Document DGVZwmYqabbRJEOmvYB13gyaO

DATE: SUBJECT: FROM: THRU: TO: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS 77 WEST JACKSON BOULEYARD CHICAGO, ILLINOIS 60604 NOV O7 2018 CLEAN AIR ACT INSPECTION REPORT Galesburg Cottage Hospital, Galesburg, Illinois Vicky Mei, Environmental Engineer AECAB (IL/IN) Nathan Frank, Section Chief AECAB (IL/IN) File BASIC INFORMATION Facility Name: Galesburg Cottage Hospital Facility Location: 695 Kellogg St., Galesburg, Illinois Date of Inspection: October 24, 2018 EPA Inspector(s): 1. Vicky Mei, Environmental Engineer Other Attendees 1. Cassie Cirimotich, Chief Quality Officer, Galesburg Cottage Hospital 2. Chad Schmidgall, Facilities Director, Galesburg Cottage Hospital Contact Email Address: chad schmidgall@guorurnhealth.com Pnrpose of Inspection: General Clean Air Act Inspection Facility Type: Hospital Arrival Time: 2:30PM Departnre Time: 2:55PM Inspection Type: IZI Unannounced Inspection D Announced Inspection OPENING CONFERENCE IZI Credentials Presented IZI CBI warning to facility provided The following information was obtained verbally from Mr. Schmidgall aod Ms. Cirimotich unless otherwise noted. Company Ownership: The facility's Cleao Air Act permit was listed under the name of its former owner, Galesburg Hospital Corporation, at the time of the inspection. Ownership of the facility was traosferred in 2005 aod again in 2016 to most recently Quorum Health Corporation. Process Description: The permitted incinerator aod ethylene oxide sterilizers have not been in operation for over 10 aod 7 years respectively. The facility is currently in the process of submitting ao updated permit application to Illinois Environmental Protection Agency. The 3 natural gas boilers were installed in the 1970' s aod are inspected annually. Two of the boilers have upgraded burners. An underground diesel storage tank is available as backup aod the diesel is tested annually. TOUR INFORMATION EPA toured the facility: No Photos and/or Videos: were not taken during the inspection. Field Measurements: were not taken during this inspection. SIGNATURES Page 2 of2