Document DGynL9Y0RdMqLmpGQwZKOrjNn
m ieGENERAL l ChlLCC uP
dial comm 8*236-2923
date* October 19, 1973
copies e l Dobbins________
SG Hamilton Erie
d e p t Power Transformer Products
IRECEIVED ^VN
CB Lewis
Erie
L MacMonagle Erie
address Pittsfield, Massachusetts
SUBJECT
&PYRANOL
OCT 2 4 I9T3 EDWARD L DOBBINS ^
RM Smith
Erie
LD Sweatman Erie
JJ Farrell
EW Feuerstein
WB Gaither
DL Johnston
WK Mallon
JR Vincent
42-526
14-3
12-2 * 12-2
14-4
14-3 16-200 16-140 16-175 16-250 16-140 16rl00
Mr. A. P. Engel LPD Erie Works
Mr. J. K. McCall TSPD Erie Works
Consistent with our prior discussions you are aware of the considerable
concern that has been expressed over the effects of polychlorinated
biphengls (PCB) on the environment. In an effort to protect the
General Electric Company from unreasonable risks in this area, we are
forwarding the attached information. This information must be
CO lU u iU ill U u L U ti LU Jf'w U . U U u kW lUZrG *>V
L p 'l l i cb a< cd ~ C ilO 22^5 a ! 1 c d
transformers as part of your equipment.
The first attachment is an indemnification clause which we suggest you use with your ultimate customer on all new proposals. This indemnification clause will be included i n ^ l l new Power Transformer Products Depart ment proposals for Pyranor^transformers. The second attachment is a draft of emergency instructions in case of Pyranol^leaks dr spills. At a later date, this will probably be issued as a Company Policy, but it should not deter us from using it now with your customers. The third attachment is NEMA Standard Publication CP-P1-1973*, entitled "Guidelines for Handling and Disposal of Capacitor-and TransformerGrade Askarels". We have been advised that a change has been proposed in the Standards to include specific procedures to be followed in the event of leaks or accidents. No date for completion of this change is available. The third attachment is a copy of a caution tag which will shortly be added to all new shipments of Fyranol^fillec} Pittsfield Transformers. The fourth attachment is a copy of a PyranoF'Caution Nameplate (NP229A3316) which we attach to every PyranoInfilled unit.
GENP 003567
775129
Messrs. Engel & McCall October 19, 1973 Page 2
Should you desire additional copies of this caution nameplate to place-on existing equipment, please advise me of the number required and the serial numbers of the units on which they will be mounted. In accordance with above information, please incorporate the attached indemnification clause on PyranoJ&into your terms and conditions for products equipped with Pyranoi^transformers.
D.B. Anderson Product Sales Engineer Apparatus Transformer Sales -pal -attachments
- Registered Trademark * = To be forwarded under separate cover.
775130
GENP 003568
775131
69^
I
L.
j' T H E I N S U L A T IN G FLUID IN T H I S V R A K S F O K M E H C O N T A I N S POLYCHLORINATED BIPHENYLS, WHICH SOME STUDIES j H A V E S H O W N VIAY 1E A N E N Vif:OMl*-1Ei'JTAL C O N T A M I N A N T . i CARS SHOULD BE TAKEN TO PREVENT ENTRY INTO THE f[ E N V l O N I.iiN T . IN T H E C A S E Ol= M A L F U N C T I O N O R L E A K S j CONSULT THE INSTRUCTION .VANUAL OR THE j MANUFACTURER.
! NP
I
C A U T ION
THIS TRANSFORMER IS FILLED WITH A NONFLAMMABLE INSULATING LIQUID CONTAINING POLYCHLORINATED BIPHENYL MATERIALS (PCB'S) WHICH MAY BE HARMFUL TO THE ENVIRONMENT. EVERY EFFORT SHOULD BE MADE TO PREVENT THE ESCAPE OF PCB'S . INTO THE ENVIRONMENT AND TO CONTAIN ALL LEAKS OR SPILLS.
SHOULD ANY LIQUID LEAK BE DETECTED OR ANY SPILL BE NOTED ANYTIME DURING TRANSIT, PULL YOUR TRUCK OFF THE HIGHWAY OR PLACE CAR IN NEAREST RAIL SIDING AS SOON AS POSSIBLE. WHEN OFF THE HIGHWAY OR MAIN LINE, TRY TO STOP THE .LEAK IF POSSIBLE. DO NOT WELD ON THE UNIT. PREVENT THE LIQUID FROM SPREADING AND GETTING INTO WATER DRAINAGE AREAS. ANY LIQUID THAT IS'SPILLED ON THE TRUCK OR CAR BED OR ROADWAY SHOULD BE CLEANED OR CONTAINED WITH RAGS, DRY-RITE AND/OR DRY SAND AS SOON AS POSSIBLE. DO NOT MOVE THE TRANSFORMER IF THERE IS ANY DANGER OF THE LIQUID SPILLINGOUT ON THE ROAD OR GROUND. DO NOT OPEN ANY VALVES OR ATTEMPT TO DRAIN THE TRANSFORMER. CALL COLLECT THE GENERAL ELECTRIC COMPANY, PITTSFIELD, MASSACHUSETTS TELEPHONE AREA CODE 413, 494-1110, POWER TRANSFORMER CUSTOMER SERVICE ENGINEERING, FOR FURTHER INSTRUCTIONS.
IF AFTER 5:00 P.M. OR ON WEEKENDS, PLEASE CALL THE ABOVE NUMBER, GIVE YOUR NAME, COMPANY NAME AND WERE YOU CAN BE REACHED BY PHONE. CUSTOMER SERVICE ENGINEERING WILL CALL YOU BACK WITHIN A FEW MINUTES.
775132
GENP 003570
EMERGENCY INSTRUCTIONS IN THE CASE OF PYRANOL LEAKS OR SPILLS
There has been considerable concern over the effects of the polychlorinated biphenyl (PCB) effect on the environment. The Environmental Protective Agency of the federal government issued proposed regulations covering the potentially harmful effect of the PCB's. In order to conform to these proposed regulations and to insure that any environmental impact of pyranol leakage or spillage be minimized, this paper will document suggested emergency procedures for handling such leakage or spills.
Some general comments are appropriate to lead into this subject. First, the paramount consideration in treating spills or leakage is "contaimnent". Any leakage or spillage should not be allowed to spread unnecessarily. The second thing to be kept in mind is that the PCB's must be kept out of streams, drains, sewers, or other areas that could leak it into the major waterways. This includes the possible effects of rain washing the PCB's over large areas.
Specific suggestions for the handling of leaks or spills are detailed as follows. While these suggestions are detailed, they do not cover all possible situations and do not list all actions which might be necessary in a particular situation. The two cautions mentioned above should be kept in mind and common sense .should prevail.
1. Should any leak be detected or any spill be noted during the transit of pyranol filled equipments, the highway vehicle should be pulled off of the highway or the railroad car should be taken to the nearest railroad siding as soon as possible.
2. When-the vehicle is off the highway or main line, correct the cause of the leak if at all possible. Caution: Do not weld on the unit without contacting Customer Service Engineering, Power Transformer Products Dept., Pittsfield, Mass.
3. Soak up any spillage with absorbent materials such as sawdust, dry-rite, dry sand/or rags as soon as possible. Follow this with a clean up of the affected area with rags soaked with kerosene or other approved solvent such as perchloroephylene or trichloroethylene. Collect all materials used for this clean up and prepare them for disposal.
4. Contact Customer Service Engineering, Power Transformer Products Dept., Pittsfield, Mass, for consultation and further instructions.
5. Any pyranol containing material used to clean up spillage from #4 above should be placed in open head drums with suitable closures. The drum then should be properly labeled for shipment to any of several companies offering an acceptable disposal service. Section 4 of NEMA Standard Publication //CP-P1-1973 contains a list of companies offering PCB waste disposal.
GENP 003571
D. R. Bair 6/14/73
. 775133
INDEMNIFICATION CLAUSE - PYRANOL
PyranolLv^c o n t a i n s polychlorinated byphenyls (PCB's) which tend to persist in the environment and, therefore, special care is required in the handling, possession, use and disposition of Pyranol"I-E/ to prevent its entry into the environment. Accordingly, Buyer agrees to defend, indemnify and.hold harmless Seller, its directors,
f
officers, employees, and agents from and against any and all i
liability, lqss, damage or expense which Seller, its directors, officers, employees or agents may suffer as a result of claims, demands, costs, proceedings or judgments arising out of, or in connection with, the possession, handling, use, sale, or disposition of any Pyranol^^ purchased by Buyer, or delivered to Buyer, pursuant to this order.
Registered Trademark
775134
GENP 003572