor, ice conditions; tripping over objects (hose, pipe, valve handles, ete.); or losing footing on ladders, etc., can cause falls. Action to Prevent: a. The majority of minor, serious, and near miss injuries in the Aroclor Dept, are the result of falls. Prevention is always within the ability of the operator by use of expert operating practices. b. The following items should be done: (1) Return hose to rack after using. (2) Koep operating areas clean of ell foreign objects. (3) Return ladders to racks when not in use. (4) Keep gloves on and hands out of pockets, especially going up stairs, (5) Place guards around any area that presents a hazard that should be guarded. c. Poor lighting due to burned out bulbs should be corrected at once. Poor light ing due to inadequate facilities should be reported. d. Spills must be cleaned up immediately following their occurrence. Report any spill that ean not be cleaned up within the shift to the Chief Operatoi. Spills are to be reported in the log book. OPERATING INSTRUCTIONS AROCLORS 4 SAFETY AND HOUSEKEEPING 5. Flraa Fires can occur by: Biphenyl, Santowax R, or Santowax C Ignition. Chlorine problems In the vaporizer allowing reaction with steam to release Hydrogen. Furnace burner backfire. Wood, rags, or paper on hot lines. Sparks from welding apparatus or open flames. Action to Prevent: a. Area must be clear of trash or flamaable materials. Use trash skips and cans. b. Smoke only In areas so designated. c. Use spark producing equipment only with a fire permit end proper inspection. d. Use care In lighting gas torchs or the still furnaces. e. Fire fighting equipment Includes: (1) Two wheeled dry powder units. (2) Hose house with 200 ft. of hose. (3) Two dry powder hand extinguishers. One COj hand extinguisher. (4) Two 3/4" water hoses. (5) Hose connection north of Santowex. (6) Scott Air Paks. (7) Fire truck In fire house. f. Observe visitors In the plant and be sure they observe safety rules. 6, The following Is a list of the cheislcals hendled In the Aroclor Plsnt operations and the precautions to be taken during their handling: a. Chlorine Gas HONS 059633 Chlorine Is a very toxic corrosive gas. Leaks or back pressure can occur and liberate chlorlne gas In the area. Operators should have their cartridge type respirators handy at all times while In the area. Use of gas masks Is explained In Section B-l. OPERATING INSTRUCTIONS AROCLORS 5 SAFETY AND HOUSEKEEPING 6. a. Chlorine Gts (Cont'd.) If you are caught without a gas mask and large amounts of chlorine gas are liberated, hold your breath and go cross wind until you are out of range of the gas. Once out of the area, obtain an emergency gas mask and return to the area and correct the trouble A victim of chlorine gas fumes must be removed as quickly as possible from the gaseous area. Place patient on his back with head and back elevated. Milk may be used in mild cases as a relief from throat Irritation, If the patient has stopped breathing, start arti ficial respiration ismudlately. b. Biphenyl Biphenyl is a flammable material which will burn. Burning should not be done in the presence of Biphenyl or Biphenyl vapors. The melting point is 68.7C., flash point 106#C., the fire point 124C., and the auto Ignition temperature is 258C. Inhalation of Biphenyl fumes is not recommended since it can cause a drugged effect on the person. c. Santowax R Santowax R is a flammable material which will burn. It is relatively non-toxic to human beings. However, the vapors of Santowax R are irritating to the mucous membranes and bronlchlal tract. Prolonged breathing of the vapors should be avoided. The melting point Is 140C. d. Santowax C Same as Santowax R, since it is the crude material prior to distillation. a. Ferric Chloride Ferric Chloride is a black-brown solid. It causes only slightly irritating effects on the skin or oiucous membranes. When heated it will decompose and release toxic fumes of HCl (hydrochloric add) . It will react with water to produce toxic and corrosive HCl fumes. f. Attapulgus Barth This material is a dried earth. No danger in handling. Wash off with water to clean. g. Hydrated Line No particular hazard in handling this material The dust is irritating to the eyes and skin and should be washed off with water. h. Crude Aroclors HONS 059634 Crude Aroclors are hot since all are handled in steam traced or Jacketed lines. They can easily cause thermal burns in contact with OPERATING INSTRUCTIONS AROCLORS 6 SAFETY AND HOUSEKEEPING 6. h. Crude Aroelors (Cont'd.) the skin. Prior to air blowing, the material haa HC1 fumes entrained In it which are Irritating to the skin or mucous membranes. 1, Hydrogen Chlorine Gas This a corrosive gas which Is toxic. It Is Irritating to the mucous membranss, to the eyes, and to the respiratory tract. It will react with water to fora Hydro chloric Acid. J. Still Bottoms or Residue Fumes from still bottoms are toxic. They are extremely Irritating to the mucous membranes, to the eyes, and respiratory tract. HOUSEKEEPING The Aroclor chlorlnator and still operators are responsible for house keeping during their shift. Good housekeeping Is the mark of good operations, safety practices, quality, and costa. Housekeeping duties are equal In Importance with all other operating duties. Poor Practices Action to Prevent 1. Hoses, valve handles, dip a. Replace after use. sticks, rags, and other material on ground or floor, b. Have piece to store all necessary operating aids. Report needs to supervision. 2. Product leaks a. Tighten valve packing glands and flange bolti. b. Report leaks to Chief Operator for maintenance alteration. 3. Trash and crude drusu a. Contact chief to have drums moved from area. b. Use trash skip In area. 4. Product spills or clean out messes a. Prevent necessity of clean-out by keeping tracing, insulation, or Jacket In good repair by getting items turned In for maintenance work. HONS 059635 Spills must be cleaned up when they are made. Clean up will continue through the following shifts to finish the Job. MOMS 059636 s w u v tn w n io ' OPERATING INSTRUCTIONS AROCLORS DETAILED INSTRUCTIONS I. Chlorinatora and Blowing Tank Operation Crude Aroclora are produced by batch and continuoua chlorination In e vertical veaael. The reaction la cooled by water In an Internal coll and agitated by a circulating pump. Biphenyl, Santowax, or a mixture of the two la chlorinated with Chlorine gaa added at the bottom of the vesaela. NCI gaa vented at the top of the chlorlnator la a byproduct which la recovered In the Muriatic Acid Department. Crude Aroclor produced In batch or continuoua chlorinatora la tranaferred to the blowing operation when the chlorination la completed. Chlorine gaa can be fed to the chlorinatora from the Chlorine Plant or from tank cars. a. Batch Chlorlnator Operation (See Flow Sheet) (1) Charging Chlorinatora: (a) Chargee for the varloua crude Aroclora are as follows: Product Raw Material Tank Innage or Outage Aroclor 1121 II 1142 II 1148 II 1154 II 1160 It 1162 II 1168 II 2565 if 4065 If 5042 II 5060 , 3,000 lbs. Biphenyl 3,000 it ii 3,000 3,000 3,000 t n ii ii ii M 3,000 ii 3,000 it ii ii 1,870 lba# Biphenyl & 630 lbse Santowax C 1,620 lbs. Biphenyl & 1,080 lbs e Santowax R 3,330 lbs e Santowax R 2,500 lbs a Santowax R 68" 68" 68" 68" 68" 68" 68" If Crudo Aroclor 1142 la to be used to charge a batch chlorlnator for 1168, 1154, 1160, 1162, or 1168, the following amounts will be used. Ferric Chloride la not added to this material. Source of 1142 Inches of Material Crude Aroclor Blowing Tank 18" Crude Aroclor Catch Tank 501 of Taylor Instrument Each chargh contains 1% lba. of Ferric Chloride. HONS 059637 li HCL UNE TO MURIATIC ACID ABSORBERS CHLORINATOR CHLORINATOR CIRCULATING PUMP BATCH CHIQR1HATQB OPERATION -- - FLOW SHEET-- '' HONS 059638 lVJ Anniston plant -- MONSANTO CHEMICAL COMPANY - Anniston, ala. I TITLE ' (-BATCH CHLORJNATOR OPERATION-- FLOW SHEET . ' BftAWM T EAE AWMVKO DATS CAUB DEFT. NONE AROCLOR TS-A-701 OPERATING INSTRUCTIONS ( AROCLORS 2 C. DETAILED INSTRUCTIONS I. a. (I) (b) Drain tha charge tank and charging line If the new charge la to be different from the laat mix* (c) Set valves to receive a charge from the Biphenyl or Santowax Departments* Notify the operator you are ready for a charge. Biphenyl is obtained from the #1 or #2 Biphenyl catch tanks or the Biphenyl storage tanks. Santowax R or Santowax Cls obtained from the Santowax storage tanks. A normal 3,000 lbs. Biphenyl charge is 33 Inches innage in the charge tank for Biphenyl and 28 Inches innage for Santowax. Be sure steam Is on all transfer lines prior to starting the transfer of Biphenyl or Santowax. (d) One and one-half (1%) pounds of ferric chloride le slurried in Aroclor and dumped Into tha charge tank with each chlorlnator charge. Start the agitator in the charge tank and let' It run 13 minutes prior to charging the chlorlnator. Material in this tank should be a minimum 100C. when charging a chlorlnator. A steam coil is In the tank to maintain the temperature. (e) Close the 2" chlorine valve Into the chlorine distri butor on the chlorlnator. (f) Open the vent valve on top of the chlorlnator. (g) Open valve on charging line to the desired chlorlnator. Check to be sure the valves are closed to other chlorlnators. (h) Set valve at charge tank to the chlorlnator. Start tha charge tank pump (1) Make certain the charge is pumping by observing a drop in the level of material In the charge tank. (j) Check the charge tank to be sure it Is empty. Stop the charge tank pump. (k) Allow the charge line to drain back through the pump Into the charge tank. (l) Close valve under the charge tank, in charging line at the chlorlnator, and at the vent line on the chlorinator. (m) Set the valves on the chlorlnator to circulate the material from the bottom of the chlorlnator into the top MCNS 059639 OPERATING INSTRUCTIONS AROCLORS 3. DETAILED INSTRUCTIONS I. a. (2) Batch Chlorinator Operation: (a) Start-up, Shutdown, and Normal Operation; Assuming the chlorinator has been completely shut down, start-up Is as follows: 1. Make up a charge for the chlorinator and transfer as in the procedure (1) above. 2. Material In the chlorinators must be 120C before starting the chlorination. Check the multi-point temperature recorder. Steam can be put In the coll of the chlorinator to bring the temperature up If necessary. After start-up cooling water will be put In the coll. 3. Chlorine gas Is available from two eources--the Chlorine Plant and tank cars. Chlorine pressure on the manifold should be 20 to 25 pslg normally. Chlorine vaporiser operations are In Section f. 4. Open valve 1/3 to 1/2 on inlet rotameter to the chlorinator to be started up. Open outlet valve wide open. 5. Open valve on line to the chlorine distributor ae the chlorinator (wide open). 6. Adjust rotameter at chlorinator header to a 600 lbs/hr. chlorine reading for one (1) hour. After one hour the chlorine rate can be Increased to 800 or 900 lbs/hr. 7. Cooling water to the coll in the chlorinator can be regulated to maintain the operating temperature of the chlorination as noted on Tabla I, Page 4-a , As the chlorine feed Is increased normally, the water rate must be Increased. 8. Samples are taken at the suction line of the circulating pump at the bottom of the chlorinator. Dependent on the material being produced, the specific gravity, softening point, or hold point, are run on all the batch chlorinators every two (2) hours or odd numbered hours (7, 9, 11, etc.). On some of the higher chlorinated products samples are not started until the chlorinator has been on for four (4) hours. 9. When the chlorination is near completion it may be necessary to run the specific gravity, softening point, or hold point every 10 to 15 minutes. HONS 059640 OPERATING INSTRUCTIONS AROCLORS DETAILED INSTRUCTIONS 4. I. a. (2) (a) 10. Whan tha chlorination haa been completed (See Table I on Page 4*11. ahut off the chlorine feed valve to the distributor at tha chlorlnator. 11. Note the chlorine preeeure on the main header. If It la above 30 pelg notify the chlorine plant you have removed a chlorlnator or chlorlnatora from operation. Tell them when you can atart It back up. If more than one chlerinator la to be off at a time, notify tha chlorine plant prior to shutting off tha chlerinator. 12. Meaaure the outage of the blowing tank to be pumped Into. 13. Sat valvea on the chlorlnator to pump out line to allow traneferrlng to tha dealred blowing tank. 14. Cloae valve on the chlorlnator pump-out lino, atop circulating pump, and meaaure outage on the blowing tank. 15. Record tranafer Information on each chlorlnator in tha log book. Normal blowing tank lnnagea ara: Arodor Blowing Tank Innage 1121 1148, 1154, 1160, 1162 5060 16. Tha chlerinator la now ready to start back up. NOTE: If thla chlorlnator has had 1160, 1162, 1168, of 5060 in It, and It la to be ahut down for 2 or 3 hours, waah tha chlorlnator out with approximately 100 gallons of 1142. (b) Temporary shutdown of a chlorlnator: During ndrmal operation, failure ef chlorine feed, a tank car ampting, or a cutback at tha chlorine plant can cause short shutdowns on the chlorlnatora. Normally If a partial reduction In chlorine feed occurs, tha continuous system la shut Off and batch chlorlnatora are operated. 1. Shut off the chlorino valve at the distributor an the chlorlnator or chlorlnatora as necessary. 2. Check the chlorine header pressure and rotameter feed to other chlorlnatora. It should be 20-25 pelg. M0NS 059641 tABLE I BATCH CHLORIHATOR OPERATOR? CCBDITICWS aroclor Chlorlnator Charge: Biphenyl (Lbs.) Santowax C Tl21 LIQUID AROCLORS 1142 114A 1154 3,000 3,000 3,000 3,000 3,000 3,000 3,000 Stntowu R. Approximate Pound. Chlorine Required to produce Batch 1,600 3,330 5,560 7,040 9,030 9,480 12,740 Chlorination Tonp: Beginning 130C 130C 130C 130C 130C 130C 130C Ending 140C 150 C 155C 155C 160C 160C 265C Pinal Specific Gravity 1.150 Range 1.160 0 65C 1.344 1.357 0 65C 1.410 1.420 0 65C 1.500 1.510 0 65C 1.558 { 1.582, 1.572 11.586 1 0 90C 0 90cj' O Hold Point SOLID AROCLORS 1, 870 630 1,620 1,080 9,300 10,100 140C 180C 140C 210C 5042* 3,330 3,630 160C 240C 5060* 2,500 7,500 160C 250C HONS 0 5 9 6 4 2 Softening Point Height of Crude Batch *Soild Aroclors 3,750 5,080 5,550 6,350 7,160 7,545 7,080 66 72C 6,660 22 72C 50 56C 7, 160 4,250 105 115C 6,000 OPERATING INSTRUCTIONS AROCLORS DETAILED INSTRUCTIONS 5. I. a. (2) (b) 3. Check to tee that liquid chlorine le being fed to the vaporizer and that eteain is on the vaporiser. Steam pressure should be 10 psig. Discharge pressure on the vaporizer should be 1 to 2 psig greater than the pressure on the chlorine header. (Normally 23 psig on air regulator valve setting). 4. Notify the chlorine plant of the problem and see if they have shut down or cut back. 5. If the shutdown is to be longer then two hours, it may be necessary to put steam on the chlorinator coil to keep the temperature at 120C minimum. Normally the circulating pump will continue to run. 6. Shutdowns should be minimized. If the cause of the cutback can easily be remedied, start the chlerlnetors beck up immediately. 7. Notify your Chief Operator or Department Supervision Immediately in case ef e problem. (c) Prolonged Chlorinator Shutdown: Operations can occur which will require e day or longer shutdowns. Normally e chlorination will ba finished and pumped out as in normal operating procedure (a) above. The chlorinator will be shutdown completely end the cooling water cut off the coil. If maintenance personnel ere to work on the chlorinator it may be neeeesary te vent the vessel end purge it with C02* NOTE: Chlorine valves an the main headar te tha ehlerlnator will ba tagged out as well as transfer lines into the vessel. The circulating pump or circuit breaker hex twitch will be tagged out. b. Continuous Chlorinator Operation (See Flow Sheet) The continuous chlorinator operation consists ef four caecade flew chlerlnetors in series where specific levels ef chlorination occur. Biphenyl Is fed into the first chlorinator where the material is chlorinated end overflows to the second chlorinator. This continues until tha finished preduct comes off the final unit, flews threugh the continuous blew tank, end te the catch tank. Chlorine is fed te each chlorinator continuously. This chlorination system can ba reduced te three (3) chlorlnators In series In case problems occur with one unit. Normally 1142 is the only liquid Arecler produced on the continuous systtm, however, 1148 and 1154 can also be produced with the chlorlnators set for different levels of chlorination. MOMS 059643 "UN0|Q OPERATING INSTRUCTIONS AROCLORS 6. DETAILED INSTRUCTIONS I. b. (1) Charging Mix and Feed Tanks: (a) Check the level In the mix tank. The tank low level annunciator alarm should have sounded (Set for 25% full). Silence the alarm by pushing the acknowledge button on the control panel. (b) Set valves to receive a charge of Biphenyl. Notify the Biphenyl still operator to pump a charge to the mix tank. Fill the tank to a 75% full level. Cleee the valve in the charge line. (c) Start the agitator in the mix tank. (d) Add 3% pounds of ferric chloride. Allow the Biphenyl and ferric chloride to mix until the feed tank requires filling. (e) The feed tank low level alarm sounds the annunciator system at 25% full in the feed tank. The mix tank batch can be dropped into the feed tank. (f) Stop the agitator in the mix tank. (g) Open the valve under the mix tank and allow the Biphenylferric chloride mix to drop into the feed tank. The level indicator in the feed tank should indicate approximately 85% full. (h) Close the valve under the mix tank when the mix tank is empty. (1) Prepare another mix for the Biphenyl mix tank as noted above. Low level alarm in the mix tank should sound. (2) Continuous Chlorinator Operation: (a) Start-up and Normal Operation: 1. Charge each of the four chlorinators (#5, 6, 7, & 8) with Biphenyl as in a regular charge. Start cir culating pumps on the chlorinators. See Section C.I.a. 2. Chlorinate the material to the following levels: Stage 1st 2nd 3rd 4th Chlorinator 5 6 7 8 Specific Gravity 1.078 - 1.104 1.170 - 1.196 1.254 - 1.280 1.336 - 1.362 MGNS 059645 OPERATING INSTRUCTIONS A&OCLORS 7 DETAILED INSTRUCTIONS 1. b. (2) (a) 3. Close the valve on the chlorine distributor en each chlorlnator when the correct specific gravity level has been reached. Hold this chlorlnator until all four are ready. It nay be necessary to put steam on the chlorlnator to keep the temperature at 120*C. 4. Check the Biphenyl feed tank to be sure a mix has been charged. 5. Set the valves on the Biphenyl feed line to #3 chlorl netor to allow circulation back to the feed tank. 6. Start the Biphenyl feed pump. 7. Set the valves on the overflow lines at the chlorl* natore as follows. Crude from #5 chlorlnator to overflow to #6 chlorlnator, #6 overflows to #7, #7 overflows to #8, #8 overflows to the continuous air blow tank, and then to the crude Aroclor catch tank. 8. When all four chlorlnators have reached the correct specific gravity level, start the chlorine feed to each of the chlorlnators (600 lbs/hr. on each) and open the valve to start Biphenyl feed to #5 chlorl* nator (2 GPM Biphenyl). (See Table II). Chlorine feed is adjusted at the rotameters on #5, #6, and #7 chlorlnators to maintain the required specific gravity level. The required specific gravity is set on the Taylor controller for #8 chlorlnator (normally 1.330). The Accu Ray controller will adjust the chlorine feed automatically to #8 chlorlnator to maintain the indicated specific gravity. Normally #5 chlorlnator chlorine feed Is lower than tha other three chlorlnators. 9. Samples will be caught and the specific gravity run on chlorlnators #5, #6, and #7 every other hour on evenhours (8,10, 12, etc.). A sample will be run on #8 chlorlnator every 4 hours (8, 12, 4, 8;**)* 10. Cooling water to the coil in the chlorlnators can be regulated to maintain an operating temperature range In the chlorlnators at 120~160*C As the chlorine feed is increased normally the water rate must be Increased. 11. Crude Aroclor 1142 produced on the #8 chlorlnator overflows into the continuous air blow tank. Air regulated to 5 psig at three manual control valves is blown Into the Aroclor. The crude Aroclor then flows into the Crude Aroclor catch tank. MQNS 05964b table II 7a. \ OPERATINS OF BIPHENYL FLOW & SPECIFIC GRAVITY RECORDER CONTROLLERS This procedure starts with the FRC set at manual and gives step-wise changes to automatic and back to manual. This is for the Taylor Recorder Controllers used on: 1. Biphenyl feed on the continuous chlorinators and 2. Aroclor specific gravity on No. 8 Chlorinator. Operation 1. FRC on manual Set point moved to give desired flow as indicated on recording sheet Switching FRC Manual Seal Automatic Adjust FRC set point knob until control valve gives the desired flow indlceted by Red recording pen. 2. Transfer FRC to seal. Place set pointer (Red) opposite flow recording pen (Red) 3. Transfer FRC from seal to automatic. Adjust FRC set pointer until flow levels out if any fluctuations occur. The instrument can be left in this position for automatic control of flow ee the set point le adjusted. Return System to Manual Control 4. Note FRC output air signal. Transfer from automatic to seel. 5. Adjust FRC set pointer (Red) to the seme output air. 6. Transfer from teal to manual. Adjust set point if fluctuations ( occur. MONS 059647 OPERATING INSTRUCTIONS I AROCLORS C. DETAILED INSTRUCTIONS 8. I, b. (2) (a) 12. A high annunciator alarm signal will indlcata vhan to transfer material from the crude Aroclor catch tank. The high level alarm is set at 757. full tank on the level gauge. When the high alarm sounds you normally have 30 minutes to start pump out or material begins to back up and fill the chlorinator system. Off-grade material will be produced If this occurs. 13. Crude 1142 may be transferred to a blowing tank, the #3 Aroclor still roof tank, to the charge tank, or to a batch chlorinator. Normal operation is to a blowing tank. 14. Set valves to allow transfer from the crude Aroclor catch tank to the blowing tank. 15. Measure the outage on the bloving tank. 16. Start the catch tank transfer pump. 17. When the level In the tank reaches OX on the level < gauge close the valve In the discharge line at the pump. Stop the pump. 18. Measure the outage In the blowing tank. Racord this Information in the log book. Approximately 30" to 36" of material will be transferred Into the blowing tank. 19. In routine operation Crude 1142 Is sometlmas charged to the batch chlorinator charge tank or dlractly to a chlorinator for chlorination to a higher Aroclor. A chlorinator charge of 1142 la 50X of the Taylor level indication gauge on the catch tank. 20. This chlorinator system will continue to operate with the following normal operation. a. Make mix tank batches. b. Fill feed tank as required. c. Check specific gravity on individual chlorlnstors. d. Correct chlorine flow rate to individual chlori- nators as required. e. Transfer crude produced in the eetch tank as required. f. Observe temperature on the chlorlnstors and adjust water rate as required. (b) Temporary Shutdown: MOMS 059648 During normal operation failure of chlorine feed for any reason can cause short shutdowns on the continuous chlori nator system. For temporary partial cut-backs the batch system is operated and the continuous chlortnatora are cut OPERATING INSTRUCTIONS AROCLORS DETAILED INSTRUCTIONS 9 L b. (2) (b) off. The batch chlorlnatora can be fed chlorine from a car while the chlorine plant blows air to the continuous units. In case of cut back to the continuous chlorlnatora proceed as follows: 1. Shut off the automatic Biphenyl feed valve to the #5 chlorlnator by using the automatic controller* 2. Close the valves at the chlorine distributor on chlorlnatora #5, 6, 7, and 8* 3. Close the manual block valve at the automatic Biphenyl feed valve to assure no leakage occurs* 4. Proceed to check out system to determine the reason for the cut back if you have not been informed* Example: Empty chlorine car, chlorine plant cut back, failure of chlorine vaporizer, electrical failures* 3* Notify the chlorine plant of the problem if it is in the Aroclor Dept* If the chlorine plant has cut back ask for how long. Start feeding from the chlorine car. 6. If the shutdown is to be longer than two hours it may be necessary to put steam on the chlorlnator coll to keep the temperature at 120C minimum. Normally the circulating pump will continue to run. 7. Notify your Chief Operator or Department Supervision in case of a problem. (c) Prolonged Chlorlnator Shutdown: Operation or inspection of a vessel can occur which will require a longer shutdown than 8 to 10 hours. In this case the chief operator and department supervision should be contacted Immediately. (d) Continuous Operation on 3 Chlorlnators: Routine inspection of the catalyst in the Aroclor chlorinators occurs every six months. At this time a chlorl nator must be shut down and taken out of service for 8 to 12 hours. In this case the following procedure should be followed to run 3 chlorlnatora continuously: 1. Switch valves on the overflow line from one chlorlnator to another to allow by-passing a particular chlorlnator. MGNS 059649 OPERATING INSTRUCTIONS AROCLOR S 10. DETAILED INSTRUCTIONS I. b. (2) <d) 2. Shut off the Biphenyl feed to the first stage chlorinator. Chlorinate the material to the following levels; Stage 1st 2nd 3rd Chlorinator 5 6 8 Specific Gravity 1.108-1.124 1.224-1.240 1.345-1.355 NOTE: Indicates #7 chlorinator out of the syste Any one of the four can be by-passed. Start the Biphenyl feed again. 4. Continue operation of the contlnuoue system. The chlorinator removed from service should be chlori nated to a finished Aroclor and pumped out. The chlorinator will be shut down completely. Stop water flow to the cooling coll* II maintenance personnel care to work on the chlorinator it may be necessary to vent the chlorlnatox and purga it with C(>2. The Chlorine In the feed line from the rotameter to the distributor should be vented into the chlorinator and then shut off prior to venting the vessel* NOTE: Chlorine valves on the main header to the chlorinator will be tagged out as well as transfar lines into the vessel. The cir culating pump switch or circuit braakar box will be tagged out. c. Blowing Tank Operation Crude Aroclor* produced in the chlorinators must be air blown for a minimum of one hour before the material Is fad to the stills. Steam Is maintained on the colls of the blowing tank during this operation. Residual HC1 blown out of the crude Aroclor Is drowned In e S&K water jet which pulls a suction on the blowing tanks. (1) Transferring batch to blowing tank: HONS 059650 (a) Measure outage on blowing tank material is to be trans ferred into. (b) Sat valves in pump-over line so material will be pumped only to the desired blowing tank. (c) Open valve at chlorinator from the circulating line Into the pump-over line. (d) Close valve In circulating line back into the top of the chlorinator. ( OPERATING INSTRUCTIONS AROCLORS 11 C. DETAILED INSTRUCTIONS I. e. (1) (e) Check the blowing tank to be aure material is flowing into it. (f) When the transfer of material is complete, close valve on the pump-over line and open valve in the circulating line into the top of the chlorinator. (g) Measure outage on blowing tank after material has been trans ferred. Note measurements before and after transfer in the log book. Examples of Innage expected are: Crude Aroclor Blowing Tank Innage 1121 1148, 1154, 1160, 1162 5060 14" 16"-18" 20" (2) Air Blowing Crude Aroclors: (e) Open the velve in the water line feeding the Schutte & Koerting drowning Jet* (b) Check the blowing tanks to be sure the Jet is pulling a suction on the tanks. Open hatch on the lid of the tanks to feed the suction, then close the hatch. (c) Open valve in air distribution line to at least two of the four blowing tanks. (d) Open discharge valve on the air blower to be started. (e) Close discharge valve on the air blower to be left idle. (f) Start motor on the air blower. (g) Crude Aroclors transferred to the blowing tanks must be air blown for at least one hour before feeding to the still. (3) Transferring material from blowing tank to a still or roof tank: (a) Check material in the tank to be sure it is the Aroclor needed and has been air blown the required length of time. (b) Turn steam on transfer lines and the pump. (c) Set valves in transfer line to tank material is to be pumped to. Notify still operator if tank is in his operating ares. (d) Start blowing tank pump. MONS 059651 ( .OPERATING INSTRUCTIONS AROCLOR S 12 C. DETAILED INSTRUCTIONS l. c. (3) (t) Check level in the tank to be sure materiel is being trans ferred. (f) When the transfer la complete atop the pump and close the pump auction and discharge valves. Mii-asurc outage in the t#r.k. d. Hethod of Running Specific Gravities: (1) Catch representative sample of material In metal cylinder provided for this purpose. On the ehlorinators, the sample point is at the pump suction or inlet. (?) Take sample to control room. (3) Allow water to run down outside of cylinder while stirring semple vigorously until the sample la 10C above the temperature at which the sample la run. See Chart l page 4a. (4) Cut off the water whan the sample la 10C above the deelred tempera ture. Keep stirring until the sample Is 1C above the temperature at which the sample is to be run. Stop stirring. Allow the hydro meter that has bean thoroughly cleaned to sink Into the sample until it reaches equilibrium. (5) Observe reading on the hydrometer. Record on the operating data sheet along with the time the sample was taken. (6) In case the temperature was off one or two degrees when the reading was taken, a correction can ba applied. It la 0.001 specific gravity unite per C. If the temple wee 2C high, add 0.002 specific gravity units to the reading. If the sample was 2C low, subtract 0.002 specific gravity unite from the reading. (7) Carefully clean the hydrometer and thermometer. Place them in tack provided for this purpose. Dump sample in the 55 gal. drum for this purpose. ' Method of Running Hold Points MQNS 059652 (1) Obtain representative sample of material from saoq>le line at inlet to pump. Catch sample in a pint can. (2) The racaptacla for running the sample la 1" x 4%" pyrex tuba sealed at one end. The tube la inserted in e square 8 ounce bottle which la Insulated in bottom by a layer of 1" asbestos fiber. The tuba is held in plane by a large cork. The insulation is used In an / effort to keep the Aroclor from cooling too rapidly. (3) Pour the material Into the tube until It is filled within iy of the top. (4) The material will probably crystallize in the cold tube and will have to ba melted again. OPERATING INSTRUCTIONS AROCLORS 13. DETAILED INSTRUCTIONS t. (5) When materiel Is melted, Insert e suitable thermometer (0-360C) which Is fitted with a cork to hold It In place. The bulb of the thermometer should be fitted In the center of the sample, care being taken that It Is not too close to the aide of the tuba. (6) Heat the tube to 200C, piece It In the asbestos Jacket and then put It In the bottle. (7) Take readings on the thermometer every 30 seconds. At first the temperature will drop rapidly (4-6C between readings). This drop will decrease and finally coma to a stop, and stay constant for several readings or will start to go back up several degrees. (8) Record the point at which the temperature remains constant, or In cate of a rite, the highest point of the rise Is the hold point of the material. f. Method of Running Softening point* (1) Obtain representative saaple of Material from sample line at Inlet to puap. Catch saaple In can lid or pyrex beaker. (2) Heat ring and saaple. (3) Place ring on can lid or aetal plate and fill with saaple until asterlal stands slightly higher than edge of ring. W Cool ring and lid froa bottom of sides until saaple sets up, being careful not to get any water on top of saaple* (5) Finish cooling by running water on top of saaple, after it sets up. (6) Remove filled ring froa lid and trla off any material that is on the outside. (7) Make slight indentation on top of sample In the center of the ring with a heated wire to hold ball in plac~ (8) 711 1 .bea,ker with water or clycer,ine. MGNS 059653 (a) Use water when expected softening point Is under 80C. (b) Use glycerine when expected softening point Is over 80C. () Place ring in saaple holder, place ball on saaple and put holder in beaker. (10) Adjust thermometer In holder so that tip of bulb protrudes 1/4" through hole in cross bar that holds samples. (11) Place beaker on stand with screen under it and set burner under the stand. operating instructions AROCLORS 14. DETAILED INSTRUCTIONS f. (12) Light burner and adjuet to give a temperature rise aa shown on the thermometer of SC par minute. (13) Bring temperature up 5C per minute until bell falls through sample. (14) Record temperature at time ball falls to lower cross bar as the aoftenlng point. g. Chlorine Vaporiser Liquid Chlorine from tank cars la vaporized In a shell and tube exchanger using steam for heat. Vaporized chlorine at 25 palg enters the chlorine header to the Arodor chlorlnatora. The vaporizer has the following safe guards: (1) Chlorine level control on vaporizer. (2) Steam pressure regulator - maintain 10-12 palg (team praasura. (3) Steam control valve - regulated by temperature control of chlorine entering the vaporizer. (4) Chlorine faed control valve to vaporizer. (5) Chlorine faed pressure control valve to chlorine header from the vaporizer discharge. The controls for this unit are necessary to minimize the possibility of a chlorine leak or a fire. Excessive heat above 25 palg steam pressure will allow chlorine to corrode Iron at axceaslve rates. Holes will occur In the tube bundle end steam will mix with chlorine. A reaction occurs to form HC1 gaa and H*. At theae temperatures a fire will normally occur and the hydrogen will burn. (1) Start Up Chlorine Vaporizer: (a) Open manual valve on the steam line to the vaporizer. (b) Set the vaporizer temperature control at 65C to 70C to allcw the steam control valve to open. (c) Check to be sure steam pressure to the vaporizer la 12 palg or lower. (d) Hook up take-off lines to the chlorine car. Hear gaa mask while making this connection. Open valve on the car to take on chlorine when cer la connected. Open valve In the liquid chlorine line. (e) Open the block valves on each aide of the automatic liquid chlorine take-on valve. Close the by-pass valve around the control velve. MQNS 059654 OPERATING INSTRUCTIONS ( AROCLORS 15. C PE'lAltEO INSTRUCTIONS I. g. (1) (f) Check the vaporizer level control to be sure It closes the liquid chlorine control valve when the vaporiter Is approxi mately one-half full. (g) Set the air regulator to the chlorine feed valve to the chlorine header* Set to maintain a pressure of 25 pslg on the chlorine header* Open this valve slowly* This valve begins to open et 18 pslg - it is wide open at 30 pslg. (h) Observe operation to ba sura the chlorine header pressure does not exceed 25 pslg end the steam pressure to the vaporiser Is below 12 pslg* High chlorine pressure can cause extreme problems at the chlorine plant and result in chlorine release to the atmosphere. (2) Shutdown Chlorine Vaporiser: (e) Close block valve on each alda of liquid chlorine control \ valve* (b) Allow steam to vaporize liquid chlorine in the vaporiser. (c) Shut off block valve in steam line to the vaporizer or close the steam control valve by adjusting the set point on the vaporizer temperature controller. (d) Close the automatic chlorine feed valve to the chlorine header. Close the block valve in the line to the header. () If the liquid chlorine car is to be disconnected do the following: 1. Put on gas mask for use In connecting end disconnecting car* 2* Close manual valve in 1" liquid chlorine line to vaporizer* 3. Close angle valve on top of the chlorine tank car. 4. Break union on the pipe connection line. Slowly let the chlorine pressure bleed off. When pressure Is released remove the piping. HGNS 059655 l h. Trouble Shooting Chlorlnator and Blowing Tank Operation Problem Possible Cause & Action (1) High Chlorine Pressure a) Vaporizer feeding too much chlorine on Header (30 pslg or more) from car. Action: Check operation of vaporiser OPERATING INSTRUCTIONS AROCLORS 16. DETAILED INSTRUCTIONS I. h. Trouble Shooting Chlorlnator & Blowing Tank Operation (Cont'd.) Piobiem Possible Cause & Action Action: Ccnt'd. set point of chlorine valve to the header (should be 25 pslg or less) b) Chlorine Plant may be sending an excess amount of air. Action: Check with Chloine Plant chief operator. c) Two, three, or more ohlorinators nay bs cut off. Action: Notify Chlorine Plant chief operator. Get chlorinators back in operation as soon as possible. d) Pressure gauge could be bad. Action: Check other gauge. Notify chief operator gauge needs replacing. e) Valve to HC1 Dept, or line could be closed or plugged. Action: Check acid operator. Observe pressure gauge on HC1 off-gas line. Open valve If closed. Go down drowning tower if tower line is plugged. (2) Chlorine leaks a) Leak at. pipe lines, flanges, ruptured line. etc. Action: Use ammonia bomb to find the leak. Shut off (valve off) leek from system if possible. Nofity chief operator need for repair. Make temporary repair or shut down if necessary. HONS 059656 ( OPERATING INSTRUCTIONS AROCLORS 17. c PTAILED INSTRUCTIONS X. h. Trouble Shooting (Cont'd.) Problcm Possible Cause (* Action b) Pressure problem at. Chlorine vaporizer. Action: Check rupture disc c-r relief valve t.o if they are blowing. Match chlorine pressure on vaporizer. Shut off chlorine from the tank ret and bleed the vaporizer pressure down. c) Vaporizer tube leaks. ' 1 Action: Check steam pressure to vaporizer. May fall off. Check vaporizer chlorine pressure. Watch for chlorine leaks. Shut off chlorine from th* tank car and bleed the vaporizer pressure down. (3) HCI fumes a) Fumes from the blowing tanks. Action: Check water pressure to the S&K jet (should be 30 pflg minimum). Check to see if a valve in the vapor line le closed. Water line to jet can become plugged with sticks, etc. from the cooling tower. It may be. necessary to * shut off air blower temporarily. b) Fume8 from the HGl off-gas line above the chlorinators. Action: Check, pressure of HCI header (normally 1-?. peig). If greater it may be necessary to go to the drowning tower. If necessary use ammonia bomb to find the leak. Hake temporary repair or notify chief operator need for permanent repair. Valve off leak if possible. I c) Fumes from charging * ch] ori nac.or. Action: Complete charging of the vessel and shui off the vent valve. MGNS 059657 OPERATING INSTRUCTIONS ( AROCLORS 18. C DETAILED INSTRUCTIONS l. h. Trouble Shooting (Cont'd.) Problem Possible cauae & Action (A) Chl.orlnator temperature a) Cooling coil plugged or plugging, hi gh Action: Check water flow to the chloriliator. Be sure maximum water is being used. Check coll to see if it is plugging (water valve wide open & email stream of water flow). Check water feed pressure to cooling coil* (normally 60 pelg) b) Chlorine feed to high. (1,000 Iba/hr. or above) Action: Reduce chlorine feed If additional water la not available. (5) Leaking valve, pipe line, ( flange, pump, etc. a) Aroclors are a hard material to contain in pipe line*. The material 1* hot causing leak*. Action: Try to tighten up on valve stuffing box, bolt* at flange, etc. Notify chief operator if additional repair work is needed. b) Leaks at pumps with mechanical seal* oi * packing. Action: Notify chief operator the mechanical, seal needs to be adjusted or replaced. On pumps with packing glands, try to tighten leaking gland plate. If leak can not be stopped, notify the chief operator. (6) Plugged Lines a) Biphenyl, Santowax, and Solid Axoclor line* plug easily when not hot. Action: Check to be sure steam or hot Aroclor Is on pipe line. If not, I put. steam on and give it time to heat up the line. Check pipe lines and valves for exposed area* not steam traced or Insulated. Use. HONS 059658 CO2 and try to blow the line out. Use a torch flame to heat the pipe line as a last resort. OPERATING INSTRUCTIONS AROCLORS 19. DETAILED INSTRUCTIONS I. h. Trouble Shooting (Cont'd.) Problem Possible Cauae & Action (7) Free Chlorine off Chlorlnator Normally free chlorine is indicated in the off-gas vent line at the HCl absorber sever box* Free chlorine lose is e safety hazard as well as an excessive cost. It can be caused by Inadequate reaction of the Biphenyl and might Indicata formation of unstable Aroclors. If this situation can not be corrected Immediately the following should be checked: Action: a) Gat samples of ArocLor from the chlorlnatore and check for water. If water is in the Crude Aroclor it will boll and bubble more than usual - appears to sizzle* In cast water is found In a sample remove the chlorl nator from service. Normally a hole in the cooling coll will be the source of water. b) Check chlorlnator temperatures on ths multipoint temperature recorder. Each chlorlnator ahould be above 120C* Use steam In the colls to heat up If ntcessary. A quick increase In chlorine will sometimes raise the temperature quickest* c) Check the off-gas sample for each chiorinator and have the Lab run analysis for free chlorine. Isolate the bed chlorlnator* Normally Lab analysis Is light yellow to yellow in color. Red Indicates excessive free chlorine In the liquid chlorinatora. Red color la normal for the solid chlori natora* Resample a chlorlnator with ex cessive free chlorine* Remove this chlorl nator from service and tee If the problem of free chlorine is solved* d) Inadequate amounts of catalyst present as Ferric Chloride or iron turnings can cause excess free chlorine In the off*ga line* This situation ahould never occur since the chlorlnator* ace checked every six months. If It ahould, notify the chief operator and department supervision immediately. MOWS 059659 OPERATING INSTRUCTIONS AROCLORS 20 DETAILED INSTRUCTIONS I. h. Trouble Shooting (Cont'd.) Problem Possible Cause & Action (8) Leaking Cooling Coll In Chlorinators Corrosion in the chlorinatore occasionally result* in a water leak into a chlorinator. Wet chlorine and HCI gag are extremely corrosive ard can cause extensive damage fast. Any leak should be found and the chlorinator removed from service immediately. Action: a) Sample the chlorinator* and check for water. If water Is present in the Crude Aroclor it will holl AnJ bubble more than usual appears to sizzle. b) Off color a id <u t> f'.iiactc Acid absorber may indicate in* I'loirture proMe.t. Excess corioMon wcjU pur irc.i in the HCI gas and cause the towr-r acid to be yellow instead of cl ear. HONS C59660 OPERATING INSTRUCTIONS AROCLORS 21. c * detailed INSTRUCTIONS 11. Aroclor Stills. Earth Treatment, and Filtration Aerated Crude Aroclor from a blowing tank or a roof tank is fed to the still tank. Hydrated lime la added to the Crude Aroclor. Vacuum la applied to the still and the Aroclor la circulated through the furnace coil and heated to the vaporization temperature* Vapors pass up an open column to the condenser. Distilled Aroclor is collected in a receiver and then transferred Into a blending tank. ^ Distilled Aroclors are treated with Attapulgus Earth In the blending tank,[ filtered, analyzed, and packaged or held in storage. Aroclor 1266 and all distilled Solid Aroclors do not receive earth treatment. They are drawn directly from the receiver Into suitable containers or trans ferred to the flaker operation. Still residue or bottoms from each distillation are sold as Montars or discarded. a. Charging and Start-Up of Aroclor Stills (1) Charges for various Aroclors: Under normal conditions Crude Liquid Aroclore are charged con tinuously to the still from a blowing tank or roof tank to a 55" outage. This level ia maintained by an automatic level con troller. Occasionally, Liquid Aroclors are charged batch-wlae. When this Is done, the crude Is charged to a 25" outage. Aroclor 1168 is never charged continuously, since this crude is pumped directly to the still from the chlorlnacor. This Aroclor le not air blown. Crude Solid Aroclors are charged batch-wise to a 30" outage in the still. (2) Prepare blowing tank for transfer of charge. (a) Check to be sure steam is on the pump and charging lines. Material to be pumped must be hot or It will damage the mechanical seals on #3 and #4 blowing tank pumps. (b) Check temperature of material in blowing tank to be sure It is hot enough to transfer (120-140C). (c) Check with chlorlnator operator to be sure Crude Aroclor has been elr blown one hour. (3) Prepare Still to receive charge: (a) Close valve in bottom line under the still. (b) Open vent valve on the still. MQNS 059661 (c) Remove vent cap on measuring nipple on the still. OPERATING INSTRUCTIONS AROCLORS 22. c rglAlLE-D INSTRUCTIONS II. a. (3) <d) Open valve on charging line at the still. Heat on valve is sometimes required on Solid Aroclora. (e) Set valves in charging line to pump from the desired blowing tank to the correct still. (f) If Aroclor 1168, 4065, 5042, or 5060 is to be distilled ap proximately 75-100 gallons of 1142 or 1154 should be charged to the still and heated to 200C. The neaterlal Is then drawn out of the still. Otherwise the still pump may plug. (*) Close main valve In vscuum line to the still just above the receiver. Start steam to the vacuum Jets. Adjust water to Intercondenser on middle stage. The Jets on #2 and 43 stills should pull down to 20-30 tom Hg absolute on the receiver. No. 1 still Jet should pull down to 3-6 mm Hg ebsolute on the receiver. (4) Charging the still and start-up: (a) Set valves in line to the still. (b) Start the blowing tank pump. (c) Observe material entering the still. (d) Insert rod in measuring middle on the still and check amount of material In the still. As soon as 10-15 inches of material is In the still, start the circulating pump. (e) When complete charge is in the still stop the charging pump. Allow lines to drain and close valve in charging line at the still. (f) Close valve under blowing tank. (g) Add hydrated lime through the measuring nipple using funnel provided for this purpose. Add 250 pounds of lime for each five (5) still receiver batches of liquid Aroclor. All solid Aroclors (1268, 4465, 5442, 2565, and 5460) require 100 pounds of lime for each still batch. MQN5 059663 (h) Replace cap on nipple over still. (i) Light gas burners on furnace end set gas pressure at 5 pslg on each burner. (J) Check temperature recording instrument to be sure It is operating correctly. (k) In case temperature chart does not indicate a rise in temperature, check for plugged lines or instrument problems. OPERATING INSTRUCTIONS AROCLORS 23. DETAILED INSTRUCTIONS II. (A) (k) Turn the pump off and on a couple of tiroes. It nay be necessary to pull a vacuum through the coil. Check the still pump ampmeter to be sure the pump Is pulling a load. Have the electrician check the instrument if the tempera ture does not rise. (l) Adjust the gas burners to give maximum rate of temperature rise without overheating. A spread of 10-1SC between the coll inlet and outlet is normal. Gas pressure is normally as follows on the stills when maximum rate is achieved: Still Ho. 1 2 3 Gas Burner pressure 15 psig 20 psig 30 psig No. 1,2, and 3 still furnaces are operated with the dampers 1/3 to 1/4 open. (m) Open valve in main vacuum line to the vacuum Jets above the receiver. Vacuum should be: Receiver No. 1 2&3 mm Hg Absolute 3-5 mm Hg (for Solid Aroclors) 20-30 mm Hg (for Liquid Aroclor (n) Start water on condenser aa material starts to come over. Adjust water to keep from plugging up the condenser. NOTE: Vacuum problems on the stills are usually due to flashing of product over, plugged vacuum Lines, leaks In the still system, leaks at pump packing, water adjustment on inter condenser on jets, changes In steam pressure to the jets, or problems In the Jet nozzles. Flashing can be stopped by adjusting the cooling water on the condenser or operation of the still at a slower rate. Vacuum trouble must be traced systematically from the jet, to the receiver, and then to the still. (o) Gas pressure on the burners is adjusted until the coil tem peratures reach a point about 20C below the expected dis tillation temperature* Normally a 10C temperature spread is obtained on the inlet and outlet of the coil. (p) Batch data sheets are filled out during each distillation. Information Includes still lot number, material being dis tilled, start time, finish time, temperature spread on the still colls, end time for the distiLlation, etc.--(See distillation sheet next page) (5) Operation of still during distillation: HONS 059664 (a) Regulate the gas pressure at the burners to give maximum distillation rate consistent with a good color of the product. (See Item 4. (1) above) TABLE III DISTILLAXIOB OPERATING COWPITIOW3 LIQUID AROCLORS AROCLORS1221 1242 1248 1254 Approximate Temperatures at which various Aroclors start distilling 35-40 am Yac.Liqs. ______________ 3-3 VacSols.__________________________ _ 1260 1262 ________ SOLID AROCLORS 1268 4465_________5442 5460 Column Cell Inlet Coil Outlet Approximate Finishing temperature when bottoms are not to be drawn 155C 165C 170C 165C 170C 175C 170C 180C 190C 190 C 200C 220C 195C 210C 225C 235C 245 rC 255C 225 C 240C 245C 220C 235C 245C 215C 24QC 250C 260C 280C 290C Column Coil Inlet Coil Outlet Approximate Finishing temperature after which bottoms are to be drawn Column Coil Inlet Coil Outlet Finishing Specific Gravity Finishing Hold Poing Finishing Softening Point 180C 1S5C 190C 205C 210C 220C 230C 240C 250 C 240C 245C 255C 265C 270C 280C 275C 280C 290C 310C 330C 375C 215C 225C 240 C 1.1821.192 <? 25C 230C 240C 250C 1.3811.392 <? 25C 250C 255C 265C 1.4051.415 (? 65C 280C 290C 310C 1.4951.505 <3 65C 315C 325C 340 C 320C 335C 345C 285C 295C 340C 1.555- 1.5721.566 1.583 (3 90C @ 90C 350C 360C 410C 315 C 340 C 390C 0 355 C 375C 410C 150170C 60-66C 46-52C 98-105.5C NOTE: Aroclor 1232 is a blend of Aroclors 1221 and 1242 HONS 039665 OPERATING INSTRUCTIONS AROCLORS 24 DETAILED INSTRUCTIONS II. a. (5)| (b) The lower the vacuum, the faster the distillation rate. (See Table III for Distillation Operation conditions of the different Aroclora.) (c) Coll temperature spread - Coil inlet and outlet temperature must be watched closely at the end of the distillation. Still bottoms are very viscous; therefore, if the circulating pump is in poor condition, or the distillation is carried too far, circu lation may stop and the coil will become plugged or be burned. Heat from the furnace actually burns the Aroclor to carbon. If the coil outlet temperature jumps suddenly and the inlet temperature ataya the same or falls, cir culation has nearly stoppad. In this case, cut the burners off quickly and suck the coil. If the coil cannot be sucked, it la plugged and will have to be replaced. Observation of the ampmetera on the still circulating pump motors will also Indicate when the pump has stopped circulation. Normally the pump motor will pull 20 to 40 amps during a distillation. A sudden Increase In the amp load indicates the coll Is probably plugging. A sudden decrease indicates the pump load has dropped off and the coll la plugged. (d) Transfer of receiver to blend tank or flaker hold tank. (1) Observe level of material in the still receiver. When material la 8" to 12" from the sight glass the receiver of material is transferred to a blend tank or the flaker hold tank. (2) Check to be sure steam heat is on the transfer Lines and the pump. If Solid Aroclors are to be transferred to the flaker hold tank the hot Aroclor heat Is used. (3) Set valves in line to the blend tank desired (or the flaker hold tank). (4) Start transfer pump under the receiver. (5) Allow material to pump until the receiver is empty. Do not let the still lose vacuum. This entire transfer can be made while the still is operating. (6) Check the blend tank or flaker hold tank to be sure the matdtial is being transferred. (7) Close the valves and stop the pump when the transfer is complete. MONS 059666 OPERATING INSTRUCTIONS aroclors 25 PK1AILFI) INSTRUCTIONS II. b. Stopping the Distillation (1) General Operation: (a) Run down on stills. Stop feed to still and distill off material in the still tank until an outage of 82" to 84" Is reached for Liquid Aroclors. Normally an outage of 75" to 80" Is reached for Solid Aroclors. (b) Reduce gas pressure on the burners to 5 pslg. (c) Close valve in vacuum line above the receiver. (d) Reduce water flow to the condenser as the distillation stops. (2) Operation dependent on Aroclor being distilled: Aroclors 1221, 1242, 1248, 1254, 1260, and 1262: (a) Stop circulating pump after 15-20 minutes. (b) Release vAcuum through the vent valve on the coil. Suck the coll clean for one to three minutes. (c) Remove cap from the measuring nipple on the still. (d) Measure bottoms in the. still and record In the log book. (e) Prepare to draw bottoms and then recharge the still to start another distillation. Aroclors 1268, 4465, 5442, and 5460: (a) Heat upper and lower valves under the receiver with a small gas flame for 15 alnutea before the distillation finished. (b) Close valve to suction of receiver pump. (c) Open top valve In drawout line. (d) Release vacuum through drawout line, controlling rate of release with lower valve. (e) Flush out line by allowing 1-2 gallons to run into a bucket or 55 gallon trash drum. (f) Catch sample in small beaker or can lid and check softening or hold point according to method described In instructions for chlorlnators. 1. If softening or hold point Is too low, close valves, let drawout line drain and run distillation farther to raise softening or hold point. MCNS 05966? OPERATING INSTRUCTIONS AROCLORS 26 DETAILED INSTRUCTIONS XI. b. (2) (f) 2. If sample lo in specification, open vent on top of the receiver and draw out into drums or transfer to the flaker head tank to allow flaking the material* NOTE: Aroclor 1268 and 5460 is flaked. 3* If the softening point is too high, charge the still for the next distillation and run the first part into the receiver. Check the softening point at intervals; when ok, draw into drums or transfer to flaker head tank as required. NOTE: Care should be taken in finishing the Crude Aroclor so this does not have to be done. (g) Stop the circulating pump after 15-20 minutes If the distillate is ready for transfer. (h) Release tha vacuum through the vent valve on the coll. Suck the coil clean for one to three minutes. (I) Remove the cap from the measuring nipple on the still. (J) Measure the bottoms in the still and record in the log book. (k) prepare to draw bottoms and then recharge the still to start the next distillation. c. Drawing Bottoms (1) Schedule for drawing bottoms: (a) Arodors 1221, 1242, 1248, 1254, 1260, and 1262: Draw bottoms after every 10th distillation. (b) Aroclor 1268: Draw bottoms after every 4th distillation. (c) Aroclor 4465: Draw bottoms after every 3rd distillation. (d) Aroclors 5442 and 5460: Draw bottoms after every 2nd distillatlon. (2) Operation: (e) Place estimated number of scrap drums required (normally 7 or 8) In an arc on the floor beneath the still and under the hood so each drum can be filled without being moved. (b) Check bottom line to be sure it can be turned to reach ell drums without becoming unscrewed from the valve. (c) Check to be sure the exhaust fan is running. HONS 059668 OPERATING INSTRUCTIONS AROCLORS 27. DETAILED INSTRUCTIONS II. c. (2) (d) Heat: the valve at the bottom of the still to be sure it is not stuck. Use a small gas flame for 15 minutes before drawing bottoms. (e) Obtain assistance to draw bottoms. Have pezson put on face shield. NOTE: Fumes from this operation are toxic. The material to be drawn into drums is hot. Do not stay under the hood while bottoms are being drawn. (f) Set dravout line at a drum. Open valve under the still. Shut off valve when the drum is filled within 8-10" of top. Use hook rod to determine level in the drum. (g) Move draw-out line to next drum. Open valve under the etlll. Continue until the still is empty. (h) Close valve under the still. (1) Allow drums to set under the hood until they have cooled (6-10 hrs.). Then palletize the drums at the dock for transfer to the dump. d. Earth Treatment of AroclorB Liquid Arodors 1221, 1242, 1248, 1254, 1260, and 1262 are treated with Attapulgus Earth for three hours per the following procedure: (1) Collect two receiver distillations in a blend tank. (2) Prepare Attapulgus earth which le to be added to the blend tank. This earth must be dried in an oven for a minimum of four hours at a temperature of 210-250C. (3) Start the agitator in the blending tank and add forty (40) pounds of dried earth for two receiver distillation batches. (4) Agitate the mixture of earth and Aroclor for three (3) hours at the following temperatures. Aroclor 1221 Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Aroclor 1262 Temperature 60 - 70C 70 - 80C 89 - 90C 90 -100C 100 -U0C 110 -120C MONS 059669 OF&fiATIHG INSTRUCTIONS AROCLORS 28 DETAILED INSTRUCTIONS II. . Filtration of Arocloca (L) Prepare filter for filtration of Aroclor by cleaning the earth from the previous filtrations from the press and installing new filter paper. (a) Run tightening screw back to permit removal of papers. (b) Separate and clean frames and remove used papers. Be sure no earth is left on the surfaces of the plates and frames. Discard earth and paper In a 55 gallon trash drum. (c) Install new papers and tighten the press. Use two papers between each plate. (2) Starting Filtration: (a) After the Aroclor has been earth treated for three hours start filtration. (b) Set valves in the system to pump the treated Aroclor from the blend tank, through the filter press, and back to the blend tank. Recycle this material until no earth la visible in a sample from the filter. (c) Set valves to direct material to the Filtrate Receiver when the material haa cleared up. (d) Catch a sample of the filtrate. Check specific gravity and color. Record data in log book. At present the Lab must ok color. (3) Transfer to Storage Tank: (a) Measure outage of material in the filtrate tank and record in the log book. (b) Set valves in the line so the Aroclor will be pumped to the desired storage tank. (c) Check to be sure steam is on the transfer pump and the transfer lines. (d) Start the pump under the filtrate receiver. (e) Close the valve under the filtrate receiver end atop the transfer pump when the Aroclor haB been pumped out. (f) Measure innage in the storage tank and record In the log bouk HONS 059670 OPERATING INSTRUCTIONS AROOLORS 29. DETAILED INSTRUCTIONS II. f. Trouble Shooting AroclorStllla, Earth Treatment, and Storage Operation Problem Pusatble Cause & Action (I) Still Vacuum Problems a) Jet not operating properly. Action? Close valve on receiver and be sure the jet will pull down. Check steam pressure to the jet, check vacuum lines for leaks, or plugs, and check the jet for plugging. Notify the chief operator repairs ara necessary. b) Plugged condenser. Action: Put steam or flame heat on the condenser to unplug. c) Leeks in the system. Action: Apply full vacuum to the Jet. Check out the piping system, the still, still pump, and the receiver for leaks. d) Minor Jet problems. Action: Water to the intercondenser must be adjusted properly. Steam to the jet must be constant. Nozzles in the Jet must be in good condition. (2) Holes or plugs of still colls e) Coils occasionally wear until a hole comes in the coil from heating and age. Black smoke In the furnace, or out the furnace stack indicates Aroclor is burning. Action: If the leak is minor continue operation until the still la finished. Notify the chief operator repairs are necessary. b) Running down in the still at the end of a distillation, failure of the pump, or excess heating of a coll can cause a coll to plug. Action: Check the pump ampmeter to see how many amps are required. (Normal 25-30 amps). A higher reading would MGNS 059671 OPERATING INSTRUCTION! AROCLORS 30. DETAILED INSTRUCTIONS II. f. (Continued) Problem (3) Plugged Lines (A) Off-Color Aroclor on a Still Possible Cause & Ax.t.lon indicate the coil is plugging. Cut the fire off of the furnace lnm.ediar.ely, check the inlet end outlet coll tempera ture to determine if coll has over heated. Notify the chief opeiator If the coil must be changed out. a) Solid Aroclors end the still residue will plug line*, still coils, sal pumps when it Is not kept hot. Action: Check to be sure steam or hot Aroclor is on the pip* line. If net put steam on and give it time to heat up the line. Check pipe lines and valves for exposed ereas not steam traced or insulated. Use CO2 and try to blow the line out. Use a gas torch flame to heat the valve or pipe line. a) Rapid or too fast a heat-up on a still. Action: Decrease fire and stop distillate, then increase temperature slowly to give good color Aroclor (normally 10 on 1242). b) Rapid surges in the vacuum system can cause material to burp over. Action: Check vacuum control - adjust to give good control. Notify chief operator if repairs are necessary. c) Run-down on a still can cause carry-over of high color material at end of e distillation. Action: Watch temperature tprf-id on run down. Do not exceed final temperature on a distillation. Do not let tem perature spread exceed 15C. MONS 059622 OPERATIC INSTRUCTIONS AORCLORS 31. DETAILED INSTRUCTIONS II. f. (Continued) Problem Possible Cause & Action (5) High Moisture In Aroclor a) Moisture above 50 ppm Is too high In finished Aroclor8. Normally material must be 20 to 25 ppm to be loaded In specification, since moisture is picked up during loading. Action: Start sampling to determine where the moisture is being obtained. It may be necessary to run a pressure test on tank colls to determine the problem. Notify the chief operator as soon as material out of specification Is found. (6) Bad Electrical Property Problem In Aroclor a) Resistivity and stability of the Aroclors are very critical in this quality pro duct. Material must be loaded at a 500 resistivity minimum to be In specification. Since the electrical property drops during loading, It should be 700-800 when loaded. If material is low In the storage tank It Is trans ferred back to the blending tank for earth treatment, laboratory check, and then loaded to a car. (7) Still Receiver Transfer ) Transfer pump will not pump the receiver Pump Problems out under vacuum. Action: Check the lines to be sure the valves are set correctly. Check lines at bottom of the receiver to be sure they are not plugged. If necessary to pump out, shut off vscuum on the still and transfer the receiver. Notify the chief operator that the pump, relief valve, or the pipe lines need work. HONS 059673 OMTmuFVf OPERATING INSTRUCTIONS AROCLORS 32. C. DETAILED INSTRUCTIONS III. Loading Refined Aroclors Aroclors are shipped In five gallon cans; 55 gallon drums; A,000, 7,000, and 8,000 gallon tank cars; and 3,000 or A,000 gallon tank trucks to customers. a. Spotting Tank Cars Normally the railroad switch crew will spot cars at the Aroclor loading dock. Occasionally It will be necessary to move a car. When It Is necessary use the half track and pull the car into position. (1) Obtain help to move the car. (2) Attach hook on cable at front of the half track to a strong part of the car. Do not hook onto the ladder or other weak parts. (3) Release the winch and let out 15 to 20 feet of cable to connect to the car. (4) Release the brakes on the car. (5) Use the half track to pull the car into position. Put the half track in four wheel drive. Do not use the winch to pull the car. (6) Stop pulling the car when It is in position. (7) Set the brake on the car. (8) Remove the cable hook from the car and wind up on the winch drum. b. Filling Tank Cara or Trucka Aroclore are shipped in lined vessels to protect the electrical pro* perties from contamination. Most vessels are lined with aluminum or a tinc-tln lining. (1) Inspection of car or truck for loading: (a) Enter each car or truck for inspection prior to loading. If necessary clean out the vessel. All material In the tank should be removed. Damaged lining areas should ba cleaned of rust particles. Report damaged areas. (b) Use a tank entering permit and a fire permit when entering a car. Observe safety rules for each permit. (c) A fellow worker must be on top of the car holding the rope harness. Wear the safety belt harness, an air mask, gas test the car, and use a light when entering a tank car or truck. HONS 059674 OPERATING INSTRUCTIONS AROCLORS 33. DETAILED INSTRUCTIONS III. b. (1) (d) Fill out tank Inspection sheet. (2) Put steam on the car after it is clean. (3) Check to be sure there is enough material In a storage tank to load a car or truck as required. (An 8,000 gallon car requires about 63" of material in #2, #3, and #4 storage tanks. (A) Circulate the material in the storage tank for two (2) hours, sample the tank, and have the sample checked for loading by the laboratory. If material is in specification proceed with loading of the tank. (5) Install diaper cloth sock in the filter in the loading line and place a sock over the end of the loading line extension* (6) Attach extension to the loading line at the dock and place sock end Into the dome of the car. (7) Connect ground wire to the car. (8) Set valves in the loading line from the storage tank to the loading dock. Do not open valve in line at the car. NOTE: Care should be taken to see that the correct valves are opened so only the desired Aroclor enters the loading line. (9) Start pump at the storage tank. (10) Open valve in drain line at the loading dock and allow one drum of Aroclor to flow through the line to flush out the loading line. (ID Close valve in drain line and open valve in line to the cap. Approximately hours is required to load a car. (12) When the car la loaded, stop the pump, and close valve to the loading line. Fill car up one to two feet into the dome of the car. (13) Remove loading line from car. (14) Take samples from car and send to laboratory for final analysis. (See Schedule) MONS 059675 OPERATING INSTRUCTIONS AROCLORS 34. DETAILED INSTRUCTIONS III. b. (14) SAMPLES TO BE TAKEN FOR LIQUID AROCLOR LOTS MATERIAL IANK CARS - TRUCKS or DRUMS 1221 2 X 1/2 Gallon 1232 1242 2 X 1/2 Gallon 3 X 1/2 Gallon & 1 x 5 Pint 1248 2 X 1/2 Gallon 1254 1260 3 X 1/2 Gallon & 1 x 5 Pint 3 X 1/2 Gallon 1262 2 X 1/2 Gallon (15) Close and tighten lid on car. (16) Seal car and record seal number and car number in Aroclor log book. c. Filling Drums Liquid Aroclor can be drummed from the storage tanks or the filtrate receiver. Solid Aroclors that are drummed are normally filled from the still receiver. Solid Aroclors 1268 and 5460 are normally flaked and bagged. Aroclor 2565 Is a non-distllled product which is drummed from the blowing tanks. The following steps should be followed when material is to be drummed: (1) Send a representative sample (1/2 Gal. for Liquid Aroclors) of the material to the laboratory for inspection. If the material la via storage tank it should be circulated for two (2) hours. Material in a filtrate receiver or blowing tank should be agitated for 20 to 30 minutes. If material Is in specification proceed with drumming. (2) Check the scales to be used. Set the scales for the weight specified for each drum (See Table IV). (3) Start the pump. HONS 059676 Material 1221 1232 1242 1248 1254 1260 1262 1262 - 107. Toluene 1262 - 10 Xylene 1260 - 10% Toluene A13B3B 5442 2565 4465 Inerteen PFO TABLE. IV AKOCl-OR FIN I SHE': GOODS DRUM WEIGHTS Drum Weights Lbs. 50 or 520 50 or 550 55 or 600 55 or 600 60 or 600 60 or 600 60 or 600 60 or 600 60 or 600 60 or 600 65 or 675 50 or 450 500 50 or 500 65, 360, or _*JL55_0*iJi 34-8 MONS 059677 GPitfcATlflC INSTRUCTIONS AROCLORS 35. DETAII.Ef) INSTRUCTIONS HI. c. (4) Open the v*lve in the duum-c-.jt lino and allow approximately 5 to 30 gallons ct material to flow through the line into a dram to fl u$li out the line. brumal ng from a filtrate tank should t.eke five gallons of material to flush the line. Drurmln^ from a storage tank should take 30 gallons to flush the line. (5) Fill 5 or 6 drums of material no the specified weight; stencil the name of product, lot number, net weight of each drum, and the initials of the person doing the work. See next page for drum weights - Table IV. (6) Sample these drums with a thief for final drum sample per schedule for loading tank cara (b. (14)). (7) Continue drumming the Aroclor when the lab gives the final ok that material Is In specifications. (8) Drum material until you have the required quantity of drume. Filled drums are palletized and moved to the loading plat form for transfer to the warehouse. HONS 059678 OPERATING INSTRUCTIONS AROCLORS 36 C. DETAILED INSTRUCTIONS IV. Flaking Aroclort Aroclor* 1268, 5460, and 5060 ara flaked on a drum flaker and baggod in 100 lb. bags. a. Preparation for Flaking (1) Place hot Aroclor heat on the pipe lines, valves, and flaker hold tank. Heat the Aroclor system up to 250C. Observe temperature on the multi-point recorder in the chlorinator control room. (2) Pump Aroclor to be flaked into the flaker hold tank. (3) Check temperature of material in the hold tank. It should be 22QC. min. Temperature recorded on #3 still multi-point recorder. b. Start-Up of Flaker System (1) Turn electrical heat in the flaker pan on about 20 to 30 minutes before start-up. (2) Open valve in water line feed to the flaker drum. (3) Start the flaker drum. Start breaker at discharge of flaker. (4) Open valve at bottom of the flaker hold tank. (5) Open valve at sight glass to start Aroclor feed Into the flaker pan. Observe flow in sight glass. Adjust valve to maintain the level in the flaker drum about one Inch from the top of the drum. (6) Observe operation to be eure the drum la picking up the material. (7) After the flaker has run 15 to 20 minutes notify the Chief Operator materiel is in the hopper to be begged. (6) Continue to flake until the flaker hold tank is empty. c. Shutdown of Flaker (1) Normally the flaker will be run until the hold tank is empty. (2) Allow the drum to pick up materiel from the pan until it will no longer contact the hot liquid product. (3) Stop the flaker drum and the breakers. MGNS 059639 OPERATING INSTRUCTIONS AROCLORS 37. C. DETAILED INSTRUCTIONS IV. c. (4) Turn off Che electrical heat Co the flaker pan. (5) Close the valve in the water line to the flaker drum. (6) Close the valve at bottom of the flaker hold tank and at the sight glass feed to the pan. d. Bagging Solid Arodors (1) Check to be sure flaked material is in the hopper under the flaker (2) Get bags ready for use and stack near the bagging machine. (3) Get a stencil for the bags with name of the product, lot number, net weight of each bag, and the initials of the person doing the bagging. (4) Set up an empty pallet behind the bagger to stack filled bags on. (5) Check the scales to be used. Set the scales for the weight specified for each bag (normally 100 lbs.). (6) Open the slide gate valve above the bagger. (7) Stencil each bag. Insert the bag on the bagger nozzle. Clamp the bag in position. Be sure the bag support is at the right height. (8) Start the bagger. Fill the bag until It is nearly full. Stop the bagger. (9) Check the weight of each bag to be sure it is correct. Add material or take out as is necessary to get correct weight. Place bags on the pallet and move to the loading platform for transfer to the warehouse. (10) Continue to operate the bagger until ell the material in the hopper is in bags. When complete, stop the bagger and put up all items left. (11) Flaked material may hang up In the hopper. Turn on the electric vibrator for about one minute if this occurs. It may be necessary to remove the plate over the chute from the hopper to the bagger and poke the material into the begging sMchlne. 1 MONS 059680 OPERATING INSTRUCTIONS AROCLORS 38. DETAILED INSTRUCTIONS IV* d* (12) Occasionally flaked material hangs up In the screw In the bagger and becomes molten. When this occurs stop the bagger and let it cool for 10 minutes and try again. At times the screw must be removed from the bagger and cleaned as follows: (a) Tag out the electrical switch. 00 Close the slide gate valve above the bagger. <0 Remove the back cover on the bagger. (d) Remove the belts on the screw drive pulley. (e) Pull the screw out* Clean all molten material off the screw and out of the screw chamber* (f) Replace the screw in the bagger. Put the belts on tha drive pulley and replace the back cover of the machine <g> Throw the switch on the electrical starter box and remove the tag out card* 00 Open the slide gate valve above the bagger. (O Start the bagger Into operation. HONS 059681 OPERATING INSTRUCTIONS AKOCLORS 39. C. DETAILED INSTRUCTIONS V* Crushing Aroclors Several of the Montara (Aroclor still bottoms or residue) are crushed and repackaged In drums for customers. a. Select drums of material to be crushed. b. Break the material In the drum by hitting the side of the drum with a hammer. c. Place new empty drum under the crusher to collect the crushed material. Check the scales to be used. d. Start the crusher. e. Feed the material from the drum into the jaw crusher by use of a hand scoop. f. Fill the drums to the desired weight. Stencil the drums with the name of the product, lot number, net weight of each drum, and the initials of the person doing the work. g. Continue this operation until the required number of drums are filled. Then stop the crusher and clean up the scales, crusher, and surrounding area. h. Ail drums filled are palletized and moved to the loading platform for transfer to the warehouse. HONS 059682 OPERATING INSTRUCTIONS AROCLORS 40. DETAILED INSTRUCTIONS VI. Milling Aroclors Aroclor 1268 is the only Aroclor which Is sold as a milled product. The material must first be flaked. a. Select the drums of material to be milled. b. Check the scales to be used. Place a new drum under the milling machine to collect the 1268. c. Crushed dry Ice Is used during milling to keep the machine cool. This keeps the Aroclor 1268 from clogging up the machine. d. Start the mill and auger. e. Fill the bucket with crushed 1268. f. Blend dry ice with the 1268 and feed It Into the hopper over the mill. Use approximately five pounds of dry Ice to each 100 pounds of Aroclor 1268 that Is milled. g. Fill the drums to tba specified weight (normally 200 lbs.). Stencil the drums with the name of the product, lot number, net weight of each drum, and the Initials of the person doing the work. h. Continue this operation until the required number of drums are filled. Then stop the milling siachine and dean up the acales, the milling machine, and the milling roam. 1. All drums filled are palletised and moved to the loading platform for transfer to the warehouse. HONS 059683 HONS 059684 PROCEDURE OPERATING INSTRUCTIONS AROCLORS EMERGENCY PROCEDURE This 1b the plan for departmental action In the event a hazardous situation or Injuries warrant emergency action either In the Aroclor Department or within the Anniston Plant* 1. Hazardous situations which might occur are: a. Operational accidents or difficulties, such as, explosions, fires, release of toxic fumes, etc* b. Forces of nature - hurricanes, tornadoes, floods, lightning, tc. c. Deliberate damage - malicious actions, sabotage, direct enemy action. 2. The primary considerations in the event of a disaster are: a. The cere of injured Individuals and evacuation of personnel to safe areag. b. Measures to prevent any, or further, property or equipment damage. c. Measures to provide accurate end thorough information so that other plant peraonnal and the community can be informed, if necesaary. d. Prompt restoration of effected facilities and resumption of un interrupted operations. 3. Responsibility: The areas of responsibility and overall department organization for disaster control are as follows: a. Chief Operator - Responsible for continuing or closing down pro duction facilities as conditions permit; for directing fire fighting end dabege control activities In the department area; keeping department supervision fully Informed of conditions within the department. b. Operators - Responsible for evacuation of all personnel from danger area; for directing end assisting in first aid and rescue missions; reporting to end keeping chief operator informed of conditions within his area of responsibility. NOTE: All actions of the Fire Brigade are coordinated with the Chief Operator. A. Details of Flan: a. In the event of an emergency, personnel must be accounted for. The first assembly area for the department Is the open area south of the HB-40 Plant near the ladder rack, the second or alternate assembly area la east of the Aroclor-Blphenyl Building in the road near the shop entrance. HONS 059605 OPERATING INSTRUCTIONS aroclors 2 EMERGENCY PROCEDURE 4. Details of Plan (Cont'd.) a. It la vary Important to know where people are In an emergency or before action la taken to correct an emergency. If the alternate area has to be used, take whatever safety equipment you can, from the department, to the assembly area. b. If assistance Is needed, pertinent phone numbers of Plant personnel to be contacted are as follows: H. J. Williams J. W. Molloy R. G. Moody J. R. McCl.ln P. H. Sturman L. C. Fuhrmelat.r J. H. Aldridge E. W. Schramm Dr. J. C. Francis 237-1952 236-3973 236-7906 237-4428 237-5704 236-6773 237-7281 237-7087 237-5612 (Home) Main Gate 236-2961 (308 or 317) c. In the event of a plant disaster, the Plant Manager's office la the control center. The alternate control center la the Guard Room at the Service Building. The medical center is the Plant Dispensary. The alternate medical center is the Service Building. d. If the emergency or disaster occurs before or after the day shift, or on a weekend, the department Chief Operator shall notify the guard on duty and the guard will be responsible for notifying plant supervision. e. Immediately upon discovering a fire, or a current or imminent disaster condition, turn in an alarm. DIAL 211 and tell where and what the emergency is. If the guard cannot be contacted end the local Fire Department la needed, call them at 237-3541, giving them location, material burning, size of ares involved, etc. Then call the department supervision. NOTE: Chief Operator may designate this Job to one of the Operators. f. Emergency Situations The following equipment emergencies are possible at the Aroclor Dept. Be prepared to take action in the event they should occur. Prepare yourself by knowing what to do - get help beforehand on any part that la not understood. MONS 059686 OPERATING INSTRUCTIONS AKOCLORS 3 EMERGENCY PROCEDURE f. Emergency Situations (Cont'd.) Emergency 1. Fire handling Biphenyl 2. Chlorine Releaee a. Tank Car b. Chlorine Plant Action a. Turn In alarm - Dial 211. b. Remove Injured from fire area take care of them. c. Proceed under Chief Operator to extinguish the flrei 1. Dry powder extinguisher 2. Fire truck - dry powder and water 3. Water d. Pull power on all motors. a. Cut off gas to Arodor and Biphenyl stills at main cut-off at Northwest corner of blowing tank area. f. Shut down Department - Notify Chlorine Plant shutdown Is necessary. a. Obtain help and turn In alarm If necessary - Notify Chief Operator. b. Obtain gat mask or Scott Air Fak. c. Shut off source of Chlorine. d. Notify Chlorine Plant If shutdown Is necessary. a. Disconnect Clj connection at car If necessary. f. If vaporiser Is full of liquid Chlorine, vent to the Chlorine car; then shut off car. g. Notify Department Supervision at soon as possible. MGNS 059687 OPERATING INSTRUCTIONS AROCLORS EMERGENCY PROCEDURE Emergency (Cont'd.) 3. HC1 Release 4* Fire or explosion At KB-40, Santcwax, or Biphenyl Dept* 3. Emergency In the Plant 6. Equipment failure creating hazard* 7. Injuries end Treatment ' Action a. Obtain help and turn In alarm If necessary - Notify Chief Operator* b. Obtain gas mask or Scott Air Pak. c. Shut off source of HCl gas* d. Notify Chlorine Plant if shutdown Is necessary* e. Notify Department Supervision as soon as possible. a. Turn In alarm, shut down Aroclor Dept* Notify Chlorine Plant. Obtain gas mask, go to an assembly point, be prepared to eealat in stopping the fire aa directed by Chief Operator. a* Prepare to shut down on orders. a. Notify Chief Operator or Department Supervision. b. Take appropriate action* a. Obtain help* b. Prevent further injuries to person involved* c* Make comfortable. d. Know your first aid: 1* Mouth-to-mouth resuscitation. 2* How to use a resuscltetor. 3* How to remove from electrical contact. 4. Action for a beet stroke* 5. Cheat massage for heart failure* 6. Emergency action in case of burns* 7. Location of stretcher, blanket, oxygen. 8* Know equipment available from the dispensary. e. Contact Plant Physician aa soon as possible if necessary. Meka contact through Plant Guard or Dept* Supervision* MGNS 059688 COLD WATER TREATMENT OF BURBS ' (Thermal & Chemical) KHlIMiKKi rmAauui Tharmal Burn - Tha type of burn you.would get by: 1. Direct exposure to flame. 2. Skin make* contact with hot aurfacc. 3. Hot material*, auch a* molten Santowax, aolldlfy when It touchea the akin, thereby holding the heat in the akin. Chemical Burn - The type of burn you would get by: 1. Contact with Muriatic or Sulfuric Add. 2. Contact with Potassium or Sodium Hydroxide. 3. Contact with any add or atrong alkali material. Treatment Thermal Burn* If possible, submerge burn area In container of cold water (50F). Tha container My be a drum, water pall, wash baaln - anything that will hold the water. Follow these steps: 1. Put water In container to desired depth. 2. Try to obtain a water temperature of 50F. by adding Ice cubes. 3. Submerge burn araa below the surface of the water. 4. Trensport Injured person to tha doctor, keeping burned surface subMrged In water. If burn is In area that can not be submerged In water, it Is a good practice to taka tha cleanest cloth or toweling that you can obtain, soak It In cold water (wringing out excess water), and place on the burned area. This would be an area such as tha back, ahouldars, or stoMch. UNDER NO CIRCUMSTANCES SHOULD A PERSON SUFFERING FROM THERMAL BURNS BE PLACED UNDER RUNNING HATER. There Is a danger of the Basil droplets of water striking the burned area, causing pain to auch an extent as to result In shock. Treatment - Chemical Burns 1. Place Injured person under safety shower or some other method of washing with large amounts of water. 2. Remove contaminated clothing while under the shower. 3. If goggles are worn, keep In place until all tha chemical has baan washed from the body. General In our dlspanaary we have an ointment labeled Sulfathlxole. This Mterlal Is used In the treatment of burnt, both tharmal and chemical. It allows an Injury to heal from the Inside out, which Is usually tha situation with a burn Injury. 4 MONS 059689