Document DGgD96j4Bm5o9qgvZeNxMO1Mn
ENGINEERING AUTHORITY
CEA NO.
date
1430 (Rev. 2)
August 10,
1967
PRODUCT TITLE
Aroclors
'
'
Increase Aroclor Capacity
DIVISION
Organic
CED APPROVAL
PLANT
Anniston
DISTRIBUTION
CED SECTION MANAGER. CED PROJECT MANAGER
P. Stevens D. Gabelman
jyt'Zs/Qn
DIVISION REPRESENTATIVE .
CED Central Files 0. R. Bailey (2) J. M. Depp M. Dmytryszyn F. W. Encoh F. J. Holzapfel S. B. Johnson
(International projects F. P. LaBelle
only)
R. E. Lenz J. W. Mashek Russell L. Miller C. L. Parish A. B. Terry (2) M. R. Thompson (2)
C. E. Anagnostopoulos jHTjC. Carder
BMP*--"Stag--mm
J. " Cresce
R. Eo Emling Lo C. Fuhrmeister Do Bo Hosmer R. Eo Howard H. L. Minckler
SCOPE Aroclor production facilities at Anniston will be expanded by the addition of tankage for storage and for the preparation of blends, drumming facili ties in a new building (to be expanded on another project, CEA 1452, into a product warehouse), new and larger flakers for solid Aroclors and for biphenyl in the same building, and packaging equipment for flaked products. Tank truck loading and a new track spur with tank car loading and unloading facilities are included.
Preliminary scope of work and order-of-magnitude capital estimates have been made. An appropriation grade estimate will be prepared for trans mission to the Division; engineering will proceed with design and ordering of long delivery equipment on General Manager's approval.
The expansion of Aroclor facilities at Krummrich plant, originally included in CEA 1430 for evaluation purposes, will be handled as CEA 1800.
distribution OF CHARGES Pre-project charges--through CED expense to Organic Division's SARE. Capitalized engineering--to CED1s Uncompleted Additions to Property and then transferred to Organic Division's Uncompleted Additions to Property. Start-up and post-project charges--through CED expense to Organic
Division/s SARE. .
^^
ESTIMATED "EXPENSED" FNGINFFRING
PROBABLE COST-CAPITAL PROJECT$ 1,600,000
_______________________
TARGET DATES APPROPRIATION REQUEST APPROVAL START ENGINEERING________________________ START OPERATION,__________________________
November 1967
September 1967 January
DSW 182477
THIS DOCUMENT IS THE PROPERTY OF MONSANTO COMPANY AND THE RECIPIENT IS RESPONSIBLE FOR ITS SAFEKEEPING AND DIS POSITION IT CONTAINS CONFIDENTIAL INFORMATION WHICH MUST NOT BE REPRODUCED, REVEALED TO UNAUTHORIZED PERSONS
OR SENT OUTSIDE THE COMPANY WITHOUT PROPER AUTHORIZATION.
C E- 14
STLCOPCB4050795
CHANGE IN TIMING OF EXPENDITURES OF A PROJECT ALREADY LISTED (LR - 786)
1. Title: Expand Aroclors to 125 M lbs./year - WGK and Anniston (No change from last listing).
2. Amount of Project: $3,000,000 - (No change from last listing)
3. Description: This project contemplates additional new facilities to increase the capacity of Aroclors from 87,000,000 lbs./yr. to 125,000,000 lbs./yr. to improve quality and to increase our storage capacity. Additions at both the Krummrich Plant and the Anniston Plant are involved. Quality upgrading is needed to meet competition overseas and to protect our position in the domestic market. These changes are required to protect our good profit position in 'the plasticizer, heat transfer fluid, and dielectric fluids market.
4. Estimated Return on Investment: 13-16% on gross investment and 30% on NFC. (No change from original listing)
5. Request to be Submitted: First quarter, 1968. (A change from the original estimate of fourth quarter, 1967.)
6. Timing of Expenditures:
Revised
Original
3rd quarter, 4 th quarter. 1st quarter, 2nd quarter, 3rd quarter, 4 th quarter, 1st quarter, 2nd quarter. 3rd quarter.
1967 1967 1968 1968 1968 1968 1969 1969 1969
$-
-
47,000 148,000 343,000 581,000 754,000 634,000 493,000
$ 15,000 73,000
187,000 468,000 652,000 761,000 618,000 226,000
-
DSVV 182478 8/22/67
STLCOPCB4050796
R. 8. Yates - OMtxtl OfieM August 8, 1967 Aroclor Expansion - CXA 1430
J. 0. Bright
R. s. Howard R. P. Stevens
Joe Cxesce
You requested, during our review seating of July 28, that we evaluate another expansion Case IV that would add a minimum amount of capital at Anniston with a larger capa city increase at WGX. In addition, you requested that we review the justification for the individual pieces at Anniston in Case II.
Case IV would include -
1. At Anniston
Add new (solid Aroclor) flakier in the south end of Bldg. 27. Replace four existing storage tanks with new tanks. Hake no changes to existing loading or drumming operation. Estimated cost $525,000.
2. At WOK
Add 60 M lbs./yr. new liquid Aroclor capacity. Add five storage tanks. Estimated cost $1,975,000. The total for Case IV is $500,000 less than Case II but we cannot claim any labor savings in the drum ming or reduction of tank car leasing cost at Anniston for this case.
Return on gross investment for Case IV is 15.0% compared to 15.156 for Case II. A more meaningful comparison, incre mental return after taxes on new capital, with 1967 as the base year, for this esse is 18.656 compared to 17.656 for Case II.
Sven this is not particularly significant except to point out that Case IV is not appreciably better on a return basis. You are aware that Case IV will not provide the ability to store minimum inventories, to fill orders quick ly and to segregate products which Case II provides. These pluses do not show up on R0I.
The breakdown of Case II at Anniston with justification based on information from the plant 1st
DSW 182479
STLCOPCB4050797
Joe Cresce
2 August 8, 1967
1. Storage tanks, blend tanks, drisraingt estimated cost $1,125,000.
For .this case a capacity increase (liquids) of 5.7 M lbs./yr. elimination of 15 tank cars (lease) and reduction of 3 men are claimed.
Incremental return after taxes on new capital with 1967 as the base year is 11.19&.
2. Hew solid Aroclor flaker, new biphenyl flaker and packaging equipioent for both* estimated cost $490,000.
A capacity increase of 1 H lbs./yr. of solid Aroclor and reduction of 2 men are claimed.
Incremental return after taxes on new capital with 1967 as the base year is 12.0%,
If you have any questions, please call.
vo
DSW 182480 STLCOPCB4050798