E*. B. ZACHSY GO.
inter-office correspondence
TO: ROY ENO from: EMERSON jbHNSTON re: OSHA INSPECTION JOB #2361
OATE JANUARY 29, 1981
attention of:
C ? CONFERENCE
January 27, 1931 Victor Yar.ta Pro,
r, P roj :
Mr. Frazier explained the purpose of his visit was to corduct a general in
spection and was not present due to any complaint. He asked what type of
work Zachry was involved in cn tn .3 p:rjeo: and ii * ere ' ire any
or. inis site under Zarhry's jz
rt. . .". 'i
and OSHA 200 was requested and reviewed. I -a to the fact that it :_* r.=nr:nj
lunch tine it was agreed that Mr. Frazier would present himself at tre prc'-c-cz
office at 12:30 p.m. to begin the inspection.
Inspection started at 12:30 p.m. on January 27, 1981. The party included Roger Frazier - OSHA, Ben Brown - UCC Safety, Victor Yanta - Project Manager, Emerson Johnston - Safety Engineer, Philip Mayberry - Office clerk.
Bl'ILI.HNG 167 - In at 12:35 p.m.
Blacklight room - check of 110V extension cord for grounding. Inspection of work area - shop/storage building 167. Instrument calibration shop - grounding check. Pipe Fab Shop behind 167.
BOILER #2 AREA - In at 1:00 p.m.
Check ground/voltage on welding machine #92009. Inspection of upper levels.
BOILER #4 AREA - Out at 1:30 p.m.
Excavation and cement pouring area. Check for ear protection.
PIPE BRIDGENBETWEEN BECON AREAS - In at 1;30 out at 1:35 p.m.
Ingersoll Rand compressor. Auto off/on switch for impact wrench. Welding bottle rig.
02 AREA - In at 1:35 p.m.
Check of ground on welding machine #92015, welding lead on machine. Random safety belt and line checked. Check welding machine 92013 and welding leads.
INSIDE 02 BUILDING - In at 1:40 p.m.
Walk through downstairs area inspected. Check of piping work area upstairs. Check Hilti^drill and extension o-rd for grounding. Cut of building at 1:50 p.
Check welding machine -:'9i018. Check of gas cylinders for proper tie-cewns storage.
DE 0001
a a 3ACHRY CO,
INTER-OFFICE CORRESPONDENCE
to.PROM:
OSHA INSPECTION - CONTINUED
date
ATTENTION OF:
r ' r-.-T--csnp. AREA - Ir. at 2:10 n.n.
Crecr. cf riccing on lifted vessel - capacity lif-ing Manitovoc Crar.e #91300.
C. ocV. grrunding ar.d vlcir.s r*.c;'.`.-'ne :
cue -'2006. C.-.-ar. runts for
r.gging streps. Cheer, or Ir.gersoli-?.':::! -..r-.r r--.ssor.
#743. Safety glasses checked. Out at 2:30 p.m.
SVS 20 - In at 2:30 p.m. - Out at 2:25- "-
Cr.acked electrical ground on extension ctrd. Check of craft s'.. .':s s-jlvss : roc
Sub 20. Check automatic hand held threader for grounding. r-vV t:
truck 063-407 at 3:05 p.m. Gasoline drum pu.r.p eperatior..
s.rj;k -
gasoline, diesel, lubricating oils. Talked with employee (truck operator) #594
checked truck for fire extinguisher.
WELDING AND FAB SHOP - MECHANICS - In at 3:10 p.m.
Visual inspection of area. Checked ground on disc grinder, electrical connections and welding leads. Bottles in rack secure. Check Hiller welding machine #72401. Check mechanic's switch box. Visual check of area.
Toolroom checked.
Checked behind fab shop. Spoke with employee #330.
Recommended "NO SMOKING" sign for field truck eventhough entire project is a no smoking area. Talked with employee #575 (Foreman). Tom Self - showed records on crane and all equipment pertaining to maintenance, especially checked the critical elements of-Manitowoc crane and both Gallion cherrypickers. Recommended monthly safety report of safety checks of the crane, operating parts, cable.
Went back inko the toolroom and he checked electrical records both monthly and quarterly and spoke with Jose Canales #559.
Field inspection ended at 3:55 p.m.
He checked the water cooler plug in the-office building.
At 4:00 p.m...Mr. Frazier stated: "I want to congratulate you on a safe job. I was very much surprised as I expected to find a number of violations. Due to the time of day I will return tomorrow to complete the closing conference."
CLOSING CONFERENCE - 10:30 a.m. - January 28. 1981
In attendance were Roger Frazier - OSHA, Victor Yanta - Project "-sr.tter, Erarsor. .Jihr.stcr. - Safetj' Engineer.
DE 000119
HL a SACHRY CO,
INTER-OFF/CE CORRESPONDENCE
TO: FROM:
re: OSHA INSPECTION - CONTINUED.
DATE ATTENTION OF:
Xr. "easier e::plsir.ed closing procedures, p
p:ric.: = , Ir-tter of correction, disc 1-ineti end teg procedure and welding on stairless .ee,1l -----
advised that whatever stainless steel welding left was minimal since it is pre-fabbed and shipped to Zachry Company through Union Carbide Corporation.
l.c. r.:.oier stated: "1 find no violet'1 cns . i'.is si . 1 -- of possible alleged violation of record keeping i.e. I.'a.-.i.:- c: r.o annual inspection form filed. If indeed this were a visit::t r.ot be serious and before completing my report we can check vi Carbide to determine if they would have it on file."
t. ci-.'-J .eld cn
Following the closing we did locate the annual in Mr. Morecrafts file. Mr. Frazier then stated: "I would suggest for your own satisfaction Mr. Johnston, that you keep a monthly inspection report on file."
Mr. Frazier reviewed 1926.550 A-(6) which concerns annual inspecting and 1926.550 B-(2) which refers to ANSI B30.5-1968. He also reviewed from general industry 1910.180 - (b) (6) inspecting records. Mr. Frazier stated: "This is practically the same as covered in ANSI B-30.5 1968." "I have completed my business with Zachry Company, however, I wish to see Mr. Morecraft about visiting others on site."
cc: A.C. Grona J.C. Morecraft
DE 000120